CH323706A - Hydraulic turbine installation - Google Patents

Hydraulic turbine installation

Info

Publication number
CH323706A
CH323706A CH323706DA CH323706A CH 323706 A CH323706 A CH 323706A CH 323706D A CH323706D A CH 323706DA CH 323706 A CH323706 A CH 323706A
Authority
CH
Switzerland
Prior art keywords
turbine
beams
installation according
flange
installation
Prior art date
Application number
Other languages
French (fr)
Inventor
Raeber Victor
Original Assignee
Vevey Atel Const Mec
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Vevey Atel Const Mec filed Critical Vevey Atel Const Mec
Publication of CH323706A publication Critical patent/CH323706A/en

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03BMACHINES OR ENGINES FOR LIQUIDS
    • F03B11/00Parts or details not provided for in, or of interest apart from, the preceding groups, e.g. wear-protection couplings, between turbine and generator
    • F03B11/06Bearing arrangements
    • F03B11/063Arrangements for balancing axial thrust
    • F03B11/066Arrangements for balancing axial thrust in vertical axis machines
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Hydraulic Turbines (AREA)

Description

  

  Installation de     turbine    hydraulique    L'évolution actuelle de la construction des  turbines hydrauliques montre que l'on cher  che à construire des machines robustes pré  sentant les meilleures qualités de fonctionne  ment et de sécurité, ayant un rendement éner  gétique excellent et permettant une réalisation  de l'ensemble de l'installation la plus écono  mique possible.  



  Ce dernier point joue aujourd'hui un rôle  de plus en plus important, car le point de vue  choisi est celui conduisant à la meilleure ren  tabilité d'une installation complète, même si  le rendement mécanique du groupe se trouve  légèrement réduit. La considération des éco  nomies réalisables sur les ouvrages du génie  civil a influencé fortement la construction des  groupes électrogènes dont le coût sera égale  ment réduit.  



  Les constructeurs ont donc cherché ces  dernières années à réaliser des groupes le plus  court possible, et dans le cas des turbines Ka  plan, hélice et Francis, par exemple, à axe  vertical, au lieu de poser le pivot par l'inter  médiaire d'un croisillon, sur le stator de l'al  ternateur, ils l'ont mis sur le fond supérieur de  la turbine.  



  Ce déplacement permet de réduire en hau  teur le groupe, donc de réaliser des écono  mies sur les ouvrages de génie civil et sur le  groupe lui-même.    Le montage du pivot sur le fond supérieur  de la turbine va nécessairement modifier la  construction de     ce    dernier élément qui doit,  sans tensions et     déformations    exagérées, trans  mettre le poids des masses tournantes du  groupe et la résultante des poussées hydrauli  ques à     l'anneau    des entretoises qui, en général,  est scellé     dans    la     maçonnerie.     



  Tous les constructeurs de turbines hydrau  liques ont étudié et réalisé des fonds supérieurs  de turbines suffisamment robustes pour assu  rer une bonne transmission des charges pro  venant de la     pivoterie.     



  Les différentes solutions retenues consis  tent à relier l'anneau central disposé au droit  des patins du pivot et recevant la charge, à  l'anneau des entretoises par des nervures ver  ticales et radiales et des éléments de surfaces  judicieusement disposés conférant au tout une  solidité     suffisante.     



  Ces solutions sont lourdes, elles présentent  l'inconvénient de transmettre les charges par  des poutres discontinues.  



  L'installation de turbine hydraulique selon  l'invention est aussi du type indiqué ci-dessus,  c'est-à-dire une     installation    dans laquelle les  charges     axiales    du pivot sont     transmises    à une  bride, scellée au moins en partie dans la ma  çonnerie,     par    un fond de la     turbine.     



  Cette     installation    est caractérisée par le  fait que le fond de la turbine comprend des      poutres continues réparties autour de l'arbre  de la turbine et s'étendant d'un bord à l'autre  du fond.  



  Le dessin annexé représente, schématique  ment et à titre d'exemple, plusieurs formes  d'exécution de l'installation selon l'invention.  



