CA3232437A1 - Leak-proof upper tundish nozzle - Google Patents

Leak-proof upper tundish nozzle Download PDF

Info

Publication number
CA3232437A1
CA3232437A1 CA3232437A CA3232437A CA3232437A1 CA 3232437 A1 CA3232437 A1 CA 3232437A1 CA 3232437 A CA3232437 A CA 3232437A CA 3232437 A CA3232437 A CA 3232437A CA 3232437 A1 CA3232437 A1 CA 3232437A1
Authority
CA
Canada
Prior art keywords
gas
inner portion
protective
ceramic inner
nickel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CA3232437A
Other languages
French (fr)
Inventor
Bruce R. Forman
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ArcelorMittal SA
Original Assignee
ArcelorMittal SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ArcelorMittal SA filed Critical ArcelorMittal SA
Publication of CA3232437A1 publication Critical patent/CA3232437A1/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D41/00Casting melt-holding vessels, e.g. ladles, tundishes, cups or the like
    • B22D41/50Pouring-nozzles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D41/00Casting melt-holding vessels, e.g. ladles, tundishes, cups or the like
    • B22D41/50Pouring-nozzles
    • B22D41/52Manufacturing or repairing thereof
    • B22D41/54Manufacturing or repairing thereof characterised by the materials used therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/10Supplying or treating molten metal
    • B22D11/103Distributing the molten metal, e.g. using runners, floats, distributors
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D41/00Casting melt-holding vessels, e.g. ladles, tundishes, cups or the like
    • B22D41/50Pouring-nozzles
    • B22D41/502Connection arrangements; Sealing means therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D41/00Casting melt-holding vessels, e.g. ladles, tundishes, cups or the like
    • B22D41/50Pouring-nozzles
    • B22D41/52Manufacturing or repairing thereof
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D41/00Casting melt-holding vessels, e.g. ladles, tundishes, cups or the like
    • B22D41/50Pouring-nozzles
    • B22D41/58Pouring-nozzles with gas injecting means

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Continuous Casting (AREA)
  • Casting Support Devices, Ladles, And Melt Control Thereby (AREA)

Abstract

A gas injected upper tundish nozzle comprising: a protective can; a ceramic inner portion disposed within said protective can, said ceramic inner portion having gas flow pathways therein; a gas injection port attached to said protective can allowing for the injection of gas through the protective can and into the gas flow pathways within the ceramic inner portion. A gas flow seal is formed between the protective can and the ceramic inner portion. The gas flow seal blocks gas leakage from the gap between the protective can and the ceramic inner portion. The gas flow seal is formed of nickel or an alloy of nickel.

