CA2683236A1 - Method and apparatus for forming an alloy plug in an oil or gas well - Google Patents
Method and apparatus for forming an alloy plug in an oil or gas well Download PDFInfo
- Publication number
- CA2683236A1 CA2683236A1 CA2683236A CA2683236A CA2683236A1 CA 2683236 A1 CA2683236 A1 CA 2683236A1 CA 2683236 A CA2683236 A CA 2683236A CA 2683236 A CA2683236 A CA 2683236A CA 2683236 A1 CA2683236 A1 CA 2683236A1
- Authority
- CA
- Canada
- Prior art keywords
- alloy
- well
- well casing
- casing
- plug
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910045601 alloy Inorganic materials 0.000 title claims abstract description 44
- 239000000956 alloy Substances 0.000 title claims abstract description 44
- 238000000034 method Methods 0.000 title claims abstract description 21
- 229910001092 metal group alloy Inorganic materials 0.000 claims abstract description 24
- 239000004568 cement Substances 0.000 claims abstract description 18
- 238000003801 milling Methods 0.000 claims abstract description 10
- 239000007787 solid Substances 0.000 claims abstract description 9
- 238000007711 solidification Methods 0.000 claims abstract description 5
- 230000008023 solidification Effects 0.000 claims abstract description 5
- 238000010438 heat treatment Methods 0.000 claims description 25
- 239000007788 liquid Substances 0.000 claims description 9
- 239000000463 material Substances 0.000 claims description 7
- 229910052797 bismuth Inorganic materials 0.000 claims description 6
- JCXGWMGPZLAOME-UHFFFAOYSA-N bismuth atom Chemical compound [Bi] JCXGWMGPZLAOME-UHFFFAOYSA-N 0.000 claims description 6
- 230000008018 melting Effects 0.000 claims description 5
- 238000002844 melting Methods 0.000 claims description 5
- 238000003825 pressing Methods 0.000 claims 1
- 230000000452 restraining effect Effects 0.000 claims 1
- 230000009919 sequestration Effects 0.000 abstract description 5
- 239000007789 gas Substances 0.000 description 19
- 229910002092 carbon dioxide Inorganic materials 0.000 description 15
- CURLTUGMZLYLDI-UHFFFAOYSA-N Carbon dioxide Chemical compound O=C=O CURLTUGMZLYLDI-UHFFFAOYSA-N 0.000 description 12
- 229910000831 Steel Inorganic materials 0.000 description 12
- 239000010959 steel Substances 0.000 description 12
- 238000007789 sealing Methods 0.000 description 10
- 230000015572 biosynthetic process Effects 0.000 description 6
- ATJFFYVFTNAWJD-UHFFFAOYSA-N Tin Chemical compound [Sn] ATJFFYVFTNAWJD-UHFFFAOYSA-N 0.000 description 5
- 230000007797 corrosion Effects 0.000 description 5
- 238000005260 corrosion Methods 0.000 description 5
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 5
- 229910001152 Bi alloy Inorganic materials 0.000 description 4
- 239000012530 fluid Substances 0.000 description 4
- 229910000743 fusible alloy Inorganic materials 0.000 description 4
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 4
- 239000011435 rock Substances 0.000 description 4
- 239000000126 substance Substances 0.000 description 4
- 231100000331 toxic Toxicity 0.000 description 4
- 230000002588 toxic effect Effects 0.000 description 4
- GYHNNYVSQQEPJS-UHFFFAOYSA-N Gallium Chemical compound [Ga] GYHNNYVSQQEPJS-UHFFFAOYSA-N 0.000 description 3
- 239000012267 brine Substances 0.000 description 3
- 239000001569 carbon dioxide Substances 0.000 description 3
- 239000000374 eutectic mixture Substances 0.000 description 3
- 229910052733 gallium Inorganic materials 0.000 description 3
- 239000007791 liquid phase Substances 0.000 description 3
- 239000000155 melt Substances 0.000 description 3
- 229910052751 metal Inorganic materials 0.000 description 3
- HPALAKNZSZLMCH-UHFFFAOYSA-M sodium;chloride;hydrate Chemical compound O.[Na+].[Cl-] HPALAKNZSZLMCH-UHFFFAOYSA-M 0.000 description 3
- 238000003860 storage Methods 0.000 description 3
