CN100339661C - Heating supply equipment for individual radiator - Google Patents

Heating supply equipment for individual radiator Download PDF

Info

Publication number
CN100339661C
CN100339661C CNB2004100391590A CN200410039159A CN100339661C CN 100339661 C CN100339661 C CN 100339661C CN B2004100391590 A CNB2004100391590 A CN B2004100391590A CN 200410039159 A CN200410039159 A CN 200410039159A CN 100339661 C CN100339661 C CN 100339661C
Authority
CN
China
Prior art keywords
water box
water
box
subjacent
quirk
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2004100391590A
Other languages
Chinese (zh)
Other versions
CN1560532A (en
Inventor
马承东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNB2004100391590A priority Critical patent/CN100339661C/en
Publication of CN1560532A publication Critical patent/CN1560532A/en
Application granted granted Critical
Publication of CN100339661C publication Critical patent/CN100339661C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Solid-Fuel Combustion (AREA)
  • Heat-Pump Type And Storage Water Heaters (AREA)

Abstract

The present invention relates to energy-saving and environmental protecting heating equipment for individual radiators, and a manufacture method thereof. The present invention has technical scheme that the present invention comprises a furnace body and is characterized in that a water channel is composed of an inner furnace wall and an outer furnace wall in the furnace body; the upper part of a heat resource device is provided with a lower water box, a water return pipe and a water outlet pipe; one end of the water return pipe and one end of the water outlet pipe are communicated with the lower water box, and the other end of the water return pipe and the other end of the water outlet pipe are communicated with the furnace body; the upper part of the lower water box is orderly provided with a middle water box, a fire baffling water box and an upper water box; the lower water box, the middle water box, the fire baffling water box and the upper water box are communicated by a water pipe; the upper water box and the water channel at the top of the furnace body are communicated by the water pipe; long fire channels are arranged among the lower water box, the middle water box and the fire baffling water box, penetrate through the lower water box, the middle water box and the fire baffling water box, and extend to the lower part of the upper water box; a middle fire channel is arranged between the middle water box and the lower water box, penetrates through the middle water box and the lower water box, and extends to the lower part of the upper water box; the lower water box is also provided with a short fire channel which penetrates through the lower water box and extends to the lower part of the middle water box.

