CN100334839C - Method for realizing network resource time management - Google Patents

Method for realizing network resource time management Download PDF

Info

Publication number
CN100334839C
CN100334839C CNB2004100642885A CN200410064288A CN100334839C CN 100334839 C CN100334839 C CN 100334839C CN B2004100642885 A CNB2004100642885 A CN B2004100642885A CN 200410064288 A CN200410064288 A CN 200410064288A CN 100334839 C CN100334839 C CN 100334839C
Authority
CN
China
Prior art keywords
resource
time
information
business
version
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2004100642885A
Other languages
Chinese (zh)
Other versions
CN1744513A (en
Inventor
任旭东
朔释布莱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Huawei Digital Technologies Co Ltd
Original Assignee
Huawei Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co Ltd filed Critical Huawei Technologies Co Ltd
Priority to CNB2004100642885A priority Critical patent/CN100334839C/en
Publication of CN1744513A publication Critical patent/CN1744513A/en
Application granted granted Critical
Publication of CN100334839C publication Critical patent/CN100334839C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The present invention discloses a method for realizing the time management of network resources, which comprises the steps that a time edition comprising occupation information of the resources is established for the network resources; when a resource request transmitted from a service is received, the time edition of the resources requested by the service is invoked, and the information of resource occupation in the time edition is enquired to judge whether the resources are occupied by other services within the occupation time or not; if the resources are occupied by other services within the occupation time, the resource request is declined; otherwise, the time edition information of the resources is updated. After using the method of the present invention, each resource requesting service can determine whether the resources can be occupied in a certain period of time by enquiring time records, and the implementation time of services can be adjusted in time according to the information of the time records; furthermore, planners have visual and unambiguous recognition of the development of the resources, and thus, the present invention contributes to the counting and the maintenance of occupation situations of all the resources on the time axis for the system planners.

