CN100391288C CNB2004101017580A CN200410101758A CN100391288C CN 100391288 C CN100391288 C CN 100391288C CN B2004101017580 A CNB2004101017580 A CN B2004101017580A CN 200410101758 A CN200410101758 A CN 200410101758A CN 100391288 C CN100391288 C CN 100391288C
Authority
CN
China
Prior art keywords
base station
address
pvc
station controller
configuration file
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2004101017580A
Other languages
Chinese (zh)
Other versions
CN1798413A (en
Inventor
薛君良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Jiechuang Enterprise Management Co ltd
Original Assignee
Huawei Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co Ltd filed Critical Huawei Technologies Co Ltd
Priority to CNB2004101017580A priority Critical patent/CN100391288C/en
Publication of CN1798413A publication Critical patent/CN1798413A/en
Application granted granted Critical
Publication of CN100391288C publication Critical patent/CN100391288C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mobile Radio Communication Systems (AREA)

Abstract

The present invention discloses a method for building a remote maintenance access. The method comprises the process that a base station establishes default PVC connection according to a PVC default attribute and initiates a bootstrap protocol request to a base station controller side through the PVC connection; the base station controller side receives the bootstrap protocol request and obtains the IP address of the base station and the IP address of a base station controller from the self saved data configuration files of the base station, and the two IP addresses are sent to the base station through a bootstrap protocol response; the base station obtains the IP addresses from the bootstrap protocol response, an IPOA access is established according to the obtained IP addresses and the PVC default attribute, and the base station can obtain the data configuration files from the base station controller side via the IPOA access. The method for building a remote maintenance access of the present invention can set the same IPOA access configuration data for a special maintenance access and a remote maintenance access, and thus, the method can not bring bandwidth waste and can not increase the maintenance cost of an RNC.

