CA3152650A1 - Side saddle rig design with integrated mpd - Google Patents

Side saddle rig design with integrated mpd Download PDF

Info

Publication number
CA3152650A1
CA3152650A1 CA3152650A CA3152650A CA3152650A1 CA 3152650 A1 CA3152650 A1 CA 3152650A1 CA 3152650 A CA3152650 A CA 3152650A CA 3152650 A CA3152650 A CA 3152650A CA 3152650 A1 CA3152650 A1 CA 3152650A1
Authority
CA
Canada
Prior art keywords
mpd
coupled
drilling rig
wellbore
manifold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CA3152650A
Other languages
French (fr)
Inventor
Derek Patterson
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nabors Drilling Technologies USA Inc
Original Assignee
Nabors Drilling Technologies USA Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nabors Drilling Technologies USA Inc filed Critical Nabors Drilling Technologies USA Inc
Publication of CA3152650A1 publication Critical patent/CA3152650A1/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/08Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/10Valve arrangements in drilling-fluid circulation systems
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/02Surface sealing or packing
    • E21B33/08Wipers; Oil savers
    • E21B33/085Rotatable packing means, e.g. rotating blow-out preventers
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B15/00Supports for the drilling machine, e.g. derricks or masts
    • E21B15/003Supports for the drilling machine, e.g. derricks or masts adapted to be moved on their substructure, e.g. with skidding means; adapted to drill a plurality of wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/10Valve arrangements in drilling-fluid circulation systems
    • E21B21/106Valve arrangements outside the borehole, e.g. kelly valves
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/02Surface sealing or packing
    • E21B33/03Well heads; Setting-up thereof
    • E21B33/06Blow-out preventers, i.e. apparatus closing around a drill pipe, e.g. annular blow-out preventers

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • Earth Drilling (AREA)
  • Joints Allowing Movement (AREA)

Abstract

A drilling rig includes an integrated MPD system. The drilling rig includes a drill rig floor and a substructure. The drilling rig includes a managed pressure drilling (MPD) manifold positioned on the drill rig floor or coupled to the substructure. The drilling rig includes a rotating control device (RCD) coupled to a blowout preventer (BOP), the BOP coupled to a wellbore. The drilling rig includes a flowline coupled to the RCD. The drilling rig includes an MPD line coupled to the BOP, the MPD line fluidly coupled between the annulus of the wellbore and the MPD
manifold. The drilling rig includes an MPD outlet line, the MPD outlet line fluidly coupled between the MPD manifold and the flowline.

Description

SIDE SADDLE RIG DESIGN WITH INTEGRATED MPD
Cross-Reference to Related Applications [00 0 1] This application is a nonprovisional application which claims priority from U.S.
provisional application number 63/161,671, filed March 16, 2021, which is incorporated by reference herein in its entirety.
Technical Field/Field of the Disclosure
[0002] The present disclosure relates to the drilling of wells, and specifically to a drilling rig system for use in a wellsite.
Background of the Disclosure
[0003] Drilling rigs may be configured to be traveled from location to location to drill multiple wells within the same area known as a wellsite. In certain situations, it may be desirable to travel across an already drilled well for which there is a well-head in place.
Further, mast placement on land-drilling rigs may have an effect on drilling activity. For example, depending on mast placement on the drilling rig, an existing well-head may interfere with the location of land-situated equipment such as, for instance, existing wellheads, and may also interfere with raising and lowering of equipment needed for operations. Managed pressure drilling involves the regulation of the annulus pressure of a wellbore being drilled to reduce unwanted flow of fluid into and out of the wellbore from the formation.
Summary
[0004] The present disclosure provides for a drilling rig. The drilling rig may include a drill rig floor and a substructure. The drilling rig may include a managed pressure drilling (MPD) manifold positioned on the drill rig floor or coupled to the substructure. The drilling rig may include a Date Recue/Date Received 2022-03-16 rotating control device (RCD) coupled to a blowout preventer (BOP), the BOP
coupled to a wellbore. The drilling rig may include a flowline coupled to the RCD. The drilling rig may include an MPD line coupled to the BOP, the MPD line fluidly coupled between the annulus of the wellbore and the MPD manifold. The drilling rig may include an MPD outlet line, the MPD outlet line fluidly coupled between the MPD manifold and the flowline.
[0005] The present disclosure also provides for a method. The method may include positioning a drilling rig in a wellsite at a first location aligned with a first wellbore.
The drilling rig may include a drill rig floor and a substructure. The drilling rig may include a managed pressure drilling (MPD) manifold positioned on the drill rig floor or coupled to the substructure. The drilling rig may include a rotating control device (RCD) coupled to a blowout preventer (BOP), the BOP coupled to a wellbore. The drilling rig may include a flowline coupled to the RCD. The drilling rig may include an MPD line coupled to the BOP, the MPD line fluidly coupled between the annulus of the wellbore and the MPD manifold. The drilling rig may include an MPD outlet line, the MPD
outlet line fluidly coupled between the MPD manifold and the flowline. The method may include disconnecting the BOP from the first wellbore; traveling the drilling rig to a second location in the wellsite aligned with a second wellbore; and coupling the BOP to the second wellbore.
Brief Description of the Drawings
[0006] The present disclosure is best understood from the following detailed description when read with the accompanying figures. It is emphasized that, in accordance with the standard practice in the industry, various features are not drawn to scale. In fact, the dimensions of the various features may be arbitrarily increased or reduced for clarity of discussion.

