CA2913827A1 - Methods, systems and devices for predicting reservoir properties - Google Patents

Methods, systems and devices for predicting reservoir properties Download PDF

Info

Publication number
CA2913827A1
CA2913827A1 CA2913827A CA2913827A CA2913827A1 CA 2913827 A1 CA2913827 A1 CA 2913827A1 CA 2913827 A CA2913827 A CA 2913827A CA 2913827 A CA2913827 A CA 2913827A CA 2913827 A1 CA2913827 A1 CA 2913827A1
Authority
CA
Canada
Prior art keywords
well
data
subterranean formation
production rate
predicted
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CA2913827A
Other languages
French (fr)
Other versions
CA2913827C (en
Inventor
Frederick David Gray
Dragana Todorovic-Marinic
Byron Matthew Kelly
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CNOOC Petroleum North America ULC
Original Assignee
Nexen Energy ULC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nexen Energy ULC filed Critical Nexen Energy ULC
Publication of CA2913827A1 publication Critical patent/CA2913827A1/en
Application granted granted Critical
Publication of CA2913827C publication Critical patent/CA2913827C/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V11/00Prospecting or detecting by methods combining techniques covered by two or more of main groups G01V1/00 - G01V9/00
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V2210/00Details of seismic processing or analysis
    • G01V2210/60Analysis
    • G01V2210/66Subsurface modeling
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V2210/00Details of seismic processing or analysis
    • G01V2210/60Analysis
    • G01V2210/66Subsurface modeling
    • G01V2210/663Modeling production-induced effects

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Economics (AREA)
  • General Physics & Mathematics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Marketing (AREA)
  • Mining & Mineral Resources (AREA)
  • Tourism & Hospitality (AREA)
  • Geology (AREA)
  • General Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Theoretical Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Development Economics (AREA)
  • Fluid Mechanics (AREA)
  • Public Health (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Water Supply & Treatment (AREA)
  • Game Theory and Decision Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Geophysics (AREA)
  • Geophysics And Detection Of Objects (AREA)

Abstract

Methods, devices and computer-readable media for predicting hydrocarbon production rates for a subterranean formation are described. A method includes: receiving or generating, by at least one processor, well logs from data collected from at least one well in the subterranean formation; generating from the well logs a predicted production rate log for the at least one well; receiving, by the at least one processor, a field dataset for the subterranean formation, the field dataset including field data at locations in 3-dimensions of a volume of the subterranean formation; identifying the predicted production rate log for the at least one well as one or more targets, determining a transform relating the field data and the predicted rate log for the at least one well; and using the transform, generating a predicted production rate for each location of the volume of the subterranean formation.