- 229910052787 antimony Inorganic materials 0.000 description 2
- WATWJIUSRGPENY-UHFFFAOYSA-N antimony atom Chemical compound [Sb] WATWJIUSRGPENY-UHFFFAOYSA-N 0.000 description 2
- 238000005553 drilling Methods 0.000 description 2
- 230000002349 favourable effect Effects 0.000 description 2
- 238000009472 formulation Methods 0.000 description 2
- 239000002803 fossil fuel Substances 0.000 description 2
- 230000005484 gravity Effects 0.000 description 2
- 238000002347 injection Methods 0.000 description 2
- 239000007924 injection Substances 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 239000003345 natural gas Substances 0.000 description 2
- 229910001128 Sn alloy Inorganic materials 0.000 description 1
- 239000002253 acid Substances 0.000 description 1
- 230000002378 acidificating effect Effects 0.000 description 1
- 230000015556 catabolic process Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 239000012141 concentrate Substances 0.000 description 1
- 238000006731 degradation reaction Methods 0.000 description 1
- 238000009792 diffusion process Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 238000010952 in-situ formation Methods 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 150000007522 mineralic acids Chemical class 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000007790 solid phase Substances 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/005—Waste disposal systems
- E21B41/0057—Disposal of a fluid by injection into a subterranean formation
- E21B41/0064—Carbon dioxide sequestration
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/12—Packers; Plugs
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/13—Methods or devices for cementing, for plugging holes, crevices or the like
- E21B33/134—Bridging plugs
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02C—CAPTURE, STORAGE, SEQUESTRATION OR DISPOSAL OF GREENHOUSE GASES [GHG]
- Y02C20/00—Capture or disposal of greenhouse gases
- Y02C20/40—Capture or disposal of greenhouse gases of CO2
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Earth Drilling (AREA)
- Physical Or Chemical Processes And Apparatus (AREA)
Abstract
Method for forming a downhole plug within an abandoned well casing for preventing the flow of gas through the plug and reaching the surface, particularly for CO2 sequestration projects. A milling tool mills out a longitudinal section of the perimeter of the well casing and surrounding cement and detritus to expose the well bore. A heater containing solid metallic alloy is lowered into the casing and the alloy is melted so that it fills the milled out area and flows into the face of the well bore. The heater is removed to allow the alloy to solidify. The upper casing acts to restrain any movement of the plug following solidification of the alloy.
Description
TITLE OF THE INVENTION
METHOD AND APPARATUS FOR SEALING WELLS
CROSS-REFERENCE TO RELATED APPLICATION
This application claims priority from provisional application serial number 61/106,936 filed October 20, 2008 and entitled METHOD AND APPARATUS FOR SEALING WELLS IN CO2 SEQUESTRATION PROJECTS.
INTRODUCTION
This invention relates to a method and apparatus for the sequestration of carbon dioxide and, more particularly, to the sequestration of carbon dioxide from large fossil fuel burning facilities.
METHOD AND APPARATUS FOR SEALING WELLS
CROSS-REFERENCE TO RELATED APPLICATION
This application claims priority from provisional application serial number 61/106,936 filed October 20, 2008 and entitled METHOD AND APPARATUS FOR SEALING WELLS IN CO2 SEQUESTRATION PROJECTS.
INTRODUCTION
This invention relates to a method and apparatus for the sequestration of carbon dioxide and, more particularly, to the sequestration of carbon dioxide from large fossil fuel burning facilities.