  La     fig.    1 est une vue en coupe axiale d'une  turbine Kaplan à arbre vertical.  



  Les     fig.    2 à 5 sont des vues en plan de  diverses dispositions possibles des     poutres    con  tinues dans l'installation selon la     fig.    1.  



  La     fig.    6 est une vue en coupe d'une autre  forme d'exécution de l'installation.  



  En référence à la     fig.    1, cette installation  de turbine hydraulique comprend une roue de  turbine Kaplan 1 fixée à l'extrémité inférieure  d'un arbre vertical 2 transmettant la puissance  de la turbine à une génératrice non représentée.  Le poids des masses     tournantes    de cette ins  tallation et la résultante des poussées hydrau  liques sont supportés par un pivot 3 dont la  couronne de patins 11 repose sur le fond su  périeur 4 de la turbine.  



  Dans cette forme d'exécution, le fond su  périeur 4 de la turbine est en une pièce avec  le fond supérieur du distributeur 5 dont les  aubes 6 sont     solidaires    d'arbres de commande  7 faisant saillie au-dessus du fond 4.  



  Le fond 4 prend appui sur une bride 8  scellée dans la maçonnerie constituant le puits  9 dans lequel est placée la turbine. Cette bride  8 fait partie de l'anneau des entretoises 10.  



  Ce fond 4, qui doit supporter la forte  charge du pivot 3, comprend, contre sa face  inférieure, des poutres continues 12 réparties  autour de l'arbre de la turbine et s'étendant  d'un bord à l'autre du fond 4.  



  Le nombre de ces poutres continues 12  varie selon les dimensions de la turbine et la  charge du pivot 3.  



  Les     fig.    2 à 5 montrent diverses disposi  tions possibles des poutres 12.  



  A la     fig.    2, seulement deux poutres 12 sont  prévues de part et d'autre de l'arbre 2 et s'éten  dent jusqu'au bord du fond 4.    La     fig.    3 montre une construction à l'aide  de trois poutres 12.  



  La     fig.    4 montre quatre poutres 12 répar  ties autour de l'arbre 2. Quant à la     fig.    5, elle  montre une disposition utilisant six poutres 12  entrecroisées. On pourrait, bien entendu, pré  voir encore un plus grand nombre de poutres  12 sous le fond 4.  



  Comme on le remarque sur les     fig.    1 à 5, la  partie médiane 15 des poutres 12 est, dans  tous les cas représentés, disposée sous la cou  ronne de patins 11 du pivot 3. On peut dire,  en outre, que ces poutres 12 sont disposées  dans des plans parallèles à l'axe de rotation  de la turbine et même qu'elles sont tangentes  à un cylindre virtuel d'axe confondu avec l'axe  de rotation de la turbine et dont la génératrice  passe par la partie centrale de chaque patin 11.  



  Ces poutres 12 peuvent soit reposer libre  ment par leurs extrémités sur la bride 8, soit  être encastrées partiellement ou totalement à  leurs extrémités dans le fond 4 qui, lui, repose  sur la bride 8.  



  En variante, ces poutres 12, au lieu d'être  disposées sous le fond 4, pourraient être pla  cées au-dessus du fond de la turbine.  



  Dans tous les cas envisagés, ces poutres  12, qui constituent en quelque sorte des ner  vures du fond 4, peuvent être formées par des  éléments laminés et soudés entre eux, par une  exécution de fonderie ou encore par une com  binaison de tôles laminées avec des éléments  venus de fonderie (acier coulé).  



  La forme d'exécution représentée à la     fig.     6 se distingue de celle représentée à la     fig.    1  uniquement par le fait que le fond supérieur 4  de la     turbine    ne s'étend pas jusqu'à la bride 8,  mais repose sur une pièce intermédiaire, en  l'occurrence le fond supérieur du distributeur  13 qui, lui, repose sur la bride 8 faisant partie  de l'anneau des entretoises 10. En outre, un  anneau 14 a été     _prévu    sous la couronne de  patins 11.  