Description

METHODS, SYSTEMS AND DEVICES FOR PREDICTING
RESERVOIR PROPERTIES
FIELD
[0001] The present application relates to the field of reservoir modelling, and particularly to methods, systems and devices for modelling subterranean dynamic reservoir properties based on collected physical data.
BACKGROUND
[0002] Hydrocarbon exploration involves trade-offs between the number and spacing of wells (and associated costs) and the accuracy of data which may impact production forecasting and resource development planning. Often geological properties obtained from various wells use average properties over a given area to provide an assessment of a reservoir. It some instances, estimating with averages may provide a limited picture of geological variations in a subterranean formation.
SUMMARY
[0003] In accordance with one aspect, there is provided a method of predicting hydrocarbon production rates for a subterranean formation. The method includes: receiving or generating, by at least one processor, well logs from data collected from at least one well in the subterranean formation; generating from the well logs a predicted production rate log for the at least one well; receiving, by the at least one processor, a field dataset for the subterranean formation, the field dataset including field data at locations in 3-dimensions of a volume of the subterranean formation; identifying the predicted production rate log for the at least one well as one or more targets, determining a transform relating the field data and the predicted rate log for the at least one well; and using the transform, generating a predicted production rate for each location of the volume of the subterranean formation.
[0004] In accordance with another aspect, there is provided a device for predicting hydrocarbon production rates for a subterranean formation. The device includes at least one processor configured for: receiving or generating well logs from data collected from at least one well in the subterranean formation; generating from the well logs a predicted production rate log for the at least one well; receiving a field dataset for the subterranean formation, the field dataset including field data at locations in 3-dimensions of a volume of the subterranean formation; identifying the predicted production rate log for the at least one well as one or more targets, determining a transform relating the field data and the predicted rate log for the at least one well; and using the transform, generating a predicted production rate for each location of the volume of the subterranean formation.
[0005] In accordance with another aspect, there is provided a non-transitory computer-readable medium or media having stored thereon, computer-readable instructions. The computer-readable instructions, when executed by at least one processor, configure the at least one processor for: receiving or generating well logs from data collected from at least one well in the subterranean formation; generating from the well logs a predicted production rate log for the at least one well; receiving a field dataset for the subterranean formation, the field dataset including field data at locations in 3-dimensions of a volume of the subterranean formation; identifying the predicted production rate log for the at least one well as one or more targets, determining a transform relating the field data and the predicted rate log for the at least one well; and using the transform, generating a predicted production rate for each location of the volume of the subterranean formation.
[0006] Many further features and combinations thereof concerning embodiments described herein will appear to those skilled in the art following a reading of the present disclosure.
DESCRIPTION OF THE FIGURES
[0007] In the figures,
[0008] Fig. 1 is a cross sectional view of an example geological formation and well;
[0009] Fig. 2 is an example system to which aspects of the present disclosure may be applied;
[0010] Figs. 3 and 4 are cross sectional view of example geological formations including example energy sources and sensors;
[0011] Figs. 5, 6 and 7 are flowcharts illustrating aspects of an example method for predicting reservoir properties;
[0012] Fig. 8 is a chart showing example well log data;
[0013] Fig. 9 is a chart showing an example linear regression;
[0014] Fig. 10 is a visual representation of example predicted production rates in three-dimensions as illustrated along wells and through an example geological formation;
[0015] Fig. 11 is a top view map of an example drainage area showing different predicted production rates; and
[0016] Fig. 12 is a visual representation of example predicted production rates as they vary along the length of the various wells.
DETAILED DESCRIPTION
[0017] In hydrocarbon development, accurate estimations of rates of production can help provide information regarding the value and/or viability of a project/resource. These estimations may also guide the number and location of wells. Due to the high cost of development, there can be significant financial incentives to have as much and as accurate information as possible. In some examples, it may be important to keep the cost and amount of time spent acquiring the information low.
[0018] In some estimation methods such as fractal contouring, average well values are determined and then can be geologically contoured by a geologist or computer algorithm to estimate information between wells.
[0019] In some embodiments, aspects of the present disclosure may provide more potentially accurate and/or more granular predicted rates of production based on measured geological properties between wells.
[0020] Fig. 1 illustrates a cross-sectional view of a subterranean resource or geological formation 110 which may include a number of different layers of materials having different physical characteristics as illustrated in Fig. 1 by the lines in the formation. It should be understood that these lines are illustrative only and that geological formations may have any number of layers or types of material which may not have distinct delineations but may be gradual or may contain mixtures or combinations of different material. There may also be lateral and/or vertical variations in the types of material contained within any of the geological formations.
[0021] In evaluating the subsurface or subterranean formations, in some examples, data can be collected from one or more wells 100 drilled into or around the formations. In some examples, the wells can be exploratory wells, production wells or wells for any other purpose. The wells can include vertical wells, horizontal wells, or any wells of any direction or structure, and/or any combination thereof.
[0022] In some examples, data collected from the well(s) 100 can include or can be used to create logs of the geologic formations penetrated by the well(s). The data can be collected from core samples or by measurements taken by devices in the borehole.
[0023] In some examples, the well data collected or generated from well measurements can include, but are not limited to, gamma ray logs, bulk density logs, neutron density logs, induction resistivity logs, and/or well core or image data.
[0024] The embodiments of the devices, systems and methods described herein may be implemented in a combination of both hardware and software. These embodiments may be implemented on programmable computers, each computer including at least one processor, a data storage system (including volatile memory or non-volatile memory or other data storage elements or a combination thereof), and at least one communication interface.
[0025] Program code may be applied to input data to perform the functions described herein and to generate output information. The output information may be applied to one or more output devices. In some embodiments, the communication interface may be a network communication interface. In embodiments in which elements may be combined, the communication interface may be a software communication interface, such as those for inter-process communication. In still other embodiments, there may be a combination of communication interfaces implemented as hardware, software, and combination thereof. In some examples, devices having at least one processor may be configured to execute software instructions stored on a computer readable tangible, non-transitory medium.
[0026] The following discussion provides many example embodiments.
Although each embodiment represents a single combination of inventive elements, other examples may include all possible combinations of the disclosed elements. Thus if one embodiment comprises elements A, B, and C, and a second embodiment comprises elements B
and D, other remaining combinations of A, B, C, or D, may also be used.
[0027] The technical solution of embodiments may be in the form of a software product.
The software product may be stored in a non-volatile or non-transitory storage medium, which can be a compact disk read-only memory (CD-ROM), a USB flash disk, or a removable hard disk. The software product includes a number of instructions that enable a computer device (personal computer, server, or network device) to execute the methods provided by the embodiments.
[0028] The embodiments described herein are implemented by physical computer hardware, including computing devices, servers, receivers, transmitters, processors, memory, displays, and networks. The embodiments described herein provide useful physical machines and particularly configured computer hardware arrangements. The embodiments described herein are directed to electronic machines and methods implemented by electronic machines adapted for processing and transforming electromagnetic signals which represent various types of information. The embodiments described herein pervasively and integrally relate to machines, and their uses; and the embodiments described herein have no meaning or practical applicability outside their use with computer hardware, machines, and various hardware components. Substituting the physical hardware particularly configured to implement various acts for non-physical hardware, using mental steps for example, may substantially affect the way the embodiments work. Such computer hardware limitations are clearly essential elements of the embodiments described herein, and they cannot be omitted or substituted for mental means without having a material effect on the operation and structure of the embodiments described herein. The computer hardware is essential to implement the various embodiments described herein and is not merely used to perform steps expeditiously and in an efficient manner.
[0029] Fig. 2 shows an example system 200 include one or more devices 205 which may be used to predict hydrocarbon production rates. In some examples, a device 205 may be a computational device such as a computer, server, tablet or mobile device, or other system, device or any combination thereof suitable for accomplishing the purposes described herein.
In some examples, the device 205 can include one or more processor(s) 210, memories 215, and/or one or more devices/interfaces 220 necessary or desirable for input/output, communications, control and the like. The processor(s) 210 and/or other components of the device(s) 205 or system 250 may be configured to perform one or more aspects of the processes described herein.
[0030] In some examples, the device(s) 205 may be configured to receive or access data from one or more volatile or non-volatile memories 215, or external storage devices 225 directly coupled to a device 205 or accessible via one or more wired and/or wireless network(s) 260. In external storage device(s) 225 can be a network storage device or may be part of or connected to a server or other device.
[0031] In some examples, the device(s) 205 may be configured to receive or access data from sensors or devices 230 in the field. These sensors or devices 230 may be configured for collecting or measuring well, seismic or other geological and/or physical data. In some examples, the sensor(s)/device(s) 230 can be configured to communicate the collected data to the device(s) 205 and/or storage device(s) 225 via one or more networks 260 or otherwise. In some examples, the sensors or devices 230 may be connected to a local computing device 240 which may be configured to receive the data from the sensors/devices 230 for local storage and/or communication to the device(s) 205 and/or storage device(s) 225.
[0032] In some examples, a client device 250 may connect to or otherwise communicate with the device(s) 205 to gain access to the data and/or to instruct or request that the device(s) 205 perform some or all of the aspects described herein.
[0033] With reference to Figs. 3 and 4, subterranean resource or geological formation data can be collected from the field to ascertain information between wells and/or information otherwise not provided by well log data.
[0034] Similar to Fig. 1, Figs 3 and 4 illustrate a cross-sectional views of a subterranean resource or geological formation 110 which may include a number of different layers of materials having different physical characteristics as illustrated by the lines in the formation.
It should be understood that these lines are illustrative only and that geological formations may have any number of layers or types of material which may not have distinct delineations but may be gradual or may contain mixtures or combinations of different material. In some instances, each individual geological formation may have lateral and / or vertical variations in the types of materials of which they are comprised.
[0035] Field data may be used to create logs for porosity, saturation, permeability, and/or other similar static properties and has been used to create a sum or average for these attributes over a two-dimensional area. However, these averages or totals may provide a limited granularity as to the dynamic flow properties of a geological formation.
[0036] In Fig. 3, a controlled energy source 310 such as a seismic vibrator, dynamite or other explosive, air gun, or the like can be configured to generate seismic waves. Sensors 300 such as geophones, accelerometers, MEMS devices, seismometers, receivers and the like can be positioned at the surface or elsewhere to collect seismic data associated with the geological formation(s) 110 based on reflected or otherwise detected seismic waves.
[0037] In some examples, the sensors 300 can be positioned to generate a three-dimensional (3D) log or grid of data points for locations within the subterranean formation(s).
[0038] In some examples, the sensors 300 can be positioned such that reflected waves have a larger angle of incidence 0 which can in some examples provide greater density information for the geological formations. In some examples, the amount of density information acquired from a detected wave may be a function of the sine of the angle of incidence. By way of example, the following is an equation relating density to the sine of the angle of impedance:
-Acr Ap _4,62 Ap Afi R(0), + tan 0)( sin' 0 + 13:
sin 2 0 - tan 2 0 AP
\2 2 a p a, 2 p 2 _ P