Date Recue/Date Received 2022-03-16
[0007] FIG. 1 depicts a side elevation view of a drilling rig consistent with at least one embodiment of the present disclosure.
[0008] FIG. 2 depicts a side elevation view of the drilling rig of FIG. 1 from the other side of the drilling rig.
[0009] FIG. 3 depicts a partial side elevation view of the drilling rig of FIG. 1.
[0010] FIG. 4 depicts a top view of the drilling rig of FIG. 1.
Detailed Description
[0011] It is to be understood that the following disclosure provides many different embodiments, or examples, for implementing different features of various embodiments.
Specific examples of components and arrangements are described below to simplify the present disclosure. These are, of course, merely examples and are not intended to be limiting. In addition, the present disclosure may repeat reference numerals and/or letters in the various examples. This repetition is for the purpose of simplicity and clarity and does not in itself dictate a relationship between the various embodiments and/or configurations discussed.
[0012] FIGS. 1-4 depict drilling rig 10 consistent with at least one embodiment of the present disclosure. Drilling rig 10 may include drill rig floor 20, right substructure 30, and left substructure 40. Right and left substructures 30, 40 may support drill rig floor 20. Mast 50 may be mechanically coupled to one or both of right and left substructures 30, 40 or drill rig floor 20. As would be understood by one having ordinary skill in the art with the benefit of this disclosure, the terms "right" and "left" as used herein are used only to refer to each separate substructure to simplify discussion and are not intended to limit this disclosure in any way. In some embodiments, drill rig Date Recue/Date Received 2022-03-16 floor 20 may include V-door 23, defining a V-door side of drill rig floor 20 and V-door side 22 of drilling rig 10. In some embodiments, drill rig 10 may be a side-saddle drilling rig such that V-door 23 and V-door side 22 may be located over right substructure 30. V-door side 52 of mast 50 may correspondingly face right substructure 30. By facing V-door side 22 of drilling rig 10 toward one of the substructures 30, 40, equipment and structures that pass through the V-door 23 or to drill rig floor 20 from V-door side 22 of drilling rig 10 may, for example, be less likely to interfere with additional wells in the well field. In other embodiments, V-door side 22 and mast V-door side may face left substructure 40. In some embodiments, as depicted in FIG. 1, drilling rig 10 may be centered over wellbore 12.
[0013] In some embodiments, drilling rig 10 may include integrated managed pressure drilling (MPD) system 100. Integrated MPD system 100 may be used, for example and without limitation, to allow wellbore 12 to be drilled using managed pressure techniques such that integrated MPD
system 100 controls annulus pressure of wellbore 12. In some embodiments, integrated MPD
system 100 may be used to maintain the pressure within wellbore 12 during make up or break-out operations when employed with, for example and without limitation, a check valve at a drill bit of a drill string used with drilling rig 10. Components of integrated MPD system 100 may be coupled to or positioned on drilling rig 10 such that integrated MPD system 100 may travel with drilling rig 10 during a travel operation such as a skidding operation or a walking operation to move drilling rig 10 from a first location in a wellsite aligned with a first wellbore to a second location in a wellsite aligned with a second wellbore or during a transport operation.
[0014] With reference to FIG. 1, in some embodiments, integrated MPD system 100 may include rotating control device (RCD) 101. RCD 101 may be operatively coupled to blowout preventer (BOP) 103. BOP 103 may be mechanically and fluidly coupled to wellbore 12. RCD
101 may Date Recue/Date Received 2022-03-16 operate to allow a drill string to pass through BOP 103 while maintaining a sealed fluid connection with the annulus of wellbore 12 and a drill string positioned within wellbore 12. RCD 101 may include output port 105 fluidly coupled to flowline 107. Flowline 107 may be used to return drilling fluid within the annulus of wellbore 12 to mud handling equipment when wellbore 12 is drilled outside of a managed pressure drilling operation. In some embodiments, flowline 107 may be coupled to RCD 101 via flowline valve 109. Flowline valve 109 may be closed during MPD
operations and opened during non-MPD operations. Flowline valve 109 may, in some embodiments, be a gate valve, ball valve, or orbit valve.
