CN100383349C - Method for reconstructing operation platform column foundation in existing workshop - Google Patents

Method for reconstructing operation platform column foundation in existing workshop Download PDF

Info

Publication number
CN100383349C
CN100383349C CNB2005102005176A CN200510200517A CN100383349C CN 100383349 C CN100383349 C CN 100383349C CN B2005102005176 A CNB2005102005176 A CN B2005102005176A CN 200510200517 A CN200510200517 A CN 200510200517A CN 100383349 C CN100383349 C CN 100383349C
Authority
CN
China
Prior art keywords
operating platform
foundation
platform column
operation platform
patten
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2005102005176A
Other languages
Chinese (zh)
Other versions
CN1730848A (en
Inventor
卢小平
赵仁芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CNB2005102005176A priority Critical patent/CN100383349C/en
Publication of CN1730848A publication Critical patent/CN1730848A/en
Application granted granted Critical
Publication of CN100383349C publication Critical patent/CN100383349C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The present invention discloses a method of reforming the column foundation of an operation platform in a workshop. A column foundation of an old operation platform or equipment foundation in an original workshop is reserved when a column foundation of a new operation platform is made in an original workshop, the column foundation of the new operation platform is constructed near the column foundation of the old operation platform, and the column foundation of the new operation platform is cast on the column foundation of the original old operation platform or the top face of the equipment foundation and a column base pile of the new operation platform. The present invention has the advantages that construction investment is greatly saved, construction work is reduced, construction periods are shortened, etc., and in addition, because the present invention carries out the construction of the column foundation of the new operation platform on the old foundation, which causes the new foundation to be provided with higher and reliable foundation conditions. The occurrence of the phenomena of the disproportionation and the deformation of foundation settlement can be effectively avoided by adopting the present invention, and the present invention also avoids the large excavation of the foundation.

Description

A kind of method of reconstructing operation platform column foundation in existing workshop
Technical field:
The present invention relates to a kind of method of reconstructing operation platform column foundation in existing workshop, belong to Equipment Foundations technical field of construction in the old factory building.
Technical background:
For original old industrial production factory, though the existing equipment of its production department can satisfy the needs of production capacity at that time, but along with the raising of the improvement of expanding economy and production technology, production capacity, improve environment requirement etc., the existing equipment of production department can not satisfy the existing needs of producing.Thereby, must transform original factory building, to adapt to new needs.For old factory, because the transformation of production technology, operating platform and Equipment Foundations in original factory building are furnished with very big change.In the prior art, the common way of reconstructing operation platform column foundation in existing workshop is: at first with original platform, basic complete removal, and bases such as the operating platform of the new configuration of constructing again, equipment.Because in the demolishing process of original base, the above soil layer of substrate absolute altitude all there is in various degree destruction, platform patten, the Equipment Foundations of new configuration can only place old soil layer.Therefore, existing this way not only can not make full use of original base, but also exists shortcomings such as the construction works amount is big, construction period length, construction investment height.
Summary of the invention:
The objective of the invention is to: provide a kind of method that can make full use of original base and can save construction investment, minimizing construction working amount, the reconstructing operation platform column foundation in existing workshop of shortening duration of a project greatly, to overcome the deficiencies in the prior art.
When the present invention is achieved in that the new operating platform patten of in original factory building making, keep old operating platform patten or Equipment Foundations in original factory building, at first near this old operating platform patten, construct new operating platform column foundation pile to design elevation, and make new operating platform column foundation pile embed basement rock or place on the bearing stratum that meets design requirement, then platform post on the former operating platform column basis of haveing been friends in the past or Equipment Foundations pillar are blocked to the Ji Ding that is lower than new operating platform patten, and the end face of former have been friends in the past operating platform column basis or Equipment Foundations cutter hair, clean with water clean after, on the end face of former have been friends in the past operating platform column basis or Equipment Foundations and new operating platform column foundation pile top-pour outpour new operating platform patten, new operating platform patten is placed on former have been friends in the past operating platform column basis or Equipment Foundations and the new operating platform column foundation pile.
When former have been friends in the past operating platform column basis or Equipment Foundations are step basic, then adopt plain concrete that its step is leveled up to the Ji Ding of former have been friends in the past operating platform column basis or Equipment Foundations.
Owing to adopted technique scheme, the present invention compared with prior art, the present invention has can save construction investment greatly, reduce the construction working amount, shorten advantage such as duration of a project.In addition, because original old factory building all has 10 years even longer productive life, the sedimentation of its original platform patten and Equipment Foundations ground, distortion all tend towards stability, and bearing capacity of soil, the density in its basic influence basin all should have significantly raising.And the present invention carries out the construction of new platform patten on this basis, can make new basis that higher, more reliable foundation condition is arranged, therefore, adopt the present invention can avoid the generation of foundation settlement inequality, metaboly effectively, and also avoided basic heavy excavation.
Description of drawings:
Structural representation when accompanying drawing 1 is constructed for adopting the present invention;
Accompanying drawing 2 is the schematic top plan view of accompanying drawing 1.
In the accompanying drawings: 1 is new operating platform column foundation pile; 2 are platform post or Equipment Foundations pillar on the former operating platform column basis of haveing been friends in the past; 3 is old operating platform patten or Equipment Foundations in original factory building; 4 is new operating platform patten; 5 for filling up at the old operating platform patten of step or the plain concrete on the Equipment Foundations.
The specific embodiment:
Further specify embodiments of the invention below in conjunction with accompanying drawing: when in original factory building, making new operating platform patten, it is motionless to keep interior old operating platform patten of original factory building or Equipment Foundations 3, size and design attitude according to the new operating platform patten 4 of required making are determined near the operating platform column foundation pile 1 of constructing new this old operating platform patten, and carry out new operating platform column foundation pile 1 by traditional foundation pile preparation method and construct, the height of the operating platform column foundation pile 1 that it is new is made by design elevation, make new operating platform column foundation pile 1 embed basement rock or place on the bearing stratum that meets design requirement, then platform post on the former operating platform column basis of haveing been friends in the past or Equipment Foundations pillar 2 are blocked to the Ji Ding that is lower than new operating platform patten 4, end face cutter hair with former have been friends in the past operating platform column basis or Equipment Foundations 3, clean with water clean after, on the end face of former have been friends in the past operating platform column basis or Equipment Foundations 3 and the operating platform patten 4 that makes new advances by traditional method cast on the new operating platform column foundation pile 1, new operating platform patten 4 is placed on former have been friends in the past operating platform column basis or Equipment Foundations 3 and the new operating platform column foundation pile 1.
When former operating platform column basis or Equipment Foundations 3 of haveing been friends in the past during, then adopt plain concrete 5 that its step is leveled up to the former Ji Ding that has been friends in the past operating platform column basis or Equipment Foundations 3 and get final product for step basic.