where 8 is the angle, R(8) is the seismic response with angle, a is the average compressional wave velocity, 13 is the average shear wave velocity, p is the average density, and A is an operator indicating the change in the above properties across a boundary.
[0039] In some examples, one or more sensors 300 can be positioned to collect data from wide-angle waves such as waves having an angle of incidence of 45 degrees or greater to provide a desired level of density information. The sensors can also be positioned as a function of the depth of the target formation.
[0040] Any number or arrangement of sensors and energy source locations can be used to create the desired resolution of data points in the 3D volume of the formations.
[0041] Fig. 4 shows another example whereby sensors 300 can be positioned in a well to collect vertical seismic profile data. In another example, energy source(s) 310 can be positioned in a well, and sensors 300 can be positioned at the surface to collect reverse vertical seismic profile data. In another example, energy source(s) 310 can be positioned in one well, and sensors 300 can be positioned in a second well to collect cross-well seismic data.
[0042] In some examples, combinations of seismic or other field data collected from any number of source/sensor arrangements can be combined to create one or more field data sets.
[0043] In some examples, field data regarding the subterranean formations can be additionally or alternatively collected. Such data can include electromagnetic data, gravity data and the like.
[0044] Any subset or combination of the aforementioned data sources may be used to collect field data for use in the prediction of hydrocarbon production rates.
[0045] Fig. 5 shows a flowchart illustrating aspects of an example method 500 for predicting hydrocarbon production rates for a subterranean resource. At 510, one or more processor(s) 210 and/or other aspects of device(s) 205 may be configured to receive or generate well logs from data collected from at least one well in the subterranean formation 110.
[0046] In some examples, the well logs can be received or accessed from one or more memories 215, storage devices 215, 225, and/or sensors or field devices 230, 240. In some examples, the well logs can include gamma ray well log(s), bulk density well log(s), neutron density well log(s), resistivity well log(s), core and/or well image data, nuclear magnetic resonance log(s), and/ or any other well log that can be measured in the well.
[0047] As illustrated by the flow diagram in Fig. 6, in some examples, well logs, such as logs derived directly from measured values, can be used to generate additional well logs. In some examples, these generated well logs can include, but are not limited to, logs for fractional porosity, fractional oil saturation, permeability in any direction, and/or height or exploitable bitumen in place. Fig. 6 includes example equations and models for deriving, generating or otherwise determining logs and values which may be used to generate a predicted production rate log, and which, in some examples, are based on data representative of physical measurements or attributes of a well or formation.
In some examples, some of the petrophysical and/or other equations/models may be industry standards as described, for example, in "Crain's Petrophysical Handbook", Ross Crain;
Woodhouse, R. "Athabasca Tar Sand Reservoir Properties Derived from Cores and Logs", Transactions SPWLA 17th Annual Logging Symposium, Paper T,1976; Deutsch Permeability - Hosseini, A.H., Leuangthong, O., and Deutsch, C.V., "An integrated Approach to Permeability Modeling Using Micro Models", SPE-117517-PP, 2008;
SPE/PS/CHOA Heavy Oil Symposium, October 20-23, 2008, Calgary, AB.
[0048] In some examples, the reservoir height H can be one of or the lesser of the height of the formation, the height of the bitumen within the formation, or the height of the first barrier to fluid flow above the base of the bitumen within the formation. The reservoir height can be measured from the base of the formation, the base of the bitumen, or the elevation of a well placed in the formation.
[0049] In some examples, some or all of the generated well logs may be generated by the processor(s) 210 of device 205 from received or accessed well log data. In some examples, some or all of the generated well logs may have been previously generated by a remote, field 240 or other device and may be stored at and accessed/received from one or more storage device(s) 225, 215 and/or memory(ies) 215.
[0050] At 520, processor(s) can be configured to generate a predicted production rate log for each of one or more wells based on the received or generated well logs. In steam-assisted gravity drainage (SAGD) hydrocarbon production techniques, the estimated maximum production rate can be determined by the equation:
2.436Solf jaH
Q = 2 L _______________________________________ 7111)s wherein Q is the oil rate, L is the horizontal length of the well, cl) is the fractional porosity, AS, is the difference between initial oil saturation and residual oil saturation to steam, K is permeability, g, is the acceleration due to gravity, a is the thermal diffusivity of the reservoir, H is the reservoir height, m is a constant between 3 and 4 depending on the oil viscosity to temperature relation, and vs is the kinematic viscosity of crude at steam temperature.
[0051] In some examples, by combining the values that are generally constant over a large area, the equation can be expressed as:
Q = C L Vc136S0KH
wherein C is an estimated constant. In some examples, processor(s) can be configured to calculate C for a reservoir based on measured maximum production rate data for one or more wells associated with the reservoir. In some examples, processor(s) can be configured to calculate C using a prediction simulator such as Computer Modelling Group Ltd.'s STARS
software. In some examples, the simulator can be configured to divide a reservoir into cells and to solve differential equations at the cell boundaries to determine values for calculating or estimating C.
[0052] In some examples, the processor(s) can be configured to determine C based on a measured and/or simulated production rate for one or more wells. The processor(s) can be configured to obtain Q by dividing by the length of the respective one or more wells. Based on the values for Q, L, cI, AS,, K and H for each well for which production rates were measured or simulated, the processor(s) can apply the equation above to estimate the value of C for each well.
[0053] In some examples, the processor(s) can be configured to estimate C
for an entire region/project/resource, etc using a measure of a central value for C (e.g.
mean, average, median, mode values). In some examples, the overall estimate for C may be based on the estimated C values for each well and the well locations relative to each other.
[0054] In some examples, with this later equation, the processor(s) at 520 can be configured to generate a predicted production rate log for one or more wells based on each well's respective porosity, saturation, permeability, and height or exploitable bitumen in place (EBIP) logs. An illustrative example of well logs and the resulting predicted production rate log can been seen in Fig. 8.
[0055] At 530, one or more processor(s) 210 and/or other aspects of device(s) 205 may be configured to receive or generate a field dataset for the subterranean formation, the field dataset including field data (such as seismic, electromagnetic, electrical resistivity and/or gravity data) at different points or locations within the 3D volume of the subterranean formation. In some examples, the field dataset can be visualized as a 3D grid or mesh of values from the collected data from seismic sensors and the like.
[0056] In some embodiments, processor(s) 210 and/or other aspects of device(s) 205 may be configured to the field dataset may be configured to generate the field dataset in a defined grid of any spacing. In some examples, field data samples can be placed into the defined grid based on their geometry relative to the grid.
[0057] In some examples, seismic or other field data may be acquired at a specified sampling rate to obtain desired grid data granularity. For example, seismic sampling rates may affect the collected data grid spacing in the vertical direction. In some instances, a sample rate of 1 ms may provide a vertical grid data granularity of 1 meters.
[0058] The spatial sampling of data in a grid may be related to one-half the spacing between the source(s) in one direction and the sensor(s) in the other direction. For example, when source(s) and sensor(s) are spaced 20 meters apart, the horizontal grid data granularity may be 10 meters by 10 meters.
[0059] By combining the above, example sampling rate and source/sensor spacing, the 3D spatial grid may be 10 m x 10 m x lm. Other spacings and sampling rates may also be used.
[0060] In some examples the field dataset can include a grid of data representing density, impedance, reflectivity, water saturations and the like.
[0061] With reference to Fig. 7, in some examples, field datasets, such as data derived directly from measured values, can be used to generate additional data grids.
In some examples, these generated data grids can include, but are not limited to, 3D
logs/arrays/grids for porosity, saturation, permeability, and/or height or exploitable bitumen in place.