Description

A kind of method that realizes network resource time management
Technical field
The present invention relates to the network resource management technology, particularly relate to a kind of method that realizes network resource time management.
Background technology
Gradually relax control in market, under the overall situation of intensified competition, the strategic emphasis of telecom operation enterprise enlarges scale by original investment networking, progressively turn to and improve user satisfaction, network management level and network application efficient, and then turn to the competition of comprehensive operation management level.Under this background, network resource management system (NRM) grows up very soon as the important component part of network operation support system, in telecommunication management network (TMN), occupy critical role rapidly, become the important means that telecom operators improve network operation efficient, activate the service, realize the whole network intensive management fast.
The Internet resources that telecom operators had comprise physical resource and logical resource.The infrastructure of telecommunication such as pipe-line-network, cable system, cable network, machine room are physical resources, are the bases that communication network is built.On the infrastructure of telecommunication, transmission network, switching network, data network, intelligent network, digital communication network professional communication networks such as (DCN) have been set up.Scheduling and configuration by to network have formed logical resources such as passage, circuit, number, form complicated multi-level topological structure between the logical resource again.The object of NRM management is exactly the operator whole physics, the logical network that have and the node that connects these networks (as the machine room physical equipment etc.).
The storage of every kind of resource of network resource management system maintaining network.As mentioned above, these resources can be physical resources, as cable, port, veneer, frame, machine frame, panel, equipment and machine room etc., also can be logical resource, as SDH (Synchronous Digital Hierarchy) (SDH) section, SDH path, end to end circuit, PDH (Pseudo-synchronous Digital Hierarchy) (PDH) system and SDH ring etc.Telecom operators must be according to the frequent planning network topology of client's demand, equipment and circuit supply.This planning at Internet resources must often be upgraded, to determine various state of resources, because the state of Internet resources is dynamic changes, so the time management at Internet resources is a ring important in the network resource management, the meaning of time management be embodied in basically can to future date Internet resources plan so that more effectively carry out network topology and circuit supply etc. according to the state of Internet resources.
Yet, up to now, also less than method to Internet resources being planned in date in the future, when certain service needed takies a resource, whether can only inquire about this resource when needs take idle, if current this resource is just by other calling service, when other business that also has no way of finding out about it discharges this resource, so can't make further planning to the enforcement of this business.So there is a kind of demand of Internet resources being carried out time management in network resource management.
Summary of the invention
Main purpose of the present invention is to provide a kind of method that realizes network resource time management, so that more effectively Internet resources are planned.
The objective of the invention is to be achieved through the following technical solutions:
A kind of method that realizes network resource time management comprises the steps:
A, set up the time version of the occupied information that comprises this resource respectively for Internet resources, the occupied information of this resource comprises the business information and the holding time information of the business that takies this resource;
B, when receiving the resource request of the resource information that comprises business information, holding time information and institute's request resource that a business sends, access the time version of this business institute requested resource;
Occupied information in C, the query time version judges whether resource is taken by other business, if then refuse this resource request within the holding time that described resource request is asked; Otherwise interpolation sends the business information and the holding time information of the business of resource request in the time of resource version.
Wherein, described business information is Business Name and/or service identification.
Wherein, described holding time information comprises and takies zero-time and take the termination time.
Preferably, further comprise after the step C:
When in the time version that detect to arrive resource take zero-time the time, send the trigger notice message that comprises resource name at least to the business of this resource of request, the business of this resource of indication request takies this requested resource.
Wherein, described trigger notice message comprises that also business takies the zero-time that takies of resource.
Wherein, described resource information is resource name and/or resource identification.
Preferably, in step B, receive the resource request that a business sends after, further comprise: judge whether this business institute requested resource exists, if then access the time version of this requested resource; Otherwise, create the time version of this requested resource of this requested resource and initialization, in the time of resource version, add this professional business information and holding time information, finish then.
Wherein, the time version of described resource comprises that also at least one configuration information of resource, described configuration information are the configuration status of resource and zero-time and the termination time that resource has this configuration status.
Wherein, the time version of described resource is at least one, and each time version comprises a configuration information of resource, and described configuration information is the configuration status of resource and zero-time and the termination time that resource has this configuration status.
Wherein, the described resource request of step B also comprises configuration information of resource,
In step C, if resource is not taken by other business in the holding time that described resource request is asked, then judge the identical configuration information of configuration information that in the corresponding time version of this requested resource, whether has with in the resource request, if interpolation sends the business information and the holding time information of the business of resource request in the time version that the information that is configured is judged; Otherwise system update is configured the resource allocation information in the time version that information judges, adds the business information and the holding time information of the business that sends resource request then in the time version that the information that is configured is judged.
The invention provides a kind of method that realizes network resource time management, this method is to set up the time version of the occupied information that comprises this resource for Internet resources, when resource request that the business that receives is sent, access the time version of this business institute requested resource, and the resource occupation information in the query time version, judge whether resource is taken by other business in zero-time with between the termination time, if then refuse this resource request; Otherwise, upgrade the time version information of this resource.And Internet resources are not carried out time management in the prior art, business can't be asked its resource needed in advance.
From the contrast scheme of the present invention and prior art as can be seen, method of the present invention can be set up a subscription time record for each resource, the time comprise all professional holding times of estimating that take this resource in the interocclusal record, each ask this resource business can by query time write down determine whether can be at a time between section take this resource, and can according to the time interocclusal record information in time adjust the professional enforcement time.
And, each resource is according to its configuration status difference, can have a plurality of time versions, this time version begins to show continuously the configuration status of resource on time shaft from asset creation, make the designer have understanding directly perceived and clear and definite to the differentiation situation of resource, and the person provides better reference to can be the systems organization, and the person that helps to the systems organization adds up the situation that takies of all resources on the time shaft and safeguards.
Description of drawings
Fig. 1 is the flow chart that Internet resources is carried out time planning according to of the present invention;
Fig. 2 is the schematic diagram of the some time version of a resource of the present invention;