- 2 -BACKGROUND OF THE INVENTION
To prevent carbon dioxide (C02) from entering the atmosphere when large fossil fuel burning facilities are used, a proposed solution is to capture the C02, concentrate and compress it and transport it to a depleted oil or gas field which is then used as a storage vessel facility. The compressed C02 is injected into the depleted and depressurized geologic formation previously holding oil or gas. The process is capital intensive and time consuming and it clearly is only of value if the storage is permanent and there is no leakage from the reservoir where the C02 is injected. Fields that may be satisfactory to hold the C02 have defining characteristics which include being closed and with no natural fractures or permeable cap rock. These depleted fields also contain numerous wells that have been abandoned following depletion. The usual procedure of dealing with such abandoned wells includes plugging the wells with cement and capping the well casings near the surface with a sealed steel plate. The wells will have been drilled through the cap rock of the storage reservoir so they too must be permanently sealed or they will become conduits for the injected C02 to lead to the atmosphere
To prevent carbon dioxide (C02) from entering the atmosphere when large fossil fuel burning facilities are used, a proposed solution is to capture the C02, concentrate and compress it and transport it to a depleted oil or gas field which is then used as a storage vessel facility. The compressed C02 is injected into the depleted and depressurized geologic formation previously holding oil or gas. The process is capital intensive and time consuming and it clearly is only of value if the storage is permanent and there is no leakage from the reservoir where the C02 is injected. Fields that may be satisfactory to hold the C02 have defining characteristics which include being closed and with no natural fractures or permeable cap rock. These depleted fields also contain numerous wells that have been abandoned following depletion. The usual procedure of dealing with such abandoned wells includes plugging the wells with cement and capping the well casings near the surface with a sealed steel plate. The wells will have been drilled through the cap rock of the storage reservoir so they too must be permanently sealed or they will become conduits for the injected C02 to lead to the atmosphere
- 3 -which is undesirable.
The use of cement which is commonly used in the completion of wells and sealing them when they are subsequently abandoned is not a reliable procedure to prevent leakage of gas under pressure. This is so particularly with older wells which have used cement with less sophisticated cement formulations than those formulations presently available. The unreliability of such abandonment procedures has let to a proposed change in well abandonment procedure being mandated by the Alberta Energy Resources Conservation Board. This proposed change now requires that abandoned well caps not be sealed so as to avoid the safety problems resulting from accidental damage of a abandoned well casings and the inadvertent release of flammable natural gas which has accumulated below the well cap as a result of gas diffusion through sealing cement which has become permeable over time. The cement further does not form a particularly tight seal against the steel wall of the well casing and cracks can develop from a variety of causes that then act as conduits for gas flow through towards the surface. Well cement in contact with C02 and water or brine is also vulnerable to damage and
The use of cement which is commonly used in the completion of wells and sealing them when they are subsequently abandoned is not a reliable procedure to prevent leakage of gas under pressure. This is so particularly with older wells which have used cement with less sophisticated cement formulations than those formulations presently available. The unreliability of such abandonment procedures has let to a proposed change in well abandonment procedure being mandated by the Alberta Energy Resources Conservation Board. This proposed change now requires that abandoned well caps not be sealed so as to avoid the safety problems resulting from accidental damage of a abandoned well casings and the inadvertent release of flammable natural gas which has accumulated below the well cap as a result of gas diffusion through sealing cement which has become permeable over time. The cement further does not form a particularly tight seal against the steel wall of the well casing and cracks can develop from a variety of causes that then act as conduits for gas flow through towards the surface. Well cement in contact with C02 and water or brine is also vulnerable to damage and
- 4 -deterioration through chemical reaction.
Yet a further disadvantage with the use of cement plugs in well abandonments relates to long term degradation of the steel well casing. Over time, corrosion of the steel casing is likely occur within a certain period. The corrosion can again allow undesirable gas defusion to the surface. To prevent this possibility, it has been suggested that the steel casing be removed following well abandonment and that a reliable gas seal be deployed within the open well bore.
SiTMMARY OF THE INVENTION
According to one aspect of the invention, there is provided a method of forming a metal alloy plug within the well casing of a well bore of an abandoned oil or gas well to prevent the flow of gas through said metal alloy plug comprising the steps of dropping a casing milling tool down said well casing to a predetermined depth within said well casing, said well casing having a plug below said predetermined depth, milling out a longitudinal section of said well casing and the well cement and detritus
Yet a further disadvantage with the use of cement plugs in well abandonments relates to long term degradation of the steel well casing. Over time, corrosion of the steel casing is likely occur within a certain period. The corrosion can again allow undesirable gas defusion to the surface. To prevent this possibility, it has been suggested that the steel casing be removed following well abandonment and that a reliable gas seal be deployed within the open well bore.
