CN100371534C - Technique for constructing pre-biased support and support pile - Google Patents

Technique for constructing pre-biased support and support pile Download PDF

Info

Publication number
CN100371534C
CN100371534C CNB2005100954449A CN200510095444A CN100371534C CN 100371534 C CN100371534 C CN 100371534C CN B2005100954449 A CNB2005100954449 A CN B2005100954449A CN 200510095444 A CN200510095444 A CN 200510095444A CN 100371534 C CN100371534 C CN 100371534C
Authority
CN
China
Prior art keywords
pile
side slope
supporting
displacement
materials
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2005100954449A
Other languages
Chinese (zh)
Other versions
CN1760474A (en
Inventor
梅国雄
周峰
宋林辉
赵建平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Tech University
Original Assignee
Nanjing Tech University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Tech University filed Critical Nanjing Tech University
Priority to CNB2005100954449A priority Critical patent/CN100371534C/en
Publication of CN1760474A publication Critical patent/CN1760474A/en
Application granted granted Critical
Publication of CN100371534C publication Critical patent/CN100371534C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The present invention discloses a technique for constructing a pre-displacement supporting pile used for supporting a side slope. Holes are drilled in the position of the side slope to be supported, then flexible buffer materials are filled in the holes, and finally the reinforcement concrete is cast in the space of the holes without the flexible buffer materials, the supporting pile is composed of a concrete pile body and a flexible buffer pile body which are close to each other, and steel bars are arranged in the concrete pile body. The present invention has the advantages that when the present invention is used for supporting the side slope, the sliding force of materials behind the pile (rock mass or soil mass) is firstly resisted by the anti-sliding force of the materials; in the process, the side slope body requires the definite displacement, when the displacement reaches the permitted value, namely, when the anti-sliding capacity of side slope materials reaches the threshold, the flexible material part in the pre-displacement supporting pile allows displacement of the side slope body to finish at once; the reinforcement concrete pipe body starts to exert function at once, namely, the sliding force part of the side slope body materials, which is not counteracted by the anti-sliding force is borne by the supporting pile.

