CN100401815C - General connecting device and method utilized to down load version of base station and manintain not elemonts in centralization - Google Patents

General connecting device and method utilized to down load version of base station and manintain not elemonts in centralization Download PDF

Info

Publication number
CN100401815C
CN100401815C CNB031152066A CN03115206A CN100401815C CN 100401815 C CN100401815 C CN 100401815C CN B031152066 A CNB031152066 A CN B031152066A CN 03115206 A CN03115206 A CN 03115206A CN 100401815 C CN100401815 C CN 100401815C
Authority
CN
China
Prior art keywords
base station
network element
connection device
gce
general connection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB031152066A
Other languages
Chinese (zh)
Other versions
CN1520209A (en
Inventor
韩凌飞
刘红军
吴谷河
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CNB031152066A priority Critical patent/CN100401815C/en
Publication of CN1520209A publication Critical patent/CN1520209A/en
Application granted granted Critical
Publication of CN100401815C publication Critical patent/CN100401815C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The present invention relates to general connecting equipment and a method which are used for the downloading of base station versions and the centralized maintenance of net elements. The general connecting equipment (GCE) is mainly composed of an E1 drive circuit, an Ethernet port circuit, a digital switching network (DSN), a field programmable gate array (FPGA), a CPU, an RAM and FLASH, wherein the RAM and the FLASH are associated with the CPU. Through the equipment, remote base station versions of a plurality of base stations can be simultaneously downloaded, and therefore, the speed and the stability are greatly improved. After the general connecting equipment is introduced, the centralized maintenance of a plurality of net elements can be realized, rare IP addresses can be saved, and the complex configuration of IP addresses is avoided. By assigning centralized maintenance channels and downloading time slot channels on the GCE, the centralized maintenance of net elements and the downloading of remote base station versions can be simultaneously realized. Remote-end net element nodes can be transmitted through optical fibers, and therefore, the equipment has larger bandwidth and a lower error code transmission rate. The equipment can sufficiently utilize resources of the existing trunk circuit to improve the utilization rate of the resources, and the method for networking has the characteristics of simpleness and flexibility.

