CA2880906C - Wellbore desanding system - Google Patents

Wellbore desanding system Download PDF

Info

Publication number
CA2880906C
CA2880906C CA2880906A CA2880906A CA2880906C CA 2880906 C CA2880906 C CA 2880906C CA 2880906 A CA2880906 A CA 2880906A CA 2880906 A CA2880906 A CA 2880906A CA 2880906 C CA2880906 C CA 2880906C
Authority
CA
Canada
Prior art keywords
pump
fluid
wellbore
production
fluidizing device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CA2880906A
Other languages
French (fr)
Other versions
CA2880906A1 (en
Inventor
Mark E. Wolf
Tariq Ahmed
Gareth David Thomas
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
National Oilwell Varco LP
Original Assignee
National Oilwell Varco LP
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by National Oilwell Varco LP filed Critical National Oilwell Varco LP
Publication of CA2880906A1 publication Critical patent/CA2880906A1/en
Application granted granted Critical
Publication of CA2880906C publication Critical patent/CA2880906C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells
    • E21B43/121Lifting well fluids
    • E21B43/126Adaptations of down-hole pump systems powered by drives outside the borehole, e.g. by a rotary or oscillating drive
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B37/00Methods or apparatus for cleaning boreholes or wells
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04CROTARY-PISTON, OR OSCILLATING-PISTON, POSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; ROTARY-PISTON, OR OSCILLATING-PISTON, POSITIVE-DISPLACEMENT PUMPS
    • F04C13/00Adaptations of machines or pumps for special use, e.g. for extremely high pressures
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04CROTARY-PISTON, OR OSCILLATING-PISTON, POSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; ROTARY-PISTON, OR OSCILLATING-PISTON, POSITIVE-DISPLACEMENT PUMPS
    • F04C13/00Adaptations of machines or pumps for special use, e.g. for extremely high pressures
    • F04C13/008Pumps for submersible use, i.e. down-hole pumping
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04CROTARY-PISTON, OR OSCILLATING-PISTON, POSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; ROTARY-PISTON, OR OSCILLATING-PISTON, POSITIVE-DISPLACEMENT PUMPS
    • F04C2/00Rotary-piston machines or pumps
    • F04C2/08Rotary-piston machines or pumps of intermeshing-engagement type, i.e. with engagement of co-operating members similar to that of toothed gearing
    • F04C2/10Rotary-piston machines or pumps of intermeshing-engagement type, i.e. with engagement of co-operating members similar to that of toothed gearing of internal-axis type with the outer member having more teeth or tooth-equivalents, e.g. rollers, than the inner member
    • F04C2/107Rotary-piston machines or pumps of intermeshing-engagement type, i.e. with engagement of co-operating members similar to that of toothed gearing of internal-axis type with the outer member having more teeth or tooth-equivalents, e.g. rollers, than the inner member with helical teeth
    • F04C2/1071Rotary-piston machines or pumps of intermeshing-engagement type, i.e. with engagement of co-operating members similar to that of toothed gearing of internal-axis type with the outer member having more teeth or tooth-equivalents, e.g. rollers, than the inner member with helical teeth the inner and outer member having a different number of threads and one of the two being made of elastic materials, e.g. Moineau type

Landscapes

  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Physics & Mathematics (AREA)
  • Structures Of Non-Positive Displacement Pumps (AREA)
  • Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)
  • Pipeline Systems (AREA)

Abstract

The invention relates to system and method for desanding an oil well that includes a fluidizing device (TORE), connected to a downhole pump that connects to a production tubing such that a supply duct is connected to the discharge of the pump and a discharge duct is connected to the suction of the pump. Embodiments include a pressure balance transition device between the TORE and the pump and/or a flow splitting device in the production tubing after the discharge of the pump. Other embodiments relate to a system and method for desanding an oil well in which a fluidizing unit is connected to a pump such that the supply duct is connected to an opening in the pump body or pump rotor and a discharge duct is connected to the suction of the pump. If connected to the rotor, the supply duct is integral to the pump rotor.

