CA2939553C - Mecanisme de soupape a butee a delais hydraulique - Google Patents

Mecanisme de soupape a butee a delais hydraulique Download PDF

Info

Publication number
CA2939553C
CA2939553C CA2939553A CA2939553A CA2939553C CA 2939553 C CA2939553 C CA 2939553C CA 2939553 A CA2939553 A CA 2939553A CA 2939553 A CA2939553 A CA 2939553A CA 2939553 C CA2939553 C CA 2939553C
Authority
CA
Canada
Prior art keywords
time delay
piston
controlled
openings
controlled time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CA2939553A
Other languages
English (en)
Other versions
CA2939553A1 (fr
Inventor
Kevin R. George
James A. Rollins
John T. Hardesty
David S. Wesson
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Geodynamics Inc
Original Assignee
Geodynamics Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from US14/840,473 external-priority patent/US9650866B2/en
Application filed by Geodynamics Inc filed Critical Geodynamics Inc
Publication of CA2939553A1 publication Critical patent/CA2939553A1/fr
Application granted granted Critical
Publication of CA2939553C publication Critical patent/CA2939553C/fr
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B34/00Valve arrangements for boreholes or wells
    • E21B34/06Valve arrangements for boreholes or wells in wells
    • E21B34/063Valve or closure with destructible element, e.g. frangible disc
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B34/00Valve arrangements for boreholes or wells
    • E21B34/06Valve arrangements for boreholes or wells in wells
    • E21B34/08Valve arrangements for boreholes or wells in wells responsive to flow or pressure of the fluid obtained
    • E21B34/085Valve arrangements for boreholes or wells in wells responsive to flow or pressure of the fluid obtained with time-delay systems, e.g. hydraulic impedance mechanisms
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B34/00Valve arrangements for boreholes or wells
    • E21B34/06Valve arrangements for boreholes or wells in wells
    • E21B34/10Valve arrangements for boreholes or wells in wells operated by control fluid supplied from outside the borehole
    • E21B34/108Valve arrangements for boreholes or wells in wells operated by control fluid supplied from outside the borehole with time delay systems, e.g. hydraulic impedance mechanisms
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/20Displacing by water
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B2200/00Special features related to earth drilling for obtaining oil, gas or water
    • E21B2200/06Sleeve valves
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B34/00Valve arrangements for boreholes or wells
    • E21B34/06Valve arrangements for boreholes or wells in wells
    • E21B34/14Valve arrangements for boreholes or wells in wells operated by movement of tools, e.g. sleeve valves operated by pistons or wire line tools

Landscapes

  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • Fluid-Pressure Circuits (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

Il est décrit un appareil et un procédé prévoyant un délai de temporisation pendant linjection dun fluide pressurisé dans une formation géologique. Dans un aspect de linvention, une vanne de jonction activée par la pression dun fluide ouvre des orifices à la suite dun intervalle de temps déterminé pour permettre au fluide de passer dun tubage de puits à une formation. Le délai de temporisation contrôlé permet de tester lintégrité du tubage avant que le fluide ne passe par les orifices. Ce délai de temporisation permet également dutiliser plusieurs vannes dans le même tubage de puits et dexercer une action de nettoyage au jet ciblée pouvant mieux pénétrer le revêtement dun tubage en béton.
CA2939553A 2015-08-31 2016-08-22 Mecanisme de soupape a butee a delais hydraulique Active CA2939553C (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US14/840,473 2015-08-31
US14/840,473 US9650866B2 (en) 2013-03-07 2015-08-31 Hydraulic delay toe valve system and method

Publications (2)

Publication Number Publication Date
CA2939553A1 CA2939553A1 (fr) 2017-02-28
CA2939553C true CA2939553C (fr) 2023-10-03

Family

ID=56799308

Family Applications (1)

Application Number Title Priority Date Filing Date
CA2939553A Active CA2939553C (fr) 2015-08-31 2016-08-22 Mecanisme de soupape a butee a delais hydraulique

Country Status (3)

