CN100415436C - Method for producing cold rolling continuous welding metal inner composite pipe - Google Patents

Method for producing cold rolling continuous welding metal inner composite pipe Download PDF

Info

Publication number
CN100415436C
CN100415436C CNB2004100514976A CN200410051497A CN100415436C CN 100415436 C CN100415436 C CN 100415436C CN B2004100514976 A CNB2004100514976 A CN B2004100514976A CN 200410051497 A CN200410051497 A CN 200410051497A CN 100415436 C CN100415436 C CN 100415436C
Authority
CN
China
Prior art keywords
strip
metal
cold rolling
roll coil
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2004100514976A
Other languages
Chinese (zh)
Other versions
CN1748932A (en
Inventor
严孟杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIXIN (YINGDE) HOT ROLLING STAINLESS COMPOSITE STEEL CO Ltd
Original Assignee
JIXIN (YINGDE) HOT ROLLING STAINLESS COMPOSITE STEEL CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIXIN (YINGDE) HOT ROLLING STAINLESS COMPOSITE STEEL CO Ltd filed Critical JIXIN (YINGDE) HOT ROLLING STAINLESS COMPOSITE STEEL CO Ltd
Priority to CNB2004100514976A priority Critical patent/CN100415436C/en
Publication of CN1748932A publication Critical patent/CN1748932A/en
Application granted granted Critical
Publication of CN100415436C publication Critical patent/CN100415436C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The present invention discloses a method for manufacturing a cold rolling continuous welding metal inner composite pipe. The present invention orderly comprises the following steps: step 1, determining dimensions of a metal tape coil; step 2, decoiling; step 3, cold rolling and shaping in a pipe manufacturing machine set; step 4, welding into the pipe; step 5, cutting after finishing. In the step 3, 2 to 3 fixed inner spreaders are arranged in the pipe manufacturing machine set, when the composite pipe is shaped, through calendering, an inner-layer multi-layer metal tape extends out of seams of an outer-layer basal-layer metal tape after pipe manufacture by 1 to 3 millimeters at seam edges at both sides after pipe manufacture. The cold rolling continuous welding metal inner composite pipe produced according to the present invention has the advantages of low manufacturing cost, excellent corrosion protection performance and excellent reprocessing performance, and solves the infiltrating problems when the metal composite pipe welds different elements. The metal composite pipe is widely applied on industry, and huge economical and social benefits can be generated.