[0062] In some examples, some or all of the generated field data grids may be generated by the processor(s) 210 of device 205 from received or accessed field data. In some examples, some or all of the generated field data grids may have been previously generated/transformed by a remote, field 240 or other device and may be stored at and accessed/received from one or more storage device(s) 225, 215 and/or memory(ies) 215.
[0063] For example, it has been observed that, in some instances, well logs used for the predicted production rate log (e.g. fractional porosity logs, fractional oil saturation logs, and permeability logs) show a strong correlation to the density logs. Therefore, in accordance with aspects of the present disclosure, predicted density logs from wide-angle seismic or other field data may be used to generate a predicted production rate log.
Similarly, in some examples, other attributes of the seismic or other field data may be related to the predicted rate log. In some examples, a collection of such attributes may be determined and used together to predict the predicted rate log via multi-linear regression or neural network methods.
[0064] At 540, identifying the predicted production rate log(s) from the well data as target(s), processor(s) can be configured to determine a transform relating the field data and the predicted production rate log(s) from the well data.
[0065] In some examples, the processor(s) can be configured to determine a transform by applying linear and/or multi-linear regression. In some examples, the processor(s) can be configured to determine a transform by generating/training a neural network, agenetic algorithm, or any other multi-parameter estimation method.
[0066] In some examples, determining a transform may include generating a weighted equation, neural network or other equation or model which defines or models a relationship between the desired output log(s) (e.g. predicted production rate log) from well log data and the seismic or other field datasets. In some examples, the field datasets can be elastic logs (e.g. sonic, shear-wave sonic, density) and/or properties that may be calculated from the elastic logs (e.g. Young's modulus, Poisson's ratio, compressibility, etc.).
In some examples, the processor(s) can be configured to use the seismic response equation, R(0), above or a similar amplitude versus offset or other equation to identify the elastic properties which are related to the desired output log(s) (e.g. predicted production rate log). In some examples, the elastic properties may include P-impedance, S-impedance and density.
[0067] In some examples, the processor(s) can be configured to calculate the identified elastic properties using the seismic response or other equation, and the desired output log(s) using the elastic properties at the well locations. Based on the desired output log(s) from the elastic properties and the output log(s) from the well data, the processor(s) can be configured to generate a transform using a multi-linear regression, neural network, genetic algorithm or other suitable model.
[0068] Fig. 9 shows a chart illustrating a linear regression and a resulting transform relating the field (seismic) data and the predicted production rate log(s).
[0069] At 550, using this transform, the processor(s) can be configured to generate a predicted production rate for each location of the volume of the subterranean formation for which field data was received/generated.
[0070] In some examples, the processor(s) can be configured to generate the transform and/or generate the predicted production rate for each location using any of the equations described herein (e.g. the equation for Q above) or otherwise. In some embodiments, the processor(s) can be configured to apply these equations based on a constant factor C which can, in some examples, be measured or simulated based on well data as described above or otherwise.
[0071] In this manner, the methods, systems and devices described herein can generate a grid of predicted production rates i.e. a value for each 3D unit in a subterranean formation volume. In some examples, this grid of predicted production rates may provide a more refined/granular characterization of the value/viability of specific portions of a reservoir in three dimensions between core holes. In some examples, as the grid is based on data associated with physical field data between the wells, the predicted production rates may be more accurate than rough estimates taken by averaging between wells.
[0072] In some examples, the 3D grid may provide a visual representation for quantifying production, resources, cost, risk and/or value for specific portions of a resource.
[0073] At 560, the processor(s) may optionally be configured to generate a visual 3D map or representation of the resource's predicted production rates on a per unit volume basis. In some examples, the processor(s) may be configured to sum or otherwise aggregate the production rates over identified drainage areas of the resource/formation.
[0074] At 570, the processor(s) may receive data or inputs identifying locations/positions of wells and/or drainage areas. In some examples, these wells may be existing or prospective wells. Based on the unit volume grid of predicted production rates and/or other predictions and the locations/positions of the inputted well/drainage area data, the processor(s) may be configured to sum or aggregate the associated predicted production rate units to generate a predicted production rate, cost, and/or economic viability for the inputted wells/drainage areas.
[0075] For example, Fig. 10 illustrates a perspective view illustrating a three-dimensional visual representation of predicted production rates along different wells 1010 and through different regions of a subterranean resource 1020. The different shades of grey (or color if visible) represent different levels predicted production rates for each unit volume included in the visual representation.
[0076] For example, Fig. 11 illustrates a top view map 1110 of a drainage area showing the different predicted production rates for the various regions, and some SAGD well locations 1120. In some examples, the top view may be generated by summing volumetric unit predicted production rates below the surface of each unit area of the top view visual representation 1110. In some examples, this may include summing wedges, boxes, columns, etc. of per unit volume predicted production rates below the surface of each unit area.
[0077] Fig. 12 shows a visual representation of the predicted production rates as they vary along the length of the identified wells. In some examples, this granular modelling of production rates may provide information to determine not only the potential best location(s) for well development, but also the potentially most valuable portions of those wells.
[0078] In some embodiments, the methods and devices described herein may be computationally more efficient than previous methods wherein static formation properties such as porosity, saturation and permeability were individually estimated over a 2D area using multi-linear regression or neural networks for each property. These 2D
maps were then combined to predict a maximum 20 rate map.
[0079] In contrast, in addition to creating 3D granular information regarding a dynamic property such as production rate, the methods, devices and systems described herein may, in some embodiments, decrease computation requirements by a factor of three by only using a single multi-linear regression, neural network or other model. In some embodiments, the reduction in computational steps by the methods, devices and systems described herein may reduce (compounding) error bars on the estimated output log(s).
[0080] In some example embodiments, the methods and devices described above may be similarly applied to generate 3D granular data sets for predicted steam use, energy use, water use, steam-to-oil ratios and/or water-to-steam ratios. In some examples, this may involve generating log(s) for these predicted attributes based on well data at 520;
determining, at 540, a transform relating seismic data to the well predicted logs; and based on the transform, at 550, generating a predicted 3D data set for one or more of these predicted attributes. In some examples, since these predicted attributes may affect the economics of a well or a project, the methods and devices described herein may similarly be used to predicting the economic viability of a well/project/resource/etc.
[0081] Although the embodiments have been described in detail, it should be understood that various changes, substitutions and alterations can be made herein without departing from the scope as defined by the appended claims.
[0082] Moreover, the scope of the present application is not intended to be limited to the particular embodiments of the process, machine, manufacture, composition of matter, means, methods and steps described in the specification. As one of ordinary skill in the art will readily appreciate from the disclosure of the present invention, processes, machines, manufacture, compositions of matter, means, methods, or steps, presently existing or later to be developed, that perform substantially the same function or achieve substantially the same result as the corresponding embodiments described herein may be utilized.
Accordingly, the appended claims are intended to include within their scope such processes, machines, manufacture, compositions of matter, means, methods, or steps
[0083] As can be understood, the examples described above and illustrated are intended to be exemplary only. The scope is indicated by the appended claims.

