CH231333A - Method for operating an energy transmission system with high-voltage direct current in the transmission line. - Google Patents

Method for operating an energy transmission system with high-voltage direct current in the transmission line.

Info

Publication number
CH231333A
CH231333A CH231333DA CH231333A CH 231333 A CH231333 A CH 231333A CH 231333D A CH231333D A CH 231333DA CH 231333 A CH231333 A CH 231333A
Authority
CH
Switzerland
Prior art keywords
operating
direct current
long
disturbed
voltage direct
Prior art date
Application number
Other languages
German (de)
Inventor
Haftung Licentia Beschraenkter
Original Assignee
Licentia Gmbh
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Licentia Gmbh filed Critical Licentia Gmbh
Publication of CH231333A publication Critical patent/CH231333A/en

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/36Arrangements for transfer of electric power between ac networks via a high-tension dc link
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H7/00Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions
    • H02H7/26Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured
    • H02H7/266Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured involving switching on a spare supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/60Arrangements for transfer of electric power between AC networks or generators via a high voltage DC link [HVCD]

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Stand-By Power Supply Arrangements (AREA)
  • Direct Current Feeding And Distribution (AREA)

Description

  

  Verfahren zum     Betrieb    einer     Energieübertragnngsanlage        mit    hochgespanntem  Gleichstrom in der     Fernleitung.       Bei der Energieübertragung mit hochge  spanntem Gleichstrom hat sich die folgende  Anordnung als vorteilhaft herausgestellt: Man  benutzt für die Fernleitung zwei Aussenleiter  entgegengesetzter Polarität und erdet die  elektrischen Mitten der     Umformerstationen.     In diesem Falle ergeben sich besonders gün  stige Isolationsverhältnisse der gesamten Über  tragungsanlage. Die Aussenleiter können dabei  j e nach den     vorliegenden    Verhältnissen als Frei  leitungen oder als Kabel ausgeführt werden.  



  Normalerweise führen bei dieser Anord  nung nur die beiden Aussenleiter Gleichstrom.  Bei einer     Betriebsstörung,    die den Ausfall  einer Hälfte der Anlage     zur    Folge hat, kann  die andere Hälfte im Betrieb bleiben; der  Strom fliesst dann über den Aussenleiter der  gesunden Anlagehälfte und zurück über die  Erde. Auf diese Weise wird allein durch die  Unterteilung der gesamten Anlage in zwei    Hälften     eine    50     o/oige    Reserve erzielt. Dieser  Betrieb unter Ausnutzung der Erde als Rück  leiter bei Ausfall einer Anlagehälfte ist unter  Umständen für andere     Einrichtungen,    wie  z.

   B. benachbarte Postleitungen, magnetische       Institute    oder dergleichen     nachteilig    und gibt zu       Störungen    dieser Einrichtungen Anlass. Ausser  dem bereitet die Aufrechterhaltung einer guten       Erdverbindung    bei länger     dauerndem    Strom  fluss über die     Erdungsstelle    vielfach Schwierig  keiten.

   '  Die Erfindung beseitigt diese Nachteile  und gestattet bei Ausfall einer Stationshälfte  die Energieübertragung mit der andern Hälfte       aufrechtzuerhalten.    Sie     betrifft    ein Verfahren  zum Betrieb     einer        Energieübertragungsanlage     mit hochgespanntem Gleichstrom in der Fern  leitung, bei der zwei Aussenleiter entgegen  gesetzter     Polarität    verwendet werden und  die elektrischen Mitten der Stationen betriebs-      mässig geerdet sind.

   Nach der     Erfindung    wird  bei Ausfall einer Anlagehälfte     dureh    eine  nicht auf der Fernleitung liegende Störung  die nicht gestörte Anlagehälfte weiter be  trieben unter Verwendung der Fernleitung  der gestörten Anlagehälfte als Rückleitung.  



  Die Figur zeigt beispielsweise eine An  lage zur Ausführung des Verfahrens nach  der Erfindung. Die Drehstromnetze 1 und l'  sind über die     Stromrichterstationen        '2    und ?'  sowie über die     Gleichstromhochspannungs-          kabel    3 und 4 miteinander verbunden. Die  elektrischen Mitten der     Stromrichterstationen     sind     über    die Schalter 5     (bezw.    5') geerdet.

    Ausserdem sind in jeder Station zwei     Erdungs-          schalter    6     vorgesehen,    um die Kabel span  nungslos machen zu können.     ',Hit    7 sind     ferner     in jeder Station Umschalter zum Wechseln  der Energierichtung bezeichnet. Normaler  weise sind die Schalter- 5 in beiden Stationen  geschlossen; die     Schalter    6 sind dagegen  geöffnet. Von den Schaltern 7 sind die zur  jeweiligen Energierichtung gehörenden Schal  ter geschlossen.  



