CA2579245C - Method of intensification of natural gas production from coal beds - Google Patents

Method of intensification of natural gas production from coal beds Download PDF

Info

Publication number
CA2579245C
CA2579245C CA2579245A CA2579245A CA2579245C CA 2579245 C CA2579245 C CA 2579245C CA 2579245 A CA2579245 A CA 2579245A CA 2579245 A CA2579245 A CA 2579245A CA 2579245 C CA2579245 C CA 2579245C
Authority
CA
Canada
Prior art keywords
pressure
fluid
coal
well
fracture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CA2579245A
Other languages
French (fr)
Other versions
CA2579245A1 (en
Inventor
Matthew Miller
J. Ernest Brown
Alexey Evgenievich Barykin
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Schlumberger Canada Ltd
Original Assignee
Schlumberger Canada Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Schlumberger Canada Ltd filed Critical Schlumberger Canada Ltd
Publication of CA2579245A1 publication Critical patent/CA2579245A1/en
Application granted granted Critical
Publication of CA2579245C publication Critical patent/CA2579245C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B28/00Vibration generating arrangements for boreholes or wells, e.g. for stimulating production
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/003Vibrating earth formations
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/006Production of coal-bed methane
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • E21B43/267Methods for stimulating production by forming crevices or fractures reinforcing fractures by propping

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • Geochemistry & Mineralogy (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Chemical & Material Sciences (AREA)
  • Cleaning In General (AREA)
  • Cleaning By Liquid Or Steam (AREA)
  • Perforating, Stamping-Out Or Severing By Means Other Than Cutting (AREA)
  • Earth Drilling (AREA)
  • Solid Fuels And Fuel-Associated Substances (AREA)
  • Pipe Accessories (AREA)

Abstract

A method of intensification of natural gas production from the coal beds, comprising exposure of the coal bed to pressure pulsing is disclosed. An embodiment comprises exposure of the coal bed to pressure pulsing in combination with hydraulic fracturing of the coal bed. Another embodiment comprises exposure of the coal bed to pressure pulsing in combination with creation of a cavity in the coal bed by cyclically increasing pressure of the fluid in the well and depressurizing rapidly the fluid.

Description

METHOD OF INTENSIFICATION OF NATURAL GAS PRODUCTION

FROM COAL BEDS

The present invention relates to methods for intensification of natural gas production from the coal beds.
The reserves of natural gas associated with coal deposits worldwide are estimated at 8,000 trillion cubic feet. This gas is adsorbed onto the coal surface and desorbs upon reducing pressure. The desorbed natural gas can flow towards production wells through the butt and cleat network of the coal bed.
Because of the low effective permeability of coal beds, stimulation methods are applied to increase the rate of production. Another complicating factor is that some coal beds are wet, and require dewatering in order to reduce the pore pressure and allow the desorption process to begin. Water is more difficult to remove than gas because its viscosity is two orders of magnitude higher, this causing greater flow resistance in the low permeability butt-cleat porosity network.
In addition, water must be pumped out of the well using some mechanical lift assistance. Moreover, water reduces the effective permeability of the butt-cleat network by creating interfaces that resist entry into small constrictions in the flow path and by occupying a large fraction of the pore space.

The most common existing methods of methane extraction include the creation of a cavity in the coal seam (cavitation), hydrological fracturing of the coal bed, or directional drilling parallel to the bedding of the seam.

The method of creation of a cavity in the coal seam reduces the amount of damage to the surrounding structure that may have resulted during drilling, and gives an area from which the methane can be extracted. Typically cavitation is performed on open-hole completed wells (no casing across the production interval) in a cyclic manner.
Thus the treatment is usually referred to as cavitation cycling.

Conventional hydraulic fracturing technique is performed on cased-hole perforated completion wells typically when the coal permeability is less than 20 mD. As an option of this method, the hydraulic fracture drilling technique might be used; it involves drilling an initial cased borehole and a second borehole some distance away from the original one which acts to collect loose coal material and as a dewatering location of the formation.

Directional drilling involves angling the drill stem so that drilling is not vertical, but will parallel the coal seam.

Once the appropriate borehole is completed by using whatever method, dewatering must also occur to reduce the pressure in the formation. Pressure drop promotes methane release from within the coal into the cleats directed along the beds. If the cleats contain a high enough permeability, that is, inter-connectivity, then the methane will flow from the coal into the well bore and can be extracted.

Cavitation cycling, the most characteristic method for methane extraction, uses several mechanisms to link the wellbore to the coal fracture system: creates a physical cavity in the coals of the open-hole section (up to 10 feet in diameter); propagates a self-propping, vertical fracture that extends up to 200 feet away from the wellbore (parallel to the direction of least stress), and creates a zone of shear stress failure that enhances permeability in a direction perpendicular to the direction of least stress, as disclosed e.g. in book by Palmer, I.D., Lambert, S.W., and Spitter, J.L.
"Coalbed methane well completions and stimulations", Chapter 14 in AAPG Studies in Geology 38, pp.303-341, and publication by Khodaverian, M. and McLennan, "Cavity completions: a study of mechanisms and applicability", Proceedings of the 1993 International Coalbed Methane Symposium (Univ. of Alabama/Tuscaloosa), 1993, pp.89-97.