Description

LEAK-PROOF UPPER TUNDISH NOZZLE
Field of the Invention The present invention relates to the casting of steel slabs and more specifically to upper tundish nozzles used in such casting. Most specifically, the invention relates to argon injected upper tundish nozzle designs by which argon leakage therefrom is minimized/eliminated.
Background of the Invention The present invention relates to an improved design for upper tundish nozzle.
The nozzle is designed to be used in continuous casting of steel into slabs.
Figure 1 depicts a cross section of such a continuous casting line. The line includes a ladle 1 which continuously brings fresh steel to the tundish 2. The tundish 2, controls the flow therefrom into the casting mold 3.
Figure 2 is a closer view of the tundish 2 and the casting mold 3 and specifically shows the position of the upper tundish nozzle 4, which is the focus of the present invention. The upper tundish nozzle 4 collects the molten steel from the tundish 2 and directs the steel through a gate valve and into the casting mold 3.
Figure 3 is a simplified cross section of an upper tundish nozzle 4. The upper tundish nozzle 4 is composed of a ceramic inner portion 6 and a protective can 5 which houses and protects the fragile ceramic inner portion 6.
The ceramic inner portion 6 of such nozzles are often formed from a porous, gas permeable refractory material which may be a ceramic oxide of aluminum, silicon, magnesium, chromium, or zirconium, or mixtures thereof. Alternatively, the ceramic inner portion 6 of the nozzle may be formed of a ceramic material having pierced/tunneled holes in the ceramic to provide set gas flow paths within the ceramic inner portion 6.
The porous, gas permeable refractory material and/or the pierced/tunneled holes provide flow paths for Argon gas which is injected into the upper tundish nozzle 4 during continuous casting to deter clogging of the upper tundish nozzle 4 with solid inclusions.
The argon flow also affects the flow pattern of steel in the upper tundish nozzle 4, the gate valve and subsequently in the casting mold 3.
As alluded to above, the inside surface of the ceramic inner portion 6 of the upper tundish nozzle 4 defines a bore for conducting a flow of liquid steel.
The outside surface of the ceramic inner portion 6 is enveloped in a protective can 5. The protective can 5 can be formed of metallic sheet material, such as steel, that may be spaced apart from the outside surface of the ceramic inner portion 6 in order to define one or more annular, gas conducting spaces. The argon gas is injected into the upper tundish nozzle 4 via a gas injection port 7. Figure 3 indicates the argon gas injection port 7, as well as the argon flow path 8 in an upper tundish nozzle 4 having a porous ceramic inner portion 6.
In operation of an upper tundish nozzle 4 having a porous ceramic inner portion 6, pressurized inert gas (such as argon) is permeated through the annular space between the outside surface of the ceramic inner portion 6 and the protective can 5 that may circumscribe it while molten metal flows through the bore of the upper tundish nozzle 4. The inert gas flows through the gas flow paths 8 in the porous ceramic inner portion 6. The argon eventually escapes the porous ceramic inner portion 6 as argon
2
3 PCT/IB2021/058717 bubbles 9. These bubbles may advantageously form a fluid film over the surface of the bore within the upper tundish nozzle 4 that prevents that molten metal from making direct contact with the inner surface forming the bore. By insulating the bore surface from the molten metal, the fluid film of gas prevents the small amounts of alumina that are present in such steel from sticking to and accumulating onto the surface of the nozzle bore. The prevention of such alumina deposits is important, as such deposits will ultimately obstruct the flow of molten steel until it congeals around the walls of the bore, thereby clogging the upper tundish nozzle 4. Such a clogged nozzle 4 necessitates the shutting down of the casting process and the replacement of the nozzle 4.
While such upper tundish nozzles 4 have generally shown themselves to be effective in retarding the accumulation of bore-obstructing alumina deposits, the inventors have observed a number of shortcomings associated with such nozzles.
One specific issue relates to leakage of argon gas, i.e., the loss of argon from the system in areas that are not the inner bore surface of the upper tundish nozzle 4. Such leaks can jeopardize the function of the gas in penetrating to the interior bore of the upper tundish nozzle 6. If the gas leaks are serious enough it could interfere with forming a protective fluid film over the surface of the nozzle bore. The pressure of the inert gas must be maintained at a level high enough to overcome the considerable backpressure that the molten steel applies to the surface of the bore. Ideally, the gas pressure should be just enough to form the desired film. If it is too high, the gas can stir the steel excessively, thus creating additional defects. Thus, the control of the gas pressure and flow is critical and must be maintained within a narrow range. Any significant leak can jeopardize the desired delicate pressure balance. Further such argon loss is an added expense to production and therefore should be minimized if possible.
Clearly, there is a need for an improved upper tundish nozzle 4 design that minimizes or eliminates the leakage mechanisms inherent in the prior art designs.
Summary of the Invention The present invention relates to a leak-proof gas injected upper tundish nozzle.
The nozzle includes a protective can and a ceramic inner portion disposed within the protective can. The ceramic inner portion preferably has gas flow pathways therein.
The nozzle further includes a gas injection port attached to the protective can which allows for the injection of gas through the protective can and into gas flow pathways within the ceramic inner portion.
The nozzle also includes at least one gas flow seal formed between the protective can and the ceramic inner portion. The gas flow seal blocks gas leakage from the gap between the protective can and the ceramic inner portion. The gas flow seal may be formed from nickel or an alloy of nickel.
The gas flow seal may be formed by depositing nickel or nickel alloy into any gaps between the protective can and the ceramic inner portion by a method selected from the group consisting of electroplating, electroless plating, nickel/alloy foil strips, sputtering, plasma vapor deposition, and metal printing.
In one embodiment, the gas flow seal may be formed by electroplating nickel or nickel alloy into any gaps between the protective can and the ceramic inner portion. The nickel or nickel alloy may be electroplated across the gap on the exterior of the
4 protective can and the exterior of ceramic inner portion. The nickel or nickel alloy may be electroplated across the gap on the exterior of the protective can and the exterior of the ceramic inner portion after the protective can and ceramic inner portion have been formed into a unitary piece.
The nickel or nickel alloy may be deposited onto one or both of the interior surface of the protective can and the exterior surface of the ceramic inner portion.
Preferably, the nickel or nickel alloy may be deposited onto one or both of the interior surface of the protective can and the exterior surface of the ceramic inner portion before the protective can and ceramic inner portion have been formed into a unitary piece.
The protective can may be formed of a metal material, preferably steel. The ceramic inner portion may be formed from a porous ceramic material and the gas flow pathways may comprise the pores within the porous ceramic material. The ceramic inner portion may be is formed from a gas permeable refractory material consisting of a ceramic oxide of one or more of aluminum, silicon, magnesium, chromium, or zirconium, or mixtures thereof.
The ceramic inner portion may not be porous or gas permeable and the gas flow pathways may be formed directly into the body of the ceramic inner portion.
The gas flow pathways may include a gas distribution manifold and gas distribution channels.
The gas distribution channels may have gas outlets to release the gas into the steel flowing within the upper tundish nozzle.