Description

The general connection device and the method that are used for base station edition download and network element centralized maintenance
Technical field
The invention belongs to the communications field, specifically relate to a kind of general connection device and method that is used for base station edition download and network element centralized maintenance.
Background technology
It is to guarantee that the base station is normal, a kind of necessary means of steady operation that base station edition is downloaded.
The downloading mode of base station edition has at present:
The one, download in the base station by base station controller by background net management, control channel is generally adopted in the physical channel.
Its shortcoming is:
Generally can only carry out version to the near-end base station downloads;
Tightr with the associativity of concrete equipment;
These base stations require to belong to below the base station controller usually.
The 2nd, a PCM adapter is installed on a computer, the other end of card connects base station controller by pcm interface, finishes the conversion of computer bus interface to the E1 interface.
Its shortcoming is:
Speed of download is lower;
When adopting the PCM adapter, strong to computer dependency, program will be followed the upgrading of computer and operating system and correspondingly be changed;
The PCM adapter is difficult to adapt to different operating system.
As shown in Figure 1: present administering and maintaining for Telecommunication Network Element, all be to adopt the background net management server to link to each other with the processor on foreground mostly by TCP/IP, wherein, all be to adopt TCP/IP to connect between local network management, 97 interface message processor (IMP)s, NM server, webmaster terminal, the network element.
As can be seen, if distance is long between the entity that any two needs connect, the centre just need connect (by mode error rate height such as dialing) by router from this scheme.And owing to consider space and efficient, present most network elements and do not support to stride the TCP/IP of router and connect, if desired all network elements are carried out remote centralized and safeguard, just need the background net management server to carry out cascade, further limited the flexibility that connects.As can be seen, this scheme networking is huge from accompanying drawing 1, complexity, and the system cost height, but can realize fast.
Summary of the invention
The object of the present invention is to provide a kind of general connection device and method that is used for base station edition download and network element centralized maintenance.By introducing general connection device of the present invention (GCE), can overcome the shortcoming of said method.
Being used for the base station downloads:
Can realize that version is carried out in the base station under any base station controller to be downloaded;
Can carry out version to a plurality of base stations simultaneously downloads;
These base stations can be the base stations of near-end or far-end;
The physical channel can be speech path channel or control channel;
And adopt the Ethernet interface of standard between the computer, and adopt the E1 interface of standard between the switch, little to computer dependency, versatility is stronger;
Efficient and stability have all obtained large increase.
The centralized maintenance that is used for Telecommunication Network Element:
Adopt the E1 interface of standard between general connection device (GCE) and the switch, and adopt the Ethernet interface (adopting the standard ICP/IP protocol) of standard between the computer, finish the function of Digital Subscriber Line access multiplexing and exchange, the conversion of HDLC Frame and ethernet data frame is provided.
The binding relationship of configurable each time slot of GCE and network element, switch are the passage that connects between NM server and the network element.
Maintenance information can be distributed to related network elements by the semifixed connection of switch by general connection device; The network element relevant information can be collected from related network elements by the semifixed connection of switch by this equipment.
This scheme makes full use of existing relay circuit resources, and the networking simple and flexible does not need to carry out complicated IP address assignment, and cost is low.Remote end module can be connected with switch by SDH, owing to be to transmit by optical fiber, therefore, even long-distance transmissions also can guarantee the smaller error rate.The structure of carrying out centralized maintenance by GCE as shown in Figure 2.
The present invention is achieved in that
A kind of general connection device that is used for base station edition download and Telecommunication Network Element centralized maintenance is characterized in that:
Described general connection device (GCE) is made up of E1 drive circuit, Ethernet interface circuit, digital switching network (DSN), field programmable gate array (FPGA), CPU and relevant random asccess memory (RAM) and high-speed memory (FLASH).
One end of described general connection device provides a plurality of E1 interfaces to connect each network element by switch;
The other end of described general connection device provides Ethernet interface, connects the background net management server by TCP/IP, finishes the function of Digital Subscriber Line access multiplexing and exchange, and the conversion of HDLC Frame and ethernet data frame is provided.
Described general connection device disposes the binding relationship of each time slot and network element, thereby realizes the dynamic management to different network elements.
Described general connection device provides a plurality of E1 passages, and the time slot in the described E1 passage can freely divide the centralized maintenance that is used in the base station edition download or is used for network element.
A kind of method that is used for base station edition download and Telecommunication Network Element centralized maintenance may further comprise the steps:
