CA2964595C - Turbine chilling for oil field power generation - Google Patents
Turbine chilling for oil field power generation Download PDFInfo
- Publication number
- CA2964595C CA2964595C CA2964595A CA2964595A CA2964595C CA 2964595 C CA2964595 C CA 2964595C CA 2964595 A CA2964595 A CA 2964595A CA 2964595 A CA2964595 A CA 2964595A CA 2964595 C CA2964595 C CA 2964595C
- Authority
- CA
- Canada
- Prior art keywords
- turbine generator
- air
- fluid
- chiller
- coil
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Control Of Eletrric Generators (AREA)
Abstract
Description
BACKGROUND
[0001] 1. Technical Field
Diesel is more expensive, is less environmentally friendly, less safe, and heavier to transport than natural gas. For example, diesel engines are very heavy, and so require the use of a large amount of heavy equipment, including trailers and trucks, to transport the engines to and from a wellsite. In addition, such engines are not clean, generating large amounts of exhaust and pollutants that may cause environmental hazards, and are extremely loud, among other problems.
Onsite refueling, especially during operations, presents increased risks of fuel leaks, fires, and other accidents. The large amounts of diesel fuel needed to power traditional fracturing opera-tions require constant transportation and delivery by diesel tankers onto the well site, resulting in significant carbon dioxide emissions.
SUMMARY
and an air chiller system associated with the at least one turbine generator. In an embodiment, the air chiller system can include a chiller unit configured to chill a fluid, and at least one coil in fluid communication with the chiller unit and positioned adjacent to the at least one air intake channel.
In an embodiment, the air chiller system can be configured to increase a power output of the at least one turbine generator
BRIEF DESCRIPTION OF DRAWINGS
However, the disclosure is not intended to be limited to the specific terms used, and it is to be understood that each specific term includes equivalents that operate in a similar manner to accomplish a similar purpose.
DETAILED DESCRIPTION
In an embodiment, usage of the term "substantially" includes +/- 5% of the cited magnitude.
After further power losses from cables, breakers, switchgear, and transformers, the electrical power generation capability is below 14.7 MW of electrical power, which is the minimum power required to operate the equipment in accordance with a particular application of fracturing equipment at a well site. Failure to meet the required pump rate against wellhead pressure may result in unsatisfactory well stimulation.
However, the cost of adding a fourth turbine generator exceeds twice the cost of using an air chiller unit. Thus, addition of one or more air chiller units represents a cost effective means to improve turbine efficiency.
A typical fracturing operation generally requires multiple turbine generators to supply electricity during times of peak demand. Peak demand may last up to half an hour at a time and generally occurs when wellhead pressure spikes during the end of a fracturing stage. The high pump rate against a high wellhead pressure creates a hydraulic horsepower requirement of up to 16,000 hydraulic horsepower (HHP) in some examples, for example where three 5.7 MW (rated power generation under nominal conditions) turbine generators are used, which requires all available power production on a 60-70 Fahrenheit day. When the full potential of the turbine generators is not required, however, it may be possible to turn off the air inlet chilling which will allow the turbines to run at a higher load, making them more efficient.
[00371 Air inlet chillers as described herein may reduce the number of required turbine generators to produce electricity for a closed circuit microgrid powering a hydraulic fracturing fleet. The electric microgrid efficiency may be increased, and its physical size decreased, by increasing turbine engine output, such as during higher temperature operating conditions. In one example, when the ambient air temperature exceeds around 55 degrees Fahrenheit, the turbines begin producing less than their rated 5.7 MW of power. When the ambient air temperature exceeds around 85 degrees, the turbines may become even less efficient. Some methods of chilling have trouble cooling humid air due to the ambient air already being close to 100%
moisture saturation. Chilling methods such as fogging or evaporative cooling are cheaper but cannot cool below wet bulb temperature, which makes them a poor choice for humid climates.
These cooling systems also risk exposing the turbine fins to water droplets which may be harmful and reduce the life of the turbine. Fortunately, methods such as vapor compression or vapor absorption may be used for better and non-damaging results. Some turbine manufacturers recommend that inlet air to the turbine not be chilled to below freezing.