Cavitation is accomplished by applying pressure to the well using compressed air or foam, and then abruptly releasing the pressure. The over-pressured coal zones provide a pressure surge into the wellbore, and the resulting stress causes dislodgement of coal chips, while abrupt fluid flowback carries the chips up the well. These cycles of pressure and blowdown are repeated many times over a period of hours or days, and the repeated alternating stress-shear failure in the coal formation creates effects that extend laterally from the wellbore, as disclosed e.g. in publication by Kahil, A. and Masszi, D. "Cavity stress-relief method to stimulate demethanation boreholes", SPE Paper No.12843. Proceedings 1984 SPE Unconventional Gas Recovery Symposium, 1984.

Conventional hydraulic fracturing technique is described in many literature sources, as well as when applied to coal rocks, e.g. in publication by Holditch, S.A. 1990. "Completion methods in coal seam reservoirs", SPE 20670. Proceedings 65th SPE Annual Technical Conference (New Orleans), p.533.

Directional drilling cannot be considered as a pure stimulation technique for natural gas production. It is worth to note that both fracturing (either conventional hydraulic fracturing or cavitation) and directionally drilling simply increase the amount of the coal seam which is associated with the well bore, but fail to increase the original porosity of the formation.

The prior art contains a tool which utilizes mechanical cutting action by means of jets to create cavity in the bed and clean its volume, as disclosed in US Patent No. 6,609,688 (August 26, 2003). The tool is provided with a plurality of ports for jetting a combination of air, water and/or drilling foam pumped through each of the ports while the tool rotates.
The tool is designed to clean and flush out coal wells not in production.

The benefit of this tool is that it opens the hole, enlarging the hole size, and cleans out the well in one run.
But this tool does not use pulsing.

The following references disclose methods that involve pressure pulsing in oil and gas industry for oil recovery enhancement. However none of these applications were aimed at enhancement of coal-bed methane production.

The principle of pumping and vibrations simultaneously is described in US patent No. 4,164,978 (1978); RU patent 16074 (1962); book "Research Activities ", M, MGI, 1975, p.61: "Use of vibration in oil production", M., Nedra, 1977; EP patent No. 0512331 (1992); US patent No. 4,164,498 (1978); RU patents Nos. 1165801 (1985); 2084705 (1993); 2085721 (1997); 2100571 (1992); 2085721 (1994); 2175718 (1997); 2193649 (2002).

Pumping and vibrations simultaneously, and vibrations with special frequencies (calculated resonance frequencies) are described in US patents Nos. 4,702,315 (1987); 3,863,717 (1975); 3,744,017 (1973); RU patents Nos. 1143150 (1994), 2231631 (2002). Pumping and vibrations simultaneously, pulse regime of pumping are described in US patent No. 4,456,068 (1984); RU patents Nos. 2221141 (2004); 2176728 (2000);
2200832 (2001).

Pumping and vibrations simultaneously, vibrations with special frequencies, burning of solid/liquid fuel-oxidizer mixtures are described in US patents Nos. 3,520,362 (1970);

3,768,520 (1973); RU patents Nos. 2128770 (1994); 2191896 (2002); 2003111855 (2004); 1434831 (1999); 1639127 (1987);
2087756 (1994).

Pumping and vibrations in period of pressure decline, cycle regime of pumping, vibrations with special frequencies are described in US patent 3520362 (1970), RU patents Nos.
2128770 (1994); 219896 (2002); 2003111855 (2004); 1434831 (1999); 1639127 (1987); 2087756 (1994); 2066746 (1996);
94023110 (1994).

Pumping and vibrations simultaneously, pulse regime of pumping, vibrations with special frequencies, injection of chemical agents, proppants, are described in US patents Nos.
5,197,543 (1993); 5,662,165 (1997); RU patents Nos. 2193649 (2002); 2186953 (2000); 2243364 (2002); 2003111855 (2004);
2066746 (1996); 94023110 (1994).

Pumping and vibrations simultaneously, vibrations with special frequencies, injection of chemical agents are described in US patent No. 5,718,289 (1998); RU patents Nos.
2175058 (1999); 2186953 (2000), 2111348 (1994), 2078200 (1994).

Pumping, vibrations, injection of foam agents, simultaneously vibrations with special frequencies, injection of foam agents are described in US patents Nos. 6,467,542 (2000); 6,015,010 (2000); 6,405,797 (2000); 6,241,019 (2000).