Brief Description of the Drawings Figure 1 depicts a cross section of a continuous casting line in which the upper tundish nozzle of the present is preferably used;
Figure 2 is a closer view of the tundish and the casting mold and specifically shows the position of the upper tundish nozzle;
Figure 3 is a simplified cross section of an upper tundish nozzle;
Figure 4 depicts a typical cross-sectional view of an upper tundish nozzle and specifically indicates gaps through which gas may leak;
Figure 5 depicts a cross-sectional view of an upper tundish nozzle including the inventive gap seal solution.
Detailed Description of the Invention The present invention is an improved argon injected upper tundish nozzle 4 which minimizes/eliminates unwanted leakage of inert gas (such as argon) therefrom.
Figure 4 depicts a typical cross-sectional view of an upper tundish nozzle 4.
The figure indicates the main components such as the protective can 5, the ceramic inner portion 6, the argon injection port 7 and the argon gas flow path 8 within the ceramic inner portion 6. In this type of upper tundish nozzle 4, the ceramic inner portion 6 may or may not be porous, but the argon flow path 8 (including a gas distribution manifold and gas distribution channels which include gas outlets to release the gas into the bore of the nozzle) is molded into the ceramic inner portion 6 during production.
As described above, the ceramic inner portion 6 may alternatively be formed of a porous ceramic without pre-made gas flow paths 8.

Figure 4 also depicts the problems addressed by the present invention. That is, there can be significant leakage of argon gas from the gap between the protective can 5 and the ceramic inner portion 6. The leakage paths 10 can be at the top and bottom gaps. In production the inner ceramic portion 6 is press formed into the protective can 5 thereby forming a unitary piece. Due to the difference in thermal expansion between the metal protective can 5 and the ceramic inner portion 6, it is very difficult, if not impossible to for a gas tight seal between them. While these gaps may seem small and insignificant, it should be noted that for a typical upper tundish nozzle 4, a gap of 0.04318 mm between the protective can Sand the ceramic inner portion 6 has the same flow area as a 3.175 mm pipe. This can result in significant loss of argon volume and pressure.
Figure 5 depicts the inventive solution devised by the present inventors. The inventors have found that a seal 11, 11' between the protect can 5 and the ceramic inner portion 6 can plug the leaks of argon. Specifically, the seal 11, 11' is formed of nickel or a nickel alloy. The temperature at the interface between the protective can 5 and the ceramic inner portion 6 is lower than the melting point of the nickel/alloy seal 11, 11'. It is believed that this seal 11,11' remains ductile at the elevated temperatures within the gap and stretches without cracking during expansion of the protective can 5 and the ceramic inner portion. This helps to prevent the gaps from leaking.
The inventors pressure tested an as received commercial upper tundish nozzle 4 to determine if there were leaks in the gaps between the protective can 5 and the ceramic inner portion 6 thereof. The nozzle pressurized and a soapy water solution was applied to the gaps. Bubbles formed, indicating significant leakage of the gas.