However, the amount of chilling equipment required to cool air down to that point may be less economical than simply using an additional turbine generator.
[0038] Coils in the filter house associated with a turbine generator may obstruct air flow to the turbine and introduce a pressure drop between the air inlet and the turbine, which may reduce turbine performance by up to around 2.0 %. The performance drop may be offset by an approximate 5-15% boost in performance from using chiller units to cool the ambient air. The range of 5-15% for the performance increase may be attributable to the refrigeration capacity of the chiller or chillers used, the wet bulb temperature of the ambient air (humidity), and the model of the turbine. However, if the 1-2% drop in performance is unacceptable, intake fans may be added to the coils in the filter house to help draw in outside air to address the pressure drop.
Example capacities for the chiller units described herein range from about 450 tons to well over 600 tons of total refrigeration capacity.
[0039] In an embodiment, the system can further include a variable frequency drive connected to the at least one electric motor to control the speed of the at least one electric motor. In an embodiment, the variable frequency drive can frequently perform electric motor diagnostics to prevent damage to the at least one electric motor. Variable frequency drives can be utilized for the fracturing equipment in some embodiments, and in other embodiments can be used for pumps and fans required for refrigeration on the chiller units, instead of more commonly used soft starters.
[0040] Schematically provided in FIG. 1 is an example 100 of operation of a chiller unit 105 and chilling coils 115 for use with a turbine generator 110 according to one embodiment of the disclosure. In the illustrated embodiment, water or another appropriate fluid (such as ammonia or a Freon mixture, among others) may be cooled by chiller unit 105. Fluid cooling at chiller unit 105 may occur by any known means. Cold water may then be pumped from chiller unit 105 through a chilled water line circuit into one or more chilling coils 115, positioned within a filter house 130 associated with turbine generator 110. At the same time, ambient air may be drawn in through one or more air intake louvers 120 positioned on a periphery of filter house 130, and may pass along the outer surfaces of the one or more chilling coils 115. As the air passes outside the coils 115 and the cold water passes inside the coils 115, heat is exchanged between the chilled coils 115 and the ambient air, thereby cooling the air.
[0041] A pump (not shown) may optionally be provided for circulating the water in the cooling system. An example of a chilled water line circuit may include supply and return headers, each having an end connected to the chiller unit 105. The chilled water line circuit may include supply lines that extend from the supply header to the turbine filter house 130, and return lines between the filter house 130 and the return header. Water in the return lines and return header will have warmed up to above the set point of the chiller unit 105 during the thermal exchange with the ambient air, and may be returned to the chiller unit 105 to be cooled back down to the predetermined temperature. Thus water in the supply header and supply lines may be cooler than water in the return lines and return header.
[0042] Chilling coils 115 may be positioned inside filter house 130 associated with the turbine generator 110 in some embodiments, or may be positioned elsewhere in the turbine generator system assembly in other embodiments. Though illustrated in FIG. 1 with two chilling coils 115, in various embodiments one, three, or more chilling coils may be utilized. In the embodiment illustrated in FIG. 1, filter house 130 can be positioned centered atop turbine generator 110. The two illustrated chilling coils 115 can be evenly spaced within filter house 130 to balance the filter house 130 on top of the turbine generator 110. This configuration can avoid the need for extra support for the filter house 130. In other embodiments, for example as illustrated in FIGS. 2A-2C, the filter house can be positioned offset from center on the turbine generator, and in some embodiments all coils can be positioned on one side within the filter house, allowing the air inlet filter to be more condensed and lighter in construction, but also causing a weight imbalance and necessitating extra support for the filter house. Extra support can include support from the EER
enclosure in some examples, or can include use of one or more vertical support pillars in other examples. Other various configurations are also envisioned.
[0043] The chilling coils 115 may be disposed in the path of ambient air that is being drawn into the filter house 130 via the plurality of air intake louvers 120 for combustion in the turbine 110.