Description

A kind of method for building up of remote maintenance channel
Technical field
The present invention relates to the processing method of maintenance channel, refer to a kind of method for building up of remote maintenance channel especially.
Background technology
Along with development of wireless communication devices and the people expansion day by day to communication requirement, communication network is more and more huger and complicated, requires also more and more higher to the maintainability of network.But, the default maintenance channel of undefined base station in the related protocol of 3-G (Generation Three mobile communication system), make the base station when initially setting up, can't not set up maintenance channel owing to set up the required configuration data of maintenance channel, or base station controller (RNC) occurs and can't the far-end operation base station etc. can't rebulid maintenance channel during communication failure, the problems referred to above bring very big inconvenience for the maintenance work of base station.
At present, initially set up or communication failure occurs for the base station and cause the situation that RNC can't the far-end operation base station, the main employing manually safeguarded to the method for near-end intervention, divide by the attendant and to be clipped to base station side and the maintenance channel desired data is set up in the configuration of RNC side, to set up the maintenance channel between base station and the RNC, thereby solve the problem that the base station normally goes into operation and moves, realize the far-end operation of RNC the base station.But the base station usually is positioned at remote bleak and desolate place in the practical application, realize the human configuration of base station very difficult; And, if it is very far away to be separated by between base station and the RNC, adopt human configuration to occur the nonsynchronous phenomenon of configuration between base station and the RNC easily.So, thisly manually not only can bring a large amount of maintenance costs to the method for near-end intervention, also can bring big inconvenience to troubleshooting.
Defective at said method, prior art proposes a kind of automatic method for building up of remote maintenance channel, utilize default PVC to connect, base station and RNC set up the special maintenance passage, download the data configuration file of this base station from the RNC side, utilize institute's data downloaded configuration file to set up remote maintenance channel between base station and the RNC then, finally realize the far-end operation of RNC this base station.Described remote maintenance channel is meant the communication port that is used for the transmission maintenance data between base station and RNC, this remote maintenance channel can be used for the base station from RNC side download-maintenance software, perhaps alarm data is uploaded to the RNC side in the base station, and perhaps the RNC side sends debug command and arrives base station etc.Among the application RNC and centralized operation maintenance console are referred to as the RNC side, wherein the centralized operation maintenance console is a control unit, is responsible for control command and configuring base station data are sent in the base station; RNC is responsible for communicating with the base station, and the control command of centralized operation maintenance console need just can send to the base station through RNC.The described required data configuration file of remote maintenance channel of setting up is provided with by the centralized operation maintenance console, and is stored in the centralized operation maintenance console.When described base station needed the data download configuration file, the centralized operation maintenance console sent to RNC with the data configuration file of self storage, by the maintenance channel between RNC and the described base station data configuration file is sent to described base station.The content of data configuration file comprises: receive path delay compensation, receiving antenna mode, reception GBUS mode of operation, sendaisle delay compensation, RRU connection mode, base station edition number, veneer configuration data, User Network Interface (UNI) or asynchronous transfer mode inverse multiplexing (IMA) data, Access Link Control Application Protocol (ALCAP) data, base stations control port (NCP) or communication context port (CCP) data, IPOA channel arrangement data, clock data, sector data, and the home cell data etc.Wherein, IPOA channel arrangement data comprise IP address and PVC attribute.Wherein, setting up the required IP address of IPOA passage comprises: the IP address of IP address, base station and RNC.
The automatic method for building up of described remote maintenance channel is based on following prerequisite: set up physical connection between described base station and the RNC, and based on the ATM mode transfer.In case this base station and RNC set up physical connection, the centralized operation maintenance console just is provided with data configuration file for this base station.Wherein, the centralized operation maintenance console is as follows to being provided with of the IPOA channel arrangement data in the data configuration file: the centralized operation maintenance console carries out unified planning to all IP addresses, base station in advance.Herein, the centralized operation maintenance console can distribute according to the area of base station and plan IP address, base station.According to program results, the centralized operation maintenance console is that described base station is provided with an IP address, guarantees that IP address, this base station does not produce with the IP address of other base station conflict, and permanent virtual connection (PVC) attribute of this base station is set.In the following description, the Operation and Maintenance platform is A with described base station IP address setting in the hypothesis set.
As shown in Figure 1, the automatic method for building up of this remote maintenance channel of prior art may further comprise the steps:
Step 101: the base station adopts the default attribute foundation of PVC and the default PVC between the RNC to connect, and connects by default PVC and sends Bootstrap Protocol request (BOOTP request) to the centralized operation maintenance console, application IP address.
Agreement regulation: the base station needs Virtual Path Identifier (VPI) and could set up with the PVC of RNC with the configuration data of Virtual channe identifiers (VCI) and be connected, and sets up PVC and is connected required PVC attribute so among the application VPI and VCI be called.In the practical application, equipment manufacturers set in advance the PVC attribute of base station before dispatching from the factory in the base station, and this PVC attribute adopts the PVC default attribute of agreement regulation, that is: VPI=1, VCI=33.
Step 102: after the centralized operation maintenance console is received BOOTP request message, give in the step 101 and send the IP address, base station of a free time of base station assigns of BOOTP request message, and the Bootstrap Protocol response (BOOTP response) that will carry this IP address sends to the base station of sending BOOTPrequest message by RNC.
In this step, after the centralized operation maintenance console is received the BOOTPrequest message of the application IP address of sending the base station, need according to current system IP occupation condition the IP address of this free time of base station assigns, suppose that this IP address is B, the IP address, base station of then carrying in the BOOTP response message is B, the IP address that also can carry RNC in the while BOOTP response message, the IP address of supposing RNC is C.
Step 103: after BOOTP response message is received in the base station of sending BOOTP request message, from this message, obtain the IP address C of base station IP address B and RNC, set up special maintenance passage between self and the RNC automatically according to the IP address that obtains and PVC default attribute.
In this step, the special maintenance passage is that the PVC attribute is VPI=1, VCI=33, and IP address, base station is B, and the IP address of RNC is the IPOA passage of C.The IPOA passage of setting up between base station and the RNC comprises two parts content: at first, the PVC that sets up between base station and the RNC connects; Secondly, the base station is according to the IP address B configuration its own IP address that obtains from BOOTP response message, and RNC also is configured to C with its own IP address.Wherein, if the IP address configuration of RNC is just finished when the RNC initial configuration, herein needn't be again the IP address of RNC be configured.Finish after above-mentioned two steps, the IPOA passage between base station and the RNC is just set up.Suppose to send a packet from the base station to RNC, the source IP address of this packet is B so, and purpose IP address is C, and this packet is based on the ATM transmission, so need pass to the RNC side from the base station by the PVC connection.