Description

Technique for constructing pre-biased support and soldier pile thereof
Technical field
The present invention relates to a kind of support process and utensil, especially a kind of technique for constructing pre-biased support and the soldier pile thereof that can give full play to side slope material (as the rock on rock slope and the soil body of slight slope, down together) self carrying potential.
Background technology
The soldier pile overwhelming majority that is used for slope retaining at present all is a reinforced concrete pile, reinforced concrete pile intensity height, and rigidity is big, be used for slope retaining and can obtain good effect, but this type of cost is higher.Tracing it to its cause mainly is that this type of stake is used for supporting, and significant feature keeps a back side slope body static exactly, makes it not produce any displacement.In fact for the rock mass or the soil body, the ability that the opposing slippage is just arranged itself, but the performance of this ability needs it that certain displacement is arranged, as long as deformation displacement is within the range of permission, it is still more considerable that the antiskid of side slope body material self moves ability, can utilize fully.But be based on the supporting pattern of at present general " confronting the tough with toughnees ", the antiskid ability of moving of side slope material self is not utilized effectively, and has caused very big waste.
Summary of the invention
The invention provides a kind of technique for constructing pre-biased support and soldier pile thereof that can reduce support cost, the present invention can give full play to the ability that side slope material self antiskid moves.
The present invention adopts following technical scheme:
Technology of the present invention, that is: a kind of pre-biased support pile constructing process that is used for side slope is carried out supporting is holed in supporting place for the treatment of of side slope, and the flexible buffer material is set in this hole then, at last, steel concrete is built in the space in the hole beyond the flexible buffer material.
Soldier pile of the present invention is made up of the concrete pile body and the flexible buffer pile body of phase closing on the position, is provided with reinforcing bar in the concrete pile body.
Compared with prior art, the present invention has following advantage:
When the present invention is used for slope retaining, the sliding force of material after stake (rock mass or the soil body) is at first resisted by the anti-skid force of material itself, this process side slope body needs certain displacement, when this displacement reaches License Value, that is the antiskid ability of moving of side slope material self is when reaching capacity, the also end immediately of displacement of flexible material in the pre-biased support stake part institute side slope body that allows generation, the steel concrete pile body begins to play a role immediately, that is the anti-skid force of the side slope body material sliding force that is not enough to offset itself is partly transferred to soldier pile and born.In other words, use of the present invention, the sliding force that makes original side slope body by present whole bear to change to by soldier pile by the soil body and soldier pile bear jointly.Can save considerable construction cost.
Description of drawings
Fig. 1 is a construction technology schematic diagram of the present invention.
Fig. 2 is that the axis of no-feathering of the embodiment of the invention is to sectional view.
Fig. 3 is the axis of no-feathering sectional view of the embodiment of the invention.
The specific embodiment
Embodiment 1
A kind of pre-biased support pile constructing process that is used for side slope is carried out supporting, supporting place for the treatment of in side slope is holed, the flexible buffer material is set in this hole then, at last, steel concrete is built in the space in the hole beyond the flexible buffer material, in the present embodiment, the boring back is axially placed dividing plate earlier in the hole, filling flexible padded coaming in the space adjacent that surrounds by dividing plate and hole wall again with side slope, at last, build steel concrete being surrounded in another space by dividing plate and hole wall, above-mentioned flexible buffer material can adopt regular-type foam or be formed by the liquid foaming material foaming.
Embodiment 2
A kind of soldier pile that is used to implement above-mentioned technique for constructing pre-biased support, concrete pile body 1 and flexible buffer pile body 2 by phase closing on the position are formed, in concrete pile body 1, be provided with reinforcing bar 4, be provided with dividing plate 5 between concrete pile body 1 and flexible buffer pile body 2, above-mentioned flexible buffer pile body can adopt regular-type foam or be formed by the liquid foaming material foaming.

Claims (3)

1. pre-biased support pile constructing process that is used for side slope is carried out supporting, it is characterized in that holing in supporting place for the treatment of of side slope, in the hole, axially place dividing plate, the space filling flexible padded coaming that is positioned at the slope displacement updrift side that surrounds at dividing plate and hole wall then, at last, in another space that dividing plate and hole wall surround, fill and build steel concrete.
2. one kind is used to implement the described soldier pile that is used for side slope is carried out the pre-biased support pile constructing process of supporting of claim 1, it is characterized in that forming, in concrete pile body (1), be provided with reinforcing bar (4) by the concrete pile body (1) and the flexible buffer pile body (2) of mutual closing on the position.
3. soldier pile according to claim 2 is characterized in that being provided with dividing plate (5) between concrete pile body (1) and flexible buffer pile body (2).
CNB2005100954449A 2005-11-16 2005-11-16 Technique for constructing pre-biased support and support pile Expired - Fee Related CN100371534C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2005100954449A CN100371534C (en) 2005-11-16 2005-11-16 Technique for constructing pre-biased support and support pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2005100954449A CN100371534C (en) 2005-11-16 2005-11-16 Technique for constructing pre-biased support and support pile

Publications (2)

Publication Number Publication Date
CN1760474A CN1760474A (en) 2006-04-19
CN100371534C true CN100371534C (en) 2008-02-27

Family

ID=36706685

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2005100954449A Expired - Fee Related CN100371534C (en) 2005-11-16 2005-11-16 Technique for constructing pre-biased support and support pile

Country Status (1)