Description

Each door type heating installation heating equipment and preparation method thereof
Technical field
The invention belongs to the heating installation heating plant field, especially a kind of each door type heating installation heating equipment and preparation method thereof.
Background technology
Compare with traditional central heating mode, house heating has many advantages, and therefore as a kind of new heating system, the household heating mode is adopted by more and more users.But the heating equipment of house heating employing at present exists many problems, and these problems are also progressively affecting further applying of house heating.Topmost problem is that heating equipment heat energy utilization rate is not high, has increased very big use cost to the user, compares with traditional central heating mode, and cost will increase 2-3 doubly, also exists in addition owing to the insufficient problem of environmental pollution that produces of burning.
Summary of the invention
One of purpose of the present invention provides a kind of energy-saving and environmental protection, reduces the each door type heating installation heating equipment of use cost.
Another object of the present invention provides a kind of preparation method of each door type heating installation heating equipment.
Technical scheme of the present invention is: each door type heating installation heating equipment, comprise body of heater, it is characterized in that described body of heater internal protecting wall and outer furnace wall composition sluice, upper surface at body of heater is provided with exhaust smoke hole and water supply hole, the bottom of body of heater inside is provided with heat power supply device and control device, above heat power supply device, be provided with subjacent water box, return pipe and outlet pipe, return pipe and outlet pipe one end communicate with subjacent water box, the other end is communicated with body of heater, is sequentially set with middle water box, fire blocking water box and upper water box above subjacent water box; Subjacent water box, middle water box, fire blocking water box and upper water box are by cross current, and upper water box and body of heater top water channel pass through cross current; Be provided with long quirk between subjacent water box, middle water box and the fire blocking water box, long quirk passes subjacent water box, middle water box and fire blocking water box and extends to the below of upper water box; Also be provided with middle quirk between middle water box and subjacent water box, middle quirk passes middle water box and subjacent water box and extends to the below of fire blocking water box; Also be provided with short quirk on subjacent water box, short quirk passes subjacent water box and extends to the below of middle water box; The cross-sectional area of fire blocking water box is greater than the cross-sectional area of upper water box, middle water box and subjacent water box, and in body of heater the distance of fire blocking water box and inboard wall of furnace body less than the distance between upper water box, middle water box and subjacent water box and the inboard wall of furnace body.
In the quirk outer setting that connects subjacent water box and middle water box water jacket is arranged, described water jacket is communicated with subjacent water box and middle water box.
In the outer setting that connects the quirk between middle water box and the fire blocking water box water jacket is arranged, described water jacket is communicated with middle water box and fire blocking water box.
Subjacent water box, middle water box and upper water box are oval, and three's size shape is identical, and the shape of fire blocking water box is identical with subjacent water box, middle water box and upper water box, and area is greater than subjacent water box, middle water box and upper water box.
The preparation method of described house heating equipment is characterized in that comprising the following steps: the box body of (1) processing and fabricating subjacent water box, middle water box, fire blocking water box and upper water box; (2) in the box body upper punch water hole and the quirk hole of subjacent water box, middle water box, fire blocking water box and upper water box, water pipe connects the bath hole on each box body then, connect quirk hole on each box body with the quirk pipe, on subjacent water box and upper water box, the water pipe that links to each other with body of heater is installed; (3) connect water pipe corresponding position punching at inboard wall of furnace body up and down water box, upper water box, and be connected with corresponding water pipe, and the processing exhaust smoke hole; (4) on furnace body outer wall, process intake-outlet, water return outlet, feed water inlet and exhaust opening,, and install back water pipe, outlet pipe, feed pipe and exhaust smoke hole then with the inboard wall of furnace body assembling; (5) at bottom of furnace body heat power supply device and control device are installed; (6) body of heater and water box are installed on the base of furnace body.
Comprise the following steps: that also heating equipment is provided with water jacket, before the welding prerequisite, water jacket is installed in corresponding quirk tube outside respectively.
Effect of the present invention: because each door type heating installation heating equipment is provided with subjacent water box, return pipe and outlet pipe above heat power supply device, return pipe and outlet pipe one end communicate with subjacent water box, the other end is communicated with body of heater, is sequentially set with middle water box, fire blocking water box and upper water box above subjacent water box; Subjacent water box, middle water box, fire blocking water box and upper water box are by cross current, and upper water box and body of heater top water channel pass through cross current; Be provided with long quirk between subjacent water box, middle water box and the fire blocking water box, long quirk passes subjacent water box, middle water box and fire blocking water box and extends to the below of upper water box; Also be provided with middle quirk between middle water box and subjacent water box, middle quirk passes middle water box and subjacent water box and extends to the below of fire blocking water box; Also be provided with short quirk on subjacent water box, short quirk passes subjacent water box and extends to the below