  Bei Ausfall einer     Statlonsh.2i.lfte    kann die  andere     llä.lfte    über die Erde als     Rückleitung     weiterarbeiten.     LTm    die damit     zusammenliäir-          genden    Störungsmöglichkeiten zu beseitigen,  wird nun gemäss der Erfindung das Kabel  der ausgefallenen Anlagehälfte an beiden  Seiten durch     SChllessen    der entsprechenden  Schalter 6 an die elektrischen Mitten der  Stationen gelegt. Gleichzeitig     wird    mindestens  in einer Station der     Erdungsschalter    5 ge  öffnet, so dass jetzt der ganze Rückstrom  über das umgeschaltete Kabel fliessen muss.  



  Die Wiederinbetriebnahme der gestörten  Stationshälfte erfolgt ebenfalls in sehr ein  facher Weise. Zu diesem Zweck wird zu  nächst der Schalter 5 in beiden Stationen  geschlossen und das bisher geerdete Kabel  durch     Öffnen    der betreffenden Schalter 6 von  der Erde abgeschaltet. Die     entsprechenden     Schalter 7 werden eingelegt und das Kabel  von neuem hochgefahren.  



  Das     Wiederhochfahren    des Kabels kann  in verschiedener Weise erfolgen. Entweder    geschieht es bei Laststrom Null; darin     führt    bis  zur Inbetriebnahme des bisher     geerdetem        l#aliel-          stranges    die Erde den gesamten Rückstrom.  Soll auch dies     vermieden    werden, so wird       inan        zweckmässig    durch das bisher geerdete  Kabel vom Moment seiner Wiedereinschal  tung an denselben Strom schicken, wie durch  das andere, damit die     Erdrückleitung    sofort  wieder entlastet wird.

   Dieser Betriebszustand       1ä        sst    sich mit Hilfe der Gittersteuerung     der     betreffenden     Anlagehälfte    ohne weiteres her  stellen. Das Kabel führt dann bereits bei  Spannung Null gegen Erde denselben Strom  wie das andere Kabel und die Spannung des  bisher geerdeten     Kabels    wird bei gleich  bleibendem Strom mehr und mehr erhöht.  Zu diesem Zweck     müssen    die     Grittersteue-          rungen    der bisher     gest;irten        Anlagehälfte    in  beiden     Stationen        eritsprecliend    verändert wer  den.

   Bei der     Spaiinuiig    Null sind     zirnäclrst     sowohl die     Gleichrichter    als auch die Wechsel  richter auf     angenä.heit    90<B>'</B> ausgesteuert. Zur  Erhöhung der     (z'leiclipannurig    werden beide  Drehregler mehr und mehr gegen ihre     End-          stellung        gebnicht,        wobei    die relative     Ver-          schiebung    der     beiden    Drehregler     immer    so       gehalten    wird,

   dass der     gewünschte    Strom irr  dem     Kabel    erhalten bleibt. Das gleiche Ver  fahren kann auch zum     Hochfahren    der ge  samtem Anlage     verwendet     -erden.  



  Es ist nicht notwendig, dass beim Hoch  fahren des bisher geerdeten Kabels der Strom       von    Anfang an genau den gleichen     _\j'ert    hat  wie im andern Kabel. Die Erde wird in vielen  Fällen auch schon dann     geriiigend    entlastet,       wenn    die     StrUnle    in beiden Kabeln eine be  stimmte zulässige Verschiedenheit aufweisen.  Dies hat vor allem bei niedrigen Werten der       (Tleichspannung    des bisher gestörten Kabels  den     Vorteil.    dass die Drehstromnetze nicht  unnötig stark     indul@tiv    belastet werden.  



  Wo es     zulässig    ist, dass die Erde für  kurze Zeit den vollen Betriebsstrom führt,  kann man das bisher geerdete Kabel von  der     Gleichrichterstation    aus allmählich unter  Spannung setzen und es erst nach Erreichen  des     gewünschten        Spannungs-Sollwertes    den       Betriebsstrom        übernehmen    lassen.



  Method for operating a power transmission system with high-voltage direct current in the long-distance line. In the case of energy transmission with high-tension direct current, the following arrangement has proven to be advantageous: Two outer conductors of opposite polarity are used for the long-distance line and the electrical centers of the converter stations are grounded. In this case, there are particularly favorable insulation conditions of the entire transmission system. The outer conductors can be designed as overhead lines or cables, depending on the circumstances.