Claims (2)

1. the method for a reconstructing operation platform column foundation in existing workshop, it is characterized in that: when in original factory building, making new operating platform patten, keep old operating platform patten or Equipment Foundations in original factory building, at first near this old operating platform patten, construct new operating platform column foundation pile to design elevation, and make new operating platform column foundation pile embed basement rock or place on the bearing stratum that meets design requirement, then platform post on the former operating platform column basis of haveing been friends in the past or Equipment Foundations pillar are blocked to the Ji Ding that is lower than new operating platform patten, and the end face of former have been friends in the past operating platform column basis or Equipment Foundations cutter hair, clean with water clean after, on the end face of former have been friends in the past operating platform column basis or Equipment Foundations and new operating platform column foundation pile top-pour outpour new operating platform patten, new operating platform patten is placed on former have been friends in the past operating platform column basis or Equipment Foundations and the new operating platform column foundation pile.
2. the method for reconstructing operation platform column foundation in existing workshop according to claim 1, it is characterized in that: when former have been friends in the past operating platform column basis or Equipment Foundations are step basic, then adopt plain concrete that its step is leveled up to the Ji Ding of former have been friends in the past operating platform column basis or Equipment Foundations.
CNB2005102005176A 2005-09-06 2005-09-06 Method for reconstructing operation platform column foundation in existing workshop Expired - Fee Related CN100383349C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2005102005176A CN100383349C (en) 2005-09-06 2005-09-06 Method for reconstructing operation platform column foundation in existing workshop

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2005102005176A CN100383349C (en) 2005-09-06 2005-09-06 Method for reconstructing operation platform column foundation in existing workshop

Publications (2)

Publication Number Publication Date
CN1730848A CN1730848A (en) 2006-02-08
CN100383349C true CN100383349C (en) 2008-04-23

Family

ID=35963263

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2005102005176A Expired - Fee Related CN100383349C (en) 2005-09-06 2005-09-06 Method for reconstructing operation platform column foundation in existing workshop

Country Status (1)