SiTMMARY OF THE INVENTION
According to one aspect of the invention, there is provided a method of forming a metal alloy plug within the well casing of a well bore of an abandoned oil or gas well to prevent the flow of gas through said metal alloy plug comprising the steps of dropping a casing milling tool down said well casing to a predetermined depth within said well casing, said well casing having a plug below said predetermined depth, milling out a longitudinal section of said well casing and the well cement and detritus
- 5 -surrounding said well casing and above said plug so as to expose the wall of said well bore while leaving the upper portion of said well casing above said milled out area and while leaving the bottom portion of said well casing below said milled out area, removing said casing milling tool and dropping a heater into said well casing to said predetermined depth, said heater carrying a solid metallic alloy plugging material, increasing the temperature of said heater to melt said metallic alloy and maintaining said increased temperature until said melted metallic alloy has flowed from said heater and permeated said well bore to a desired depth, removing said heater from said well casing and allowing said melted metallic alloy to solidify within said well bore, said casing and said milled out area.
According to a further aspect of the invention, there is provided apparatus used to form a metallic alloy plug within a well casing, said apparatus comprising a milling tool used to mill out a longitudinal section of a well casing at a predetermined depth within said well casing and leaving the upper and lower portions of said well casing above and below said milled out area and a heating tool operable to carry solid metallic alloy billets, to melt said
According to a further aspect of the invention, there is provided apparatus used to form a metallic alloy plug within a well casing, said apparatus comprising a milling tool used to mill out a longitudinal section of a well casing at a predetermined depth within said well casing and leaving the upper and lower portions of said well casing above and below said milled out area and a heating tool operable to carry solid metallic alloy billets, to melt said
- 6 -billets at an elevated temperature of said heating tool to form liquid alloy and to maintain said elevated temperature of said heating tool until said liquid alloy flows into said milled out area for a desired time period, said heating tool having a connected power cable to supply power to said heating tool and to lower and raise said heating tool within said well casing.
BRIEF DESCRIPTION OF THE SEVERAL VIEWS OF THE DRAWINGS
Specific embodiments of the invention will now be described, by way of example only, with the use of drawings in which:
Figure 1 is a diagrammatic side cross-sectional view of a cement plugged well with a window milled through the casing and the cement sheath surrounding the casing;
Figure 2 is a diagrammatic side cross-sectional view of a fusible alloy heater lowered within the well to the milled window;
Figure 3 is a diagrammatic side cross-sectional
BRIEF DESCRIPTION OF THE SEVERAL VIEWS OF THE DRAWINGS
Specific embodiments of the invention will now be described, by way of example only, with the use of drawings in which:
Figure 1 is a diagrammatic side cross-sectional view of a cement plugged well with a window milled through the casing and the cement sheath surrounding the casing;
Figure 2 is a diagrammatic side cross-sectional view of a fusible alloy heater lowered within the well to the milled window;
Figure 3 is a diagrammatic side cross-sectional
- 7 -view of the molten alloy following heating which extends through the milled window and into the formation; and Figure 4 is a diagrammatic side-cross sectional view of the solidified alloy plug extending through the window and into the formation with the alloy heating tool withdrawn from the well.
DESCRIPTION OF SPECIFIC EMBODIMENT
It is useful to select an interval for forming the gas sealing plugs in the abandoned wells. Several sites for forming the gas sealing plugs may be selected with several plugs set. The formation of only one such plug will be described herein, it being understood that such a process can apply to several other sites that may be considered favorable for the sealing process.
Conveniently, a favorable site for a sealing plug within a well 105 will be in an area adjacent a permeable stratum atop an impermeable stratum such as cap rock such as that site generally illustrated at 100 in Figure 1. The cap rock 101 will seal the top of the reservoir into which the
DESCRIPTION OF SPECIFIC EMBODIMENT
It is useful to select an interval for forming the gas sealing plugs in the abandoned wells. Several sites for forming the gas sealing plugs may be selected with several plugs set. The formation of only one such plug will be described herein, it being understood that such a process can apply to several other sites that may be considered favorable for the sealing process.