Fig. 3 is the flow chart according to service appointment occupying system resources of the present invention.
Embodiment
In order to make the purpose, technical solutions and advantages of the present invention clearer, the present invention is further described below in conjunction with the drawings and specific embodiments.
Method of the present invention is at first to manage historical record respectively settling time for all physical resources and logical resource in the resource management system (being designated hereinafter simply as system), it is the time version, the time version comprises the state in the section between a certain resource at a time, such as the configuration status and the seizure condition of this resource, the configuration status of resource refers to the functional status of resource self; The seizure condition of resource refers to take the information such as Business Name, resource occupation time and release time of this resource.
After having set up the time version of resource, when this resource of certain service request, need to determine by the time version of inquiring about this resource whether this resource is taken by other business within the time period of this service implementation in advance, if this resource was not taken by other business in this time period, then this business can be used this resource in this time period, like this, the time management historical record of this resource will upgrade, if this resource is taken by other business in this time period, then this business can't be used this resource in this time period, need other resource of request, or postpone the enforcement time of this business.
Fig. 1 carries out the flow chart of time planning according to of the present invention to Internet resources, and as can be seen from Figure 1, this flow process comprises the steps:
Step 101: manage historical record settling time for resource in advance, promptly set up the time version of resource.
Usually, when establishing resource, set up the time version of this resource, comprise the configuration status of this resource when creating in the time version of resource, i.e. the functional status of resource self, for example, a SDH ring its speed grade when creating is STM-1, i.e. 155MB;
The seizure condition that also comprises resource in the time version of resource, promptly take this resource Business Name, take zero-time and take the termination time, under initial condition, the seizure condition of resource is idle;
The time version of resource also comprises the zero-time and the termination time of this time version, and resource is when creating, and the zero-time of its time version is the creation-time of resource, and the termination time is the infinity.
Step 102: when the designer plans this resource, import the configuration status of title, planning time and the planning of this resource.
Step 103: system accesses the time version of this resource according to the resource name of input.
Step 104: system is the newly-built time version of this resource, the zero-time of the time version that this is up-to-date is the planning time, termination time is the infinity, the termination time of the last time version of up-to-date time version changes the planning time into, and the configuration status of this up-to-date time version is the configuration status of designer's input.
For example, the creation-time of a SDH ring is 0: 0: 0 on the 1st May in 2004, its speed grade is STM-1, a time version 1 then when creating, this SDH ring is arranged, the configuration status of SDH ring is the STM-1 speed grade in this time version, zero-time is 0: 0: 0 on the 1st May in 2004, and the termination time is the infinity.
If the designer wishes 0: 0: 0 on the 1st October in 2004 speed grade that this SDH encircles to be upgraded to STM-4, be 622MB, then need a newly-built time version 2, the configuration status of SDH ring is the STM-4 speed grade in this time version 2, zero-time is 0: 0: 0 on the 1st October in 2004, and the termination time is the infinity; In addition, also the termination time in the time version 1 to be revised as 0: 0: 0 on the 1st October in 2004.
Like this, when the configuration status of resource was planned, system will be to the newly-built time version of this resource, so a resource can have a plurality of time versions, the zero-time of a certain version is exactly the concluding time of last version, and the concluding time of up-to-date version is the infinity.So the time version of resource has reflected the variation of resource configuration state, the time version of resource not only has old version and current version, also has version in the future.For example, as shown in Figure 2, SDH ring can have two old versions (June 8 was to June 9, and June 9 was to June 10), a current version (June 10) and two versions in future (June 11 to June 13, and after June 13) at a certain special time (June 10).It is noted that the zero-time of time version and termination time are the dates in Fig. 2 in order to simplify demonstration, in actual applications, the zero-time of time version and termination time can be specific to seconds.
Like this, the state of resources person that can be shown to the systems organization clearly in the system, so that the clear and definite differentiation process of the functional status of this resource of designer, so that resource is carried out flexible configuration.
When the zero-time of a time version that arrives resource, triggering this time version is the current time version, and system changes the configuration of resource according to the configuration information in the time version.And, after the time of resource, version was set up, can change the time version, promptly shift to an earlier date, delay, deletion or rollback time version, so that the resource of system is planned flexibly according to actual conditions.
Owing to can comprise the occupied information of resource in the time version of resource, thus system when carrying out plan of operation, can preengage its resource that should take, to improve the efficient of service implementation.
Fig. 3 is the flow chart according to service appointment occupying system resources of the present invention, and as can be seen from Figure 3, this flow process comprises the steps:
Step 301: professional A initiates a resource request, input institute requested resource title, professional required resource distribution, the zero-time that takies this resource and termination time.
Step 302: whether system exists this resource according to the name query of resource request input, if then forward step 303 to; Otherwise, forward step 307 to.
Step 303: the time version of this resource of system call, obtain zero-time and the corresponding time version between the termination time.
Step 304: system judges by the time version of this resource of inquiry whether this resource is taken by other business, if then forward step 309 in zero-time with between the termination time; Otherwise forward step 305 to.
Step 305: system judges whether the resource allocation information of corresponding time version satisfies the professional required resource distribution of input, if then forward step 306 to; Otherwise, forward step 308 to.
Step 306: system accepts business A to the request of this resource, and upgrades the time version of this resource, increases the seizure condition of this resource in corresponding time version, finishes then.
Step 307: the professional institute of system creation requested resource, the time version of this resource of initialization forwards step 306 then to.
Step 308: the configuration information in the corresponding time version of system update forwards step 306 then to.
Step 309: the refusal A of system business shows that to the request of this resource this resource is taken by other business, finishes then.
Like this, professional A just is stored in the time version of resource the seizure condition of resource, and when arrival took zero-time, system triggered automatically, sent information to professional A, and informing business A takies this resource, triggers professional A and takies this resource and need not manual operation.
The seizure condition of resource comprises the Business Name that takies this resource, takies zero-time and takies the termination time, it is noted that in a time version of resource, can comprise a plurality of seizure conditions.For example, the time version zero-time of SDH ring is 0: 0: 0 on the 1st January in 2002, termination time is 0: 0: 0 on the 1st January in 2003, two seizure conditions are arranged in this time version, one is professional A, taking zero-time is 0: 0: 0 on the 1st March in 2002, and taking the termination time is 0: 0: 0 on the 31st May in 2002; It two is professional B, and taking zero-time is 0: 0: 0 on the 1st October in 2002, and taking the termination time is 0: 0: 0 on the 31st November in 2002.
In concrete implementation process, can carry out suitable improvement, to adapt to the concrete needs of concrete condition to the method according to this invention.Therefore be appreciated that according to the specific embodiment of the present invention just to play an exemplary role that in order to restriction protection scope of the present invention, for example, the present invention not only is not confined to the logic entity of network system, can also be applied to the physical entity in the network system.