Description

WELLBORE DESANDING SYSTEM
Field of the Invention Noon The present invention generally relates to a method and system for desanding an oil well by hydrodynamically fluidizing liquid and solid mixtures in said well and transporting them to the surface. More specifically, the invention relates to a method and system for adapting TORE solids fluidizing technology to remove accumulated solids from a producing wellbore.
Background of the Invention
[0002] Wells that produce heavy oil from low pressure reservoirs require some form of artificial lift, such as pumping for example, from the bottom of the wellbore to raise the fluids to the surface. These wells may be produced without sand screens or other forms of downhole sand control that would limit the wells' productivity. As a result, wells of this type are prone to produce significant quantities of sand. In many cases, the upward velocity of the production fluids in the wellbore is not sufficient to lift the sand with the fluid production, and a portion of the sand settles to the bottom of the well. Over time, the sand in the bottom of the well covers up the portion of the well that is open to the oil reservoir, effectively blocking the flow of fluids from the reservoir into the wellbore. It may also plug or restrict the flow into the pump. The current method of solving such a problem requires a workover rig, crane and/or a coiled tubing unit to remove the pump and flush the sand out of the well.
100031 Employing liquid pressure for long-range conveyance of materials in bulk is described by U.S. Patent No. 4,992,006 to Drobadenko et al., which may be referred to for details. However, the invention of the '006 patent is of particular use in the mining industry, construction, metallurgy and agriculture. It discloses a device for hydraulic conveyance of loose materials with a toroidal chamber having an equatorial plane thereof set with respect to a horizontal plane at an angle dependant on the internal friction of the loose material, when saturated with the liquid used for hydraulic conveyance. The chamber is provided with pipes for charging the loose material and for discharging the liquid, both of the pipes being arranged on one side with respect to the meridianal plane, and a slurry discharge unit arranged on its other side.