Base station edition is deposited earlier to computer;
Set up the communication port between computer and the base station;
By control channel or speech channel base station edition is downloaded.
Described foundation further may further comprise the steps from the communication port of computer through Zhongdao near-end of GCE, switch or telepoint base station:
Be used in the time slot that base station edition is downloaded in general connection device (GCE) side for this network element branch;
The corresponding time slot of repeat circuit plate for general connection device (GCE) side repeat circuit plate and base station edition download on switch is set up semi-fixing continuing.
When adopting control channel, directly carry out version and download by the maintenance channel of having set up.
Adopt speech channel, need the base station to carry out an analog call so that allow the base station controller be that it distributes voice channel time slot.
Further comprise following steps during described employing speech channel:
Assign the base station edition download command by this locality or centralized network management to the base station, comprised called number in the message;
This order is received in the base station, by control channel, has begun an analog call, reports the call proceeding success message by this locality or centralized network management after base station controller is finished call proceeding;
Background net management is received the download work that just begins base station edition after this message, the download channel that is given information and transmitted by general connection device (GCE);
After base station edition was downloaded end, the base station reported the download end to the backstage;
Indication base station in backstage is torn the work on road open, tears the road open and finishes the back base station controller and report background net management, thereby finish the work of whole base station edition download.
According to number of base stations, a plurality of E1 interfaces by general connection device (GCE) side carry out version simultaneously to a plurality of base stations and download.
A kind of method that is used for base station edition download and Telecommunication Network Element centralized maintenance may further comprise the steps:
Unify numbering for different network element nodes, be used to identify different network element nodes, each network element all has a unique node number, and network element can carry out addressing by this node number;
Upward distribute corresponding time slot at general connection device (GCE) for this network element;
On switch, set up semi-fixing continuing, be used to get through from centralized network management through the path of general connection device (GCE) to the network element node for the repeat circuit plate of general connection device (GCE) side repeat circuit plate and corresponding network element side;
The maintenance information that webmaster is assigned sends to general connection device (GCE) by Ethernet, has wherein comprised the node number and the maintenance information of network element in the data packet message;
General connection device (GCE) is transmitted to corresponding network element according to the node number of network element in the message and the configuration information of self by switch;
When message when the network element node is sent to centralized network management, this message will send to general connection device (GCE) by switch;
After general connection device (GCE) is received message, go out the node number of corresponding network element, send to centralized network management by Ethernet again according to the channel number at message place and the configuration extraction of self.
Effect of the present invention is:
Can realize that by this equipment a plurality of base stations are carried out the remote base stations version simultaneously downloads, and has improved its speed and stability greatly; Can realize the centralized maintenance of a plurality of network elements and can save rare IP address and avoid complicated IP address configuration by introducing general connection device; By on GCE, distributing centralized maintenance and downloading centralized maintenance and the download of remote base stations version that the time slot passage can be realized network element simultaneously; The remote network element node can pass through Optical Fiber Transmission, has higher bandwidth and smaller error transfer rate; Can make full use of existing relay circuit resources, improve the utilance of resource; Adopt this method networking to have the characteristics of simple and flexible.
Description of drawings
Fig. 1: realize many network elements centralized maintenance structural representation by the server cascade.
Fig. 2: realize many network elements centralized maintenance structural representation by GCE.
Fig. 3: GCE device structure block diagram.
Fig. 4: ZXPCS networking structure figure.
Fig. 5: GCE is used for the base station edition of ZXPCS and downloads.
Embodiment
The present invention realizes many base station editions downloads and many network elements centralized maintenance function by introducing general connection device (GCE).
The hardware block diagram of GCE as shown in Figure 3, GCE mainly is made up of E1 drive circuit, Ethernet interface circuit, digital switching network (DSN), field programmable gate array (FPGA), CPU and relevant RAM and FLASH.
Equipment one end provides a plurality of E1 interfaces to connect each network element by switch, the other end provides Ethernet interface, connect the background net management server by TCP/IP, finish the function of Digital Subscriber Line access multiplexing and exchange, the conversion of HDLC Frame and ethernet data frame is provided.
The binding relationship of configurable each time slot and network element among the while GCE, thus realization is to the dynamic management of different network elements.