Cold water circulates through the chilling coils 115 so that thermal energy in the ambient air is transferred to the cold water to cool the ambient air. In one example, the water temperature is around 40 degrees Fahrenheit; the temperature may depend on the ambient air temperature and humidity. In one example, a higher air temperature and more humid ambient air requires lower temperature water to pass through the chilling coils. A greater amount of energy may be imparted into the turbine by combusting air that is chilled, dry, and dense, rather than air that is warm, moist, and has a low density.
[0044] In one non-limiting example of use, the chiller unit 105 may refrigerate water or any other appropriate fluid to a set temperature point, which may be predetermined and in one embodiment may be around 40 degrees Fahrenheit. In the illustrated example, chilling coils 115 in the turbine filter house 130 act as a dehumidifier to condense moisture from the air being fed to the turbine generator 110. The condensate from the filter house 130 may be collected and deposited into a dedicated condensation holding tank 125 for disposal via a drain line.
[0045] In some embodiments, the collective system formed by the chiller unit 105, cold water supply channel, coils 115, and water return channel may form a closed-loop system. In other embodiments, the collective system may be open.
[0046] FIGS. 2A through 2C show schematic block diagrams 200-a, 200-b, 200-c of alternate examples of coil and inlet air arrangement in the turbine filter house. In these alternate designs, ambient air enters the filter house 230-a, 230-b, 230-c through one or more air intake louvers 220-a, positioned on a periphery of the filter house 230-a, 230-b, 230-c. This arrangement may require a small support (not shown) to help hold up the unbalanced filter house 230-a, 230-b, 230-c. In one embodiment, the filter house weight is less than 12,000 pounds, with most of the weight being supported by the turbine generator structure 210-a, 210-b, 210-c.
[0047] Referring specifically to FIG. 2A, water or another appropriate fluid may be chilled at chiller unit 205-a, and may pass through a cold water supply channel to one or more coils 215-a.
In the illustrated example, the coils 215-a may receive the cold water from the chiller unit 205-a in a parallel arrangement, such that a portion of the cold water flows through each of the coils 215-a before returning to the chiller unit 205-a via the water return channel.
Simultaneously, ambient air may be drawn into the filter house 230-a via one or more air intake louvers 220-a positioned on a periphery of the filter house 230-a, and may be passed along the outer surfaces of the coils 215-a. As the cold water circulates through the chilling coils 215-a, thermal energy in the ambient air is transferred to the cold water to cool the ambient air and slightly warm the cold water. The cooled air may then be passed down into the turbine generator to power the turbine.
[0048] Although illustrated in FIG. 2A as having two coils 215-a, in various embodiments one, three, or more coils may be used.
[0049] FIG. 2B illustrates an alternate embodiment, in which the coils 215-b are positioned in a series arrangement. In this configuration, cold water supplied by chiller unit 205-b may pass through each of the coils 215-b in series before returning to the chiller unit 205-b.
[0050] In another alternate embodiment, FIG. 2C illustrates use of three coils 215-c, positioned in parallel, to receive the cold water and cool the ambient air. In alternate embodiments, the three coils 215-c may be positioned in series, or in any combination of series and parallel.
[0051] Shown in schematic block diagram form in FIG. 3 is one example 300 of an air inlet cooling system used to cool ambient air for use by three turbine generators 310-a, 310-b, 310-c.
In the illustrated example, water or another appropriate fluid may be cooled at chiller unit 305, then passed through a cold fluid supply channel to one or more coils (not shown) positioned within or near each of turbine generators 310-a, 310-b, 310-c in parallel before returning to the chiller unit 305 to be re-chilled. As illustrated in more detail in FIGS. 1 and 2A-C, ambient air may be drawn into a filter house associated with each turbine generator 310-a, 310-b, 310-c through one or more air intake louvers and passed along the outer surface of one or more coils positioned in the filter house (not shown). In addition to cooling the ambient air, moisture in the air may be condensed onto the coil as the air is cooled, which dries the air and allows for a more efficient combustion by the turbine generators 310-a, 310-b, 310-c, producing more power in hot weather and climates.
