A kind of method of reconstructing operation platform column foundation in existing workshop
Technical field:
The present invention relates to a kind of method of reconstructing operation platform column foundation in existing workshop, belong to Equipment Foundations technical field of construction in the old factory building.
Technical background:
For original old industrial production factory, though the existing equipment of its production department can satisfy the needs of production capacity at that time, but along with the raising of the improvement of expanding economy and production technology, production capacity, improve environment requirement etc., the existing equipment of production department can not satisfy the existing needs of producing.Thereby, must transform original factory building, to adapt to new needs.For old factory, because the transformation of production technology, operating platform and Equipment Foundations in original factory building are furnished with very big change.In the prior art, the common way of reconstructing operation platform column foundation in existing workshop is: at first with original platform, basic complete removal, and bases such as the operating platform of the new configuration of constructing again, equipment.Because in the demolishing process of original base, the above soil layer of substrate absolute altitude all there is in various degree destruction, platform patten, the Equipment Foundations of new configuration can only place old soil layer.Therefore, existing this way not only can not make full use of original base, but also exists shortcomings such as the construction works amount is big, construction period length, construction investment height.
Summary of the invention:
The objective of the invention is to: provide a kind of method that can make full use of original base and can save construction investment, minimizing construction working amount, the reconstructing operation platform column foundation in existing workshop of shortening duration of a project greatly, to overcome the deficiencies in the prior art.
When the present invention is achieved in that the new operating platform patten of in original factory building making, keep old operating platform patten or Equipment Foundations in original factory building, at first near this old operating platform patten, construct new operating platform column foundation pile to design elevation, and make new operating platform column foundation pile embed basement rock or place on the bearing stratum that meets design requirement, then platform post on the former operating platform column basis of haveing been friends in the past or Equipment Foundations pillar are blocked to the Ji Ding that is lower than new operating platform patten, and the end face of former have been friends in the past operating platform column basis or Equipment Foundations cutter hair, clean with water clean after, on the end face of former have been friends in the past operating platform column basis or Equipment Foundations and new operating platform column foundation pile top-pour outpour new operating platform patten, new operating platform patten is placed on former have been friends in the past operating platform column basis or Equipment Foundations and the new operating platform column foundation pile.
When former have been friends in the past operating platform column basis or Equipment Foundations are step basic, then adopt plain concrete that its step is leveled up to the Ji Ding of former have been friends in the past operating platform column basis or Equipment Foundations.
Owing to adopted technique scheme, the present invention compared with prior art, the present invention has can save construction investment greatly, reduce the construction working amount, shorten advantage such as duration of a project.In addition, because original old factory building all has 10 years even longer productive life, the sedimentation of its original platform patten and Equipment Foundations ground, distortion all tend towards stability, and bearing capacity of soil, the density in its basic influence basin all should have significantly raising.And the present invention carries out the construction of new platform patten on this basis, can make new basis that higher, more reliable foundation condition is arranged, therefore, adopt the present invention can avoid the generation of foundation settlement inequality, metaboly effectively, and also avoided basic heavy excavation.
Description of drawings:
Structural representation when accompanying drawing 1 is constructed for adopting the present invention;
Accompanying drawing 2 is the schematic top plan view of accompanying drawing 1.
In the accompanying drawings: 1 is new operating platform column foundation pile; 2 are platform post or Equipment Foundations pillar on the former operating platform column basis of haveing been friends in the past; 3 is old operating platform patten or Equipment Foundations in original factory building; 4 is new operating platform patten; 5 for filling up at the old operating platform patten of step or the plain concrete on the Equipment Foundations.
The specific embodiment:
Further specify embodiments of the invention below in conjunction with accompanying drawing: when in original factory building, making new operating platform patten, it is motionless to keep interior old operating platform patten of original factory building or Equipment Foundations 3, size and design attitude according to the new operating platform patten 4 of required making are determined near the operating platform column foundation pile 1 of constructing new this old operating platform patten, and carry out new operating platform column foundation pile 1 by traditional foundation pile preparation method and construct, the height of the operating platform column foundation pile 1 that it is new is made by design elevation, make new operating platform column foundation pile 1 embed basement rock or place on the bearing stratum that meets design requirement, then platform post on the former operating platform column basis of haveing been friends in the past or Equipment Foundations pillar 2 are blocked to the Ji Ding that is lower than new operating platform patten 4, end face cutter hair with former have been friends in the past operating platform column basis or Equipment Foundations 3, clean with water clean after, on the end face of former have been friends in the past operating platform column basis or Equipment Foundations 3 and the operating platform patten 4 that makes new advances by traditional method cast on the new operating platform column foundation pile 1, new operating platform patten 4 is placed on former have been friends in the past operating platform column basis or Equipment Foundations 3 and the new operating platform column foundation pile 1.
When former operating platform column basis or Equipment Foundations 3 of haveing been friends in the past during, then adopt plain concrete 5 that its step is leveled up to the former Ji Ding that has been friends in the past operating platform column basis or Equipment Foundations 3 and get final product for step basic.