  En variante encore, toutes ces poutres 12,  au     lieu    d'être disposées dans des plans paral  lèles à l'axe de rotation de la turbine, pour-      raient être disposées dans des plans faisant un  certain angle avec cet axe.  



  Il est bien entendu, en outre, que les pou  tres 12 doivent être considérées comme pou  tres continues, même si du fait de leur     entre-          croisure    elles doivent être fabriquées en plu  sieurs éléments soudés ou rivés ensemble lors  du montage complet du fond 4.  



  Toutes les installations de     turbines    hydrau  liques décrites ci-dessus se rapportaient à des  turbines à arbre vertical. Toutefois, il va de  soi qu'une construction semblable à celle des  turbines indiquées ci-dessus pourrait être ap  pliquée à des turbines à arbre     horizontal    dans  lesquelles le pivot est soumis néanmoins à des  poussées hydrauliques élevées. Dans une telle  installation de turbine à arbre horizontal, la  bride 8 ne serait que partiellement scellée dans  la maçonnerie ne constituant plus un puits.



  Installation of hydraulic turbines The current development in the construction of hydraulic turbines shows that it is sought to build robust machines with the best operating and safety qualities, having excellent energy efficiency and allowing performance to be achieved. whole installation as economical as possible.



  This last point plays an increasingly important role today, because the point of view chosen is that leading to the best profitability of a complete installation, even if the mechanical efficiency of the group is slightly reduced. Consideration of the savings achievable on civil engineering works strongly influenced the construction of generator sets, the cost of which will also be reduced.



  Manufacturers have therefore sought in recent years to achieve the shortest possible groups, and in the case of Ka plan, propeller and Francis turbines, for example, with a vertical axis, instead of installing the pivot through the intermediary of a spider, on the stator of the alternator, they put it on the upper base of the turbine.



  This displacement makes it possible to reduce the height of the group, and therefore to save on civil engineering works and on the group itself. The mounting of the pivot on the upper base of the turbine will necessarily modify the construction of this last element which must, without exaggerated tensions and deformations, transfer the weight of the rotating masses of the group and the resultant of the hydraulic thrusts to the ring of spacers which, in general, is sealed into the masonry.



  All the manufacturers of hydraulic turbines have studied and produced upper ends of turbines sufficiently robust to ensure good transmission of the loads coming from the pivot.



  The various solutions adopted consist in connecting the central ring arranged in line with the pads of the pivot and receiving the load, to the ring of the spacers by vertical and radial ribs and judiciously placed surface elements giving the whole sufficient strength. .



  These solutions are cumbersome, they have the drawback of transmitting the loads by discontinuous beams.



  The hydraulic turbine installation according to the invention is also of the type indicated above, that is to say an installation in which the axial loads of the pivot are transmitted to a flange, sealed at least in part in the masonry. , by a bottom of the turbine.



  This installation is characterized by the fact that the bottom of the turbine comprises continuous beams distributed around the shaft of the turbine and extending from one edge to the other of the bottom.



  The appended drawing represents, schematically and by way of example, several embodiments of the installation according to the invention.



  Fig. 1 is an axial sectional view of a Kaplan turbine with a vertical shaft.



  Figs. 2 to 5 are plan views of various possible arrangements of the continuous beams in the installation according to FIG. 1.



  Fig. 6 is a sectional view of another embodiment of the installation.



  With reference to FIG. 1, this hydraulic turbine installation comprises a Kaplan turbine wheel 1 fixed to the lower end of a vertical shaft 2 transmitting the power of the turbine to a generator, not shown. The weight of the rotating masses of this installation and the resultant of the hydraulic thrusts are supported by a pivot 3, the ring of shoes 11 of which rests on the upper base 4 of the turbine.



  In this embodiment, the upper base 4 of the turbine is in one piece with the upper base of the distributor 5, the blades 6 of which are integral with control shafts 7 projecting above the base 4.