[0052] In one embodiment, a chiller unit 305 may be mounted on a 48-foot trailer with a total dry weight of less than 50,000 pounds (lbs), and with a life expectancy of around 10 to 12 years of oil field duty. Example chiller units may have a capacity of 450 tons of refrigeration (5,400,000 British thermal units per hour (BTU/hr)), may be powered by 600 volts (V) electricity, and consume up to 600 kilowatts (kW). In other embodiments, alternate configurations are envisioned.
[0053] FIG. 4A shows a block diagram example 400-a of powering a chiller unit 405. As shown, 600 V of electrical power is supplied to the chiller unit 405 from an auxiliary unit 440, which also supplies power to mixing equipment, such as a blender and a hydration unit (not shown) for use in hydraulic fracturing. A turbine generator 415-a, 415-b, an electronic equipment room (EER) 430-a, 430-b, and a switchgear trailer 435 form the basic components of the system. The turbine generator 415-a, 415-b may include a natural gas turbine engine coupled to a three-phase, 60 Hz, electric generator that rotates to produce power. The turbine generator 415-a, 415-b may be electrically connected to the EER 430-a, 430-b, which provides any of wiring, breakers, controls, monitoring, fire suppression support, and a battery bank for secondary power when the turbine generator 415-a, 415-b is not miming or when no other power source is connected. The combination of the turbine generator 415-a, 415-b and the EER 430-a, 430-b may be referred to as a generator set 410-a, 410-b. Each generator set 410-a, 410-b is also illustrated as having an optional elevated walkway (-catwalk") 425-a, 425-b extending between each turbine generator 415-a, 415-b and associated EER 430-a, 430-b. A filter house 420-a, 420-b associated with each generator set 410-a, 410-b may house the air intake louvers and cooling coils described in more detail above with respect to FIGS. 1-3.
[0054] In the illustrated example, a switchgear trailer 435 may be used to provide power distribution, high voltage breakers, and lock-out, tag-out capabilities. The switchgear trailer 435, together with the turbine generator 415-a, 415-b and EER 430-a, 430-b, and optionally with transformers, may form an electrical microgrid. While a pair of generator sets 410-a, 410-b is illustrated in FIG. 4A, the quantity of generator sets may be more or less, as only one is needed to form an electrical microgrid. A switchgear trailer 435 is shown in electrical communication with the generator sets 410-a, 410-b and the auxiliary unit 440. In an example, a single auxiliary unit 440 is provided for every two to four generator sets 410-a, 410-b, and may depend on a particular application.
[0055] In this embodiment, the switchgear trailer 435 is used as an electrical power hub and provides breakers for safety and switching. Lines to and from the switchgear trailer 435 represent electrical cables carrying 13.8 kV power, which is distributed to transformers (not shown) for pumping equipment, such as fracturing pumps (not shown) and auxiliary units 440. Power may then be stepped down to 600 V by the transformers or auxiliary unit 440 (which may contain a transformer). Lines from the auxiliary unit 440 to the chiller unit 405 and to the equipment represent 600 V power cables. The chiller unit 405 as shown is powered by 600 V from auxiliary unit 440. In this way, powering the chiller unit may occur in a closed, single electrical microgrid system.
[0056] As indicated above, the auxiliary unit 440 provides 600 V electrical power and electric motor control to mixing equipment on the hydraulic fracturing fleet in one embodiment. The chiller unit 405 may have onboard motor controls such that only 600 V
electrical power is supplied by auxiliary unit 440 to chiller unit 405. Thus a 13.8 kV to 600 V
step-down transformer may provide necessary electrical power to chiller unit 405, and optionally a transformer may be provided in lieu of the auxiliary unit 440. The cable layout and concept may not be altered in that option. In the example of FIG. 4A, all electrical power is three-phase AC
power. All electrical cables used have an electrical ground and ground check included, have heavy duty insulation, and may be routed along the ground.
[0057] FIG. 4B shows a schematic block diagram 400-b of an alternate power configuration. In the illustrated example, generator sets 410-a, 410-b may provide 13.8 kV power to the microgrid, and may include a 480 V transformer to provide power to compressors, filters, heaters, and other electronics. The 480 V transformer may be used to power chiller unit 405, which may be designed to be powered by 480 V in this embodiment, rather than by 600 V as described in previous embodiments. Line spanning the first EER 430-a and the chiller unit 405 may represent a 480 V power cable. This configuration will also allow the chiller unit 405 to be powered by a black start generator (not shown), which can be a diesel generator used to start the turbine generator sets 410-a, 410-b and to power the EERs 430-a, 430-b before the turbines are self-sufficient to the point of providing power to the microgrid.