GCE provides a plurality of E1 passages, and the time slot in these E1 passages can freely divide the centralized maintenance that is used in the base station edition download or is used for network element.
[1] GCE is used for the base station edition download
When GCE was used for the base station edition download, base station edition was deposited on computers earlier.When downloading, will set up the communication port between computer and the base station earlier, process is as follows:
Be used in the time slot that base station edition is downloaded in the GCE side for this network element branch.
The corresponding time slot of repeat circuit plate for GCE side repeat circuit plate and base station edition download on switch is set up semi-fixing continuing.
So just got through from the path of computer through Zhongdao near-end of GCE, switch or telepoint base station.
Base station edition is downloaded can adopt control channel or speech channel.
When base station edition is downloaded employing control channel, do not need to carry out sharing out the work of passage, downloading process is relatively simple, directly carries out version by the maintenance channel of having set up and downloads.
If passage adopts speech channel, need the base station to carry out an analog call so that allow the base station controller be that it distributes voice channel time slot.For this reason:
1. at first need to assign the base station edition download command to the base station, comprised called number in the message by this locality or centralized network management;
2. after this order is received in the base station, just begun an analog call, after base station controller is finished call proceeding, reported the call proceeding success message by this locality or centralized network management.What this process was walked is control channel;
3. background net management is received the download work that just begins base station edition after this message, in this process, and the download channel that GCE gives information and transmits;
4. after base station edition was downloaded end, the base station reported the download end to the backstage;
5. indication base station in backstage is torn the work on road open.Tear open the road finish after base station controller report background net management, thereby finish the work that whole base station edition is downloaded.
The GCE side has a plurality of E1 interfaces, and according to number of base stations, GCE can carry out version simultaneously to a plurality of base stations and download.
[2] GCE is used for the centralized maintenance of Telecommunication Network Element
For the centralized maintenance of Telecommunication Network Element, in order to identify different network element nodes, need to give different network element nodes to unify numbering, each network element all has a unique node number, and network element can carry out addressing by this node number.
When carrying out centralized maintenance by this equipment:
1. at first on GCE, distribute corresponding time slot for this network element;
2. on switch, set up semi-fixing continuing then, just got through from centralized network management through the path of GCE to the network element node for the repeat circuit plate of GCE side repeat circuit plate and corresponding network element side;
3. the maintenance information assigned of webmaster sends to GCE by Ethernet, has wherein comprised the node number and the maintenance information of network element in the data packet message;
4.GCE be transmitted to corresponding network element by switch according to the node number of network element in the message and the configuration information of self;
When message when the network element node is sent to centralized network management, this message will send to GCE by switch;
6.GCE after receiving message, go out the node number of corresponding network element, send to centralized network management by Ethernet again according to the channel number at message place and the configuration extraction of self;
So just realized the centralized maintenance of Telecommunication Network Element.
ZXPCS is the powerful personal wireless communications system product that ZTE is developed, it combines access network technology, personal handyphone system PHS (PersonalHandset System) and global system for mobile communications GSM technology, MAP by standard is realized interconnecting of the whole network, can realize user's roaming call easily, for people provide good voice-and-data service.
The wireless access side networking structure of system as shown in Figure 4.Background net management can be realized the remote download of base station edition and the centralized maintenance of network element simultaneously by equipment GCE among the figure.
When carrying out centralized maintenance by GCE, GCE is transmitted to corresponding network element according to the node number of network element and the time slot configuration information of self by IGW after receiving message; Otherwise, when packet when network element is sent to centralized network management, message can send to GCE by IGW.After GCE receives packet, by Ethernet notice centralized network management.Thereby realize the centralized maintenance of a plurality of ANU.
The base station program version of ZXPCS is downloaded and is adopted speech channel, relates to each modules such as background net management, backstage download module, GCE, ANU, CSC and CS.Wherein, GCE mainly finishes the translation function of E1 data and Ethernet data bag, for program is downloaded the forwarding passage that gives information.
The base station edition down load application is seen shown in the accompanying drawing 5.
The present invention by introduce a general connection device (GCE) version of remote base stations program downloaded and the centralized maintenance of network element a kind of new method is provided, and in practical engineering project, obtained good effect.Because can also promoting, its versatility, this equipment be used for a lot of other purposes as concentrating environmental monitoring etc.