From the above, the base station need know and distribute to its own IP address B, the IP address C of RNC and the PVC attribute of IPOA passage could be set up and RNC between the IPOA passage.
Step 104: the special maintenance passage is passed through from RNC side data download configuration file in the base station of sending BOOTP request message.
Wherein, the IPOA channel arrangement data in the data configuration file are that the centralized operation maintenance console is this base station assigns, and IPOA channel arrangement data comprise: IP address and PVC attribute.Wherein, setting up the required IP address of IPOA passage comprises: the IP address of IP address, base station and RNC.
In the practical application, the centralized operation maintenance console is saved in the data configuration file of corresponding base station for each base station is provided with the IP address.In a single day these IP addresses are assigned with, and are not the IP addresses of idle condition just, so the centralized operation maintenance console is that IP address, the base station A that is provided with in the data configuration file of IP address, the base station B of special maintenance channel allocation and this base station is different in the step 102.The centralized operation maintenance console also can be saved in the IP address of RNC in the data configuration file of base station, and the IP address of supposing RNC is C.
The centralized operation maintenance console also can be saved in the data configuration file of corresponding base station for each base station is provided with the PVC attribute, and this PVC attribute is different with the PVC default attribute of agreement regulation.Suppose in the present embodiment that the centralized operation maintenance console is that the PVC attribute that described base station is provided with is VPI=7, VCI=100.
Step 105: after data configuration file was downloaded and finished, base station resets adopted IPOA channel arrangement data and RNC in institute's data downloaded configuration file to set up remote maintenance channel, thereby realized the far-end operation of RNC to the base station.
After reset operation was carried out in the base station, all the elements that comprise according to data configuration file disposed relevant base station data.Such as: the base station adopts IPOA channel arrangement data and the RNC in the data configuration file to set up remote maintenance channel.
By data downloaded configuration file in the step 104 as can be known, the remote maintenance channel of setting up in this step is that the PVC attribute is VPI=7, VCI=100, and IP address, base station is A, and the IP address of RNC is the IPOA passage of C.
From above-mentioned steps 101~105 as can be seen, when RNC can't carry out far-end operation to the base station, the base station obtained the IP address by setting up default PVC connection from RNC, sets up the special maintenance passage.This special maintenance passage is interim foundation of communication failure of setting up or repairing for the base station is initial between RNC and the base station, is used for the base station and obtains data configuration file from the RNC side, so this maintenance channel is called the special maintenance passage.In the practical application, this special maintenance passage is the IPOA passage.The base station will reset to self after obtaining data configuration file from the RNC side, set up remote maintenance channel then.
Prior art adopts to be set up remote maintenance channel automatically and realizes that there is following defective in RNC to the base station far-end method of operating: cause the situation that RNC can't the far-end operation base station for communication failure occurring, though existing IPOA passage as remote maintenance channel can't normally use, the PVC attribute is VPI=7 in the existing remote maintenance channel but RNC is still for this base station keeps, the PVC of VCI=100 connects, this PVC connects still occupied bandwidth resource, the base station utilizes default PVC to connect by the described process of step 101 and sends BOOTP request message simultaneously, and the default PVC that sends BOOTP request message connects also occupied bandwidth resource.In this case, a base station can take two PVC simultaneously and connect, so the waste that this method of prior art can be brought system bandwidth.When the number of base stations of being responsible for safeguarding as RNC reaches thousands of, this bandwidth waste especially severe that becomes, even can cause the Traffic Channel bandwidth occupancy.
If for fear of bandwidth waste, when RNC need be in the base station can't normally use as the IPOA passage of remote maintenance channel, the corresponding PVC of deletion connected.Though such processing method has been avoided bandwidth waste, has increased maintenance workload to RNC, strengthen the maintenance cost of RNC.
From top analysis as can be seen, prior art or bring higher maintenance cost perhaps causes the serious waste of bandwidth, can't avoid above-mentioned two shortcomings simultaneously.
Summary of the invention
In view of this, main purpose of the present invention is to provide a kind of method for building up of remote maintenance channel, reduces the waste of bandwidth resources, and reduces the maintenance workload of RNC.
For achieving the above object, technical scheme of the present invention specifically is achieved in that
A kind of method for building up of remote maintenance channel, side of base station controller setting is set up the special maintenance passage identical base station IP address required with remote maintenance channel, and is provided with that to set up the required base station PVC attribute of remote maintenance channel be the PVC default attribute of setting up the used agreement of special maintenance passage regulation; Wherein, described special maintenance passage is the maintenance channel that utilizes the PVC default attribute to set up, the maintenance channel of described remote maintenance channel for utilizing the PVC default attribute identical with described special maintenance passage to set up is used for the transmission maintenance data and realizes the far-end operation of side of base station controller to the base station;
This method also comprises: the base station obtains the IP address, base station of described setting and the IP address of base station controller from side of base station controller, sets up remote maintenance channel between self and the base station controller according to the IP address that is obtained and PVC default attribute.
This method further comprises: side of base station controller is with the IP address, base station and the base station PVC attribute that are provided with, and the base station controller IP address that this side is preserved is saved in the data configuration file of this base station correspondence.
Preferably, the described IP address that obtains base station and base station controller is set up remote maintenance channel and specifically be may further comprise the steps:
A1. described base station connects to side of base station controller by default PVC initiates the Bootstrap Protocol request;
B1. after side of base station controller is received the Bootstrap Protocol request,, and described two IP addresses are sent to described base station by the Bootstrap Protocol response from the IP address that the data configuration file of the described base station of this side storage obtains IP address, described base station and base station controller;
C1. described base station obtains the IP address from Bootstrap Protocol response, set up the IPOA passage according to IP address that obtains and PVC default attribute, and with the IPOA passage set up as remote maintenance channel.
Preferably, the IP address that obtains base station and base station controller, described base station specifically may further comprise the steps:
A2. described base station connects to side of base station controller by default PVC initiates the Bootstrap Protocol request;
B2. after side of base station controller is received the Bootstrap Protocol request,, and described two IP addresses are sent to described base station by the Bootstrap Protocol response from the IP address that the data configuration file of the described base station of this side storage obtains IP address, described base station and base station controller;