of middle water box; The cross-sectional area of fire blocking water box is greater than the cross-sectional area of upper water box, middle water box and subjacent water box, and in body of heater the distance of fire blocking water box and inboard wall of furnace body less than the distance between upper water box, middle water box and subjacent water box and the inboard wall of furnace body.Therefore after the heat power supply device igniting, the flame that fully prolongs burning can directly heat the water in the water box by quirk on the one hand, on the other hand, flame is through behind the quirk, be subjected to stopping of fire blocking water box, heat returns the water that continues to add in hot water box and the water pipe, and middle water box and upper water box also can play the effect that stops flame.So just can make flame through too much return cycle, along the heating surface that gushes against two-way convection current repeatedly, heat exchanging process is fully finished, and the heat loss of smoke evacuation is extremely low, thereby improves the utilization of heat energy.Through detecting, the thermal efficiency reaches 91.68%, and therefore, operating cost is cheap.With 150M 2The heating family is an example, and per hour air consumption is 0.8KG, and the per kilogram liquefied gas is by 3.5 yuan of calculating, if every day, the equipment operation was 4 hours, the heating phase is 120 days, and the expense that needs is 1350 yuan altogether, and the house heating cost of equipment that adopts is at present wanted more than 5000 yuan at least.Because sufficient combustion has reduced atmosphere pollution, has environmental protection function.
Control device of the present invention comprises wheel leakage protective, power-off protection, indoor anoxia protection arrangement etc., and temperature can set up on their own according to user's needs.The fuel gas source air valve is opened simultaneously igniting automatically, and when water temperature reached 65 ℃, water circulating pump started, when return water temperature reaches the established standards value, and the equipment automatic-closing valve, out of service.
The present invention is described further below in conjunction with drawings and Examples.
Description of drawings
Accompanying drawing is a structural representation of the present invention.
The specific embodiment
Each door type heating installation heating equipment, comprise body of heater 1, described body of heater 1 internal protecting wall 2 and outer furnace wall 3 are formed the sluice, upper surface at body of heater 1 is provided with exhaust smoke hole 4 and water supply hole 5, the bottom of body of heater 1 inside is provided with heat power supply device 6 and control device, above heat power supply device 6, be provided with subjacent water box 7, return pipe 8 and outlet pipe 9, return pipe 8 and outlet pipe 9 one ends communicate with subjacent water box 7, the other end is communicated with body of heater 1, is sequentially set with middle water box 10, fire blocking water box 11 and upper water box 12 above subjacent water box 7; Subjacent water box 7, middle water box 10, fire blocking water box 11 and upper water box 12 are communicated with by water pipe 17, and upper water box 12 passes through cross current with body of heater 1 top water channel; Be provided with long quirk 13 between subjacent water box 7, middle water box 10 and the fire blocking water box 11, long quirk 13 passes subjacent water box 7, middle water box 10 and fire blocking water box 11 and extends to the below of upper water box 12; Quirk 14 in also being provided with between middle water box 10 and subjacent water box 7, middle quirk 14 pass middle water box 10 and subjacent water box 7 and extend to the below of fire blocking water box 11; Also be provided with short quirk 15 on subjacent water box 7, short quirk 15 passes subjacent water box 7 and extends to the below of middle water box 10; The cross-sectional area of fire blocking water box 11 is greater than the cross-sectional area of upper water box 12, middle water box 10 and subjacent water box 7, and in body of heater 1 distance of fire blocking water box 11 and inboard wall of furnace body 2 less than the distance between upper water box 12, middle water box 10 and subjacent water box 7 and the inboard wall of furnace body 2.In the quirk outer setting that connects subjacent water box 7 and middle water box 10 water jacket 16 is arranged, water jacket 16 is communicated with subjacent water box 7 and middle water box 10.In the outer setting that connects the quirk between middle water box 10 and the fire blocking water box 11 water jacket 16 is arranged, water jacket 16 is communicated with middle water box 10 and fire blocking water box 11.Subjacent water box 7, middle water box 10 and upper water box 12 are oval, and three's size shape is identical, and the shape of fire blocking water box 11 and subjacent water box 7, middle water box 10 are identical with upper water box 12, and area is greater than subjacent water box 7, middle water box 10 and upper water box 12.
The preparation method of house heating equipment comprises the following steps: the box body of (1) processing and fabricating subjacent water box, middle water box, fire blocking water box and upper water box; (2) in the box body upper punch water hole and the quirk hole of subjacent water box, middle water box, fire blocking water box and upper water box, water pipe connects the bath hole on each box body then, connect quirk hole on each box body with the quirk pipe, on subjacent water box and upper water box, the water pipe that links to each other with body of heater is installed; (3) connect water pipe corresponding position punching at inboard wall of furnace body up and down water box, upper water box, and be connected with corresponding water pipe, and the processing exhaust smoke hole; (4) on furnace body outer wall, process intake-outlet, water return outlet, feed water inlet and exhaust opening,, and install back water pipe, outlet pipe, feed pipe and exhaust smoke hole then with the inboard wall of furnace body assembling; (5) at bottom of furnace body heat power supply device and control device are installed; (6) body of heater and water box are installed on the base of furnace body.In addition, comprise the following steps: that also heating equipment is provided with water jacket, before the welding prerequisite, water jacket is installed in corresponding quirk tube outside respectively.