100041 U.S. Patent No. 4,952,099, also to Drobadenko et al., which may be referred to for details, describes a device for hydraulic conveyance of loose materials with four pipes, one for liquid discharge, the second for loose material charging, the third for feeding the pressure liquid flow and a fourth for slurry discharge in an upward flow. The pipes are held by a hemispherical cover and are arranged coaxially in such a manner that the loose material charging pipe is accommodated inside the liquid discharge pipe, the pressure liquid flow feeding pipe is accommodated inside the loose material charging pipe, and the slurry upward flow discharging pipe is accommodated inside the pressure liquid flow feeding pipe, all of the pipes being arranged coaxially with the longitudinal axis of a housing chamber and having some of their portions located inside the chamber.
woos] U.S. Patent No. 4,978,251, to Drobadenko et al., which may be referred to for details, describes a method and an apparatus for conveying materials in bulk by liquid pressure. The method is carried out by an appropriate apparatus and involves loading a material in bulk into a chamber through a loading pipe and then supplying liquid under pressure through a pipe for supplying liquid in the form of a downward annular flow, and discharging the material in bulk in an upward flow through a discharge pipe mounted to extend coaxially with, and inside the pipe for supplying liquid. A zone of recirculation flows of liquid is formed in the chamber by swirling the annular flow to an extent determined by a ratio of the rotational component of velocity to the axial component of velocity at least equal to 0.4. The material in bulk is discharged in the zone of recirculation flows.
100061 Prior patents '009 and '251 both require a pressurized container or vessel that is loaded with solids when it is not under pressure and then sealed and pressurized in order to fluidize and transport solid material in a slurry. It is impossible to install and operate a pressurized container within a wellbore that could be loaded and then sealed in this manner.
[0007] U.S. Patent 5,562,159, assigned to Merpro Tortek Limited, which may be referred to for details, describes a well uplift system to raise material, such as production fluid, from a bore hole that involves pumping water down a pipe to a fluidizing unit (TORE) so that the water activates and entrains the material and carries it up through a discharge conduit to a separator for at least partially separating the fluid and the material. The supply duct in the '159 is connected to a water source at the surface of the well and the discharge duct is
3 connected to a conduit that runs to the surface. However, these features of the '159 invention create a pressure at the bottom of the well (due to the static head of the water column within the supply duct from the surface) that is greater than the pressure within the reservoir in the vast majority of wells that could benefit from this technology. This pressure from the supply duct halts the passing of fluids from the reservoir into the well. In order for the '159 invention, which does not require any artificial lift, to function properly, the pressure in the reservoir would have to be sufficient to lift the fluids to the surface and overcome the static head that would be imposed on the reservoir from the water supply conduit.
Since the problem of high sand production is typically not existent in wells with high reservoir pressure, the previous invention has limited commercial applicability for low pressure reservoirs that produce significant quantities of sand that needs to be removed. In addition, there is the added challenge and cost of providing a separate water supply conduit from the surface to the TORE.
100081 US 5,853,266 to Merpro Tortek Limited, also which may be referred to for details, teaches an improvement to the fluidizing unit of the kind described in the above patents.
Specifically, a fluidising unit comprising a supply duct which is arranged to be fed with liquid under pressure, and a discharge duct within the supply duct and projecting beyond the outlet of the supply duct. The end of the supply duct is closable when the fluidizing unit is not in use. A screen is associated with the supply duct, the screen having at least one oblique opening, and being positioned so that liquid passing through the supply duct passes through the or each opening in the screen and is caused to swirl.
100091 Accordingly, there is a need for improved methods and systems, for preventing the accumulation of solids that can stop the flow of fluids into a well, that are not subject to the disadvantages of the prior art. These are now provided by the present invention.
Summary of the invention tom] The current invention basically relates to a wellbore desanding system having a fluidizing device that comprises a supply duct and a discharge duct; and a pump functionally connected to the fluidizing device and comprising a discharge end and a suction end such that the supply duct is connected to the discharge end of the pump and the discharge duct is
4 connected to the suction end of the pump. The current invention relates to a wellbore desanding system comprising a fluidizing device in the well such as at the bottom of the well to continuously fluidize and lift solids from the well bottom thereby preventing accumulation of solids in the well, wherein the fluidizing device is connected to a downhole pump which in turn connects to a production tubing such that the supply duct (water supply conduit for example) is connected to the discharge of the pump and a discharge duct is connected to the suction of the pump. In an embodiment of the invention the fluidizing device is placed below the casing perforations in the bottom of the well.
room An embodiment of the wellbore desanding system of the current invention comprises a fluidizing device having a supply duct and a discharge duct; and a pump functionally connected to the fluidizing device and comprising a discharge end and a suction end such that the supply duct is connected to the discharge end of the pump and the discharge duct is connected to the suction end of the pump and the system further comprises a pressure balance transition device that receives the sand laden fluid from the fluidizing device (TORE), mixes it with the well production fluids from the well casing and feeds the combined stream to the inlet of the pump. The pressure balance transition device may be designed so that well fluid entering the transition device from the well casing passes through a restricted area in order to create a zone of low pressure within the transition device. The difference in pressure between the casing and the transition device provides the energy required to lift the heavier sand laden fluid from the TORE discharge through the small diameter conduit and into the transition device. In an aspect of the invention, the pressure balance transition device is located between the TORE and the pump.
[0012] A further embodiment of the wellbore desanding system according to the present invention comprises a fluidizing device having a supply duct and a discharge duct; and a pump functionally connected to the fluidizing device and comprising a discharge end and a suction end such that the supply duct is connected to the discharge end of the pump and the discharge duct is connected to the suction end of the pump and the system further comprises a flow splitting device located in the production tubing just after the discharge of the downhole pump. This device diverts a portion of the fluids discharged from the pump into the conduit that is connected to the supply duct of the TORE. The flow splitting device may include a restriction that will reduce the pressure from the discharge of the pump and control the flow
5 PCT/US2013/053871 to the supply duct of the TORE. In another embodiment of the invention, the flow splitting device includes an opening to the casing comprising a non-return valve (check valve) that only allows fluids to enter the conduit connected to the TORE supply duct.
[0013] In an embodiment of the wellbore desanding system of the current invention, the discharge port is added to the pump body or to the pump rotor that allows fluids to be directed to the TORE at the appropriate pressure that is required to operate the TORE. This alternate method eliminates the need for the flow splitting device and the restriction for reducing pressure. In this embodiment of the current invention, the wellbore desanding system comprises a fluidizing device having a supply duct and a discharge duct; and a pump functionally connected to the fluidizing device having a stator section and a rotor section, such that the rotor section comprises an inlet chamber arranged to receive production fluid from the well and feed it through the supply duct to the fluidizing device. .
[00141 The current invention also relates to a wellbore desanding system comprising a fluidizing device in a well to continuously fluidize and lift solids from the well bottom thereby preventing accumulation of solids in the well, wherein the fluidizing device is connected to a downhole pump which in turn connects to a production tubing such that the supply duct is connected to an opening in the pump body (stator) and a discharge duct is connected to the suction of the pump. In an embodiment of the invention the fluidizing device is placed in the bottom of the well such as, for example, below the casing perforations.