Claims (22)

WHAT IS CLAIMED IS:
1. A method of predicting hydrocarbon production rates for a subterranean formation, the method comprising:
receiving or generating, by at least one processor, well logs from data collected from at least one well in the subterranean formation;
generating from the well logs a predicted production rate log for the at least one well;
receiving, by the at least one processor, a field dataset for the subterranean formation, the field dataset including field data at locations in 3-dimensions of a volume of the subterranean formation;
identifying the predicted production rate log for the at least one well as one or more targets, determining a transform relating the field data and the predicted rate log for the at least one well; and using the transform, generating a predicted production rate for each location of the volume of the subterranean formation.
2. The method of claim 1 wherein determining the transform comprises applying at least one of a linear regression, a genetic algorithm, a neural network analysis, or a multi-parameter estimation method.
3. The method of claim 1 wherein the well logs include logs for porosity, saturation, permeability and bitumen column height.
4. The method of claim 1 wherein the field data includes at least one of seismic data, gravity data, electrical resistivity data or electro-magnetic data.
5. The method of claim 1 wherein the field data includes wide-angle seismic data.
6. The method of claim 5 wherein the wide-angle seismic data is collected from seismic waves having an angle of incidence greater than 45 degrees.
7. The method of claim 1 wherein the field data includes density data.
8. The method of claim 1 wherein the predicted production rate log generated from the well logs is based on the equation:
where C is a constant, L represents a horizontal length of the well, .PHI.
represents fractional porosity, .DELTA.S o represents a difference between initial oil saturation and residual oil saturation to steam, K represents permeability, and H represents reservoir height.
9. The method of claim 1 comprising: generating a three-dimensional visual representation of at least a portion of the subterranean formation using the predicted production rates for the locations of the volume corresponding to the portion of the subterranean formation.
10. The method of claim 1 comprising: determining a predicted production rate for identified drainage areas or positioned wells using the predicted production rates for the locations of the volume corresponding to locations of the identified areas or positioned wells in the subterranean formation.
11. The method of claim 1 comprising: determining a constant factor C for generating the predicted production rate log for the at least one well and the predicted production rate for each location of the volume of the subterranean formation;
wherein determining the constant factor C is based on measured or simulated well data.
12. A device for predicting hydrocarbon production rates for a subterranean formation, the device comprising: at least one processor configured for:
receiving or generating well logs from data collected from at least one well in the subterranean formation;
generating from the well logs a predicted production rate log for the at least one well;