The inventors electroplated nickel onto the upper tundish nozzle 4 in areas that completely overlapped the gap between the protective can 5 and the ceramic inner portion 6. After the electroplating of the seal 11, 11', the nozzle was again pressure tested and it was seen that the leaks had been plugged. This was of course at room temperature and not at steel casting temperatures.
Next the can with the electroplated nickel seals 11, 11' was subjected to thermal testing by pouring liquid steel into the nozzle using a 100 lb open air furnace. The pour went from a ladle through the upper tundish nozzle 4 into an ingot mold under the nozzle. After the steel solidified, the nozzle was examined, and it was found that the electroplated nickel seal 11,11' was completely intact and even survived a direct metal splash.
The present inventor envisions two different types of nickel seals. The first type of nickel seal 11 is described above. It is applied externally to cover the gaps between the protective can 5 and the ceramic inner portion 6. This type of seal 11 is generally applied after the upper tundish nozzle 4 is formed.
Alternatively, the nickel material may be applied to one or both of the protective can 5 and the ceramic inner portion 6 before the upper tundish nozzle 4 is formed. The nickel is deposited strategically on the protective can 5 and/or ceramic inner portion 6 to form the nickel seal 11' there between.
While the inventors have used electroplating to deposit the nickel seals 11,11'.
Other viable techniques include electroless plating, nickel foil strips, sputtering, plasma deposition, metal printing and the like. What is important is not how the nickel got into position but rather forming the nickel seal 11,11' between the protective can
5 and the ceramic inner portion.

Claims (14)

l claim:
1. A gas injected upper tundish nozzle (4), said nozzle comprising:
a protective can (5);
a ceramic inner portion (6) disposed within said protective can (5), said ceramic inner portion (6) having gas flow pathways therein;
a gas injection port (7) attached to said protective can (5); said gas injection port (7) allowing for the injection of gas through said protective can (5) and into said gas flow pathways (8) within said ceramic inner portion (6);
a gas flow seal (11,11') formed between said protective can (5) and said ceramic inner portion (6), said gas flow seal (11,11') blocking gas leakage from the gap between said protective can (5) and said ceramic inner portion (6); said gas flow seal (11,11') being formed of nickel or an alloy of nickel.
2. The gas injected upper tundish nozzle (4) of claim 1, wherein said gas flow seal (11, 11') is formed by depositing nickel or nickel alloy into any gaps between said protective can (5) and said ceramic inner portion (6) by a method selected from the group consisting of electroplating, electroless plating, nickel/alloy foil strips, sputtering, plasma vapor deposition, and metal printing.
3. The gas injected upper tundish nozzle (4) of claim 2, wherein said gas flow seal (11, 11') is formed by electroplating nickel or nickel alloy into any gaps between said protective can (5) and said ceramic inner portion (6).
4. The gas injected upper tundish nozzle (4) of claim 3, wherein said nickel or nickel alloy is electroplated across said gap on the exterior of said protective can (5) and said ceramic inner portion (6).
5. The gas injected upper tundish nozzle (4) of claim 4, wherein said nickel or nickel alloy is electroplated across said gap on the exterior of said protective can (5) and said ceramic inner portion (6) after said protective can (5) and ceramic inner portion (6) have been formed into a unitary piece.
6. The gas injected upper tundish nozzle (4) of claim 2, wherein said nickel or nickel alloy is deposited onto one or both of the interior surface of said protective can (5) and the exterior surface of said ceramic inner portion (6).
7. The gas injected upper tundish nozzle (4) of claim 6, wherein said nickel or nickel alloy is deposited onto one or both of the interior surface of said protective can (5) and the exterior surface of said ceramic inner portion (6) before said protective can (5) and ceramic inner portion (6) have been formed into a unitary piece.
8. The gas injected upper tundish nozzle (4) of claim 1, wherein said protective can (5) is formed of a metal material.
9. The gas injected upper tundish nozzle (4) of claim 8, wherein said protective can (5) is formed of a steel material.
10. The gas injected upper tundish nozzle (4) of claim 1, wherein said ceramic inner portion (6) is formed from a porous ceramic material and said gas flow pathways comprise the pores within said porous ceramic material.
11. The gas injected upper tundish nozzle (4) of claim 10, wherein said ceramic inner portion (6) is formed from a gas permeable refractory material consisting of a ceramic oxide of one or more of aluminum, silicon, magnesium, chromium, or zirconium, or mixtures thereof.
12. The gas injected upper tundish nozzle (4) of claim 1, wherein said ceramic inner portion (6) is not porous or gas permeable and said gas flow pathways are formed directly into the body of said ceramic inner portion.
13. The gas injected upper tundish nozzle (4) of claim 12, wherein said gas flow pathways include a gas distribution manifold and gas distribution channels.
14. The gas injected upper tundish nozzle (4) of claim 13, wherein said gas distribution channels having gas outlets to release said gas into the steel flowing within said upper tundish nozzle.
CA3232437A 2021-09-24 2021-09-24 Leak-proof upper tundish nozzle Pending CA3232437A1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/IB2021/058717 WO2023047153A1 (en) 2021-09-24 2021-09-24 Leak-proof upper tundish nozzle