A further embodiment has supply duct or TORE inlet tube external to the pump casing.
[00151 The current invention also relates to a wellbore desanding system comprising a fluidizing device in a well to continuously fluidize and lift solids from the well bottom thereby preventing accumulation of solids in the well, wherein the fluidizing device is connected to a downhole pump which in turn connects to a production tubing such that the supply duct is connected to an opening in the pump rotor and a discharge duct is connected to the suction of the pump. In a further embodiment, the supply duct is integral to the rotor (or TORE priming rotor) In an embodiment of the invention the fluidizing device is placed in the bottom of the well such as, for example, below the casing perforations.
6 [0016] Another aspect of the current invention is a method for lifting oil from an underground petroleum reservoir through a well to the surface of the ground, wherein the method comprises placing a fluidizing device or TORE in the bottom of a well, passing the oil through the fluidizing device, passing the fluid from the fluidizing device into a pump, passing the fluid through a production tubing to the surface. In an embodiment of the invention the method further comprises passing the oil fluid through a pressure balance transition device after passing the oil fluid through the TORE. In yet another embodiment of the invention, the above method(s) further comprise passing the oil fluid through a flow splitting device in the production tubing so as to divert a portion of the fluids discharged from the pump into the conduit that is connected to the supply duct of the TORE. In another embodiment of the invention, the above methods may further comprise placing the fluidizing device below the casing perforations in the bottom of the well.
[00171 A further aspect of the current invention is a method for lifting oil from an underground petroleum reservoir through a well to the surface of the ground, wherein the method comprises placing a fluidizing device or TORE in the bottom of a well, passing the oil through the fluidizing device, passing the fluid from the fluidizing device into a pump, and passing the fluid through a production tubing to the surface such that the method(s) further comprises passing the oil fluid through a discharge port in the pump body or the pump rotor that diverts a portion of the flow from the mid-section of the pump at an appropriate pressure for feeding the TORE device. In another embodiment of the invention, the above methods may further comprise placing the fluidizing device below the casing perforations in the bottom of the well.
[00181 The current invention also provides for a method for lifting production fluid from an oil-producing wellbore comprising providing a fluidizing device comprising a supply duct and a discharge duct; providing a pump functionally connected to the fluidizing device and comprising a stator section end and rotor section, such that the stator section comprises an inlet chamber arranged to receive production fluid from the well and to feed the production fluid to the fluidizing device through the supply duct; passing the production fluid through the fluidizing device; and passing the production fluid from the fluidizing device to a production tubing.
7 [0019] The current invention also provides for a method for lifting production fluid from an oil-producing wellbore comprising providing a fluidizing device comprising a supply duct and a discharge duct; providing a pump functionally connected to the fluidizing device and comprising a stator section end and rotor section, such that the rotor section comprises an inlet chamber arranged to receive production fluid from the well and to feed the production fluid to the fluidizing device through the supply duct and wherein the supply duct is integral to the pump rotor; passing the production fluid through the fluidizing device;
and passing the production fluid from the fluidizing device to a production tubing.
[0020] A further aspect of the invention is a method for desanding a wellbore wherein said method comprises placing a fluidizing device or TORE in the bottom of a well, passing the oil through the fluidizing device, passing the sand-laden fluid from the fluidizing device into a pump, passing the fluid through a production tubing to the surface. In an embodiment of the invention the method further comprises passing the oil fluid through a pressure balance transition device. In yet another embodiment of the invention, the above method(s) further comprise passing the oil fluid through a flow splitting device in the production tubing so as to divert a portion of the fluids discharged from the pump into the conduit that is connected to the supply duct of the TORE.
[0021] In yet another embodiment, the current invention provides for a method for desanding a wellbore comprises placing a fluidizing device such as a TORE in the well, passing the oil through the fluidizing device, passing the sand-laden fluid from the fluidizing device into a pump, passing the oil fluid through a discharge port in the pump body or the pump rotor that diverts a portion of the flow from the mid-section of the pump at an appropriate pressure for feeding the TORE device.
[0022] The current invention also provides for a method for desanding an oil-producing wellbore comprising providing a fluidizing device comprising a supply duct and a discharge duct; providing a pump functionally connected to the fluidizing device and comprising a stator section end and rotor section, such that the stator section comprises an inlet chamber arranged to receive production fluid from the well and to feed the production fluid to the fluidizing device through the supply duct; passing the production fluid through the fluidizing device; and passing the production fluid from the fluidizing device to a production tubing.
8 [0231 The current invention also provides for a method for desanding an oil-producing wellbore comprising providing a fluidizing device comprising a supply duct and a discharge duct; providing a pump functionally connected to the fluidizing device and comprising a stator section end and rotor section, such that the rotor section comprises an inlet chamber arranged to receive production fluid from the well and to feed the production fluid to the fluidizing device through the supply duct and wherein the supply duct is integral to the pump rotor; passing the production fluid through the fluidizing device; and passing the production fluid from the fluidizing device to a production tubing.
Brief description of the drawings [0024] An example of an oil-well and associated system, constructed in accordance with the present invention is illustrated diagrammatically in the accompanying drawings in which:
[0025] Figure 1 schematically shows a partial view, in longitudinal section, of an embodiment of the present invention.
[00261 Figure 2 schematically shows a partial view, in longitudinal section, of an alternate embodiment of the present invention in which the supply duct is connected to an opening in the pump body or stator.
[0027] Figure 3 schematically shows a partial view, in longitudinal section, of an alternate embodiment of the present invention in which the supply duct is connected to an opening in the pump rotor.
Detailed description [0028] In accordance with the present invention, a wellbore desanding system is provided that comprises a fluidizing device at the bottom of the well, placed, for example, below the casing perforations in the bottom of the well, to continuously fluidize and lift solids from the well bottom thereby preventing accumulation of solids in the well that can stop the flow of fluids into the well, wherein the fluidizing device is connected to a pump such that the supply duct (water supply conduit for example) is connected to the discharge of the pump and a discharge duct is connected to the suction of the pump. Artificial lift of heavy oil with sand is primarily carried out by progressive cavity pumps or jet pumps. The current invention can be adapted to be used with any type of a downhole pump including progressive cavity and jet pumps.
9 [0029] Also in accordance with the present invention, a wellbore desanding system is provided that comprises a fluidizing device at the bottom of the well, placed, for example, below the casing perforations in the bottom of the well, to continuously fluidize and lift solids from the well bottom thereby preventing accumulation of solids in the well that can stop the flow of fluids into the well, wherein the fluidizing device is connected to a pump such that the supply duct (water supply conduit for example) is connected to an opening in the pump body or pump rotor and a discharge duct is connected to the suction of the pump.
[0030] Fluids entering an oil production well from an oil bearing reservoir must travel up through the well to reach the surface. The fluid pathway from the reservoir to the surfaces is usually as follows: 1. fluid passes from the reservoir through perforations in the well casing to enter the bottom of the well; 2. fluid travels up through the well casing to a pump which boosts the pressure of the fluid giving it the energy it needs to travel to the surface; 3. fluid exits the pump and enters the bottom of a small diameter production tubing;