  Normally only the two outer conductors carry direct current in this arrangement. In the event of a malfunction that results in the failure of one half of the system, the other half can remain in operation; the current then flows over the outer conductor of the healthy half of the system and back over the earth. In this way, a 50% reserve is achieved simply by dividing the entire system into two halves. This operation using the earth as a return line in the event of failure of one half of the system is under certain circumstances for other facilities, such.

   B. neighboring postal lines, magnetic institutes or the like disadvantageous and gives rise to disturbances in these facilities. In addition, maintaining a good earth connection in the event of a long-term current flow through the earthing point often creates difficulties.

   The invention eliminates these disadvantages and allows energy transmission to be maintained with the other half if one half of the station fails. It relates to a method for operating a power transmission system with high-voltage direct current in the long-distance line, in which two outer conductors of opposite polarity are used and the electrical centers of the stations are operationally earthed.

   According to the invention, in the event of failure of one half of the system, a fault not lying on the long-distance line will continue to operate the non-disturbed half of the system using the long-distance line of the disturbed half of the system as a return line.



  The figure shows, for example, a system for performing the method according to the invention. The three-phase networks 1 and 1 'are via the converter stations' 2 and?' and connected to one another via the DC high-voltage cables 3 and 4. The electrical centers of the converter stations are grounded via switches 5 (or 5 ').

    In addition, two earthing switches 6 are provided in each station in order to be able to de-energize the cables. ', Hit 7, changeover switches for changing the energy direction are also designated in each station. Normally the counters 5 are closed in both stations; the switches 6, however, are open. Of the switches 7 belonging to the respective energy direction scarf ter are closed.



  In the event of failure of one of the 2nd statons, the other 11th can continue to work as a return line via earth. In order to eliminate the possible interferences associated therewith, according to the invention, the cable of the failed system half is now connected to the electrical centers of the stations on both sides by closing the corresponding switches 6. At the same time, the earthing switch 5 is opened in at least one station, so that now the entire reverse current must flow through the switched cable.



  The restart of the disturbed half of the station is also done in a very simple manner. For this purpose, the switch 5 is closed to the next in both stations and the previously grounded cable is disconnected from the ground by opening the relevant switch 6. The corresponding switches 7 are inserted and the cable is started up again.



  There are various ways to restart the cable. Either it happens at zero load current; in it, the earth carries the entire reverse current until the previously earthed l # alielstrong is put into operation. If this is also to be avoided, inan expediently send the same current through the previously earthed cable from the moment it is switched on again as through the other, so that the earth return line is immediately relieved.

   This operating state 1ä can be easily established with the help of the grid control of the relevant plant half. The cable then already carries the same current as the other cable at zero voltage to earth and the voltage of the previously earthed cable is increased more and more with the current remaining the same. For this purpose, the grid controls of the previously controlled half of the system in both stations must be changed in accordance with the requirements.

   With the Spaiinuiig Zero, both the rectifiers and the inverters are controlled to approx. 90 <B> '</B>. To increase the (z'leiclipannurig, both rotary controls are turned more and more towards their end position, whereby the relative shift of the two rotary controls is always held so that

   that the desired current is maintained in the cable. The same process can also be used to start up the entire system.



  It is not necessary that when the previously grounded cable is started up, the current has exactly the same value from the start as in the other cable. In many cases, the earth is already relieved to a considerable extent if the strings in both cables show a certain permissible difference. This has the advantage, especially at low values of the (DC voltage of the previously disturbed cable, that the three-phase networks are not subjected to an unnecessarily strong inductive load.



  Where it is permissible for the earth to carry the full operating current for a short time, the previously earthed cable can be gradually energized from the rectifier station and only let it take over the operating current after the desired voltage setpoint has been reached.

 

Claims (1)

PATENTANSPRUCH: Verfahren zum Betrieb einer Energieüber- tragungsanlage mit hochgespanntem Gleich strom in der Fernleitung, bei der zwei Aussen leiter entgegengesetzter Polarität verwendet werden und die elektrischen Mitten der Sta tionen betriebsmässig geerdet sind, dadurch gekennzeichnet, dass bei Ausfall einer An lagehälfte durch eine nicht auf der Fern leitung liegende Störung die nicht gestörte Anlagehälfte Weiterbetrieben wird unter Ver wendung der Fernleitung der gestörten An lagehälfte als Rückleitung. UNTERANSPRüCHE 1. PATENT CLAIM: A method for operating a power transmission system with high-voltage direct current in the long-distance line, in which two external conductors of opposite polarity are used and the electrical centers of the stations are operationally grounded, characterized in that if one half of the system fails, one does not The disturbed half of the plant continues to operate using the long-distance line of the disturbed half of the plant as a return line. SUBCLAIMS 1. Verfahren nach Patentanspruch, da durch gekennzeichnet, dass die bei einer Stö rung als Rückleitung dienende Fernleitung einseitig geerdet wird. 2. Verfahren nach Patentanspruch, da durch gekennzeichnet, dass zur Wiederinbe triebnahme der gestörten Anlagehälfte zu nächst in der bisher abgeschalteten Anlage hälfte bei der Gleichspannung Null annähernd derBetriebsstromeingestellt wird, und dass dann eine allmähliche Spannungserhöhung in der in Betrieb zu nehmenden Anlagehälfte erfolgt. Method according to claim, characterized in that the long-distance line serving as a return line in the event of a fault is earthed on one side. 2. The method according to claim, characterized in that, in order to restart the disturbed half of the system, the operating current is set to approximately zero in the previously disconnected half of the system, and that then a gradual increase in voltage occurs in the half of the system to be put into operation.
CH231333D 1942-02-02 1943-01-14 Method for operating an energy transmission system with high-voltage direct current in the transmission line. CH231333A (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
DE231333X 1942-02-02
DE890318X 1942-02-02
DEA7176D DE934781C (en) 1942-02-02 1942-02-03 Arrangement for energy transmission with high-voltage direct current