Description

The manufacture method of multiple tube in a kind of cold rolling continuous welding metal
Technical field
The present invention relates to the manufacturing technology of multiple tube in a kind of metal, be meant the manufacture method of multiple tube in a kind of cold rolling continuous welding metal especially.
Background technology
The application that belongs to multiple tube is mainly based on economy and aim of saving, and the specific use on various device.For example, require to possess the pressure vessel, pipeline of resistance to corrosion etc., adopting the stainless steel tube manufacturing more reasonable, but the cost height; If adopt the same pressure vessel of normal carbon steel pipe and the compound multiple tube manufacturing that makes of stainless steel tube, pipeline etc., the thickness of stainless steel tube only integral thickness 2~10%, so not only satisfy the corrosion resistance and the sufficiently high intensity of container, and reduced cost greatly.In addition, some has the metal material of superior heat resistance, corrosion-resistant and conduction, heat conductivility, as copper, manganese, titanium or chromium etc., the problem that has scarcity of resources, if adopt bilayer or multi-layered composite pipe, not only help saving resource, also can satisfy the special requirement in a lot of engineerings.
At present, metal composite pipe mainly is to adopt mechanical complex method processing and manufacturing, as hydraulic pressure composite algorithm, drawing composite algorithm etc., or adopting the welding composite algorithm etc. of clad steel plate bending welding, the shortcoming that the multiple tube that hydraulic pressure composite algorithm and drawing composite algorithm are produced exists is: the back poor processability of processing cost height, multiple tube (can not bend, processing such as folding, weldering, pressure); The shortcoming that the multiple tube that the welding composite algorithm is produced exists is: because there is the osmosis between the different metal element in the welding of composite bed end face, influence the serviceability of multiple tube.
Summary of the invention
The object of the present invention is to provide a kind of new method of making multiple tube in the metal, it is lower to utilize in the cold rolling continuous welding metal of this method preparation multiple tube to have a cost, and cycling processability is good, of many uses.
The object of the present invention is achieved like this: the manufacture method of multiple tube in a kind of cold rolling continuous welding metal, may further comprise the steps successively: (1) determines the size of metal coil tape, and described metal coil tape is meant the brazing hot rolled metal coiled composite that adopts the separated outer layer parent metal roll coil of strip and the internal layer plied timber roll coil of strip or formed by the outer parent metal roll coil of strip and the internal layer plied timber roll coil of strip; (2) uncoiling; (3) cold rolling moulding in the tubulation unit; (4) be welded into pipe; (5) cut after the finishing; Wherein: step (3) is that fixed expander in 2~3 roads is housed in the tubulation unit, makes internal layer plied timber band 1~3mm outside seam after outer parent metal band becomes pipe is stretched out on the two side seams limits of Cheng Guanhou by calendering during cold rolling moulding.
The outer parent metal roll coil of strip of the present invention comprises the carbon steel roll coil of strip or the steel alloy roll coil of strip, and the described internal layer plied timber roll coil of strip comprises the stainless steel roll coil of strip, copper strips volume or titanium strip coil etc.
Step of the present invention (4) should be selected 1~2 welding according to the thickness of tube wall, to guarantee welding effect.
The invention provides the technology of multiple tube in the metal that a kind of technology is simple, production cost is low, by multiple tube in the cold rolling continuous welding metal of the inventive method production, its mechanical performance, Corrosion Protection and cycling processability are good, have solved metal composite pipe and have welded different element infiltration problems; Metal composite pipe is widely used industrial, can produces huge economic benefit and social benefit.
Description of drawings
Below in conjunction with drawings and Examples the present invention is done to describe further, but do not constitute any limitation of the invention.
Fig. 1 is a process flow diagram of the present invention.
Fig. 2 is the cross section structure schematic diagram by multiple tube in wherein a kind of metal of invention production;
Fig. 3 is the cross section structure schematic diagram by multiple tube in the another kind of metal of invention production.
The specific embodiment
As shown in Figure 1, the manufacture method of multiple tube in a kind of cold rolling continuous welding metal of the present invention, its concrete technological process can be: determine to cut after the cold rolling moulding in the size → uncoiling → tubulation unit of metal coil tape → be welded into pipe → finishing, show each operation division is as follows:
(1) determine the size of metal coil tape: should be according to the dimensional requirement of interior multiple tube, by calculating the width of determining the outer parent metal roll coil of strip, the internal layer plied timber roll coil of strip, or the width of brazing hot rolled metal coiled composite.
(2) uncoiling: produce multiple tube in the metal as adopting the separated outer layer parent metal roll coil of strip, the internal layer plied timber roll coil of strip, then should respectively the outer parent metal roll coil of strip, the internal layer plied timber roll coil of strip be placed on uncoiling on the different uncoilers; As adopt the brazing hot rolled metal coiled composite to produce multiple tube in the metal, then only need the direct uncoiling of uncoiler.