  The bottom 4 rests on a flange 8 sealed in the masonry constituting the well 9 in which the turbine is placed. This flange 8 is part of the ring of spacers 10.



  This base 4, which must withstand the heavy load of the pivot 3, comprises, against its lower face, continuous beams 12 distributed around the shaft of the turbine and extending from one edge to the other of the base 4.



  The number of these continuous beams 12 varies according to the dimensions of the turbine and the load of the pivot 3.



  Figs. 2 to 5 show various possible arrangements of the beams 12.



  In fig. 2, only two beams 12 are provided on either side of the shaft 2 and extend to the edge of the bottom 4. FIG. 3 shows a construction using three beams 12.



  Fig. 4 shows four beams 12 distributed around the shaft 2. As to FIG. 5, it shows an arrangement using six intersecting beams 12. We could, of course, even see a larger number of beams 12 under the bottom 4.



  As can be seen in Figs. 1 to 5, the middle part 15 of the beams 12 is, in all the cases shown, disposed under the crown of runners 11 of the pivot 3. It can be said, in addition, that these beams 12 are arranged in planes parallel to the axis of rotation of the turbine and even that they are tangent to a virtual cylinder of axis coincident with the axis of rotation of the turbine and whose generator passes through the central part of each pad 11.



  These beams 12 can either rest freely by their ends on the flange 8, or be embedded partially or totally at their ends in the base 4 which itself rests on the flange 8.



  As a variant, these beams 12, instead of being placed under the bottom 4, could be placed above the bottom of the turbine.



  In all the cases considered, these beams 12, which in a way constitute the ribs of the bottom 4, can be formed by rolled elements and welded together, by a foundry execution or by a combination of rolled sheets with elements from foundry (cast steel).



  The embodiment shown in FIG. 6 differs from that shown in FIG. 1 only by the fact that the upper base 4 of the turbine does not extend to the flange 8, but rests on an intermediate piece, in this case the upper base of the distributor 13 which itself rests on the flange 8 forming part of the ring of the spacers 10. In addition, a ring 14 has been provided under the ring of runners 11.



  As a further variant, all these beams 12, instead of being arranged in planes parallel to the axis of rotation of the turbine, could be arranged in planes forming a certain angle with this axis.



  It is of course understood, moreover, that the beams 12 must be considered as continuous beams, even if, because of their intersection, they must be manufactured in several elements welded or riveted together during the complete assembly of the bottom 4.



  All of the hydraulic turbine installations described above were for vertical shaft turbines. However, it goes without saying that a construction similar to that of the turbines indicated above could be applied to turbines with a horizontal shaft in which the pivot is nevertheless subjected to high hydraulic thrusts. In such a horizontal shaft turbine installation, the flange 8 would only be partially sealed in the masonry no longer constituting a well.

 

Claims (1)