[0058] Illustrated in FIG. 4C is a schematic block diagram 400-c of another alternate system for supplying power. In this example, the turbines 415-a, 415-b produce electricity at 4,160 V, and the chiller unit 405 may be powered with this same voltage, without the need for a large three-phase power transformer. However, it is important to note that even for a 4,160 V microgrid, it will still be possible to use a transformer or auxiliary trailer to power a chiller unit 405 designed for 480 V or 600 V.
[0059] In any embodiment, silencers may be included in the filter house 420-a, 420-b to reduce noise emanating from the turbine 415-a, 415-b. In alternate embodiments the silencer is not required for the air inlet chilling system to work properly, and may be omitted.
[0060] Although illustrated in FIGs. 1-4 as having a single chiller unit, in alternate embodiments multiple chiller units may be utilized with sets of turbine generators. In some embodiments, multiple turbines may be utilized with multiple chillers. The chiller units may be designed to be modular such that excess chiller units may be easily removed from, or additional chiller units may be easily added to, a hydraulic fracturing system site without compromising operation of the system. In certain situations it may become more economical to use a multitude of smaller turbines, or due to equipment and power requirements a fleet of large turbines may be required.
[0061] One embodiment (not illustrated) may include two chiller units and six generator sets.
The chiller units may be independent from each other, each supplying chilled fluid to a dedicated bank of turbines; or chiller units may be slaved together to provide cold water as though they were a single unit. It should be pointed out that the physical layout of these generator sets and chiller units is not limited to that of the figures, but may be in any orientation or manner, and may be dependent on the size and shape of a particular job site. In another embodiment, not every turbine onsite requires a chiller unit. Instead, some turbines may be associated with a chiller unit as illustrated above, and other turbines that form part of a fracturing system may not be associated with a chiller unit, but may operate without cooled inlet air and possibly at a reduced power output.
[0062] A preferred fluid being circulated through the chiller units and the filter house coils may include clean tap water. Additives such as glycol or antifreeze may be included to keep the water from freezing if required to circulate fluid below the freezing point of water. Detergents, chlorine, or anticorrosion agents may also be added to the water or fluid to clean or unclog the fluid lines and coils.
[0063] In one example of operation, a 450 ton capacity chiller unit may have a maximum power draw of 600 kW at 600 V three-phase AC. Larger and smaller units may be built, which may be dependent on the climate and cooling requirements, and may have a different maximum power draw. In an example with two units, a total maximum power draw may be 1,200 kW, which is 600 kW for each of the two chiller units. Example cables for use with the system include diesel locomotive cable (DLO cable), which may be routed along the ground between the equipment.
Embodiments exist where two cables for each power phase are used, which may total six power cables for three-phase power. This configuration allows cables to be smaller, lighter, and easier to manage. An equipment ground spanning between the chiller unit and power source may be used, which results in seven single conductor DLO cables per 450 ton chiller unit. However, many possible cable configurations exist. A single cable per phase may be used in some embodiments, or three or more cables per phase may be used in other embodiments.
[0064] It is also possible to use multiconductor cables. These cables may include all three phases and an internal ground. A single multiconductor cable may be used, or several multiconductor cables may be used, to split the power load so that cables may be lighter and smaller. These multiconductor cables may have an internal ground and ground check, or the grounds may be external. These power cables may extend along the ground between equipment.
The cables may also be suspended like power transmission lines, and could also use non-insulated cables in that situation. Alternatively the cables may be buried underground so they are out of sight and are not trip hazards.