receiving a field dataset for the subterranean formation, the field dataset including field data at locations in 3-dimensions of a volume of the subterranean formation, identifying the predicted production rate log for the at least one well as one or more targets, determining a transform relating the field data and the predicted rate log for the at least one well; and using the transform, generating a predicted production rate for each location of the volume of the subterranean formation.
13. The device of claim 12 wherein determining the transform comprises applying at least one of: a linear regression, a genetic algorithm, a neural network analysis, or a multi-parameter estimation method.
14. The device of claim 12 wherein the well logs include logs for porosity, saturation, permeability and bitumen column height.
15. The device of claim 12 wherein the field data includes at least one of seismic data, gravity data, electrical resistivity data or electro-magnetic data.
16. The device of claim 12 wherein the field data includes seismic data collected from seismic waves having an angle of incidence greater than 45 degrees.
17. The device of claim 12 wherein the field data includes density data.
18. The device of claim 12 wherein the predicted production rate log generated from the well logs is based on the equation.
where C is a constant, L represents a horizontal length of the well, .PHI.
represents fractional porosity, .DELTA.S o represents a difference between initial oil saturation and residual oil saturation to steam, K represents permeability, and H represents reservoir height.
19. The device of claim 12 wherein the at least one processor is configured for:
generating a three-dimensional visual representation of at least a portion of the subterranean formation using the predicted production rates for the locations of the volume corresponding to the portion of the subterranean formation.
20. The device of claim 12 wherein the at least one processor is configured for:
determining a predicted production rate for identified drainage areas or positioned wells using the predicted production rates for the locations of the volume corresponding to locations of the identified areas or positioned wells in the subterranean formation.
21. The device of claim 12 comprising: the at least one processor is configured for:
determining a constant factor C for generating the predicted production rate log for the at least one well and the predicted production rate for each location of the volume of the subterranean formation; wherein determining the constant factor C is based on measured or simulated well data.
22. A non-transitory computer-readable medium or media having stored thereon, computer-readable instructions which when executed by at least one processor, configure the at least one processor for:
receiving or generating well logs from data collected from at least one well in the subterranean formation;
generating from the well logs a predicted production rate log for the at least one well;
receiving a field dataset for the subterranean formation, the field dataset including field data at locations in 3-dimensions of a volume of the subterranean formation;
identifying the predicted production rate log for the at least one well as one or more targets, determining a transform relating the field data and the predicted rate log for the at least one well; and using the transform, generating a predicted production rate for each location of the volume of the subterranean formation.
CA2913827A 2015-02-23 2015-02-23 Methods, systems and devices for predicting reservoir properties Active CA2913827C (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CA2015/050134 WO2016134443A1 (en) 2015-02-23 2015-02-23 Methods, systems and devices for predicting reservoir properties