C2. described base station obtains the IP address from the Bootstrap Protocol response, set up the IPOA passage according to IP address that obtains and PVC default attribute, the base station obtains data configuration file by described IPOA passage from side of base station controller, obtains the IP address of base station and base station controller from data configuration file.
This method further comprises: the base station resets after receiving data configuration file, then according to the data configuration file configuring base station data, utilizes the IPOA channel arrangement data in the data configuration file to rebulid the IPOA passage.
Further, side of base station controller comprises base station controller and centralized operation maintenance console, and described data configuration file is kept at the centralized operation maintenance console.
As seen from the above technical solution, the method for building up of this remote maintenance channel of the present invention is that the special maintenance passage is provided with identical IPOA channel arrangement data with remote maintenance channel, and its corresponding same PVC is connected.This method of the present invention guarantees that the base station under any circumstance takies a PVC at the most and connects, so this method can not brought the waste of bandwidth, uses this method not need to delete unnecessary PVC simultaneously and connects, so also can not strengthen the maintenance cost of RNC.
Description of drawings
Fig. 1 is for realizing the far-end operation flow chart of RNC to the base station by setting up the IPOA passage automatically between base station in the prior art and the RNC;
Fig. 2 is for realizing the far-end operation flow chart of RNC to the base station by setting up the IPOA passage automatically between base station in a preferred embodiment of the present invention and the RNC.
Embodiment
Core concept of the present invention is: side of base station controller is provided with IP address, base station, and it is the PVC default attribute of agreement regulation that base station PVC attribute is set simultaneously; The base station is from the IP address that side of base station controller obtains base station and base station controller, sets up remote maintenance channel between self and the base station controller according to the IP address that is obtained and PVC default attribute.
For making purpose of the present invention, technical scheme and advantage clearer, below with reference to the accompanying drawing embodiment that develops simultaneously, the present invention is described in more detail.
The method of the invention is based on following prerequisite: base station and RNC side have been set up physical connection, and based on the ATM mode transfer.In case base station and RNC side are set up physical connection, the centralized operation maintenance console just is provided with for this base station and the storage data configuration file.In the present embodiment, the IPOA channel arrangement data of this data configuration file are provided with as follows: the centralized operation maintenance console is provided with the IP address of described base station, suppose that IP address, this base station is A, and the PVC attribute of this base station is set to the PVC default attribute, that is: VPI=1, VCI=33.The IP address of the RNC that is provided with during the network planning that the centralized operation maintenance console also can be preserved self is saved in the data configuration file of base station, and the IP address of supposing RNC is C.
As shown in Figure 2, adopt the configuration data of method process IP OA passage of the present invention, set up the IPOA passage between base station and the RNC, realize that finally RNC is as follows to the method for the far-end operation of base station:
Step 201: set up default PVC between base station and the RNC and connect, BOOTP request message is sent to RNC in the base station then, application IP address.This step is identical with step 101, does not give unnecessary details herein.
Step 202: the centralized operation maintenance console obtains the IP address A that distributes to this base station and the IP address C of RNC from the data configuration file of the described base station of step 201 of self storage, above-mentioned two IP addresses are sent to the base station by BOOTP response message.
Step 203: after BOOTP response message is received in the base station, obtain the IP address from this message, according to IP address, base station A, the IP address C of RNC and PVC default attribute are set up the special maintenance passage between base station and the RNC.
In this step, the special maintenance passage is that the PVC attribute is VPI=1, VCI=33, and IP address, base station is A, the IPOA passage of the IP address C of RNC.
Owing to do not carry bandwidth information in the BOOTP response message, so default bandwidth value is adopted in the base station when setting up the special maintenance passage.Generally speaking, default bandwidth value is distributed to the bandwidth value of base station less than the RNC side.
Step 204: the data configuration file of the base station of sending BOOTP request message is downloaded in the base station from the RNC side by the special maintenance passage.
Step 205: after the data configuration file of described base station was downloaded and finished, reset operation was carried out in this base station, sets up remote maintenance channel according to IPOA channel arrangement data and RNC in institute's data downloaded configuration file, realized the far-end operation of RNC to the base station.
Because the IPOA channel arrangement data that are provided with in the data configuration file are: VPI=1, VCI=33, IP address, base station is A, the IP address C of RNC, so the remote maintenance channel of setting up in this step is the PVC attribute is VPI=1, VCI=33, IP address, base station is A, the IPOA passage of the IP address C of RNC.
After the base station resets, carry the data of bandwidth information according to ALCAP data in the data configuration file and IPOA channel arrangement data etc. and set up remote maintenance channel.The bandwidth of this remote maintenance channel can be supported big data quantity transmission, so can finish maintenance work such as edition upgrading well.
In concrete the application, if the maintenance channel data quantity transmitted is less, also can after execution above-mentioned steps 201~203 is set up the special maintenance passage, this special maintenance passage directly be used as remote maintenance channel, carry out maintenance task.
By above analysis as can be seen, the present invention is when process IP OA channel arrangement data, for special maintenance passage and remote maintenance channel are provided with identical IPOA channel arrangement data.Cause RNC can't the far-end operation base station time when communication failure occurring, remote maintenance channel be set up by special maintenance passage data download configuration file in the base station.What wherein, the special maintenance passage used is that default PVC connects.Because it is default PVC attribute that the PVC attribute of base station is set in the data configuration file, also be that default PVC connects so the remote maintenance channel of setting up according to the IPOA configuration data in the data configuration file uses.The maintenance channel of twice foundation all used default PVC to connect before and after this processing method of the present invention guaranteed, under any circumstance can not take two PVC between base station and the RNC and connect, so can not cause the waste of any PVC bandwidth resources.
Because the PVC attribute of all base stations all is arranged to the PVC default attribute, in order to distinguish the IPOA interface channel of different base station, the centralized operation maintenance console is when being provided with data configuration file, for different base stations is provided with different IP addresses.Through above-mentioned processing, RNC can guarantee realizability of the present invention according to different IP address, base station difference different base stations and the IPOA interface channel of RNC.
By the above embodiments as seen, the method for building up of this remote maintenance channel of the present invention is that the special maintenance passage between base station and the RNC is provided with identical IPOA channel arrangement data with remote maintenance channel, thereby guarantee that the base station under any circumstance takies a PVC at the most and connects, so this method can not brought the waste of bandwidth, also can not strengthen the maintenance cost of RNC.