Country Link
CN (1) CN100371534C (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104264693B (en) * 2014-09-24 2016-10-26 沈阳建筑大学 A kind of steel case concrete anti-slide pile structure
CN104389307A (en) * 2014-12-08 2015-03-04 中铁西北科学研究院有限公司勘察设计分公司 Self-resetting slide-resistant pile structure with energy consumption function and implementation method thereof
CN106522270B (en) * 2016-12-28 2019-04-02 华中科技大学 A kind of the pile foundation barricade antidetonation retaining structure and construction method of the buffer layer containing EPS
CN112832264B (en) * 2021-01-09 2022-06-03 三峡大学 Energy absorption buffer device and buffer method for slope support measures
CN113684842B (en) * 2021-08-26 2022-06-14 武汉大学 High-toughness functionally-graded material slide-resistant pile and construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1063733A (en) * 1992-03-19 1992-08-19 中国建筑第一工程局建筑科学研究所 Flexible rope pile bulkhead tech
CN1107194A (en) * 1994-03-16 1995-08-23 沙祥林 Three-dimension high-strength composite foundation
JP2000160565A (en) * 1998-12-02 2000-06-13 Nippon Steel Metal Prod Co Ltd Hurdle work and hurdle work executing method
JP2003116357A (en) * 2001-10-10 2003-04-22 Mitsuwa Kenzai Kk Stake for fixing plate material for planting
JP2004076371A (en) * 2002-08-16 2004-03-11 Seiichi Ozawa Disruption preventing method for mt. fuji
CN1560382A (en) * 2004-02-20 2005-01-05 中国科学院力学研究所 Design method of reinfored rift pile for securing slope

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1063733A (en) * 1992-03-19 1992-08-19 中国建筑第一工程局建筑科学研究所 Flexible rope pile bulkhead tech
CN1107194A (en) * 1994-03-16 1995-08-23 沙祥林 Three-dimension high-strength composite foundation
JP2000160565A (en) * 1998-12-02 2000-06-13 Nippon Steel Metal Prod Co Ltd Hurdle work and hurdle work executing method
JP2003116357A (en) * 2001-10-10 2003-04-22 Mitsuwa Kenzai Kk Stake for fixing plate material for planting
JP2004076371A (en) * 2002-08-16 2004-03-11 Seiichi Ozawa Disruption preventing method for mt. fuji
CN1560382A (en) * 2004-02-20 2005-01-05 中国科学院力学研究所 Design method of reinfored rift pile for securing slope

Also Published As

Publication number Publication date
CN1760474A (en) 2006-04-19

Similar Documents

Publication Publication Date Title
CN100371534C (en) Technique for constructing pre-biased support and support pile
CN105908869A (en) Structural column structure formed based on 3D printed filling wall
CN106522270A (en) Pile foundation and retaining wall anti-earthquake retaining structure comprising EPS buffer layers and construction method
KR100998502B1 (en) Gravity type precast retaining wall for having shear key and steel pile
CN203701129U (en) Bridge reinforcement foundation and bridge
JP2008303581A (en) Reinforcing structure of banking support ground
CN201620413U (en) Composite foundation with PTC perforated tubular piles with caps
CN215252792U (en) Foundation reinforcing device
Liang et al. Optimization of composite piled raft foundation with varied rigidity of cushion
KR200354766Y1 (en) Retaining wall block
CN210529683U (en) A tubular pile for soft soil foundation
CN208585636U (en) A kind of buried bucket of the resistance to compression of rotation molding
CN203701128U (en) Micro pile-reinforced bridge foundation and bridge
CN2856169Y (en) Horizontal prestressed variable pile
CN202081424U (en) Anti-lateral pressure wall body module
CN206346220U (en) A kind of pile foundation barricade antidetonation retaining structure of the cushion containing EPS
CN213952283U (en) Light-duty superelevation road bed side slope retaining wall structure
KR200274787Y1 (en) Reinforcement block
CN212427159U (en) Concrete combined foundation column for civil engineering
CN212612253U (en) Stepped T-shaped retaining wall wharf structure with anchorage
CN217325851U (en) Structure is backfilled to caisson formula bathroom foaming cement
CN2905888Y (en) Thrust-free bridge abutment system
JPH07119161A (en) Footing foundation
JPH07158087A (en) Reinforced earth structure
CN209873826U (en) Round-end-shaped anti-slide pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee