Lift Car Door Hall Door Sealing Strip And Shaping Process
Technical field
The present invention relates to sealing band and forming process, particularly be applied to the Lift Car Door Hall Door Sealing Strip And Shaping Process of elevator.
Background technology
Elevator, staircase market competition are fierce day by day at present, and product is brought in constant renewal in.Each big elevator company simplifies approximately at the prerequisite next part of ensuring the quality of products, and the sealing band that elevator is used is constantly replaced improvement.The sealing band that elevator is used plays crashproof, sealing, shading, decoration function nothing but on its function.In the prior art, the exploitation of door-window sealing band early, as the applying date is the Chinese utility model patent ZL86201189 on February 28th, 1986 " clamping type sealing band once-through method apparatus for continous formation ", it discloses a kind of rubber semi-finished product that has soft core of sebific duct and steel sheet skeleton of producing, the semi-finished once-through method apparatus for continous formation of clamping type sealing band particularly. this device just can realize that because of only needing on the rubber extruder special head of preparation and having the core pattern and the shape of the mouth as one speaks of suitable shape once-through method is continuously shaped.Also be the Chinese utility model patent ZL03269958.1 on September 23rd, 2003 " the door-window sealing band that vinyl coating is arranged " just like the applying date, it discloses a kind of door-window sealing band that vinyl coating is arranged, the U type door and window rubber strip that comprises embedded steel frame, its inwall has jaw, the sidepiece one of U type door and window rubber strip connects sponge bubble sealing member, the coating that the outside face of U type door and window rubber strip has the ethene coat film that is extruded to shape to one to constitute.But above-mentioned technology can't be applied to lift car gate sealing band, and lift car gate sealing band originally all adopted aluminum alloy bar to scurry soft rubber-plastic strip installation again and forms; Have cost height, easy shortcoming such as come off.
Summary of the invention
Technical matters to be solved by this invention is at above-mentioned defective, and provide Lift Car Door Hall Door Sealing Strip And Shaping Process, corrosion-resistant steel or cold-rolled steel skeleton bag are moulded firmly by adopting, the soft gasket of moulding the technology making, the needs of elevator functions can be satisfied, cost-cutting, good and cheap purpose can be reached again.
The present invention solves the problems of the technologies described above the technical scheme that is adopted:
Lift cage sealing strip, comprise and be installed in the hard soft modified PVC layer that is embedded with skeleton that matches on the elevator two fan car gate Room doors, the technical measures of taking comprise: skeleton is the stainless steel substrates or the cold rolling steel disc of flow forming, be positioned at hard modified PVC layer one end and be embedded with soft modified PVC layer, and two soft modified PVC layers that match have the contact surface that matches.
For optimizing technique scheme, the concrete measure of taking also comprises:
For saving cost, to gain in strength, skeleton is SUS430 steel band of model or the cold rolling steel disc of SPCC type, for adapting to the needs of various lift cage doors, its vertical sectional shape is L shaped or U-shaped or ∑ shape or ∏ shape or Γ shape or soup ladle shape.
, sealing crashproof, shading, two contact surfaces of decoration function for playing for the inclined-plane that pastes mutually or be meshed be spaced dentation.
Same reason, two contact surfaces are respectively concave surface and the convex surface that pastes mutually.
Two contact surfaces are respectively L face that fits and the face of falling L.
Same reason, the skeleton cross section is flat U-shaped, the hard modified PVC layer other end of this flat U-shaped also is embedded with soft modified PVC layer.
The forming process of lift cage sealing strip comprises skeleton forming step and mixing granulation step, and the technical measures of taking comprise: the skeleton forming step is for to cut open bar and flow forming skeleton base sheet with SUS430 steel band of model or SPCC type cold-rolled strip; The mixing granulation step is for by weight percentage, 60%~85% Vinyl chloride resin, plasticizer 10%~30%, auxiliary material 5%~10% ratio are mixed, carry out hard PVC modification and flexible PVC modification respectively, and with skeleton base sheet enforcement extrusion molding step, skeleton base sheet is mounted in the hard modified PVC layer, the end that will match simultaneously is embedded with soft modified PVC, extrusion molding; And order enters cooling and draws and get step, fixed length sawing step, the die-cut step of fixed length, location punching step.
Compared with prior art, the present invention is the stainless steel substrates or the cold rolling steel disc of flow forming by adopting skeleton, be positioned at hard modified PVC layer one end and be embedded with soft modified PVC layer, and two soft modified PVC layers that match has the contact surface that matches.The lift cage sealing strip that SUS430 type corrosion-resistant steel and the cold rolling ladle of SPCC type be soft, mould firmly not only can satisfy functional requirement from structure, and elegant in appearance, simple in structure, saves aluminium, and is easy for installation, good and cheap.
Description of drawings
Fig. 1 is the vertical section structure scheme drawing that the embodiment of the invention one SPCC-1 type is fitted in the lift cage door;
Fig. 2 is the vertical section structure scheme drawing that the embodiment of the invention two SPCC-2 types are fitted in the lift cage door;
Fig. 3 is the vertical section structure scheme drawing that embodiment of the invention Three S's PCC-3 type is fitted in the lift cage door;
Fig. 4 is the vertical section structure scheme drawing that the embodiment of the invention four SPCC-3-A and Type B are fitted in the lift cage door;
Fig. 5 is the vertical section structure scheme drawing that the embodiment of the invention five SPCC-3-C and D type are fitted in the lift cage door;
Fig. 6 is the vertical section structure scheme drawing that the embodiment of the invention six SPCC-3-E and F type are fitted in the lift cage door;
Fig. 7 is the vertical section structure scheme drawing that the embodiment of the invention seven SPCC-3-G and H type are fitted in the lift cage door;
Fig. 8 is the vertical section structure scheme drawing of the embodiment of the invention eight;
Fig. 9 is the vertical section structure scheme drawing of the embodiment of the invention nine;
Figure 10 is the vertical section structure scheme drawing of the embodiment of the invention ten;
Figure 11 is the vertical section structure scheme drawing of the embodiment of the invention 11.
The specific embodiment
Embodiment describes in further detail the present invention below in conjunction with accompanying drawing.
Structure of the present invention and be fitted in the lift cage door and see that accompanying drawing 1 is to shown in Figure 11.
Lift cage sealing strip, comprise and be installed in the hard soft modified PVC layer that is embedded with skeleton 1 that matches on the elevator two fan car gate Room doors 4, Room door 4 has mounting hole 4a, the mounting hole 4a corresponding section of sealing band of the present invention and Room door 4 has mounting hole 5, skeleton 1 is the stainless steel substrates or the cold rolling steel disc of flow forming, be positioned at hard modified PVC layer 2 one end and be embedded with soft modified PVC layer 3, and two soft modified PVC layers 3 that match have the contact surface 3a that matches.For saving cost, to gain in strength, skeleton 1 is SUS430 steel band of model or the cold rolling steel disc of SPCC type, for adapting to the needs of various lift cage doors, its vertical sectional shape is L shaped or U-shaped or ∑ shape or ∏ shape or Γ shape or soup ladle shape., sealing crashproof, shading, two contact surface 3a of decoration function for playing for the inclined-plane that pastes mutually or be meshed be spaced dentation.Same reason, two contact surface 3a are respectively concave surface and the convex surface that pastes mutually; Or two contact surface 3a are respectively L face that fits and the face of falling L, or skeleton 1 cross section is flat U-shaped, and the hard modified PVC layer other end of this flat U-shaped also is embedded with soft modified PVC layer.
Fig. 1 is the vertical section structure scheme drawing that the embodiment of the invention one SPCC-1 type is fitted in the lift cage door; Skeleton 1 vertical sectional shape is a soup ladle shape; Two contact surface 3a are the dentation that is spaced that is meshed.
Fig. 2 is the vertical section structure scheme drawing that the embodiment of the invention two SPCC-2 types are fitted in the lift cage door; Skeleton 1 vertical sectional shape is a soup ladle shape; Two contact surface 3a be different from Fig. 1 be meshed be spaced dentation; The mounting hole 4a corresponding section of sealing band of the present invention and Room door 4 has mounting hole 5, is used for firmly installing the sealing bar.
Fig. 3 is the vertical section structure scheme drawing that embodiment of the invention Three S's PCC-3 type is fitted in the lift cage door; The skeleton vertical sectional shape is a soup ladle shape; Two contact surface 3a be different Fig. 1,2 be meshed be spaced dentation.
Fig. 4 is the vertical section structure scheme drawing that the embodiment of the invention four SPCC-3-A and Type B are fitted in the lift cage door; The skeleton vertical sectional shape is a soup ladle shape; Two contact surface 3a are L face that fits and the face of falling L.
Fig. 5 is the vertical section structure scheme drawing that the embodiment of the invention five SPCC-3-C and D type are fitted in the lift cage door; The skeleton vertical sectional shape is a soup ladle shape; Two contact surfaces are recessed disc and the dome face that fits.
Fig. 6 is the vertical section structure scheme drawing that the embodiment of the invention six SPCC-3-E and F type are fitted in the lift cage door; The skeleton vertical sectional shape is a soup ladle shape; Two contact surfaces are the inclined-plane that pastes mutually.
Fig. 7 is the vertical section structure scheme drawing that the embodiment of the invention seven SPCC-3-G and H type are fitted in the lift cage door; The skeleton vertical sectional shape is a soup ladle shape; Two contact surfaces are recessed disc that fits and the dome face of different Fig. 5.
Fig. 8 is the vertical section structure scheme drawing of the embodiment of the invention eight; The skeleton vertical sectional shape is flat U-shaped, and the hard modified PVC layer other end of flat U-shaped also is embedded with soft modified PVC layer; Two contact surfaces are recessed disc that fits and dome face with Fig. 5.
Fig. 9 is the vertical section structure scheme drawing of the embodiment of the invention nine; The skeleton vertical sectional shape is flat U-shaped, and the hard modified PVC layer other end of flat U-shaped also is embedded with soft modified PVC layer; Contact surface is recessed disc that fits and the dome face of different Fig. 8.
Figure 10 is the vertical section structure scheme drawing of the embodiment of the invention ten; The skeleton vertical sectional shape is flat U-shaped, and two contact surfaces are recessed disc that fits and dome face with Fig. 5.
Figure 11 is the vertical section structure scheme drawing of the embodiment of the invention 11; The skeleton vertical sectional shape is for directly Z-shaped, contact surface for Fig. 3 be meshed be spaced dentation.
The forming process of lift cage sealing strip comprises skeleton forming step and mixing granulation step, and the technical measures of taking comprise: the skeleton forming step is for to cut open bar and flow forming skeleton base sheet with SUS430 steel band of model or SPCC type cold-rolled strip; The mixing granulation step is for by weight percentage, 60%~85% Vinyl chloride resin, plasticizer 10%~30%, auxiliary material 5%~10% ratio are mixed, carry out hard PVC modification and flexible PVC modification respectively, and with skeleton base sheet enforcement extrusion molding step, skeleton base sheet is mounted in the hard modified PVC layer, the end that will match simultaneously is embedded with soft modified PVC, extrusion molding; And order enters cooling and draws and get step, fixed length sawing step, the die-cut step of fixed length, location punching step.
Though the present invention illustrates and describes by the reference preferred embodiment,, those skilled in the art should understand, and in the scope of claims, can do the various variation on form and the details.