(3) cold rolling moulding in the tubulation unit: with the metal tape after the uncoiling send into be equipped with 2~3 roads fixedly the tubulation unit of inner dilator carry out cold rolling moulding, make internal layer plied timber band 1~3mm outside seam after outer parent metal band becomes pipe is stretched out on the two side seams limits of Cheng Guanhou by calendering during cold rolling moulding; The edge of internal layer plied timber stretches out outside the parent metal, and purpose is the scolder as the internal layer plied timber, can not interpenetrate between basic unit and the plied timber in the time of can guaranteeing to weld like this, guarantees the welding quality of multiple tube in the metal.
(4) be welded into pipe: welding should be selected 1~2 welding according to the thickness of tube wall.
(5) cut after the finishing: by the cutting of technological requirement scale, obtain multiple tube in the continuous welding metal after the finishing.
Embodiment 1:
Adopting the 1.5mm carbon steel roll coil of strip is the internal layer plied timber roll coil of strip as the outer parent metal roll coil of strip, the 0.5mm stainless steel roll coil of strip, produces
Figure C20041005149700061
Multiple tube in the cold rolling continuous welding metal.
At first according to the dimensional requirement of interior multiple tube, by calculating the width of determining the outer basic unit carbon steel roll coil of strip is that the width of 58mm, the multiple layer of the internal layer stainless steel roll coil of strip is 58mm, respectively the multiple layer of the internal layer stainless steel roll coil of strip of the outer basic unit carbon steel roll coil of strip of 1.5mm, 0.5mm is placed on send into after the different uncoiler uncoilings be equipped with 2 fixedly the tubulation unit of inner dilator carry out cold rollingly, make the multiple layer of internal layer stainless steel band 2mm outside the seam of the outer carbon steel band Cheng Guanhou of basic unit is stretched out on the two side seams limits of Cheng Guanhou by calendering during cold rolling moulding; Adopt 1 sequential welding to be connected into pipe, the stainless steel material of internal layer projection is as scolder welding internal layer clad pipe during welding; At last, multiple tube is carried out finishing, fixed length cutting on request, promptly Multiple stainless steel tube in the cold rolling continuous welding carbon steel; The cross sectional shape of multiple tube sees also shown in Fig. 2 in the metal, among the figure: the 1st, the outer basic unit carbon steel roll coil of strip, the 2nd, the multiple layer of the internal layer stainless steel roll coil of strip, the 3rd, projection.
Embodiment 2
Adopt the brazing hot rolled metal coiled composite of the 2.5mm carbon steel roll coil of strip and the 0.5mm stainless steel roll coil of strip, produce
Figure C20041005149700063
Multiple tube in the cold rolling continuous welding metal.
At first according to the dimensional requirement of interior multiple tube, by calculating the width of determining the brazing hot rolled metal coiled composite is 58mm, with the brazing hot rolled metal coiled composite be placed on send into after the uncoiling on the uncoiler be equipped with 2 roads fixedly the tubulation unit of inner dilator carry out cold rollingly, should make the multiple layer of internal layer stainless steel band 2mm outside seam after outer parent metal band becomes pipe is stretched out on the two side seams limits of Cheng Guanhou by calendering during cold rolling moulding; Adopt 1 sequential welding to be connected into pipe, the stainless steel material of internal layer projection is as scolder welding internal layer clad pipe during welding; At last, multiple tube is carried out finishing, fixed length cutting on request, promptly Multiple tube in the cold rolling continuous welding metal.The cross sectional shape of multiple tube sees also shown in Fig. 3 in the metal, among the figure: the 1st, the outer basic unit carbon steel roll coil of strip, the 2nd, the multiple layer of the internal layer stainless steel roll coil of strip, the 3rd, projection, the 4th, soldering intermediate layer.
Embodiment 3:
Adopting the 6mm carbon steel roll coil of strip is the internal layer plied timber roll coil of strip as the outer parent metal roll coil of strip, the 2mm stainless steel roll coil of strip, produces
Figure C20041005149700072
Multiple tube in the cold rolling continuous welding metal.
At first according to the dimensional requirement of interior multiple tube, by calculating the width of determining the outer basic unit carbon steel roll coil of strip is 538mm, the width of the multiple layer of the internal layer stainless steel roll coil of strip is 538mm, respectively with the outer basic unit carbon steel roll coil of strip of 6mm, the multiple layer of the internal layer of a 2mm stainless steel roll coil of strip be placed on send into after the different uncoiler uncoilings be equipped with 3 fixedly the tubulation unit of inner dilator carry out cold rolling, make the multiple layer of internal layer stainless steel band 1mm outside seam after outer parent metal band becomes pipe is stretched out on the two side seams limits of Cheng Guanhou by calendering during cold rolling moulding, adopt 2 sequential weldings to be connected into pipe then, the stainless steel material of internal layer projection is as scolder welding internal layer clad pipe during welding; At last, multiple tube is carried out finishing, fixed length cutting on request, promptly
Figure C20041005149700073
Multiple tube in the cold rolling continuous welding metal.The cross sectional shape of multiple tube sees also shown in Fig. 2 in the metal, among the figure: the 1st, the outer basic unit carbon steel roll coil of strip, the 2nd, the multiple layer of the internal layer stainless steel roll coil of strip, the 3rd, projection.
Adopt method of the present invention, can produce nominal diameter
Figure C20041005149700074
Various cold rolling continuous welding metal in multiple tube, realize compound between the various material pipes, as multiple titanium pipe in multiple copper pipe, the carbon steel in multiple stainless steel tube, the carbon steel in the carbon steel etc., satisfy different use needs.