Claims (6)

1, each door type heating installation heating equipment, comprise body of heater, it is characterized in that described body of heater internal protecting wall and outer furnace wall composition sluice, upper surface at body of heater is provided with exhaust smoke hole and water supply hole, the bottom of body of heater inside is provided with heat power supply device and control device, is provided with subjacent water box, return pipe and outlet pipe above heat power supply device, and return pipe and outlet pipe one end communicate with subjacent water box, the other end is communicated with body of heater, is sequentially set with middle water box, fire blocking water box and upper water box above subjacent water box; Subjacent water box, middle water box, fire blocking water box and upper water box are by cross current, and upper water box and body of heater top water channel pass through cross current; Be provided with long quirk between subjacent water box, middle water box and the fire blocking water box, long quirk passes subjacent water box, middle water box and fire blocking water box and extends to the below of upper water box; Also be provided with middle quirk between middle water box and subjacent water box, middle quirk passes middle water box and subjacent water box and extends to the below of fire blocking water box; Also be provided with short quirk on subjacent water box, short quirk passes subjacent water box and extends to the below of middle water box; The cross-sectional area of fire blocking water box is greater than the cross-sectional area of upper water box, middle water box and subjacent water box, and in body of heater the distance of fire blocking water box and inboard wall of furnace body less than the distance between upper water box, middle water box and subjacent water box and the inboard wall of furnace body.
2, each door type heating installation heating equipment according to claim 1 is characterized in that in the quirk outer setting that connects subjacent water box and middle water box water jacket being arranged, and described water jacket is communicated with subjacent water box and middle water box.
3, house heating equipment according to claim 1 and 2 is characterized in that in the outer setting that connects the quirk between middle water box and the fire blocking water box water jacket being arranged, and described water jacket is communicated with middle water box and fire blocking water box.
4, house heating equipment according to claim 3, it is characterized in that subjacent water box, middle water box and upper water box are for oval, and three's size shape is identical, and the shape of fire blocking water box is identical with subjacent water box, middle water box and upper water box, and area is greater than subjacent water box, middle water box and upper water box.
5, a kind of preparation method according to the described house heating equipment of above-mentioned each right is characterized in that comprising the following steps: the box body of (1) processing and fabricating subjacent water box, middle water box, fire blocking water box and upper water box; (2) in the box body upper punch water hole and the quirk hole of subjacent water box, middle water box, fire blocking water box and upper water box, water pipe connects the bath hole on each box body then, connect quirk hole on each box body with the quirk pipe, on subjacent water box and upper water box, the water pipe that links to each other with body of heater is installed; (3) connect water pipe corresponding position punching at inboard wall of furnace body up and down water box, upper water box, and be connected with corresponding water pipe, and the processing exhaust smoke hole; (4) on furnace body outer wall, process intake-outlet, water return outlet, feed water inlet and exhaust opening,, and install back water pipe, outlet pipe, feed pipe and exhaust smoke hole then with the inboard wall of furnace body assembling; (5) at bottom of furnace body heat power supply device and control device are installed; (6) body of heater and water box are installed on the base of furnace body.
6, the preparation method of house heating equipment according to claim 5 is characterized in that also comprising the following steps: that heating equipment is provided with water jacket, before the welding prerequisite water jacket is installed in corresponding quirk tube outside respectively.
CNB2004100391590A 2004-02-18 2004-02-18 Heating supply equipment for individual radiator Expired - Fee Related CN100339661C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2004100391590A CN100339661C (en) 2004-02-18 2004-02-18 Heating supply equipment for individual radiator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2004100391590A CN100339661C (en) 2004-02-18 2004-02-18 Heating supply equipment for individual radiator