and 4. fluid travels up the production tubing to the surface. The velocity of the fluids travelling up the wellbore changes depending on the diameter of the conduit it is flowing through according to the formula 4*Q
V=Tr*d2 Where: v= velocity, Q= flow rate and d= conduit diameter Therefore, the fluids flowing through the large wellbore casing at the bottom of the well travel upwards at much lower velocity than fluids flowing through the production tubing.
[0031] Sand will fall downward through the upward flowing fluid at a velocity that is dependent on the size of the sand grains. In order to lift the sand from the well, the velocity of the fluid in the upward direction must be greater than the velocity of the sand falling through the fluid. Once the sand reaches the smaller diameter production tubing, the upward velocity within the tubing is high enough to carry the sand all the way to the surface.. The desanding system of the current invention comprises a means for fluidizing the sand that settles through the slow moving fluid in the well casing, and to transport the sand through a small diameter conduit to the inlet of the pump.
10 100321 TORE solid fluidizers are described in US 4,978,251, US 4,952,099, US
4,992,006 and US 5,853,266, all of which may be referred to for details, and are well known by a person skilled in the art. In accordance with an embodiment of the present invention, a TORE is placed below the casing perforations in the bottom of a well.
100331 As shown in Figure 1, a well 3, is bored down with a casing 4.
Production fluid enters the casing 4 through wellbore perforations 5 into a flow balancing transition device 30, into a pump 40, and into a flow splitting device 60. A portion of the production fluids passing through the flow splitting device 60 enter a TORE supply conduit 12 and into the supply duct of a TORE 10, wherein the TORE fluidizes solids in the bottom of a well 3 and passes the fluidized solids through the TORE 10 into the discharge duct 11 and into a flow balancing transition device 30 that receives the sand laden-fluid from the TORE 10, mixes it with the well production fluids from the well casing 4 and feeds the combined stream to the inlet of a pump 40. The flow balance transition device is designed such that the well fluids entering the transition device from the casing will pass through a restricted area in order to create a zone of low pressure within the transition device. The difference in pressure between the casing 4 and the transition device 30 will then provide the energy required to lift the heavier sand-laden fluid from the TORE discharge through the discharge duct 11 (also referred to as a small diameter conduit) and into the transition device. Leaving the transition device 30, fluids enter the production tubing 50 through pump 40. The production tubing, in an embodiment of the invention, may comprise a flow splitting device 60, just after the discharge of the downhole pump. The flow splitting device 60 diverts a portion of the fluids discharged from the pump 40 into the conduit that is connected to the supply duct 12 of the TORE 10.
The flow splitting device 60 includes a restriction that will reduce the pressure from the discharge of the pump and control the flow to the supply duct of the TORE.
100341 The invention described is sufficient to remove sand from the bottom of the well during normal operation of the pump. In the above embodiment of the invention, the TORE
is stationary (can be for example in the stator assembly of the pump). In this configuration the external capillary tube for the TORE feed may become damaged/blocked during installation or operation. An additional aspect of the invention is included to be able to recover operation of the pump in the event of a shut-down in which a large amount of sand enters the well and blocks the inlet to the transition device 30. The flow splitting device 60, will include an opening to the casing. The opening will have a non-return valve (check valve)
11 65 that only allows fluids to enter the conduit connected to the TORE supply duct. A second non-return valve 66 will be installed between the flow splitting device and the opening to the casing. This arrangement will allow pressurized fluid to be fed to the TORE
supply duct either from the discharge of the pump, or from the casing. In the event that the transition device is covered with sand, water or fluid can be fed into the casing of the well from the surface. This water or fluid will pass through the TORE fluidizing the sand in the bottom of the well and discharging the sand-laden fluid though the pump and into the tubing. Once the sand blocking the transition device has been removed, the pump can then be restarted so the remaining sand can be removed from the well. The complete system or arrangement enables an operator of the well to clear sand from the bottom of the well without removing the pump and tubing from the well, such as with the use of a surface pump, for example.
This will greatly reduce the cost of operating wells that produce significant amounts of sand and that require periodic cleaning with expensive surface equipment.
100351 As shown in Figure 2, an alternate embodiment of the current invention is herein provided in which the supply duct 12 (referred to as TORE feed) is connected to a point in the pump stator rather than the discharge of the pump.
100361 This embodiment circumvents having to regulate the differential pressure from the pump discharge. With the supply duct connected to a midpoint in the lift pump, for example, a constant feed pressure may be supplied to the TORE regardless of the depth of the well and the discharge pressure of the pump. According to this embodiment, a well 3 includes casing 4, production tubing 50 and sucker rod string 170. Inside the well, a fluid dispersing device, TORE 10 and a pump 40 is placed. The pump situated above TORE 10, includes a pump installation device 200, pump seating assembly 220, no-turn tool section 230 (not shown) and a tag bar assembly 190, TORE inlet coupling/rotor connector 140, TORE
inlet tube 12 (supply duct which allows diverting a portion of the flow from the mid-section of the pump at an appropriate pressure for feeding the TORE device), TORE/priming stator 120 and production stator 150, TORE/priming rotor 110, and production rotor 160. Sand-laden production fluid enters the casing 4 through well perforations 5 and is mixed with fluid received from the TORE 10. The fluidized production flow continues upwards through a suction port 240, a space between the TORE/priming rotor 110 and the TORE
priming stator 120, through a discharge port 250, and into a TORE inlet chamber 130 which is shown situated in the middle of pump 40. A portion of the fluid is diverted through a TORE inlet
12 tube 12, down to the TORE 10 where it helps fluidize the produced sand as described above.
The remaining sand-laden production fluid is lifted by pump 40 and travels upwards through production tubing 50. The agitating flow going down from the TORE inlet chamber 130 to TORE 10 is shown by solid arrows, whereas the fluidized production flow moving upwards in production tubing 50 is shown by broken arrows.
100371 As shown in Figure 3, an alternate embodiment of the current invention is herein provided in which the supply duct 12 (referred to as TORE feed) is connected to a point in the pump body rather than the discharge of the pump, such as for example through the lower rotor of the pump. In this embodiment, the supply duct 12 (TORE feed) is integral to the priming rotor 110 and the TORE unit can be part of the rotating assembly fitted on the end of the rotor.
100381 This embodiment circumvents having to regulate the differential pressure from the pump discharge. With the supply duct connected to a midpoint in the lift pump, for example, a constant feed pressure may be supplied to the TORE regardless of the depth of the well and the discharge pressure of the pump. According to this embodiment, a well 3 includes casing 4, production tubing 50 and sucker rod string 170. Inside the well, a fluid dispersing device, TORE 10 and a pump 40 is placed. The pump situated above TORE 10, includes a pump installation device 200, pump seating assembly 220, no-turn tool section 230, TORE inlet coupling/rotor connector 140, TORE inlet chamber 130 (which allows diverting a portion of the flow from the mid-section of the pump at an appropriate pressure for feeding the TORE
device), TORE/priming rotor 110, TORE/priming stator 120 and production stator 150, production rotor 160. Sand-laden production fluid enters the casing 4 through well perforations 5 and is mixed with fluid received from the TORE 10. The fluidized production flow continues upwards through a suction port 240, a space between the TORE/priming rotor 110 and the TORE priming stator 120, through a discharge port 250, and into a TORE inlet chamber 130 which is shown situated in the middle of pump 40. A portion of the fluid is diverted down to the TORE 10 where it helps fluidize the produced sand as described above.
The remaining sand-laden production fluid is lifted by pump 40 and travels upwards through production tubing 50. The agitating flow going down from the TORE inlet chamber 130 to TORE 10 is shown by solid arrows, whereas the fluidized production flow moving upwards in production tubing 50 is shown by broken arrows.