Claims (3)

1. the manufacture method of multiple tube in the cold rolling continuous welding metal, may further comprise the steps successively: (1) determines the size of metal coil tape, and described metal coil tape is meant the separated outer layer parent metal roll coil of strip and the internal layer plied timber roll coil of strip or the brazing hot rolled metal coiled composite that is formed by the outer parent metal roll coil of strip and the internal layer plied timber roll coil of strip; (2) uncoiling; (3) cold rolling moulding in the tubulation unit; (4) be welded into pipe; (5) cut after the finishing; It is characterized in that: step (3) is that fixed expander in 2~3 roads is housed in the tubulation unit, makes internal layer plied timber band 1~3mm outside seam after outer parent metal band becomes pipe is stretched out on the two side seams limits of Cheng Guanhou by calendering during cold rolling moulding.
2. the manufacture method of multiple tube in the cold rolling continuous welding metal according to claim 1, it is characterized in that: the described outer parent metal roll coil of strip comprises the carbon steel roll coil of strip or the steel alloy roll coil of strip, and the described internal layer plied timber roll coil of strip comprises the stainless steel roll coil of strip, copper strips volume or titanium strip coil.
3. the manufacture method of multiple tube in the cold rolling continuous welding metal according to claim 1 is characterized in that: step (4) should be selected 1~2 welding according to the thickness of tube wall.
CNB2004100514976A 2004-09-16 2004-09-16 Method for producing cold rolling continuous welding metal inner composite pipe Expired - Fee Related CN100415436C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2004100514976A CN100415436C (en) 2004-09-16 2004-09-16 Method for producing cold rolling continuous welding metal inner composite pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2004100514976A CN100415436C (en) 2004-09-16 2004-09-16 Method for producing cold rolling continuous welding metal inner composite pipe

Publications (2)

Publication Number Publication Date
CN1748932A CN1748932A (en) 2006-03-22
CN100415436C true CN100415436C (en) 2008-09-03

Family

ID=36604691

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2004100514976A Expired - Fee Related CN100415436C (en) 2004-09-16 2004-09-16 Method for producing cold rolling continuous welding metal inner composite pipe

Country Status (1)

Country Link
CN (1) CN100415436C (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100566872C (en) * 2007-06-29 2009-12-09 吉欣(英德)热轧不锈复合钢有限公司 A kind of manufacture method of spiral composite steel tube
CN100498031C (en) * 2007-06-29 2009-06-10 吉欣(英德)热轧不锈复合钢有限公司 Manufacturing method of continuous welding metal composited tube covered with stainless steel
CN102107232B (en) * 2010-12-23 2012-07-25 江苏其元集团有限公司 Method for manufacturing steel-copper composite welded tube
CN102274853A (en) * 2011-08-13 2011-12-14 四川三洲特种钢管有限公司 Process for manufacturing hot-rolled composite corrosion-resistance double-metal steel tube
CN102794616B (en) * 2012-09-04 2016-05-25 龙岩市新罗区八合汽车配件厂(普通合伙) Trunk brake drum safety loop manufacture craft
CN103639656B (en) * 2013-11-25 2015-09-16 宝鸡市守善管件有限公司 External diameter 76mm and above 6m titanium pipeline straight seam welding technique thereof
CN105014311B (en) * 2015-06-02 2017-06-13 天津理工大学 A kind of preparation method of three-decker bimetal metallurgy multiple tube
CN105903781B (en) * 2016-04-20 2018-09-11 东莞璋泰五金制品有限公司 The processing method of high-accuracy cold tube rolling
CN110405419B (en) * 2019-07-29 2020-06-19 中国石油集团渤海石油装备制造有限公司 Preparation method of short anticorrosive steel pipe
CN110682179B (en) * 2019-10-31 2020-06-23 上海奉贤钢管厂有限公司 Production method of composite steel pipe
CN112756926A (en) * 2021-01-26 2021-05-07 苏州亿创特智能制造有限公司 Composite steel pipe and preparation method thereof

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5820326A (en) * 1981-07-29 1983-02-05 Toshiba Corp Manufacture of composite member
JPH05104134A (en) * 1990-03-30 1993-04-27 Bundy Gmbh Multilayered metal tube and method for its production
JPH071170A (en) * 1993-06-18 1995-01-06 Sumitomo Metal Ind Ltd Manufacture of welded tube by composite heat source
EP0639411A1 (en) * 1993-03-30 1995-02-22 Hewing GmbH Process for the manufacturing of multi layer composite tubes with ferrous and non ferrous metal inlets
JPH08281323A (en) * 1995-04-06 1996-10-29 Furukawa Electric Co Ltd:The Production of covering material for clad tube/seamless clad tube and production of header tube for heat exchanger
CN1136654A (en) * 1995-05-19 1996-11-27 王永家 Butt-jointing method for composite steel pipe
CN2268167Y (en) * 1996-10-04 1997-11-19 易思竞 Metal compound tube
CN1354061A (en) * 2000-11-22 2002-06-19 中国建筑第八工程局工业设备安装公司一公司 Stainless steel composite pipe welding method
CN1355074A (en) * 2000-11-24 2002-06-26 陶云龙 Technology for making laminated composite metal pipe with metallurgical interface binding

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5820326A (en) * 1981-07-29 1983-02-05 Toshiba Corp Manufacture of composite member
JPH05104134A (en) * 1990-03-30 1993-04-27 Bundy Gmbh Multilayered metal tube and method for its production
EP0639411A1 (en) * 1993-03-30 1995-02-22 Hewing GmbH Process for the manufacturing of multi layer composite tubes with ferrous and non ferrous metal inlets
JPH071170A (en) * 1993-06-18 1995-01-06 Sumitomo Metal Ind Ltd Manufacture of welded tube by composite heat source
JPH08281323A (en) * 1995-04-06 1996-10-29 Furukawa Electric Co Ltd:The Production of covering material for clad tube/seamless clad tube and production of header tube for heat exchanger
CN1136654A (en) * 1995-05-19 1996-11-27 王永家 Butt-jointing method for composite steel pipe
CN2268167Y (en) * 1996-10-04 1997-11-19 易思竞 Metal compound tube
CN1354061A (en) * 2000-11-22 2002-06-19 中国建筑第八工程局工业设备安装公司一公司 Stainless steel composite pipe welding method
CN1355074A (en) * 2000-11-24 2002-06-26 陶云龙 Technology for making laminated composite metal pipe with metallurgical interface binding

Also Published As

Publication number Publication date
CN1748932A (en) 2006-03-22

Similar Documents

Publication Publication Date Title
CN100566872C (en) A kind of manufacture method of spiral composite steel tube
CN100415436C (en) Method for producing cold rolling continuous welding metal inner composite pipe
CN100372621C (en) Method for manufacturing copper aluminium composite tubing and copper aluminium tubing produced thereby
US8661676B2 (en) Rotary die forming process and apparatus for fabricating multi-port tubes
CN101579703B (en) New technique for manufacturing high alloy steel seamless pipe with heavy calibre by adopting pilger mill
KR101752733B1 (en) Manufacturing method of double wall pipe
KR20000029325A (en) Multi-wall tube
CN206796714U (en) A kind of titanium steel composite board using ferro-niobium composite band as intermediate layer
CN101691962B (en) Processing molding method of magnesium alloy plate type heat exchanger
CN102418813B (en) Novel copper-aluminum composite pipe
CN101691976B (en) Aluminum alloy snakelike flow channel evaporation plate and processing molding method thereof
CN105579805A (en) Heat transfer pipe, method for manufacturing heat transfer pipe, and heat exchanger
CN109604367B (en) Roll bending forming device and method for variable-thickness folding type micro-channel flat tube
CN105171339A (en) Method for manufacturing inner wall composite pipe through hydraulic expansion
CN1618540A (en) Method for making soldered hot-rolled composite metal tube
CN2790654Y (en) Pressed brazing hot-rolled composite slab for producing metal composite plate
US20090242067A1 (en) Processes for textured pipe manufacturer
CN100498031C (en) Manufacturing method of continuous welding metal composited tube covered with stainless steel
CN1718292A (en) Trailer axle tube steel and its processing method
CN2760360Y (en) A cold rolling continuous-weld metallic internal composite tube
CN202126200U (en) Heat transfer tube
CN1311925C (en) Method for manufacturing metal compound pipe by braze welding, hot rolling and continuous welding
CN207486256U (en) A kind of Novel metal pipe
CN203404502U (en) Spiral seam thermo-metal composite welded pipe
CN2656771Y (en) Brazing hot-rolling metal composite pipe

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080903