Publications (2)

Publication Number Publication Date
CA2913827A1 true CA2913827A1 (en) 2016-03-21
CA2913827C CA2913827C (en) 2016-11-01

Family

ID=55539929

Family Applications (1)

Application Number Title Priority Date Filing Date
CA2913827A Active CA2913827C (en) 2015-02-23 2015-02-23 Methods, systems and devices for predicting reservoir properties

Country Status (3)

Country Link
CN (1) CN108138555A (en)
CA (1) CA2913827C (en)
WO (1) WO2016134443A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110462163A (en) * 2017-05-08 2019-11-15 哈利伯顿能源服务公司 Pixel for using formation data dissolves the system and method to assess stratum
CN113671569A (en) * 2021-08-23 2021-11-19 中油奥博(成都)科技有限公司 Method for predicting formation temperature by using acoustic logging information machine learning nonlinearity
EP4160495A1 (en) * 2021-09-30 2023-04-05 Hitachi Energy Switzerland AG Resource-constrained, multi-period scheduling model for asset investment planning

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10007015B2 (en) * 2015-02-23 2018-06-26 Nexen Energy Ulc Methods, systems and devices for predicting reservoir properties
RU2708536C2 (en) * 2017-12-29 2019-12-09 федеральное государственное автономное образовательное учреждение высшего образования "Казанский (Приволжский) федеральный университет" (ФГАОУ ВО КФУ) Method of seismic monitoring of development of ultra-viscous oil deposits
CN108979629B (en) * 2018-07-10 2021-10-26 中国海洋石油集团有限公司 Gas reservoir density calculation method based on density and neutron and nuclear magnetic resonance logging
CN110083190B (en) * 2019-04-19 2020-08-25 淮阴工学院 Green pepper greenhouse environment intelligent monitoring system based on subtraction clustering classifier
CN110671092A (en) * 2019-09-26 2020-01-10 北京博达瑞恒科技有限公司 Oil gas productivity detection method and system
CN110988998A (en) * 2019-12-24 2020-04-10 王颜 Reservoir porosity prediction method based on Hilbert spectrum and BP neural network
CN113050189B (en) * 2019-12-27 2024-06-21 北京国双科技有限公司 Reconstruction method, device and equipment of logging curve and storage medium
CN112878998B (en) * 2021-01-28 2022-07-05 成都理工大学 Method for predicting halogen storage layer and evaluating resource amount of underground brine type potassium ore and lithium ore
CN114278281B (en) * 2021-12-24 2023-11-21 北京西华益昌技术开发有限责任公司 Measurement resolution optimization method, device and equipment of measurement device and storage medium