Claims (6)

1. the method for building up of a remote maintenance channel, it is characterized in that, side of base station controller setting is set up the special maintenance passage identical base station IP address required with remote maintenance channel, and is provided with that to set up the required base station PVC attribute of remote maintenance channel be the PVC default attribute of setting up the used agreement of special maintenance passage regulation; Wherein, described special maintenance passage is the maintenance channel that utilizes the PVC default attribute to set up, the maintenance channel of described remote maintenance channel for utilizing the PVC default attribute identical with described special maintenance passage to set up is used for the transmission maintenance data and realizes the far-end operation of side of base station controller to the base station;
This method also comprises: the base station obtains the IP address, base station of described setting and the IP address of base station controller from side of base station controller, sets up remote maintenance channel between self and the base station controller according to the IP address that is obtained and PVC default attribute.
2. method according to claim 1, it is characterized in that, this method further comprises: side of base station controller is with the IP address, base station and the base station PVC attribute that are provided with, and the base station controller IP address that this side is preserved is saved in the data configuration file of this base station correspondence.
3. method according to claim 2 is characterized in that, the described IP address that obtains base station and base station controller is set up remote maintenance channel and specifically be may further comprise the steps:
A1. described base station connects to side of base station controller by default PVC initiates the Bootstrap Protocol request;
B1. after side of base station controller is received the Bootstrap Protocol request,, and described two IP addresses are sent to described base station by the Bootstrap Protocol response from the IP address that the data configuration file of the described base station of this side storage obtains IP address, described base station and base station controller;
C1. described base station obtains the IP address from Bootstrap Protocol response, set up the IPOA passage according to IP address that obtains and PVC default attribute, and with the IPOA passage set up as remote maintenance channel.
4. method according to claim 2 is characterized in that, the IP address that described base station obtains base station and base station controller specifically may further comprise the steps:
A2. described base station connects to side of base station controller by default PVC initiates the Bootstrap Protocol request;
B2. after side of base station controller is received the Bootstrap Protocol request,, and described two IP addresses are sent to described base station by the Bootstrap Protocol response from the IP address that the data configuration file of the described base station of this side storage obtains IP address, described base station and base station controller;
C2. described base station obtains the IP address from the Bootstrap Protocol response, set up the IPOA passage according to IP address that obtains and PVC default attribute, the base station obtains data configuration file by described IPOA passage from side of base station controller, obtains the IP address of base station and base station controller from data configuration file.
5. method according to claim 4, it is characterized in that, this method further comprises: the base station resets after receiving data configuration file, then according to the data configuration file configuring base station data, utilizes the IPOA channel arrangement data in the data configuration file to rebulid the IPOA passage.
6. according to each described method of claim 2 to 5, it is characterized in that side of base station controller comprises base station controller and centralized operation maintenance console, described data configuration file is kept at the centralized operation maintenance console.
CNB2004101017580A 2004-12-22 2004-12-22 Method for building remote maintenance channel Expired - Fee Related CN100391288C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2004101017580A CN100391288C (en) 2004-12-22 2004-12-22 Method for building remote maintenance channel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2004101017580A CN100391288C (en) 2004-12-22 2004-12-22 Method for building remote maintenance channel