[0015] In some embodiments, integrated MPD system 100 may include MPD line 111. MPD line 111 is fluidly coupled to the annulus of wellbore 12 through MPD port 113 formed in RCD 101 or other component of BOP 103. In some embodiments, MPD port 113 may be formed in spool 115 of BOP 103. MPD port 113 may allow for fluid returning through the annulus of wellbore 12 to be diverted from flowline 107 to integrated MPD system 100 via MPD line 111 as discussed below when flowline valve 109 is closed and subsequent valve 110 is opened.
Subsequent valve 110 may be, in some embodiments, a gate valve, ball valve, or orbit valve.
[0016] MPD line 111 may be coupled to subsequent valve 110 to provide a fluid conduit for fluid to pass from wellbore 12 to MPD manifold 117. MPD manifold 117 may be a choke manifold used to manage the pressure of the annulus of wellbore 12 through the use of one or more valves 119 as shown in FIGS. 3, 4. In some embodiments, MPD manifold 117 may be positioned on drill rig floor 20 such that MPD manifold 117 travels with drilling rig 10.
[0017] In some embodiments, as shown in FIG. 3, MPD manifold 117 may fluidly couple to Coriolis meter 123. Coriolis meter 123 may be used to measure the mass flow rate and density of Date Recue/Date Received 2022-03-16 the drilling fluid flowing through integrated MPD system 100 to, for example and without limitation, identify kicks and to provide feedback for the control of integrated MPD system 100.
In some embodiments, one or more valves may be positioned to allow fluid flowing through MPD
manifold 117 to bypass Coriolis meter 123.
[0018] In some embodiments, as shown in FIG. 1, MPD manifold 117 may be fluidly coupled to mud gas separator 121. Mud gas separator 121 may be mechanically coupled to drilling rig 10 such that mud gas separator 121 travels with drilling rig 10. Mud gas separator 121 may be used to separate drilling fluid from gases entrained with the drilling fluid returning from wellbore 12.
In some embodiments, one or more valves may be positioned to allow fluid flowing through MPD
manifold 117 to bypass mud gas separator 121.
[0019] Once the drilling fluid flows through MPD manifold 117 and, if desired, Coriolis meter 123 or mud gas separator 121, the drilling fluid may flow through MPD outlet line 125, which may be fluidly coupled to flowline 107 to allow the drilling fluid to pass to other mud handling equipment which may be positioned on drilling rig 10 or at a location proximate drilling rig 10.
[0020] In some embodiments, the components of integrated MPD system 100 may remain coupled to drilling rig 10 throughout any traveling operations such as skidding or walking operations and, in some embodiments, transport operations. In such embodiments, the fluid connections of MPD
system 100 including, for example and without limitation, the connection of MPD line 111 to BOP
103 or RCD 101, the connection of MPD line 111 to MPD manifold 117, the connection of MPD
manifold 117 to Coriolis meter 123, the connection of MPD manifold 117 to mud gas separator 121, the connection of MPD manifold 117 and Coriolis meter 123 to MPD outlet line 125, and the fluid connections between flowline 107 and MPD outlet line 125 and RCD 101, may be maintained Date Recue/Date Received 2022-03-16 throughout such traveling or transport operations. In such embodiments, such connections need not be rigged down and up for each travel and transport operation, reducing the time required to prepare for transport of drilling rig 10 and reducing delays in beginning operations after the move.
[0021] In some embodiments, integrated MPD system 100 may include MPD
controller 127. MPD
controller 127 may be positioned on drill rig floor 20 and may be used to control operation of integrated MPD system 100. MPD controller 127 may, in some embodiments, control the pressure of the annulus of wellbore 12 based at least in part on measurements of Coriolis meter 123 and other sensors by manipulating one or more valves 119 of integrated MPD system 100.
[0022] The foregoing outlines features of several embodiments so that a person of ordinary skill in the art may better understand the aspects of the present disclosure. Such features may be replaced by any one of numerous equivalent alternatives, only some of which are disclosed herein.
One of ordinary skill in the art should appreciate that they may readily use the present disclosure as a basis for designing or modifying other processes and structures for carrying out the same purposes and/or achieving the same advantages of the embodiments introduced herein. One of ordinary skill in the art should also realize that such equivalent constructions do not depart from the spirit and scope of the present disclosure and that they may make various changes, substitutions, and alterations herein without departing from the spirit and scope of the present disclosure.