Claims (16)

What is claimed is:
1. A lift pump for use in a wellbore system including a production tubing and a fluidizing device configured for desanding the wellbore, the pump comprising:
a suction port configured for receiving fluid from the fluidizing device;
a priming rotor section rotatable in a priming stator section;
a discharge port configured for passing the fluid to a chamber;
a supply duct connected to the chamber and configured for feeding a portion of the fluid to the fluidizing device; and a production rotor section rotatable in a production stator section and configured for passing a reminder portion of the fluid to the production tubing, wherein the priming rotor section is rotationally coupled to the production rotor section.
2. The pump of claim 1, wherein the supply duct is integral with the priming rotor section.
3. The pump of claim 1, wherein the supply duct is external to a pump casing.
4. The pump of claim 1, further comprising a discharge duct connected between the suction port of the pump and the fluidizing device.
5. The pump of claim 4, wherein the discharge duct comprises a pressure balance transition device including inlets configured for entering wellbore fluid, and a low pressure zone, wherein the pressure balance transition device is configured for mixing the wellbore fluid with the fluid received from the fluidizing device.
6. The pump of claim 5, wherein the pressure balance transition device further includes a flow restriction area for generating the low pressure zone.
7. A method of lifting fluid from a wellbore, comprising:
placing a production tubing and a fluidizing device configured for desanding the wellbore in the wellbore;
rotating a priming rotor section within a priming stator section for sucking fluid from the fluidizing device;
discharging the fluid into a chamber;
rotating a production rotor section rotationally coupled to the priming rotor section within a production stator section for passing a portion of the fluid from the chamber to the production tubing; and feeding a remainder portion of the fluid to the fluidizing device via a supply duct connected to the chamber.
8. The method of claim 7, wherein the fluidizing device is placed below casing perforations.
9. The method of claim 7, further comprising:
entering wellbore fluid in a pressure balance transition device; and mixing the wellbore fluid with the fluid received from the fluidizing device in the pressure balance transition device.
10. The method of claim 9, further comprising generating a low pressure zone in the pressure balance transition device using a flow restriction area.
11. A lift pump for use in a wellbore system including a production tubing and a fluidizing device configured for desanding the wellbore, the pump comprising:
a suction port configured for receiving fluid from the fluidizing device;
a priming rotor section connected to the suction port and rotatably disposed in a priming stator section;