Conveniently, a favorable site for a sealing plug within a well 105 will be in an area adjacent a permeable stratum atop an impermeable stratum such as cap rock such as that site generally illustrated at 100 in Figure 1. The cap rock 101 will seal the top of the reservoir into which the
- 8 -C02 is injected.
A section of the casing 102, conveniently less than one(l) meter in length, is milled from the casing string 103. The annulus surrounding the casing is cleaned of cement 104 and other foreign material such that the face 110 of the well bore is exposed. Figure 1 illustrates the condition of the target well at this stage of the procedure.
Generally, such a well 105 will have cement plugging material 111 within the well casing 102 at the bottom of the milled section 102. In the event, however, that there is no such cement below the milled section, a bridge plug (not illustrated) is set just below the bottom of the milled section 102 as is known.
A heating tool 112 (Figure 2) is attached to the end of an electrically conducting cable 113 and is lowered from the surface down the well casing 103 to the top of the plugged casing. The heating tool 112 is cylindrical and hollow with a retaining flange 114 near its bottom.
Electrical heating elements (not shown) are embedded within the wall of the tool 112 and are connected to an electrical power source 120 on the surface by the electrical conducting
A section of the casing 102, conveniently less than one(l) meter in length, is milled from the casing string 103. The annulus surrounding the casing is cleaned of cement 104 and other foreign material such that the face 110 of the well bore is exposed. Figure 1 illustrates the condition of the target well at this stage of the procedure.
Generally, such a well 105 will have cement plugging material 111 within the well casing 102 at the bottom of the milled section 102. In the event, however, that there is no such cement below the milled section, a bridge plug (not illustrated) is set just below the bottom of the milled section 102 as is known.
A heating tool 112 (Figure 2) is attached to the end of an electrically conducting cable 113 and is lowered from the surface down the well casing 103 to the top of the plugged casing. The heating tool 112 is cylindrical and hollow with a retaining flange 114 near its bottom.
Electrical heating elements (not shown) are embedded within the wall of the tool 112 and are connected to an electrical power source 120 on the surface by the electrical conducting
- 9 -cable 113. Billets 121 of solid fusible alloy are inserted within the hollow heating tool 112 before it is lowered down the well 105 which will be normally filled with water, brine or drilling mud to the ground surface. Such a heating tool is disclosed in our United States Patent 7,065,607, the contents of which are herein incorporated by reference.
When the heating tool 112 reaches the top of the plugged casing adjacent the milled window 102, electrical power is applied through the power cable 113 to the heating elements within the tool 112. The temperature of the elements rises above the melting point of the contained fusible alloy and the molten metal flows out of the bottom of the heating tool 112 and into the well bore 110 and casing 103 as seen in Figure 3. For a predetermined period, power continues to be applied to the heating elements to raise the temperature of the well bore 110 and the surrounding formation material above the melting point of the metal alloy. Pressure is then applied to the fluid column within the well bore 110 above the level of the molten alloy. The pressure assists in forcing the molten alloy into the porosity of the geologic stratum.
When the heating tool 112 reaches the top of the plugged casing adjacent the milled window 102, electrical power is applied through the power cable 113 to the heating elements within the tool 112. The temperature of the elements rises above the melting point of the contained fusible alloy and the molten metal flows out of the bottom of the heating tool 112 and into the well bore 110 and casing 103 as seen in Figure 3. For a predetermined period, power continues to be applied to the heating elements to raise the temperature of the well bore 110 and the surrounding formation material above the melting point of the metal alloy. Pressure is then applied to the fluid column within the well bore 110 above the level of the molten alloy. The pressure assists in forcing the molten alloy into the porosity of the geologic stratum.
- 10 -The power is then shut off to the heating tool 112 and the tool 112 is lifted from the well bore 105 and removed as seen in Figure 4. The molten alloy cools by conduction of heat to the surrounding earth and the alloy solidifies. The alloy plug 122 that remains fills the milled section 102 of casing 103, covers the end of the production casing 103 and its cement sheath 104 and renders the surrounding geologic formation impermeable to gas flow by virtue of the solid alloy that fills its porosity to a depth to effect a seal against gas flowing upward from below. By filling the entire milled section 102 of the casing 103 with solidified fusible alloy 122, the alloy plug 122 butts against the edge of the well casing 123 above and cannot move as long as the casing 123 remains competent. The well above the alloy plug 122 may be filled with cement or some other suitable material (not shown) as ballast to over balance against any subsequent pressure from below that otherwise might cause a creeping movement of the alloy plug 122. The above described alloy plugging procedure may be repeated as many times as desired in different permeable geologic strata in the open well bore in order to increase the assurance that a permanent gas seal has been assured.