Date Recue/Date Received 2022-03-16

Claims (9)

Claims:
1. A drilling rig comprising:
a drill rig floor and a substructure;
a managed pressure drilling (MPD) manifold positioned on the drill rig floor or coupled to the substructure;
a rotating control device (RCD) coupled to a blowout preventer (BOP), the BOP
coupled to a wellbore;
a flowline coupled to the RCD;
an MPD line coupled to the BOP, the MPD line fluidly coupled between the annulus of the wellbore and the MPD manifold; and an MPD outlet line, the MPD outlet line fluidly coupled between the MPD
manifold and the flowline.
2. The drilling rig of claim 1, wherein the MPD manifold further comprises one or more valves adapted to manage the pressure of the annulus of the wellbore.
3. The drilling rig of claim 1, wherein the MPD manifold further comprises a Coriolis meter.
4. The drilling rig of claim 1, further comprising a mud gas separator, the mud gas separator mechanically coupled to the drilling rig.
5. The drilling rig of claim 3, wherein the MPD manifold is fluidly coupled to the mud gas separator.

Date Recue/Date Received 2022-03-16
6. The drilling rig of claim 1, further comprising a flowline valve positioned between the RCD
and the flowline.
7.
The drilling rig of claim 6, wherein the flowline valve is a gate valve, ball valve, or orbit valve.
8. The drilling rig of claim 1, further comprising an MPD controller, the MPD
controller positioned on the drill rig floor.
9. A method comprising:
positioning a drilling rig in a wellsite at a first location aligned with a first wellbore, the drilling rig including:
a drill rig floor and a substructure;
a managed pressure drilling (MPD) manifold positioned on the drill rig floor or coupled to the substructure;
a rotating control device (RCD) coupled to a blowout preventer (BOP), the BOP coupled to the first wellbore;
a flowline coupled to the RCD;
an MPD line coupled to the BOP, the MPD line fluidly coupled between the annulus of the wellbore and the MPD manifold; and an MPD outlet line, the MPD outlet line fluidly coupled between the MPD
manifold and the flowline;
disconnecting the BOP from the first wellbore;