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7225078B2 (en) * 2004-11-03 2007-05-29 Halliburton Energy Services, Inc. Method and system for predicting production of a well
US7486589B2 (en) * 2006-02-09 2009-02-03 Schlumberger Technology Corporation Methods and apparatus for predicting the hydrocarbon production of a well location
CN101906966A (en) * 2010-07-16 2010-12-08 中国石油天然气股份有限公司 Reservoir production capacity prediction method and device
US20130124171A1 (en) * 2010-07-30 2013-05-16 John F. Schuette Systems and methods for predicting well performance
US10428626B2 (en) * 2010-10-18 2019-10-01 Schlumberger Technology Corporation Production estimation in subterranean formations
FR2966865B1 (en) * 2010-10-28 2015-05-15 IFP Energies Nouvelles METHOD FOR OPERATING A PETROLEUM STORAGE FROM HISTORICAL SETTING OF PRODUCTION DATA AND SEISMIC DATA.
US20120179379A1 (en) * 2011-01-10 2012-07-12 Saudi Arabian Oil Company Flow Profile Modeling for Wells
RU2596692C2 (en) * 2012-05-14 2016-09-10 Лэндмарк Графикс Корпорейшн Method and system for estimation of forecast hydrocarbon production
CN103645516B (en) * 2013-11-20 2016-02-03 中国石油大学(北京) Based on the method for rock physics phased oil-gas reactivation determination oil-production capacity
CN104134101B (en) * 2014-07-23 2017-09-22 中国石油集团川庆钻探工程有限公司 Low-permeability reservoir natural gas productivity prediction method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110462163A (en) * 2017-05-08 2019-11-15 哈利伯顿能源服务公司 Pixel for using formation data dissolves the system and method to assess stratum
US11525353B2 (en) 2017-05-08 2022-12-13 Halliburton Energy Services, Inc. System and methods for evaluating a formation using pixelated solutions of formation data
CN113671569A (en) * 2021-08-23 2021-11-19 中油奥博(成都)科技有限公司 Method for predicting formation temperature by using acoustic logging information machine learning nonlinearity
CN113671569B (en) * 2021-08-23 2023-12-22 中油奥博(成都)科技有限公司 Method for machine learning nonlinear prediction of formation temperature by using acoustic logging data
EP4160495A1 (en) * 2021-09-30 2023-04-05 Hitachi Energy Switzerland AG Resource-constrained, multi-period scheduling model for asset investment planning

Also Published As

Publication number Publication date
CN108138555A (en) 2018-06-08
CA2913827C (en) 2016-11-01
WO2016134443A1 (en) 2016-09-01

Similar Documents

Publication Publication Date Title
US10007015B2 (en) Methods, systems and devices for predicting reservoir properties
CA2913827C (en) Methods, systems and devices for predicting reservoir properties
US11519262B2 (en) Systematic evaluation of shale plays
CA2641867C (en) Methods and apparatus for predicting the hydrocarbon production of a well location
US10088596B2 (en) Meshless representation of a geologic environment
EP2960680B1 (en) Fracturing and reactivated fracture volumes
US8768672B2 (en) Method for predicting time-lapse seismic timeshifts by computer simulation
Li et al. Three‐dimensional geostatistical inversion of flowmeter and pumping test data
Dadashpour et al. Nonlinear inversion for estimating reservoir parameters from time-lapse seismic data
US20200095858A1 (en) Modeling reservoir permeability through estimating natural fracture distribution and properties
NO347906B1 (en) Stratigraphic function
US9523781B2 (en) Normalization seismic attribute
CN109667573A (en) Three-dimensional shale reservoir pore pressure prediction method, apparatus and electronic equipment
Rühaak et al. Upscaling thermal conductivities of sedimentary formations for geothermal exploration
CN103946896A (en) System and method for assessing heterogeneity of a geologic volume of interest with process-based models and dynamic heterogeneity
Puzyrev et al. Interpretation of deep directional resistivity measurements acquired in high-angle and horizontal wells using 3-D inversion
Orellana et al. Influence of variograms in 3D reservoir-modeling outcomes: An example
US11899150B2 (en) Velocity model for sediment-basement interface using seismic and potential fields data
Miroslav et al. Tutorial: The gravity-stripping process as applied to gravity interpretation in the eastern Mediterranean
Michelena et al. Seismic, geologic, geomechanics, and dynamic constraints in flow models of unconventional fractured reservoirs: Example from a south Texas field
AlKawai et al. Integrating statistical rock physics and pressure and thermal history modeling to map reservoir lithofacies in the deepwater Gulf of Mexico
Li et al. Facies-controlled geostatistical porosity model for estimation of the groundwater potential area in Hongliu Coalmine, Ordos Basin, China
US20140185413A1 (en) Dip seismic attributes
WO2010047858A1 (en) Method for predicting time-lapse seismic timeshifts by computer simulation
US20240036225A1 (en) Thermal conductivity mapping from rock physics guided seismic inversion