a discharge port connecting the priming rotor section to a chamber to pass the fluid to the chamber;
a supply duct connecting the chamber to the fluidizing device to feed a portion of the fluid to the fluidizing device; and a production rotor section connecting the chamber to the production tubing and rotatably disposed in a production stator section to pass a reminder portion of the fluid to the production tubing, wherein the priming rotor section is rotationally coupled to the production rotor section.
12. The pump of claim 11, wherein the supply duct is integral with the priming rotor section.
13. The pump of claim 11, wherein the supply duct is external to a pump casing.
14. The pump of claim 11, further comprising a discharge duct connected between the suction port of the pump and the fluidizing device.
15. The pump of claim 14, wherein the discharge duct comprises a pressure balance transition device including inlets configured for entering wellbore fluid, and a low pressure zone, wherein the pressure balance transition device is configured for mixing the wellbore fluid with the fluid received from the fluidizing device.
16. The pump of claim 15, wherein the pressure balance transition device further includes a flow restriction area for generating the low pressure zone.
CA2880906A 2012-08-06 2013-08-06 Wellbore desanding system Expired - Fee Related CA2880906C (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US201261680090P 2012-08-06 2012-08-06
US61/680,090 2012-08-06
PCT/US2013/053871 WO2014025835A2 (en) 2012-08-06 2013-08-06 Wellbore desanding system