Publications (2)

Publication Number Publication Date
CN1798413A CN1798413A (en) 2006-07-05
CN100391288C true CN100391288C (en) 2008-05-28

Family

ID=36819092

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2004101017580A Expired - Fee Related CN100391288C (en) 2004-12-22 2004-12-22 Method for building remote maintenance channel

Country Status (1)

Country Link
CN (1) CN100391288C (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100466796C (en) * 2006-08-25 2009-03-04 华为技术有限公司 Method and system for automatically restoring base station chaintenance channel normal operation
CN101400053B (en) * 2007-09-30 2010-06-09 大唐移动通信设备有限公司 Method and system for implementing automatically distributing EID when base station opens
CN102202332B (en) * 2011-06-09 2013-11-20 中国普天信息产业股份有限公司 Base station maintenance system
CN102711160A (en) * 2012-05-21 2012-10-03 中兴通讯股份有限公司 Method and device for information configuration
CN104080106B (en) * 2013-03-29 2017-12-29 华为技术有限公司 The method and apparatus for determining common signal channel
CN105636096A (en) * 2014-10-28 2016-06-01 中兴通讯股份有限公司 Self-recovery method and device after base station is interrupted
CN111082852B (en) * 2018-10-22 2022-12-02 中兴通讯股份有限公司 Method for establishing operation maintenance channel, airborne terminal and storage medium