- 11 -in respect of the alloy intended to be used as the alloy plug 122 for the plugging procedure, certain properties are conveniently exploited to make the procedure more efficacious. First, the alloy must conveniently expand volumetrically upon solidification from the liquid phase sufficiently to form an effective gas seal against corroded, oily, and dirty steel casing 103 as well as within the confined space of the well annulus exposed by the milling of the casing section; secondly, in the liquid state, the alloy must conveniently have a sufficiently low viscosity and surface tension in order to be successfully pressured into the permeable geologic stratum; third, the alloy must conveniently have a specific gravity high enough to displace efficiently any fluid material present such as water, brine, or drilling mud; fourth, the alloy must not chemically corrode significantly in contact with C02 or other acid gas and saltwater; fifth, the alloy must not itself corrode significantly, nor can it cause significant corrosion of the steel well casing due to galvanic action; and, sixth, the solidified alloy should be impermeable to gas flow under pressures common to gas sequestration operations.
There are further desirable properties associated
There are further desirable properties associated
- 12 -with the alloy. First, it is preferred if the alloy is comprised of component metallic elements that are not toxic if the sealing plug 122 may have the possibility of contact with fresh ground water; second, the alloy is conveniently a eutectic mixture such that the alloy melts and solidifies at a single characteristic temperature; and, third, the melting point temperature of the alloy should be low enough to allow efficient melting with a heater 112 deployed within the well without causing damage to the well bore face 110 within which the molten alloy flows at the pressure applied.
There are four known substances that expand volumetrically upon solidification from the liquid to the solid phase. The substances are water, and the metallic elements bismuth, antimony, and gallium. To be useful as a component in a well sealing plug, a substance must be solid at temperatures existing in wells. This eliminates water and gallium. Gallium melts at 29.6 C and is also corrosively attacked by inorganic acids. Antimony is possibly useful as an alloy component but it is disadvantageous in that it is toxic.
Bismuth is not toxic and a number of its alloys
There are four known substances that expand volumetrically upon solidification from the liquid to the solid phase. The substances are water, and the metallic elements bismuth, antimony, and gallium. To be useful as a component in a well sealing plug, a substance must be solid at temperatures existing in wells. This eliminates water and gallium. Gallium melts at 29.6 C and is also corrosively attacked by inorganic acids. Antimony is possibly useful as an alloy component but it is disadvantageous in that it is toxic.
Bismuth is not toxic and a number of its alloys
- 13 -expand volumetrically upon solidification from the liquid phase. Some bismuth alloys are eutectic mixtures that melt at temperatures convenient for in situ formation of plugs in wells. Bismuth and its alloys generally have low liquid phase viscosities and surface tensions and specific gravities high enough to efficiently displace fluids likely to be present in wells. Bismuth alloys are furthermore impermeable to gas flow under pressure conditions of CO2 injection wells.
While there are several bismuth alloys which may be useful to form well plugs, an alloy known as CERROTRU
(Trademark) has been shown to be most desirable under many well conditions of pressure and temperature. It is comprised of bismuth and tin, neither of which are toxic. It is also a eutectic mixture which melts and solidifies at a temperature of 137 deg.C. Tests have shown that the CERROTRU alloy of bismuth and tin does not itself corrode significantly under the physical and chemical conditions of oil, natural gas, and CO2 injection wells. In addition, the presence of this alloy in contact with well fluids and steel well casing does not cause corrosion of the casing steel.
