CA2862963C - Method for transient testing of oil wells completed with inflow control devices - Google Patents
Method for transient testing of oil wells completed with inflow control devices Download PDFInfo
- Publication number
- CA2862963C CA2862963C CA2862963A CA2862963A CA2862963C CA 2862963 C CA2862963 C CA 2862963C CA 2862963 A CA2862963 A CA 2862963A CA 2862963 A CA2862963 A CA 2862963A CA 2862963 C CA2862963 C CA 2862963C
- Authority
- CA
- Canada
- Prior art keywords
- well
- skin factor
- production rate
- predefined
- reservoir fluid
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/10—Locating fluid leaks, intrusions or movements
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
Landscapes
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geophysics (AREA)
- Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
- Investigating Or Analysing Biological Materials (AREA)
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US201261603723P | 2012-02-27 | 2012-02-27 | |
| US61/603,723 | 2012-02-27 | ||
| PCT/US2013/027949 WO2013130551A2 (en) | 2012-02-27 | 2013-02-27 | Method for transient testing of oil wells completed with inflow control devices |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CA2862963A1 CA2862963A1 (en) | 2013-09-06 |
| CA2862963C true CA2862963C (en) | 2016-03-29 |
Family
ID=47891991
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CA2862963A Active CA2862963C (en) | 2012-02-27 | 2013-02-27 | Method for transient testing of oil wells completed with inflow control devices |
Country Status (5)
| Country | Link |
|---|---|
| US (1) | US9085966B2 (de) |
| EP (1) | EP2820241B8 (de) |
| CN (1) | CN104246127B (de) |
| CA (1) | CA2862963C (de) |
| WO (1) | WO2013130551A2 (de) |
Families Citing this family (15)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US10119396B2 (en) | 2014-02-18 | 2018-11-06 | Saudi Arabian Oil Company | Measuring behind casing hydraulic conductivity between reservoir layers |
| US10392922B2 (en) | 2015-01-13 | 2019-08-27 | Saudi Arabian Oil Company | Measuring inter-reservoir cross flow rate between adjacent reservoir layers from transient pressure tests |
| US10180057B2 (en) | 2015-01-21 | 2019-01-15 | Saudi Arabian Oil Company | Measuring inter-reservoir cross flow rate through unintended leaks in zonal isolation cement sheaths in offset wells |
| US10094202B2 (en) * | 2015-02-04 | 2018-10-09 | Saudi Arabian Oil Company | Estimating measures of formation flow capacity and phase mobility from pressure transient data under segregated oil and water flow conditions |
| US10344584B2 (en) | 2016-02-12 | 2019-07-09 | Saudi Arabian Oil Company | Systems and methods for transient-pressure testing of water injection wells to determine reservoir damages |
| CN109891047B (zh) * | 2016-09-02 | 2022-04-08 | 沙特阿拉伯石油公司 | 控制碳氢化合物产出 |
| CN107989585A (zh) * | 2016-10-27 | 2018-05-04 | 中国石油化工股份有限公司 | 计算体积压裂改造体积的方法 |
| US10233749B2 (en) * | 2017-05-03 | 2019-03-19 | Saudi Arabian Oil Company | Multi-layer reservoir well drainage region |
| CN111506978B (zh) * | 2020-01-15 | 2022-11-04 | 中国石油天然气股份有限公司 | 完井管柱的油管设计方法、装置和存储介质 |
| US11231520B2 (en) | 2020-05-06 | 2022-01-25 | Saudi Arabian Oil Company | Dynamic hydrocarbon well skin modeling and operation |
| US11193370B1 (en) | 2020-06-05 | 2021-12-07 | Saudi Arabian Oil Company | Systems and methods for transient testing of hydrocarbon wells |
| US11692415B2 (en) | 2020-06-22 | 2023-07-04 | Saudi Arabian Oil Company | Hydrocarbon well stimulation based on skin profiles |
| US12180827B2 (en) | 2022-03-08 | 2024-12-31 | Saudi Arabian Oil Company | Transient pressure data analysis to determine contributing inflow control devices |
| US12024985B2 (en) | 2022-03-24 | 2024-07-02 | Saudi Arabian Oil Company | Selective inflow control device, system, and method |
| US20260092511A1 (en) * | 2023-12-11 | 2026-04-02 | Abu Dhabi National Oil Company | Method for determining an outlet configuration of a liner |
Family Cites Families (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5887657A (en) * | 1995-02-09 | 1999-03-30 | Baker Hughes Incorporated | Pressure test method for permanent downhole wells and apparatus therefore |
| US5823262A (en) * | 1996-04-10 | 1998-10-20 | Micro Motion, Inc. | Coriolis pump-off controller |
| ITMI20060995A1 (it) | 2006-05-19 | 2007-11-20 | Eni Spa | Procedimento per testare pozzi di idrocarburi a zero emissioni |
| US8131470B2 (en) * | 2007-02-26 | 2012-03-06 | Bp Exploration Operating Company Limited | Managing flow testing and the results thereof for hydrocarbon wells |
| GB0711635D0 (en) * | 2007-06-15 | 2007-07-25 | Proflux Systems Llp | Hydrocarbons |