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1445947A (en) * 2002-05-13 2003-10-01 大唐移动通信设备有限公司 Automatic building method for realizing specific operation maintenance channel in 3G base station
EP1365609A1 (en) * 2002-05-22 2003-11-26 Huawei Technologies Co., Ltd. Method for automatically establishing base station operating and maintaining channel in international mobile telecommunication networks

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1445947A (en) * 2002-05-13 2003-10-01 大唐移动通信设备有限公司 Automatic building method for realizing specific operation maintenance channel in 3G base station
EP1365609A1 (en) * 2002-05-22 2003-11-26 Huawei Technologies Co., Ltd. Method for automatically establishing base station operating and maintaining channel in international mobile telecommunication networks
CN1459941A (en) * 2002-05-22 2003-12-03 华为技术有限公司 Automatic set-up method of base station operation maintenance passage in third generation mobile communication system

Also Published As

Publication number Publication date
CN1798413A (en) 2006-07-05

Similar Documents

Publication Publication Date Title
US7706310B2 (en) Method for establishing IPOA channel-based operation and maintenance channels
CN101843162B (en) Allocation of user equipment temporary identifier by a relay node controlled by a base station
CN102571996B (en) IP (Internet Protocol) address assignment method, IP address assignment device and network system
CN101009588B (en) Method and system for configuring the distributed proxy server information
CN101399722A (en) Access method and system for wireless network device
CN111491036A (en) Internet of things equipment and communication method thereof
CN101729324B (en) Resource configuration method and household base station configuration server
CN100391288C (en) Method for building remote maintenance channel
EP1684456A1 (en) A method for data redundancy of hlr
CN110972170A (en) Base station configuration method and base station
CN106792821B (en) Access control method and device based on virtual gateway
JP2009514350A (en) Management of radio bearers in cellular communication systems
CN105072145A (en) IOT (Internet of Things) communication method and system
CN105025273A (en) Building visible intercom system connection method, password setting method and system
US6529484B1 (en) Access for mobile terminals network
CN101111014B (en) Method, equipment and system for client access to third-party server
CN100342737C (en) Method for establishing IPOA channel between base station and base station controller
CN103581354A (en) Network address allocation method and system
CN100362823C (en) Radio link procedure management method in Iub interface
CN113691427A (en) Network distribution method, first device, second device, network distribution system and processor
CN100551110C (en) The method that a kind of IPOA passage is set up and safeguarded automatically
US9699003B2 (en) Dynamic allocation and virtualization of network resources in the access network and in customer networks
CN100356746C (en) Method for carrying communication connection over LAN
CN100479609C (en) Establishment method carrier Internet protocol operation and maintenance channel under asynchronous transmission mode
KR100692657B1 (en) Method and Device for simultaneous service IPv4 and IPv6 address in Dial-up networking

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200723

Address after: 518000 Baoan District Xin'an street, Shenzhen, Guangdong, No. 625, No. 625, Nuo platinum Plaza,

Patentee after: SHENZHEN SHANGGE INTELLECTUAL PROPERTY SERVICE Co.,Ltd.

Address before: 518129 Bantian HUAWEI headquarters office building, Longgang District, Guangdong, Shenzhen

Patentee before: HUAWEI TECHNOLOGIES Co.,Ltd.

Effective date of registration: 20200723

Address after: Room 402, gate 1, building 8, Chengpin Jiayuan, Chaoyang Avenue, Yuhua street, Baodi District, Tianjin

Co-patentee after: Li Li

Patentee after: Wang Chengxia

Co-patentee after: Cao Yongmei

Co-patentee after: Shi Ningning

Address before: 518000 Baoan District Xin'an street, Shenzhen, Guangdong, No. 625, No. 625, Nuo platinum Plaza,

Patentee before: SHENZHEN SHANGGE INTELLECTUAL PROPERTY SERVICE Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201118

Address after: 225700 plant area (Economic Development Zone), 2nd floor, No.2 factory building, Xinghua science and technology entrepreneurship center, Taizhou City, Jiangsu Province

Patentee after: Jiangsu JieChuang Enterprise Management Co.,Ltd.

Address before: Room 402, gate 1, building 8, Chengpin Jiayuan, Chaoyang Avenue, Yuhua street, Baodi District, Tianjin

Patentee before: Wang Chengxia

Patentee before: Li Li

Patentee before: Cao Yongmei

Patentee before: Shi Ningning

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080528

Termination date: 20201222

CF01 Termination of patent right due to non-payment of annual fee