Claims (9)

1. one kind is used for base station edition and downloads general connection device with the Telecommunication Network Element centralized maintenance, it is characterized in that:
Described general connection device (GCE) is made up of E1 drive circuit, Ethernet interface circuit, digital switching network (DSN), field programmable gate array (FPGA), CPU and relevant random asccess memory (RAM) and high-speed memory (FLASH);
One end of described general connection device provides a plurality of E1 interfaces to connect each network element by switch;
The other end of described general connection device provides Ethernet interface, connects the background net management server by TCP/IP, finishes the function of Digital Subscriber Line access multiplexing and exchange, and the conversion of HDLC Frame and ethernet data frame is provided.
2. be used for the general connection device of base station edition download and Telecommunication Network Element centralized maintenance according to claim 1, it is characterized in that: described general connection device disposes the binding relationship of each time slot and network element, thereby realizes the dynamic management to different network elements.
3. the general connection device that is used for base station edition download and Telecommunication Network Element centralized maintenance according to claim 1, it is characterized in that: described general connection device provides a plurality of E1 passages, and the time slot in the described E1 passage can freely divide the centralized maintenance that is used in the base station edition download or is used for network element.
4. one kind is used for base station edition and downloads method with the Telecommunication Network Element centralized maintenance, may further comprise the steps:
Base station edition is deposited earlier to computer;
Be used in the time slot that base station edition is downloaded in general connection device (GCE) side for this network element branch;
The corresponding time slot of repeat circuit plate for general connection device (GCE) side repeat circuit plate and base station edition download on switch is set up semi-fixing continuing;
By control channel or speech channel base station edition is downloaded.
5. download method with the Telecommunication Network Element centralized maintenance as being used for the base station as described in the claim 4, it is characterized in that: when adopting control channel, directly carry out version and download by the maintenance channel of having set up.
6. download method with the Telecommunication Network Element centralized maintenance as being used for the base station as described in the claim 4, it is characterized in that: adopt speech channel, need the base station to carry out an analog call so that allow the base station controller be that it distributes voice channel time slot.
7. download method with the Telecommunication Network Element centralized maintenance as being used for the base station as described in the claim 6, further comprise following steps during described employing speech channel:
Assign the base station edition download command by this locality or centralized network management to the base station, comprised called number in the message;
This order is received in the base station, by control channel, has begun an analog call, reports the call proceeding success message by this locality or centralized network management after base station controller is finished call proceeding;
Background net management is received the download work that just begins base station edition after this message, the download channel that is given information and transmitted by general connection device (GCE);
After base station edition was downloaded end, the base station reported the download end to the backstage;
Indication base station in backstage is torn the work on road open, tears the road open and finishes the back base station controller and report background net management, thereby finish the work of whole base station edition download.
8. download method with the Telecommunication Network Element centralized maintenance as being used for the base station as described in the claim 4, it is characterized in that: according to number of base stations, a plurality of E1 interfaces by general connection device (GCE) side carry out version simultaneously to a plurality of base stations and download.
9. one kind is used for base station edition and downloads method with the Telecommunication Network Element centralized maintenance, may further comprise the steps:
Unify numbering for different network element nodes, be used to identify different network element nodes, each network element all has a unique node number, and network element can carry out addressing by this node number;
Upward distribute corresponding time slot at general connection device (GCE) for this network element;
On switch, set up semi-fixing continuing, be used to get through from centralized network management through the path of general connection device (GCE) to the network element node for the repeat circuit plate of general connection device (GCE) side repeat circuit plate and corresponding network element side;
The maintenance information that webmaster is assigned sends to general connection device (GCE) by Ethernet, has wherein comprised the node number and the maintenance information of network element in the data packet message;
General connection device (GCE) is transmitted to corresponding network element according to the node number of network element in the message and the configuration information of self by switch;
When message when the network element node is sent to centralized network management, this message will send to general connection device (GCE) by switch;
After general connection device (GCE) is received message, go out the node number of corresponding network element, send to centralized network management by Ethernet again according to the channel number at message place and the configuration extraction of self.
CNB031152066A 2003-01-23 2003-01-23 General connecting device and method utilized to down load version of base station and manintain not elemonts in centralization Expired - Fee Related CN100401815C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB031152066A CN100401815C (en) 2003-01-23 2003-01-23 General connecting device and method utilized to down load version of base station and manintain not elemonts in centralization

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB031152066A CN100401815C (en) 2003-01-23 2003-01-23 General connecting device and method utilized to down load version of base station and manintain not elemonts in centralization

Publications (2)

Publication Number Publication Date
CN1520209A CN1520209A (en) 2004-08-11
CN100401815C true CN100401815C (en) 2008-07-09

Family

ID=34284177

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB031152066A Expired - Fee Related CN100401815C (en) 2003-01-23 2003-01-23 General connecting device and method utilized to down load version of base station and manintain not elemonts in centralization

Country Status (1)