Publications (1)

Publication Number Publication Date
CA3232437A1 true CA3232437A1 (en) 2023-03-30

Family

ID=78032469

Family Applications (1)

Application Number Title Priority Date Filing Date
CA3232437A Pending CA3232437A1 (en) 2021-09-24 2021-09-24 Leak-proof upper tundish nozzle

Country Status (4)

Country Link
KR (1) KR20240060805A (en)
CN (1) CN117940234A (en)
CA (1) CA3232437A1 (en)
WO (1) WO2023047153A1 (en)

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3168852D1 (en) * 1981-03-11 1985-03-28 Junichi Ato Porous nozzle for molten metal vessel
US4836508A (en) * 1988-05-03 1989-06-06 Vesuvius Crucible Company Ladle shroud with co-pressed gas permeable ring
CA2064392A1 (en) * 1991-04-12 1992-10-13 James D. Engel Gas permeable well nozzle
DE102010050936A1 (en) * 2010-11-11 2012-05-16 Heraeus Electro-Nite International N.V. Floor spout nozzle for placement in the bottom of a metallurgical vessel

Also Published As

Publication number Publication date
KR20240060805A (en) 2024-05-08
CN117940234A (en) 2024-04-26
WO2023047153A1 (en) 2023-03-30

Similar Documents

Publication Publication Date Title
US5678623A (en) Casting equipment
US4836508A (en) Ladle shroud with co-pressed gas permeable ring
CA2754323C (en) Bottom pouring nozzle for arrangement in the bottom of a metallurgical vessel
US4583721A (en) Molten metal discharging device
CA3232437A1 (en) Leak-proof upper tundish nozzle
WO2023047154A1 (en) Leak-proof upper tundish nozzle
JPH0330461B2 (en)
KR100356174B1 (en) Floor sealing device and method of twin roll continuous sheet casting equipment
JP4145164B2 (en) Sliding gate plate
RU2788042C1 (en) Device for vertical casting of cylindrical aluminum alloy ingots
JPH07256415A (en) Tundish upper nozzle
JP4104717B2 (en) Casting equipment
JP7397323B2 (en) Immersion nozzle for twin drum continuous casting equipment
JPS6027580Y2 (en) Seal tube for continuous casting tundish
WO2024049331A1 (en) Apparatus for vertical casting of cylindrical billets from aluminum alloys
KR200307661Y1 (en) Tundish upper nozzle for anti-sticking type of interposition material
KR20130101016A (en) Crystal growth apparatus with ceramic coating and methods for preventing molten material breach in a crystal growth apparatus
JPH0744364Y2 (en) Upper nozzle for gas blowing used in molten metal discharge device
KR200271568Y1 (en) A gasket for collector nozzle
KR100444208B1 (en) A gasket for collector nozzle
RU2330744C2 (en) Gate-feeding device for casting on melted models
CN115740375A (en) Pouring method of steel casting
JPH052420B2 (en)
RU1785804C (en) Arrangement for casting metal
JPH07266023A (en) Reduced pressure casting method and reduced pressure casting apparatus

Legal Events

Date Code Title Description
EEER Examination request

Effective date: 20240311

EEER Examination request

Effective date: 20240311