Country Link
CN (1) CN100383349C (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111502330A (en) * 2020-04-14 2020-08-07 大唐环境产业集团股份有限公司 Secondary utilization method for building garbage foundation
CN112227751A (en) * 2020-09-14 2021-01-15 中国二十冶集团有限公司 Restoration method of old concrete column
CN112982851B (en) * 2021-02-26 2022-11-08 中国二十冶集团有限公司 Construction method of fire-fighting evacuation stair structure of movie theatre beside reserved column

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09302703A (en) * 1996-05-17 1997-11-25 Tobishima Corp Base isolation method for existing structure having pile foundation
CN1058312C (en) * 1996-08-02 2000-11-08 丛蔼森 Foundation supporting-changing method for grand building
CN1078294C (en) * 1998-12-11 2002-01-23 北京市第七城市建设工程公司 Integral foundation underpinning technology for building added floor
CN1111627C (en) * 1995-05-17 2003-06-18 广州市鲁班建筑防水补强专业公司 Method for connecting anchor-rod type supporting table

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1111627C (en) * 1995-05-17 2003-06-18 广州市鲁班建筑防水补强专业公司 Method for connecting anchor-rod type supporting table
JPH09302703A (en) * 1996-05-17 1997-11-25 Tobishima Corp Base isolation method for existing structure having pile foundation
CN1058312C (en) * 1996-08-02 2000-11-08 丛蔼森 Foundation supporting-changing method for grand building
CN1078294C (en) * 1998-12-11 2002-01-23 北京市第七城市建设工程公司 Integral foundation underpinning technology for building added floor

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
多层砖房地基基础加固处理的一些方法. 任振甲.建筑工人,第2004年第6期. 2004 *
多层砖混结构房屋增层时地基基础的加固处理. 任振甲.建筑结构,第1997年第11期. 1997 *

Also Published As

Publication number Publication date
CN1730848A (en) 2006-02-08

Similar Documents

Publication Publication Date Title
CN2916024Y (en) Anti-deformation high-voltage line tower in subsidence area
CN103526781B (en) A kind of ancient architecture foundation integrated pallet base isolation reinforcement structure and construction method thereof
CN101736757A (en) Two-way synchronous construction method of tube structure of high-rise building
CN201581409U (en) Combined tower crane foundation of cross beam supported by steel latticework columns in deep foundation pit
CN109653197B (en) Pile foundation construction method capable of being expanded in three dimensions
CN101139834B (en) Concrete pile structure
CN100383349C (en) Method for reconstructing operation platform column foundation in existing workshop
CN204456110U (en) A kind of anchor jacked pile seals pilework fast
CN204825923U (en) Relay formula underground structure
CN1844588A (en) Section bar inserting and high-pressure rotary jetting method for forming pile with expanded plates in sink area
CN204282399U (en) A kind of subway space enclosing structure
CN203795434U (en) Portal type bamboo joint mortar pile building envelope
CN102943480B (en) Loess foundation pit supporting method
CN100396855C (en) Existing one-storied factory continuation end foundation construction method
CN201581408U (en) Open caisson with sump
CN217027018U (en) A downthehole dynamic compaction gravel pile foundation structure for large tracts of land weak soil is consolidated
CN103711123B (en) The construction method of bamboo joint type mortar pile
CN214219675U (en) Herringbone foundation pit enclosing device
CN201474602U (en) Prestressed pipe pile perforated pile-driving machine
CN212175798U (en) Whole strutting arrangement of deep basal pit
CN204139190U (en) A kind of Liftable preformed bricks fetal membrane
CN109914423B (en) Foundation pit support treatment method in narrow space of house and ground warehouse
CN101892663A (en) Pile foundation manufacturing method
CN112431216A (en) Rapid sinking method for sedimentation tank open caisson of rotational flow sedimentation tank
CN203808092U (en) Novel composite pile foundation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: GUIYANG ALUMINUM AND MAGNESIUM DESIGN INSTITUTE CO

Free format text: FORMER OWNER: GUIYANG ALUMINIUM AND MAGNESIUM DESIGN INST.

Effective date: 20110718

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 550004 NO. 208, BEIJING ROAD, GUIYANG CITY, GUIZHOU PROVINCE TO: 550081 NO.2, JINZHU ROAD, JINYANG NEW DISTRICT, GUIYANG CITY, GUIZHOU PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20110718

Address after: 550081 Guiyang Province, Jinyang New District, Zhu Zhu Road, No. 2

Patentee after: Guiyang Aluminum & Magnesium Design Institute Co., Ltd.

Address before: 550004 No. 208, Beijing Road, Guiyang, Guizhou

Patentee before: Guiyang Aluminium and Magnesium Design Inst.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080423

Termination date: 20150906

EXPY Termination of patent right or utility model