Bismuth is essentially inert under well conditions, and the
While there are several bismuth alloys which may be useful to form well plugs, an alloy known as CERROTRU
(Trademark) has been shown to be most desirable under many well conditions of pressure and temperature. It is comprised of bismuth and tin, neither of which are toxic. It is also a eutectic mixture which melts and solidifies at a temperature of 137 deg.C. Tests have shown that the CERROTRU alloy of bismuth and tin does not itself corrode significantly under the physical and chemical conditions of oil, natural gas, and CO2 injection wells. In addition, the presence of this alloy in contact with well fluids and steel well casing does not cause corrosion of the casing steel.
Bismuth is essentially inert under well conditions, and the
- 14 -behavior of CERROTRU alloy approximates that of elemental tin. Under acidic conditions, tin passivates and does not corrode. Under the anaerobic well environment, the passivated tin galvanic couple with steel causes the steel to passivate also and no increased corrosion of the steel results.
Many modifications will readily occur to those skilled in the art to which the invention relates and the particular embodiments described herein should be taken as illustrative of the invention only and not as limiting its scope as defined in accordance with the accompanying claims.
Many modifications will readily occur to those skilled in the art to which the invention relates and the particular embodiments described herein should be taken as illustrative of the invention only and not as limiting its scope as defined in accordance with the accompanying claims.
Claims (6)
1. A method of forming a metal alloy plug within the well casing of a well bore of an abandoned oil or gas well to prevent the flow of gas through said metal alloy plug comprising the steps of dropping a casing milling tool down said well casing to a predetermined depth within said well casing, said well casing having a plug below said predetermined depth, milling out a longitudinal section of said well casing and the well cement and detritus surrounding said well casing and above said plug so as to expose the wall of said well bore while leaving the upper portion of said well casing above said milled out area and while leaving the bottom portion of said well casing below said milled out area, removing said casing milling tool and dropping a heater into said well casing to said predetermined depth, said heater carrying a solid metallic alloy plugging material, increasing the temperature of said heater to melt said metallic alloy and maintaining said increased temperature until said melted metallic alloy has flowed from said heater and permeated said well bore to a desired depth, removing said heater from said well casing and allowing said melted metallic alloy to solidify within said well bore, said casing and said milled out area.
2. Method as in claim 1 and further comprising applying pressure on said liquid metallic alloy following said melting of said solid metallic alloy and allowing said pressure to assist said melted alloy to flow from said heater.
3. Method as in claim 2 wherein said metallic alloy comprises bismuth as a principal component.
4. Method as in claim 1 wherein the quantity of melted metallic alloy is sufficient to entirely fill said milled out area between said upper and lower portions of said well casing, said upper well casing restraining movement of said metal alloy plug following said solidification of said metal alloy within said milled out area.
5. Apparatus used to form a metallic alloy plug within a well casing, said apparatus comprising a milling tool used to mill out a longitudinal section of a well casing at a predetermined depth within said well casing and leaving the upper and lower portions of said well casing above and below said milled out area and a heating tool operable to carry solid metallic alloy billets, to melt said billets at an elevated temperature of said heating tool to form liquid alloy and to maintain said elevated temperature of said heating tool until said liquid alloy flows into said milled out area for a desired time period, said heating tool having a connected power cable to supply power to said heating tool and to lower and raise said heating tool within said well casing.
6. Apparatus as in claim 5 and further comprising means to apply pressure on said liquid alloy to assist flow of said liquid alloy from said heating tool and into said milled out area.