Publications (1)

Publication Number Publication Date
CH231333A true CH231333A (en) 1944-03-15

Family

ID=61898967

Family Applications (1)

Application Number Title Priority Date Filing Date
CH231333D CH231333A (en) 1942-02-02 1943-01-14 Method for operating an energy transmission system with high-voltage direct current in the transmission line.

Country Status (3)

Country Link
CH (1) CH231333A (en)
DE (1) DE934781C (en)
FR (1) FR890318A (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1033770C2 (en) * 1956-07-19 1958-12-18 Siemens Ag Circuit arrangement to prevent unintentional switching on of a tube-regulated DC voltage supply that is in a highly regulated setting
DE1265791B (en) * 1962-03-30 1968-04-11 Siemens Ag DC remote supply for intermediate amplifier
DE1262425B (en) * 1965-01-06 1968-03-07 Licentia Gmbh Arrangement for stress relief of cables in high-voltage direct current transmission lines
SE380687B (en) * 1974-03-15 1975-11-10 Asea Ab PROCEDURE IN THE OPERATION OF A TWO-POLE DIRECTION TRANSMISSION JEMTE DIRECTION TRANSFER INTENDED TO BE OPERATED ACCORDING TO THE PROCEDURE.

Also Published As

Publication number Publication date
DE934781C (en) 1955-11-03
FR890318A (en) 1944-02-04

Similar Documents

Publication Publication Date Title
DE3106895A1 (en) FAULT CURRENT DETECTION, INSULATION AND REMOVAL ARRANGEMENT
DE112019003016T5 (en) Remote differential protection device
DE2509045B2 (en) Procedure for operating a two-pole direct current transmission system with a grounded center point
DE102012206864A1 (en) Electric rail vehicle and procedure for its operation
DE102011013330B3 (en) Single-phase feeding arrangement and method for supplying a supply line of an alternating current track with single-phase alternating current
DE2205076C3 (en) Multi-phase high voltage line
CH231333A (en) Method for operating an energy transmission system with high-voltage direct current in the transmission line.
DE2712232C2 (en) Procedure for decommissioning a pole of an HVDC station
EP2660964A1 (en) Electricity supply assembly with a first and a second power supply device, where the second power supply device is connected to the first power supply device
DE2026685A1 (en) Method and device for switching off direct current power transmission networks
DE2742775A1 (en) Earthing switches in series with underground cables - operate with remote control of switches and associated vacuum interrupters incorporated in run of cable
DE1538782A1 (en) DC power plant
DE2538511C2 (en) Multipoint high voltage direct current transmission system
DE920557C (en) Power transmission system working with high voltage direct current
DE19808018C1 (en) Controlling Rectifier system connected to mains across circuit breaker and transformer and each rectifier has controllable semiconductor switches in bridge circuit
DE3924909A1 (en) METHOD FOR OPERATING AN ELECTRICAL CIRCUIT BREAKER
DE623907C (en) Device for automatic switching on and off of feeder line switches in meshed distribution networks
DE1813853C3 (en) Arrangement for tapping the connection line of a high-voltage direct current transmission (HVDC) in series connection
DE680823C (en) Arrangement for coupling DC and AC networks via two groups of controlled discharge paths
DE166224C (en)
DE765920C (en) Extra high voltage switchgear
DE694441C (en) Arrangement for converting alternating current by means of a contact device working synchronously with the alternating current to be converted
DE4413440C2 (en) Circuit arrangement for the grid-friendly energy feed of an inverter system into a three-phase network
DE3236605C1 (en) Welding apparatus having a three-phase transformer
EP3900141A1 (en) Methods and systems for an ac grid having increased power throughput