| WO2009024545A1 (en) * | 2007-08-17 | 2009-02-26 | Shell Internationale Research Maatschappij B.V. | Method for controlling production and downhole pressures of a well with multiple subsurface zones and/or branches |
| US20110087471A1 (en) | 2007-12-31 | 2011-04-14 | Exxonmobil Upstream Research Company | Methods and Systems For Determining Near-Wellbore Characteristics and Reservoir Properties |
| US8898017B2 (en) * | 2008-05-05 | 2014-11-25 | Bp Corporation North America Inc. | Automated hydrocarbon reservoir pressure estimation |
| US8781747B2 (en) | 2009-06-09 | 2014-07-15 | Schlumberger Technology Corporation | Method of determining parameters of a layered reservoir |
| EP2494145B1 (de) | 2009-08-28 | 2013-12-25 | BP Corporation North America Inc. | Automatisierte schätzung in einem kohlenwasserstoffspeicher |
-
2013
- 2013-02-26 US US13/776,931 patent/US9085966B2/en active Active
- 2013-02-27 EP EP13710187.9A patent/EP2820241B8/de not_active Not-in-force
- 2013-02-27 WO PCT/US2013/027949 patent/WO2013130551A2/en not_active Ceased
- 2013-02-27 CN CN201380011210.4A patent/CN104246127B/zh not_active Expired - Fee Related
- 2013-02-27 CA CA2862963A patent/CA2862963C/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| EP2820241A2 (de) | 2015-01-07 |
| US9085966B2 (en) | 2015-07-21 |
| CN104246127B (zh) | 2017-11-17 |
| WO2013130551A3 (en) | 2014-04-03 |
| CA2862963A1 (en) | 2013-09-06 |
| US20130220008A1 (en) | 2013-08-29 |
| WO2013130551A2 (en) | 2013-09-06 |
| EP2820241B1 (de) | 2017-12-27 |
| EP2820241B8 (de) | 2018-09-05 |
| CN104246127A (zh) | 2014-12-24 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CA2862963C (en) | Method for transient testing of oil wells completed with inflow control devices | |
| EP2038809B1 (de) | Verfahren zum vergleichen und rückzuteilen der produktion | |
| US8463585B2 (en) | Apparatus and method for modeling well designs and well performance | |
| US10233749B2 (en) | Multi-layer reservoir well drainage region | |
| US20160273315A1 (en) | Optimizing oil recovery and reducing water production in smart wells | |
| US9951601B2 (en) | Distributed real-time processing for gas lift optimization | |
| CN104504604B (zh) | 一种定性气井井筒积液的方法 | |
| MX2014006711A (es) | Metodo para la interpretacion de la medicion de flujo en el fondo del pozo durante los tratamientos del pozo. | |
| US10577909B2 (en) | Real-time, continuous-flow pressure diagnostics for analyzing and designing diversion cycles of fracturing operations | |
| US7753128B2 (en) | Method and system for well production | |
| US10982516B2 (en) | Systems and methods for operating downhole inflow control valves to provide sufficient pump intake pressure | |
| US20180003016A1 (en) | Systems and Methods for Producing Gas Wells with Multiple Production Tubing Strings | |
| Cramer et al. | Pressure-based diagnostics for evaluating treatment confinement | |
| Garcia et al. | Identifying well completion applications for passive inflow control devices | |
| Jahanbani et al. | Determination of inflow performance relationship (ipr) by well testing | |
| WO2017052523A1 (en) | Temperature measurement correction in producing wells | |
| US20110301848A1 (en) | Method of diagnosing flow and determining compositional changes of fluid producing or injecting through an inflow control device | |
| Khorsandi et al. | Drawdown optimization in unconventional wells using coupled reservoir and surface modeling | |
| Charry et al. | Multizone Horizontal Openhole Gravel Pack with External Zonal Isolation and Inflow Control Devices Allows for Production of Left-Behind Reserves in Sand-Prone Reservoirs | |
| Amaral et al. | Tubing size selection for variation percentages water cut in well X field Y | |
| US11041349B2 (en) | Automatic shift detection for oil and gas production system | |
| Joseph et al. | Model for Determining Total Skin in Horizontal Wells Completed with Slotted Liners | |
| SA113340678B1 (ar) | التحكم في الضغط في عمليات الحفر مع الإزاحة المطبقة استجابة لظروف محددة سلفاً | |
| Tham et al. | Early stage of commingled water injection in a brownfield: challenges and lessons learnt | |
| Kherroubi et al. | Application of Autonomous Inflow Control Valve (AICV) in Reducing the Gas Production in Ultra-Light Oil Reservoir: Case Study |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| EEER | Examination request |
Effective date: 20150831 |
|
| H11 | Ip right ceased following rejected request for revival |
Free format text: ST27 STATUS EVENT CODE: T-6-6-H10-H11-H101 (AS PROVIDED BY THE NATIONAL OFFICE); EVENT TEXT: TIME LIMIT FOR REVERSAL EXPIRED Effective date: 20240828 |