[0065] Equipment may be mobile and trailer mounted. It is also possible to make mobile skid-mounted chiller units or bodyload units where the chilling equipment is permanently mounted to a truck frame. The chiller units and filter houses may be designed to cool inlet air for Solar Taurus 60 turbines. The specific turbine is not a requirement, however, and the air inlet chilling system may be designed to work with any turbines, larger or smaller, with minor changes. The chiller unit may contain variable frequency drives (VFDs) to control the fan motors and refrigeration capacity. This is a more expensive option that may be useful for adjusting the cooling output automatically to keep the turbine load higher and to create more efficient power generation. It is also possible to simply use soft starters to run to electric motors, which is an on or off' mode of operation and is cheaper and simpler. However, it is more difficult to adjust the output of the chiller unit by this means.
[0066] The microgrid utilizing turbine generators with air inlet chilling may be used to provide power to hydraulic fracturing equipment in all of the previous examples. This technology of efficient power generation using a closed circuit microgrid may be used for all oilfield applications, including electric drilling rigs, workover rigs, compressor stations, wireline equipment, coil tubing equipment, production equipment, isolated industrial sites, and any other applications requiring sufficient electrical power while also being positioned far from consumer power grids, having inductive loads, or having varying power demands.
[0067] FIG. 5 shows a block diagram of an example 500 of a hydraulic fracturing system which uses a single chiller unit 505 to boost the output from three turbine generators 510-a, 510-b, 510-c. The power generation equipment may be capable of supplying power to operate an 18,000+
HHP (hydraulic horsepower) fleet of hydraulic fracturing equipment in any season and in any climate with fewer turbines than would be necessary in summer months. In some embodiments, ambient temperatures may exceed 100 degrees Fahrenheit and 100% humidity without derating the turbines if 600 tons of refrigeration capacity is available from the chiller unit.
[0068] A fracturing system 500 at a well site is shown with a power generation system 502 and fracturing equipment 504. In this example, the power generation system 502 contains three natural gas powered turbine sets 510-a, 510-b, 510-c that may have one or more turbines apiece, where each turbine is accompanied by an electronic equipment and control room (EER).
In the illustrated example, the turbine sets 510-a, 510-b, 510-c provide electrical power to switchgears 514-a, 514-b, which in turn monitor and control electrical power provided to transformers 516-a, 516-b, 516-c, 516-d, 516-e, 516-f, 516-g, 516-h. The turbine sets 510-a, 510-b, 510-c may be supplied with natural gas onsite, and as their turbines spin they may generate electric power in the range from around 4180 V to around 15 kV. Any well known, natural gas powered turbine suitable to provide this amount or another similar potential of electricity is included in this disclosure. The turbine sets 510-a, 510-b, 510-c may be electrically independent and run in tandem so that in case one or more turbine loses power due to an overload, the other(s) will not shut down, thereby avoiding the sand slurry dropping out of fluid suspension in the wellbore. In some examples, the turbine sets 510-a, 510-b, 510-c may be initially powered by black start generator 512.
[0069] The transformers 516-a, 516-b, 516-c, 516-d, 516-e, 516-f, 516-g, 516-h may step down the voltage from 13.8 kV to 600 V and provide power to the twin fracturing pump trailers 520-a, 520-b, 520-c, 520-d, 520-e, 520-f, 520-g, 520-h. The pump trailers 520-a, 520-b, 520-c, 520-d, 520-e, 520-f, 520-g, 520-h may include electric motors (not shown), which in one example operate at 600 V each. The auxiliary trailers 518-a, 518-b may take the electricity at 13.8 kV from the switchgears 514-a, 514-b and provide 600 V to data van 528, sand equipment 526, hydration unit 524, blenders 522-a, 522-b, or substation 530, as well as to chiller unit 505. The auxiliary trailers 518-a, 518-b may also include transformers for stepping down the voltage.
[0070] The present disclosure described herein, therefore, is well adapted to carry out the objects and attain the ends and advantages mentioned, as well as others inherent therein. While a presently preferred embodiment of the disclosure has been given for purposes of disclosure, numerous changes exist in the details of procedures for accomplishing the desired results. These and other similar modifications will readily suggest themselves to those skilled in the art, and are intended to be encompassed within the spirit of the present disclosure disclosed herein and the scope of the appended claims.