Claims (10)

1, a kind of method that realizes network resource time management is characterized in that, this method comprises the steps:
A, set up the time version of the occupied information that comprises this resource respectively for Internet resources, the occupied information of this resource comprises the business information and the holding time information of the business that takies this resource;
B, when receiving the resource request of the resource information that comprises business information, holding time information and institute's request resource that a business sends, access the time version of this business institute requested resource;
Occupied information in C, the query time version judges whether resource is taken by other business, if then refuse this resource request within the holding time that described resource request is asked; Otherwise interpolation sends the business information and the holding time information of the business of resource request in the time of resource version.
2, the method for network resource time management according to claim 1 is characterized in that, described business information is Business Name and/or service identification.
3, the method for network resource time management according to claim 1 is characterized in that, described holding time information comprises and takies zero-time and take the termination time.
4, the method for network resource time management according to claim 3 is characterized in that, further comprises after the step C:
When in the time version that detect to arrive resource take zero-time the time, send the trigger notice message that comprises resource name at least to the business of this resource of request, the business of this resource of indication request takies this requested resource.
5, the method for network resource time management according to claim 4 is characterized in that, described trigger notice message comprises that also business takies the zero-time that takies of resource.
6, the method for network resource time management according to claim 1 is characterized in that, described resource information is resource name and/or resource identification.
7, the method for network resource time management according to claim 1, it is characterized in that, in step B, after receiving the resource request that a business sends, further comprise: judge whether this business institute requested resource exists, if then access the time version of this requested resource; Otherwise, create the time version of this requested resource of this requested resource and initialization, in the time of resource version, add this professional business information and holding time information, finish then.
8, the method for network resource time management according to claim 1, it is characterized in that, the time version of described resource also comprises at least one configuration information of resource, and described configuration information is the configuration status of resource and zero-time and the termination time that resource has this configuration status.
9, the method for network resource time management according to claim 1, it is characterized in that, the time version of described resource is at least one, each time version comprises a configuration information of resource, and described configuration information is the configuration status of resource and zero-time and the termination time that resource has this configuration status.
10, the method for network resource time management according to claim 9 is characterized in that, the described resource request of step B also comprises configuration information of resource,
In step C, if resource is not taken by other business in the holding time that described resource request is asked, then judge the identical configuration information of configuration information that in the corresponding time version of this requested resource, whether has with in the resource request, if interpolation sends the business information and the holding time information of the business of resource request in the time version that the information that is configured is judged; Otherwise system update is configured the resource allocation information in the time version that information judges, adds the business information and the holding time information of the business that sends resource request then in the time version that the information that is configured is judged.
CNB2004100642885A 2004-08-30 2004-08-30 Method for realizing network resource time management Expired - Fee Related CN100334839C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2004100642885A CN100334839C (en) 2004-08-30 2004-08-30 Method for realizing network resource time management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2004100642885A CN100334839C (en) 2004-08-30 2004-08-30 Method for realizing network resource time management

Publications (2)

Publication Number Publication Date
CN1744513A CN1744513A (en) 2006-03-08
CN100334839C true CN100334839C (en) 2007-08-29