Publications (2)

Publication Number Publication Date
CA2880906A1 CA2880906A1 (en) 2014-02-13
CA2880906C true CA2880906C (en) 2018-03-27

Family

ID=48986270

Family Applications (1)

Application Number Title Priority Date Filing Date
CA2880906A Expired - Fee Related CA2880906C (en) 2012-08-06 2013-08-06 Wellbore desanding system

Country Status (5)

Country Link
US (1) US9816359B2 (en)
AU (1) AU2013299746B2 (en)
CA (1) CA2880906C (en)
CO (1) CO7280472A2 (en)
WO (1) WO2014025835A2 (en)

Families Citing this family (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9353614B2 (en) * 2014-02-20 2016-05-31 Saudi Arabian Oil Company Fluid homogenizer system for gas segregated liquid hydrocarbon wells and method of homogenizing liquids produced by such wells
US9670757B2 (en) 2015-02-10 2017-06-06 Warren WESSEL Downhole pump flushing system and method of use
WO2018057960A1 (en) * 2016-09-23 2018-03-29 Mark Krpec Downhole motor-pump assembly
US10428635B2 (en) 2016-12-06 2019-10-01 Saudi Arabian Oil Company System and method for removing sand from a wellbore
US10697451B2 (en) * 2017-03-14 2020-06-30 Leigh Technologies Inc. Apparatus and method for pumping a reservoir
CN109132317B (en) * 2017-06-27 2020-09-08 中国石油天然气集团公司 Sand removing device for underground water seal stone cave storage sleeve
WO2019018781A1 (en) * 2017-07-21 2019-01-24 Forum Us, Inc. Apparatus and method for regulating flow from a geological formation
US10557337B2 (en) 2017-10-05 2020-02-11 Saudi Arabian Oil Company Downhole centrifugal separation and removal of sand from wells using progressing cavity pump
NO345607B1 (en) * 2019-06-27 2021-05-10 Altus Intervention Tech As Wireline clean-out tool having improved capacity
CN112647872B (en) * 2019-10-12 2022-11-25 中国石油化工股份有限公司 Underground sand suction device
US11008848B1 (en) 2019-11-08 2021-05-18 Forum Us, Inc. Apparatus and methods for regulating flow from a geological formation
US11549335B2 (en) * 2020-12-09 2023-01-10 Saudi Arabian Oil Company Downhole cleaning tools and methods for operating the same
US11649697B2 (en) * 2020-12-21 2023-05-16 Baker Hughes Oilfield Operations Llc Method and apparatus for cleaning a wellbore
CN112761583B (en) 2020-12-31 2022-03-29 西南石油大学 Underground hydraulic lifting in-situ sand prevention and sand removal oil extraction and gas production system and method

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2512764A (en) * 1946-11-05 1950-06-27 Robbins & Myers Helical gear shallow well pump
US3677665A (en) 1971-05-07 1972-07-18 Husky Oil Ltd Submersible pump assembly
SU1699879A1 (en) 1988-06-22 1991-12-23 Московский Геологоразведочный Институт Им.Серго Орджоникидзе Apparatus for hydraulic conveying of solid materials
FI94513C (en) 1989-08-08 1995-09-25 Merpro Tortek Ltd Device for hydraulic transfer of bulk materials
AU632080B2 (en) 1990-02-14 1992-12-17 Merpro Tortek Limited Device for hydraulic conveyance of loose materials
GB9205475D0 (en) 1992-03-13 1992-04-29 Merpro Tortek Ltd Well uplift system
GB9416244D0 (en) 1994-08-11 1994-10-05 Merpro Tortek Ltd Fluidising apparatus
US5934372A (en) * 1994-10-20 1999-08-10 Muth Pump Llc Pump system and method for pumping well fluids
CA2621041C (en) * 2007-09-20 2014-04-22 Source Energy Tool Services Inc. Enclosed circulation tool for a well
US8215407B2 (en) 2009-07-22 2012-07-10 Baker Hughes Incorporated Apparatus for fluidizing formation fines settling in production well
CA2769068A1 (en) * 2009-08-31 2011-03-03 Exxonmobil Upstream Research Company Artificial lift modeling methods and systems
CN105960507A (en) * 2013-12-10 2016-09-21 国民油井华高有限公司 Apparatus, systems, and methods for downhole fluid filtration

Also Published As

Publication number Publication date
CA2880906A1 (en) 2014-02-13
US20150226046A1 (en) 2015-08-13
CO7280472A2 (en) 2015-05-29
WO2014025835A3 (en) 2014-11-20
WO2014025835A2 (en) 2014-02-13
AU2013299746B2 (en) 2017-02-02
US9816359B2 (en) 2017-11-14
AU2013299746A1 (en) 2015-02-26

Similar Documents

Publication Publication Date Title
CA2880906C (en) Wellbore desanding system
US7575072B2 (en) Method and apparatus for processing and injecting drill cuttings
US2849213A (en) Apparatus for circulating drilling fluid in rotary drilling
US20100186960A1 (en) Wellbore annular pressure control system and method using accumulator to maintain back pressure in annulus
US7503384B2 (en) Multiple port cross-over design for frac-pack erosion mitigation
US10428635B2 (en) System and method for removing sand from a wellbore
US8371037B2 (en) Slurrification process
US4035023A (en) Apparatus and process for hydraulic mining
CN105705729A (en) Systems and apparatuses for separating wellbore fluids and solids during production
EP3807497B1 (en) Pumping system
US11371332B2 (en) Sand accumulators to aid downhole pump operations
CA2542413C (en) Nozzle unit and method for excavating a hole in an object
US7044229B2 (en) Downhole valve device
CN111065792A (en) System, device and method for downhole water separation
US10309425B1 (en) High flow capacity well fluid extraction jet pump providing through access
US10661236B2 (en) Method and system for blending wellbore treatment fluids
WO1999015755A2 (en) Dual injection and lifting system
US5562159A (en) Well uplift system
EA038706B1 (en) Removal of solid particles from an oil well

Legal Events

Date Code Title Description
EEER Examination request

Effective date: 20171128

MKLA Lapsed

Effective date: 20220301

MKLA Lapsed

Effective date: 20200831