Country Link
CN (1) CN100401815C (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100420326C (en) * 2006-02-21 2008-09-17 华为技术有限公司 System for maintaining mobile communication network and method thereof
CN100370867C (en) * 2006-03-28 2008-02-20 华为技术有限公司 Method for downloading base station edition
CN100373978C (en) * 2006-03-28 2008-03-05 华为技术有限公司 Method for quick downloading base station edition
CN101212342B (en) * 2006-12-27 2011-08-03 大唐移动通信设备有限公司 Multi-version network element network management method
CN101997745A (en) * 2010-11-23 2011-03-30 珠海市佳讯实业有限公司 FPGA-based E1 insertion time slot and E1_IP data aggregation hybrid access device and method
CN102843247A (en) * 2011-06-21 2012-12-26 中兴通讯股份有限公司 Method and system for concurrently processing network element message
CN105763345A (en) * 2014-12-15 2016-07-13 中兴通讯股份有限公司 Network element upgrade management method, device and system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000353096A (en) * 1999-06-11 2000-12-19 Nec Corp System and method for program download
JP2002123398A (en) * 2000-10-17 2002-04-26 Matsushita Electric Ind Co Ltd Device and method for version up processing of software in communication equipment
CN1356840A (en) * 2000-12-06 2002-07-03 深圳市中兴通讯股份有限公司 Method fyor dynamic remote downloading of small base station program in public handheld telephone system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000353096A (en) * 1999-06-11 2000-12-19 Nec Corp System and method for program download
JP2002123398A (en) * 2000-10-17 2002-04-26 Matsushita Electric Ind Co Ltd Device and method for version up processing of software in communication equipment
CN1356840A (en) * 2000-12-06 2002-07-03 深圳市中兴通讯股份有限公司 Method fyor dynamic remote downloading of small base station program in public handheld telephone system

Also Published As

Publication number Publication date
CN1520209A (en) 2004-08-11

Similar Documents

Publication Publication Date Title
US6198921B1 (en) Method and system for providing rural subscriber telephony service using an integrated satellite/cell system
CN1144482C (en) Method for providing wireless communication by means of loading circuit in a radio communication system
AU764276B2 (en) Method of providing public network service when call management device is in a down state in private wireless network
US6731621B1 (en) Mobil communication system for providing IP packet communications and method for routing IP packets
EP1430656B1 (en) Network with several subnetworks
CN100512554C (en) Radio system having distributed real-time processing
CN100455073C (en) Apparatus and method of providing signal for public and special mobile communication system
FR2809921B1 (en) METHOD FOR TRACKING COMMUNICATIONS IN A CELLULAR RADIO COMMUNICATION SYSTEM, AND NETWORK CORE USING THE SAME
CN104582004A (en) SDN-based WLAN hierarchical networking system and method
CN101453768B (en) Method for providing packet service while hand-over between different kinds networks and mobile communication terminal for the same
CN101237699B (en) Control method for establishing multiple tunnels between wireless network node and access server
CN102394818B (en) PS domain system for small-sized mobile core network and message processing method
CN100401815C (en) General connecting device and method utilized to down load version of base station and manintain not elemonts in centralization
CN100442882C (en) Multi-mode base station wireless system
CN101159893B (en) Distributed base station controller and its unit, data transmission method
CN1136749C (en) Base station for extended services
WO2023226946A1 (en) Communication method and system, and wireless access device and access controller
KR100541758B1 (en) Method of receiving renewed billing information with packet type in WLL terminal
CN102143157A (en) Data transmission method, equipment and communication system
CN1257655C (en) Switching method and network element
EP0758189A2 (en) Private wireless telecommunications system
CN101626308B (en) Routing method, equipment and system for WAP service authentication data packets
CN106792656B (en) Data transmission method and asymmetric shunting system
CN101287185B (en) Management method of external relay circuit of A interface for code transformer
US6442171B1 (en) Logical topology and address assignment for interconnected digital networks

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
ASS Succession or assignment of patent right

Owner name: ZTE CO., LTD.

Free format text: FORMER OWNER: SHENZHENG CITY ZTE CO., LTD. SHANGHAI SECOND INSTITUTE

Effective date: 20050909

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20050909

Address after: Shenzhen Nanshan District hi tech Industrial Park Science and technology south road Zhongxing building law department

Applicant after: ZTE Corporation

Address before: No. 396, Shanghai, Guilin Road

Applicant before: Shanghai Inst. of No.2, Zhongxing Communication Co., Ltd., Shenzhen City

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080709