Claims (32)
a plurality of electric pumps fluidly connected to a well associated with the subterranean formation and powered by at least one electric motor, and configured to pump fluid into a wellbore associated with the well at a high pressure so that the fluid passes from the wellbore into the subterranean formation and fractures the subterranean formation;
at least one turbine generator electrically coupled to the plurality of electric pumps so as to generate electricity for use by the plurality of electric pumps, each turbine generator having at least one air intake channel;
a transformer having a high voltage input in electrical communication with an electrical output of the turbine generator, and a low voltage output; and a step down transformer having an input that is in electrical communication with the low voltage output of the transformer; and an air chiller system associated with the at least one turbine generator, the air chiller system comprising:
a chiller unit configured to chill a fluid; and at least one coil in fluid communication with the chiller unit and positioned adjacent to the at least one air intake channel, wherein the air chiller system is configured to increase a power output of the at least one turbine generator; and wherein the step down transformer has an output that is in electrical communication with the air chiller system so as to provide electricity for use by the air chiller system.
Date Recue/Date Received 2020-08-20
a variable frequency drive connected to the at least one electric motor to control the speed of the at least one electric motor, wherein the variable frequency drive frequently performs electric motor diagnostics to prevent damage to the at least one electric motor.
Date Recue/Date Received 2020-08-20
a plurality of electric pumps fluidly connected to a well associated with the subterranean formation and powered by at least one electric motor, and configured to pump fluid into a wellbore associated with the well at a high pressure so that the fluid passes from the wellbore into the subterranean formation and fractures the subterranean formation;
a variable frequency drive connected to the at least one electric motor to control the speed of the at least one electric motor, wherein the variable frequency drive frequently performs electric motor diagnostics to prevent damage to the at least one electric motor;
at least one turbine generator electrically coupled to the plurality of electric pumps so as to generate electricity for use by the plurality of electric pumps, each turbine generator having at least one air intake channel;
a transformer having a high voltage input in electrical communication with an electrical output of the turbine generator, and a low voltage output; and a step down transformer having an input that is in electrical communication with the low voltage output of the transformer; and an air chiller system associated with the at least one turbine generator, the air chiller system comprising:
a chiller unit configured to chill a fluid; and at least one coil in fluid communication with the chiller unit and positioned adjacent to the at least one air intake channel, wherein the air chiller system is configured to increase a power output of the at least one turbine generator; and Date Recue/Date Received 2020-08-20 wherein the step down transfomier has an output that is in electrical communication with the air chiller system so as to provide electricity for use by the air chiller system.
a plurality of electric pumps fluidly connected to a well associated with the subterranean formation and powered by at least one electric motor, and configured to pump fluid into a wellbore associated with the well at a high pressure so that the fluid passes from the wellbore into the subterranean formation and fractures the subterranean formation;
Date Recue/Date Received 2020-08-20 at least one turbine generator electrically coupled to the plurality of electric pumps so as to generate electricity for use by the plurality of electric pumps, each turbine generator having at least one air intake channel;
a transformer having a primary voltage input in electrical communication with an electrical output of the turbine generator;
a second transformer having an input that is in electrical communication with a secondary voltage output of the transformer; and an air chiller system associated with the at least one turbine generator, the air chiller system comprising:
a chiller unit configured to chill a fluid; and at least one coil in fluid communication with the chiller unit, wherein the second transformer has an output that is in electrical communication with the air chiller system so as to provide electricity for use by the air chiller system.
Date Recue/Date Received 2020-08-20
a variable frequency drive connected to the at least one electric motor to control the speed of the at least one electric motor.
a plurality of electric pumps fluidly connected to a well associated with the subterranean formation and powered by at least one electric motor, and configured to pump fluid into a wellbore associated with the well at a high pressure so that the fluid passes from the wellbore into the subterranean formation and fractures the subterranean formation;
a variable frequency drive connected to the at least one electric motor to control the speed of the at least one electric motor;
at least one turbine generator electrically coupled to the plurality of electric pumps so as to generate electricity for use by the plurality of electric pumps;
Date Recue/Date Received 2020-08-20 a transformer having a high voltage input in electrical communication with an electrical output of the turbine generator, and a low voltage output;
a step down transformer having an input that is in electrical communication with the low voltage output of the transformer; and an air chiller system associated with the at least one turbine generator, the air chiller system comprising:
a chiller unit configured to chill a fluid; and at least one coil in fluid communication with the chiller unit, wherein the step down transformer has an output that is in electrical communication with the air chiller system so as to provide electricity for use by the air chiller system.