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US10693608P | 2008-10-20 | 2008-10-20 | |
US61/106,936 | 2008-10-20 | ||
US12/582,307 | 2009-10-20 | ||
US12/582,307 US20100155085A1 (en) | 2008-10-20 | 2009-10-20 | Method and apparatus for sealing wells in co2 sequestration projects |
Publications (2)
Publication Number | Publication Date |
---|---|
CA2683236A1 true CA2683236A1 (en) | 2010-04-20 |
CA2683236C CA2683236C (en) | 2017-06-20 |
Family
ID=42122707
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CA2683236A Expired - Fee Related CA2683236C (en) | 2008-10-20 | 2009-10-20 | Method and apparatus for forming an alloy plug in an oil or gas well |
Country Status (2)
Country | Link |
---|---|
US (1) | US20100155085A1 (en) |
CA (1) | CA2683236C (en) |
Families Citing this family (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8215394B2 (en) * | 2009-06-09 | 2012-07-10 | Baker Hughes Incorporated | Control line patch |
CA2688635C (en) | 2009-12-15 | 2016-09-06 | Rawwater Engineering Company Limited | Sealing method and apparatus |
GB201223055D0 (en) * | 2012-12-20 | 2013-02-06 | Carragher Paul | Method and apparatus for use in well abandonment |
WO2016069596A1 (en) * | 2014-10-27 | 2016-05-06 | Schlumberger Canada Limited | Eutectic casing window |
GB201505620D0 (en) | 2015-04-01 | 2015-05-13 | Wardley Michael | Specification for method of abandoning a well |
WO2018064171A1 (en) | 2016-09-30 | 2018-04-05 | Conocophillips Company | Through tubing p&a with two-material plugs |
US10760374B2 (en) | 2016-09-30 | 2020-09-01 | Conocophillips Company | Tool for metal plugging or sealing of casing |
WO2018063829A1 (en) | 2016-09-30 | 2018-04-05 | Conocophillips Company | Tool for metal plugging or sealing of casing |
WO2018169847A1 (en) | 2017-03-11 | 2018-09-20 | Conocophillips Company | Helical coil annular access plug and abandonment |
US11377925B2 (en) * | 2017-10-30 | 2022-07-05 | Conocophillips Company | Through tubing P and A with bismuth alloys |
US11643902B2 (en) * | 2018-04-03 | 2023-05-09 | Schlumberger Technology Corporation | Methods, apparatus and systems for creating wellbore plugs for abandoned wells |
US20220018201A1 (en) * | 2020-07-14 | 2022-01-20 | Saudi Arabian Oil Company | Casing annulus leakage repair method and system |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5667010A (en) * | 1995-03-21 | 1997-09-16 | Steelhead Reclamation Ltd. | Process and plug for well abandonment |
AU2003283104A1 (en) * | 2002-11-06 | 2004-06-07 | Canitron Systems, Inc. | Down hole induction heating tool and method of operating and manufacturing same |
-
2009
- 2009-10-20 US US12/582,307 patent/US20100155085A1/en not_active Abandoned
- 2009-10-20 CA CA2683236A patent/CA2683236C/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
US20100155085A1 (en) | 2010-06-24 |
CA2683236C (en) | 2017-06-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2683236C (en) | Method and apparatus for forming an alloy plug in an oil or gas well | |
EP1339943B1 (en) | Well sealing method and apparatus | |
US11434716B2 (en) | Releasable alloy system and method for well management | |
US20100006289A1 (en) | Method and apparatus for sealing abandoned oil and gas wells | |
CA2402218C (en) | Plug for tubulars | |
WO2018063829A1 (en) | Tool for metal plugging or sealing of casing | |
US5004298A (en) | Method of rapidly abandoning large cavities washed-out in rock salt | |
US9702216B2 (en) | Method for establishment of an annulus barrier in a subterranean well | |
US5394942A (en) | Method for stimulation of liquid flow in a well | |
EP1488074B1 (en) | Sealing method and apparatus | |
US5469918A (en) | Positive displacement device to improve placement of cement plugs | |
CA2840538C (en) | Sealing method and apparatus | |
CA2773339A1 (en) | Casing integrity pressure test system | |
US12104453B2 (en) | Downhole assembly and annular barrier with downhole assembly | |
RU2330933C1 (en) | Method of producing formation insulation during cementation of casing pipe | |
US11591512B2 (en) | Using acidic balls for acid stimulation in carbonate reservoirs | |
CA2665921A1 (en) | Method and apparatus for sealing abandoned oil and gas wells | |
US20230116346A1 (en) | Well Tool Actuation Chamber Isolation | |
EP2735696A1 (en) | Method and system for enhancing natural gas production | |
CA2828241A1 (en) | Eutectic salt abandonment plug for wellbores | |
WO2023214175A1 (en) | Methods to remove alloy plugs and annular seals and associated apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
EEER | Examination request |
Effective date: 20141208 |
|
MKLA | Lapsed |
Effective date: 20191021 |
|
MKLA | Lapsed |
Effective date: 20191021 |