Family

ID=36139726

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2004100642885A Expired - Fee Related CN100334839C (en) 2004-08-30 2004-08-30 Method for realizing network resource time management

Country Status (1)

Country Link
CN (1) CN100334839C (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101504621B (en) * 2009-04-01 2011-06-29 杭州华三通信技术有限公司 Distributed system and equipment for preventing global resource out-of-order, and its application method
CN108062611B (en) * 2016-11-09 2022-11-04 百度在线网络技术(北京)有限公司 Resource management method and device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1082300A (en) * 1992-07-28 1994-02-16 西门子公司 The communication system choosing connects the distribution method with affixed switching technology resource
WO1999008462A1 (en) * 1997-08-12 1999-02-18 Siemens Aktiengesellschaft Method, mobile station and base station for packet oriented information transmission
WO2000070791A1 (en) * 1999-05-12 2000-11-23 Samsung Electronics Co., Ltd. Method of providing burst timing for high-speed data transmission in a base station transceiver system of a mobile communication system
CN1445946A (en) * 2002-03-18 2003-10-01 华为技术有限公司 Charging method based on third generation cellular mobile communication system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1082300A (en) * 1992-07-28 1994-02-16 西门子公司 The communication system choosing connects the distribution method with affixed switching technology resource
WO1999008462A1 (en) * 1997-08-12 1999-02-18 Siemens Aktiengesellschaft Method, mobile station and base station for packet oriented information transmission
WO2000070791A1 (en) * 1999-05-12 2000-11-23 Samsung Electronics Co., Ltd. Method of providing burst timing for high-speed data transmission in a base station transceiver system of a mobile communication system
CN1445946A (en) * 2002-03-18 2003-10-01 华为技术有限公司 Charging method based on third generation cellular mobile communication system

Also Published As

Publication number Publication date
CN1744513A (en) 2006-03-08

Similar Documents

Publication Publication Date Title
AU760777B2 (en) Method and apparatus for deploying service modules among service nodes distributed in an intelligent network
US5903731A (en) System and associated method for re-engineering a telecommunications network support system with object-oriented translators
US7024450B1 (en) Method and apparatus for deploying service modules among service nodes distributed in an intelligent network
US5295139A (en) Management system for partitioned multi-bandwidth communications network
KR970701465A (en) A DATA STORAGE DEVICE
JPH10124434A (en) Method for efficiently using remote communication network resource and device therefor
EP1551129B1 (en) Generic interface for subscription management
KR20000028730A (en) NPA split management in intelligent network environment
US6944657B1 (en) Automatic network synchronization of the network configuration with the management information database
EP1332580B1 (en) Method of managing network element settings
AU728049B2 (en) Monitoring of load situation in a service database system
CN100334839C (en) Method for realizing network resource time management
EP1309162B1 (en) A method for realizing service speech dynamic load in the intelligent networks and the network configured with this method
CN101552695A (en) A unified network management method and system for multi-disciplinary networks
CA2331899C (en) Method and communications system for processing state information in a management network having a number of management levels
US7212533B2 (en) Method of managing a telecommunication network and a network management unit for implementing the method
JPH11509656A (en) Computer reservation system
US7194727B2 (en) Managing composite objects in a network
KR100441892B1 (en) Apparatus and method for integrally managing subscriber for CO-LAN
US6622146B1 (en) System managing method and apparatus for decreasing a load applied to a common processing unit
AU727725B2 (en) Event recording in a service database system
JPH06124254A (en) Network management system
JP2705627B2 (en) Management information conflict control method
EP1058463A1 (en) Monitoring system for a virtual private network
EP1245130B1 (en) Connection management in atm based network and in atm network elements

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: HUAWEI DIGITAL TECHNOLOGY CO.

Free format text: FORMER OWNER: HUAWEI TECHNOLOGY CO., LTD.

Effective date: 20081010

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20081010

Address after: No. 3, information road, Haidian District, Beijing

Patentee after: Huawei Digit Technology Co., Ltd.

Address before: Bantian HUAWEI headquarters office building, Longgang District, Shenzhen, Guangdong

Patentee before: Huawei Technologies Co., Ltd.

CP01 Change in the name or title of a patent holder

Address after: 100085 Beijing, Haidian District on the road, No. 3

Patentee after: Beijing Huawei Digital Technology Co.,Ltd.

Address before: 100085 Beijing, Haidian District on the road, No. 3

Patentee before: Huawei Digit Technology Co., Ltd.

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20070829

Termination date: 20180830

CF01 Termination of patent right due to non-payment of annual fee