Date Recue/Date Received 2022-03-16 traveling the drilling rig to a second location in the wellsite aligned with a second wellbore; and coupling the BOP to the second wellbore.
Date Recue/Date Received 2022-03-16
CA3152650A 2021-03-16 2022-03-16 Side saddle rig design with integrated mpd Pending CA3152650A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US202163161671P 2021-03-16 2021-03-16
US63/161671 2021-03-16

Publications (1)

Publication Number Publication Date
CA3152650A1 true CA3152650A1 (en) 2022-09-16

Family

ID=83271830

Family Applications (1)

Application Number Title Priority Date Filing Date
CA3152650A Pending CA3152650A1 (en) 2021-03-16 2022-03-16 Side saddle rig design with integrated mpd

Country Status (3)

Country Link
US (1) US20220298874A1 (en)
AR (1) AR125548A1 (en)
CA (1) CA3152650A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NO20230110A1 (en) 2020-09-01 2023-02-03 Nabors Drilling Tech Usa Inc Side saddle traversable drilling rig

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9464488B2 (en) * 2013-09-30 2016-10-11 National Oilwell Varco, L.P. Performing simultaneous operations on multiple wellbore locations using a single mobile drilling rig
US10094186B2 (en) * 2014-11-17 2018-10-09 Weatherford Technology Holdings, Llc Controlled pressure drilling system with flow measurement and well control
US10830009B2 (en) * 2015-05-06 2020-11-10 Schlumberger Technology Corporation Continuous mud circulation during drilling operations
US20170159372A1 (en) * 2015-12-04 2017-06-08 Schlumberger Technology Corporation Rig positioning system
US10214970B1 (en) * 2018-06-12 2019-02-26 Nabors Drilling Technologies Usa, Inc. Post and non-elongated substructure drilling rig
US20200190939A1 (en) * 2018-12-17 2020-06-18 Weatherford Technology Holdings, Llc Fault-Tolerant Pressure Relief System for Drilling

Also Published As

Publication number Publication date
AR125548A1 (en) 2023-07-26
US20220298874A1 (en) 2022-09-22

Similar Documents

Publication Publication Date Title
US8176985B2 (en) Well drilling and production using a surface blowout preventer
US8978774B2 (en) System and method for drilling a subsea well
US7185719B2 (en) Dynamic annular pressure control apparatus and method
CA2516277C (en) Dynamic annular pressure control apparatus and method
AU2013271559B2 (en) Flow control system
US8387705B2 (en) Systems and methods for running casing into wells drilled with dual-gradient mud systems
BR112015003318B1 (en) METHOD OF DRILLING A SUBSEA WELL HOLE, PRESSURE MANAGED DRILLING SYSTEMS AND METHOD OF MANAGING DRILLING PRESSURES
BR112018067677B1 (en) UNDERWATER TREE AND METHODS OF USING IT
US10808483B2 (en) System for hydrocarbon recovery
US11891861B2 (en) Multi-mode pumped riser arrangement and methods
US20220298874A1 (en) Side saddle rig design with integrated mpd
BR112020002864B1 (en) APPARATUS THAT INCLUDES A TUBE AND METHOD THAT INCLUDES RETURNING THE MUD FROM A WELL INTO A RISER
US11634954B2 (en) Surge reduction system for running liner casing in managed pressure drilling wells
WO2011043763A1 (en) Well drilling method utilizing real time response to ahead of bit measurements
US9267344B2 (en) Actuator for dual drill string valve and drill string valve configurations therefore
US20200190924A1 (en) Choke system
US20210148192A1 (en) Ball valve capping stack
CA2996170C (en) Proportional control of rig drilling mud flow
US11248442B2 (en) Surge assembly with fluid bypass for well control
US9291011B2 (en) Integral diverter system
US20150041147A1 (en) Oil well safety valve apparatus and method
US10364622B2 (en) Manifold assembly for a mineral extraction system
US9664006B2 (en) Riser isolation device having automatically operated annular seal
US20240044216A1 (en) Multi-mode pumped riser arrangement and methods
WO2022154666A1 (en) A system and method for circulating drilling fluid in connection with open water drilling