Date Recue/Date Received 2020-08-20
Date Recue/Date Received 2020-08-20
Applications Claiming Priority (4)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US201662323236P | 2016-04-15 | 2016-04-15 | |
| US62/323,236 | 2016-04-15 | ||
| US15/235,788 | 2016-08-12 | ||
| US15/235,788 US11476781B2 (en) | 2012-11-16 | 2016-08-12 | Wireline power supply during electric powered fracturing operations |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CA2964595A1 CA2964595A1 (en) | 2017-10-15 |
| CA2964595C true CA2964595C (en) | 2021-06-01 |
Family
ID=60084205
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CA2964595A Active CA2964595C (en) | 2016-04-15 | 2017-04-18 | Turbine chilling for oil field power generation |
Country Status (1)
| Country | Link |
|---|---|
| CA (1) | CA2964595C (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US12444910B2 (en) | 2022-11-01 | 2025-10-14 | Typhon Technology Solutions (U.S.), Llc | Method for accessing electric grids to power fracturing operations |
-
2017
- 2017-04-18 CA CA2964595A patent/CA2964595C/en active Active
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US12444910B2 (en) | 2022-11-01 | 2025-10-14 | Typhon Technology Solutions (U.S.), Llc | Method for accessing electric grids to power fracturing operations |
Also Published As
| Publication number | Publication date |
|---|---|
| CA2964595A1 (en) | 2017-10-15 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US11454170B2 (en) | Turbine chilling for oil field power generation | |
| US11451016B2 (en) | Switchgear load sharing for oil field equipment | |
| US12142928B2 (en) | Integrated mobile power unit for hydraulic fracturing | |
| US11680474B2 (en) | Fracturing apparatus and control method thereof, fracturing system | |
| CA2964593C (en) | Switchgear load sharing for oil field equipment | |
| US12448877B2 (en) | High horsepower pumping configuration for an electric hydraulic fracturing system | |
| US12312930B2 (en) | Fracturing system | |
| US11746636B2 (en) | Fracturing apparatus and control method thereof, fracturing system | |
| US11512632B2 (en) | Single-transport mobile electric power generation | |
| US20230392479A1 (en) | High capacity power storage system for electric hydraulic fracturing | |
| US12555984B2 (en) | Switchgear load sharing for oil field equipment | |
| US20230279762A1 (en) | Fracturing apparatus and control method thereof, fracturing system | |
| CN114109335A (en) | Fracturing equipment driven by variable-frequency speed-regulating all-in-one machine | |
| EP4226021B1 (en) | Single-transport mobile electric power generation | |
| CA2964595C (en) | Turbine chilling for oil field power generation | |
| US20230077170A1 (en) | Low voltage power generation system for fluid pumping in well operations | |
| US20230184129A1 (en) | Energy recovery for high power pumping systems and methods using exhaust gas heat to generate thermoelectric power |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| EEER | Examination request |
Effective date: 20180619 |
|
| MPN | Maintenance fee for patent paid |
Free format text: FEE DESCRIPTION TEXT: MF (PATENT, 8TH ANNIV.) - STANDARD Year of fee payment: 8 |
|
| U00 | Fee paid |
Free format text: ST27 STATUS EVENT CODE: A-4-4-U10-U00-U101 (AS PROVIDED BY THE NATIONAL OFFICE); EVENT TEXT: MAINTENANCE REQUEST RECEIVED Effective date: 20250305 |
|
| U11 | Full renewal or maintenance fee paid |
Free format text: ST27 STATUS EVENT CODE: A-4-4-U10-U11-U102 (AS PROVIDED BY THE NATIONAL OFFICE); EVENT TEXT: MAINTENANCE FEE PAYMENT DETERMINED COMPLIANT Effective date: 20250305 |