REVENDICATION Installation de turbine hydraulique dans laquelle les charges axiales du pivot sont trans mises à une bride, scellée au moins en partie dans la maçonnerie, par un fond de la tur bine, caractérisée en ce que celui-ci comprend des poutres continues réparties autour de l'ar bre de la turbine et s'étendant d'un bord à l'autre du fond. SOUS-REVENDICATIONS 1. Installation selon la revendication, ca ractérisée en ce que ces poutres sont disposées dans des plans sensiblement parallèles à l'axe de rotation de la turbine. 2. Installation selon la revendication, ca ractérisée en ce que les extrémités des poutres reposent sur la bride. CLAIM Hydraulic turbine installation in which the axial loads of the pivot are transferred to a flange, sealed at least in part in the masonry, by a bottom of the turbine, characterized in that the latter comprises continuous beams distributed around the shaft of the turbine and extending from one side of the bottom to the other. SUB-CLAIMS 1. Installation according to claim, characterized in that these beams are arranged in planes substantially parallel to the axis of rotation of the turbine. 2. Installation according to claim, characterized in that the ends of the beams rest on the flange. 3. Installation selon la revendication, ca ractérisée en ce que les extrémités des poutres reposent sur un fond de distributeur prenant appui lui-même sur la bride. 4. Installation selon la revendication, ca ractérisée en ce que la partie médiane de cha que poutre est située au droit de la couronne de patins du pivot. 5. Installation selon la revendication, ca ractérisée en ce que les poutres sont tangentes à un cylindre virtuel d'axe confondu avec l'axe de rotation de la turbine et dont la génératrice passe par la partie centrale de chaque patin. 6. 3. Installation according to claim, characterized in that the ends of the beams rest on a distributor base bearing itself on the flange. 4. Installation according to claim, characterized in that the middle part of each beam is located in line with the ring of the pivot pads. 5. Installation according to claim, ca ractérisée in that the beams are tangent to a virtual cylinder of axis coincident with the axis of rotation of the turbine and whose generator passes through the central part of each pad. 6. Installation selon la revendication et les sous-revendications 2, 4 et 5, caractérisée en ce que le fond du distributeur et le fond de la turbine constituent une seule pièce, les poutres étant disposées sous ce fond commun. Installation according to claim and sub-claims 2, 4 and 5, characterized in that the bottom of the distributor and the bottom of the turbine constitute a single piece, the beams being arranged under this common bottom.
CH323706D 1955-08-02 1955-08-02 Hydraulic turbine installation CH323706A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH323706T 1955-08-02

Publications (1)

Publication Number Publication Date
CH323706A true CH323706A (en) 1957-08-15

Family

ID=4499270

Family Applications (1)

Application Number Title Priority Date Filing Date
CH323706D CH323706A (en) 1955-08-02 1955-08-02 Hydraulic turbine installation

Country Status (1)

Country Link
CH (1) CH323706A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3545879A (en) * 1968-02-22 1970-12-08 Charmilles Sa Ateliers Hydraulic machine

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3545879A (en) * 1968-02-22 1970-12-08 Charmilles Sa Ateliers Hydraulic machine

Similar Documents

Publication Publication Date Title
JP5314708B2 (en) Wind turbine generator and tower construction method for wind turbine
WO2014002297A1 (en) Method for assembling shafting of regenerated energy power generation device, and tool for assembling shafting
JP3583362B2 (en) Wind generator
EP3277952B1 (en) Section of wind turbine tower, wind turbine tower and method of assembly
JP5010734B2 (en) Wind power generator and assembly method thereof
CH260699A (en) Umbrella type vertical axis hydraulic generator.
US8536728B2 (en) Machine support for receiving a rotor/generator assembly of a gearless wind energy plant
CH323706A (en) Hydraulic turbine installation
WO2015110749A1 (en) Turbomachine casing comprising a cavity-free shroud and yokes reinforced by stiffeners
AU2013211248B2 (en) Rotor blade for a turbine
FR2872843A1 (en) Longitudinal mast for wind turbine in marine site, involves decomposing mast into lower and upper sections, and assembling sections between them, and with base and nacelle of wind turbine in rigid manner
US4380401A (en) Bearing support
EP2678555A1 (en) Wind turbine with two rotors
KR20160095918A (en) Yaw system for wind turbine tower
CN104333180A (en) Method for mounting heavy-duty overall transport generator in power plant
FR2648638A1 (en) IMPROVEMENTS IN TRANSMISSIONS OF VEHICLES EQUIPPED WITH ELECTRIC RETARDERS
CN111502908B (en) Hub for a wind turbine, wind turbine and method for upgrading a hub of a wind turbine
EP0061399B1 (en) Chimney stack, in particular an atmospherical cooling tower
CN111502933A (en) Bearing arrangement for a wind turbine and wind turbine
CH326299A (en) Installation comprising a hydraulic machine
CH337160A (en) Hydraulic machine wheel
EP1936039A1 (en) Method of strengthening foundations comprising a slab buried in the ground, in particular foundations for pylons, and structure obtained
WO2020089674A1 (en) Wind turbine mast section, wind turbine mast and assembly method
BE1031007B1 (en) Electricity generator assembly
CH322758A (en) Hydraulic machine spiral tarpaulin