Country Link
EP (2) EP3219906B1 (fr)
CN (1) CN106481309B (fr)
CA (1) CA2939553C (fr)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107130945A (zh) * 2017-07-03 2017-09-05 西安石油大学 一种破裂盘射孔套管接箍装置
CN109505535A (zh) * 2017-09-15 2019-03-22 中国石油天然气股份有限公司 一种管柱
CA2994290C (fr) 2017-11-06 2024-01-23 Entech Solution As Methode et manchon de stimulation destines a la completion de puits dans un puits de forage souterrain
CN109296348B (zh) * 2018-10-31 2023-09-15 中国石油集团川庆钻探工程有限公司 延时开启趾端滑套
CN109296349B (zh) * 2018-11-05 2023-09-15 中国石油集团川庆钻探工程有限公司 活塞式延时开启趾端滑套
CA3120557A1 (fr) * 2018-11-26 2020-06-04 Geodynamics, Inc. Valve electronique ayant un siege deformable et procede
CN111021990B (zh) * 2019-12-18 2023-07-25 中国石油天然气股份有限公司 一种固井完井用可溶趾端滑套及其使用方法
CA3163138A1 (fr) 2019-12-27 2021-07-01 Rio WHYTE Systemes et procedes de production de materiau hydrocarbone a partir de formations non consolidees
CN113153253B (zh) * 2020-01-07 2022-08-30 中国石油天然气股份有限公司 水平井复合压裂方法
CN112780221B (zh) * 2021-03-03 2021-11-02 东营市友佳石油科技有限公司 储层无污染免射孔固井工具装置及方法
CN113110013B (zh) * 2021-04-02 2024-05-28 山西汾西重工有限责任公司 一种延时时间测试装置

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6763892B2 (en) 2001-09-24 2004-07-20 Frank Kaszuba Sliding sleeve valve and method for assembly
NO20051733D0 (no) * 2005-04-08 2005-04-08 Well Innovation As Fremgangsmate for bruk av en hydraulisk belastningskompensert tidsforsinkelse
CA3019456A1 (fr) * 2011-05-02 2012-11-02 Peak Completion Technologies, Inc. Outil de fond de trou
US8267178B1 (en) * 2011-09-01 2012-09-18 Team Oil Tools, Lp Valve for hydraulic fracturing through cement outside casing
US10107076B2 (en) * 2012-11-21 2018-10-23 Peak Completion Technologies, Inc Downhole tools, systems and methods of using
US9121247B2 (en) * 2013-03-07 2015-09-01 Geodynamics, Inc. Method and apparatus for establishing injection into a cased bore hole using a time delay toe injection apparatus
CA2892128C (fr) * 2015-05-20 2016-08-23 Geodynamics, Inc. Procede et appareil permettant l'injection dans un trou de forage gaine au moyen d'une injection de butee temporisee

Also Published As

Publication number Publication date
EP3138993B1 (fr) 2021-01-20
CA2939553A1 (fr) 2017-02-28
CN106481309A (zh) 2017-03-08
EP3219906B1 (fr) 2019-10-09
EP3219906A1 (fr) 2017-09-20
EP3138993A2 (fr) 2017-03-08
CN106481309B (zh) 2021-05-07
EP3138993A3 (fr) 2017-04-19

Similar Documents

Publication Publication Date Title
US9650866B2 (en) Hydraulic delay toe valve system and method
CA2939553C (fr) Mecanisme de soupape a butee a delais hydraulique
US10138725B2 (en) Hydraulic delay toe valve system and method
US10066461B2 (en) Hydraulic delay toe valve system and method
EP3135855A1 (fr) Système et procédé de soupape d'orteil de retard hydraulique
US20150369009A1 (en) Hydraulic Delay Toe Valve System and Method
US10138709B2 (en) Hydraulic delay toe valve system and method
US9121252B2 (en) Method and apparatus for establishing injection into a cased bore hole using a time delay toe injection apparatus
US8739879B2 (en) Hydrostatically powered fracturing sliding sleeve
US9915122B2 (en) Downhole tools, system and methods of using
US10337285B2 (en) Time-delayed downhole tool
RU2733998C2 (ru) Устройство, системы и способы многоступенчатой стимуляции
US7866392B2 (en) Method and apparatus for sealing and cementing a wellbore
US20140318780A1 (en) Degradable component system and methodology
US20140251619A1 (en) Method and Apparatus for Establishing Injection into a Cased Bore Hole using a Time Delay Toe Injection Apparatus
AU2012244360B2 (en) Resettable ball seat
WO2013070446A1 (fr) Procédé de complétion pour stimulation d'intervalles multiples
US20170107790A1 (en) Casing mounted metering device
CA2892128C (fr) Procede et appareil permettant l'injection dans un trou de forage gaine au moyen d'une injection de butee temporisee
US9995109B2 (en) Inflow control device that controls fluid through a tubing wall
US9580989B2 (en) Interventionless method of setting a casing to casing annular packer
AU2015202102A1 (en) Method and Apparatus for Establishign Injection into a Cased Bore Hole Using a Time Delay Toe Injection Apparatus

Legal Events

Date Code Title Description
EEER Examination request

Effective date: 20210820

EEER Examination request

Effective date: 20210820

EEER Examination request

Effective date: 20210820

EEER Examination request

Effective date: 20210820

EEER Examination request

Effective date: 20210820

EEER Examination request

Effective date: 20210820

EEER Examination request

Effective date: 20210820

EEER Examination request

Effective date: 20210820