Publications (2)

Publication Number Publication Date
CN1560532A CN1560532A (en) 2005-01-05
CN100339661C true CN100339661C (en) 2007-09-26

Family

ID=34441280

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2004100391590A Expired - Fee Related CN100339661C (en) 2004-02-18 2004-02-18 Heating supply equipment for individual radiator

Country Status (1)

Country Link
CN (1) CN100339661C (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5027749A (en) * 1990-10-16 1991-07-02 Stacey Heating & Plumbing Supplies, Ltd. High efficiency water heater
JPH04225751A (en) * 1990-12-26 1992-08-14 Dowa:Kk Direct-fired water heater
CN2337466Y (en) * 1998-04-04 1999-09-08 童德才 Gas-combustion warming stove
JP2000329337A (en) * 1999-05-12 2000-11-30 State Ind Inc Water heater and method for heating water
CN1412500A (en) * 2001-10-12 2003-04-23 长春市宽城锅炉排汽阀厂 Gas water-heating furnace

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5027749A (en) * 1990-10-16 1991-07-02 Stacey Heating & Plumbing Supplies, Ltd. High efficiency water heater
JPH04225751A (en) * 1990-12-26 1992-08-14 Dowa:Kk Direct-fired water heater
CN2337466Y (en) * 1998-04-04 1999-09-08 童德才 Gas-combustion warming stove
JP2000329337A (en) * 1999-05-12 2000-11-30 State Ind Inc Water heater and method for heating water
CN1412500A (en) * 2001-10-12 2003-04-23 长春市宽城锅炉排汽阀厂 Gas water-heating furnace

Also Published As

Publication number Publication date
CN1560532A (en) 2005-01-05

Similar Documents

Publication Publication Date Title
CN100339661C (en) Heating supply equipment for individual radiator
CN212457078U (en) Atmospheric energy-saving oil-gas dual-purpose heating heater
CN2781214Y (en) Hot air heating device
CN206648291U (en) Abundant combustion energy saving gas-heating hot water wall-hung boiler
CN2874301Y (en) Environment protection energy saving stove
CN205482285U (en) Thermal -arrest fires burning furnace for stoving
CN205717300U (en) Combustion natural gas heat conducting oil boiler energy saving system
CN204915199U (en) Indoor air heating system of car
CN217504336U (en) Efficient energy-saving environment-friendly type heat cleaning furnace
CN213596354U (en) Anode furnace waste heat utilization device
CN202744502U (en) Totally-air-cooling gas generator
CN221684655U (en) Waste heat recovery device of cooking range
CN214893756U (en) Energy-saving hardware pretreatment device
CN216522349U (en) Wall-mounted boiler heat recovery energy saver
CN217715442U (en) Hot blast stove for biomass fuel processing
CN213362853U (en) Energy-saving condensation boiler
CN2344718Y (en) Civil heating stove
CN202133029U (en) Superconducting fluid heat exchange furnace for heating and superconducting fluid and air heat exchange device
CN2395155Y (en) Civil warm air stove
CN2791543Y (en) Gas vertical hot blust stove
CN2775541Y (en) High efficiency energy saving hot air furnace
CN2290773Y (en) Coal-saving heating stove
CN115218263A (en) Northern rural residence heat recovery type solar radiation heating system
CN200979359Y (en) A hot blast stove
CN2521547Y (en) Outdoor domestic gas-fired warmer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
DD01 Delivery of document by public notice

Addressee: Ma Chengdong

Document name: Notification to Pay the Fees

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20070926

Termination date: 20150218

EXPY Termination of patent right or utility model