The object of the present invention is to provide methods of intensification of natural gas production from the coal beds, comprising exposure of the coal bed to pressure pulsing.

The object of the invention is attained in a method of intensification of natural gas production from the coal beds, comprising exposure of the coal bed to pressure pulsing and hydraulic fracturing of the coal bed.

The pressure pulses can be low frequency high-amplitude pressure pulses.

The hydraulic fracture can be created by the steps of injecting into the coal bed a fracture fluid at high flow rates and pressures to create the fracture; further injecting a proppant in the fracture fluid to prevent closing the fracture created, and finally injecting the fracture fluid without proppant for washing the well. The pressure pulsing can be applied either before creating the fracture, or during injecting the fracture fluid to create the fracture, or during injecting a proppant in the fracture fluid, or during finally injecting the fracture fluid without proppant, or during some or all said steps.

An embodiment of the method can comprise, before starting hydraulic fracture of the coal bed, the following steps:
running a pressure pulse generator into the wellbore at the level of treated interval;

loading the wellbore with an incompressible fluid in order to couple the coal bed to the pressure pulse generator;

adjusting the generator to create pressure pulses of specific frequency and amplitude;

transmitting the pressure pulses created by the generator to the coal bed through the incompressible fluid;

injecting the fracture fluid to the coal bed.

The aforementioned object of the invention is further attained in a method of intensification of natural gas production from the coal beds, comprising exposure of the coal bed to pressure pulsing and hydraulic fracturing of the coal bed by injecting into the coal bed a fracture fluid without proppant at high flow rates and pressures.

The object of the invention is also attained in a method of intensification of natural gas production from the coal beds, comprising exposure of the coal bed to pressure pulsing and creation of a cavity in the coal bed by cyclically increasing pressure of the fluid in the well and depressurizing the fluid.

The pressure pulses can be low frequency high-amplitude pressure pulses. The low frequency high-amplitude pressure pulses can impact the coal bed during increasing the pressure of the fluid in the well.

The method can further comprise the step of cleaning the well, wherein the fluid used for transferring pressure pulses is replaced by the efficient foamy cleaning medium.

A fluid driven generator can be used for creation of the pressure pulses and the foamy cleaning medium is pumped through said generator.

In another embodiment, a generator for creation of the pressure pulses can be placed in nearby well, and pressure pulsing of the coal bed can be simultaneously accompanied with injecting the foamy cleaning medium in the treated well.

The object of the present invention is further attained in a method of intensification of natural gas production from the coal beds, comprising exposure of the coal bed to pressure pulsing, creation of a cavity in the coal bed by cyclically increasing pressure of the fluid in the well and depressurizing rapidly the fluid, and well cleaning, comprising the steps of: running a pressure pulse generator into the wellbore at the level of treated interval; loading the wellbore with an incompressible fluid in order to efficiently couple the coal bed to the pressure pulse generator; adjusting the generator to create pressure pulses of specific frequency and amplitude and transmitting the pressure pulses created through said fluid to the coal bed;
creating a pressure gradient in the near wellbore zone by injecting fluid above the pressure of the coal bed;
depressurizing rapidly the fluid in the wellbore to cause breakdown of the coal bed and produce rubblized coal; running well cleaning by circulating efficient foamy cleaning medium across the treated interval to aid fluidization and transport of the rubblized coal to the surface.

In this method, a fluid discharge pressure pulse generator without a resonator can be employed, so that a pulsing jet produces cutting/reaming action on the coal bed.

The aforementioned method steps can be repeated after refilling the wellbore with the ihcompressible fluid.
Application of pressure pulses to coal seams promotes opening the butt-cleat network and enhancing its permeability.
The pressure pulses can be applied alone, or they can be combined with hydraulic fracturing and cavitation operations.

Application of stand alone high amplitude, low frequency pressure pulses to the coal bed will cause tensile and shear failure of the formation fabric. These tensile and shear cracks may form preferentially along the butt and cleat network, as in the case of a coal seam, or they may form along new failure planes. The cracks will tend to become somewhat misaligned due to the relaxation of anisotropic stress that pre-exists in some coal formations. What's more, spalling, rubblization, or shear displacement of the reservoir material may occur which prevents the tensile and shear cracks from healing completely. In all cases, the apparent permeability of the formation will increase, enabling higher gas production rates, and higher dewatering rates (if water is present).

Application of pressure pulses can be used to enhance the cavitation process which is limited by the strength of the coal formation and the ability to create tensile and shear failure deep around the wellbore during each over-pressure/depressurization cycle. Applying high amplitude, low frequency pressure pulses during the over-pressure/
depressurization process will expand the failure zone during each cavitation cycle. Thus, either fewer cycles are required to cause the desired growth of the effective wellbore diameter, or the ultimate diameter of the effective wellbore can be significantly larger than in the standard cavitation process.

Application of pressure pulses can be used to enhance the hole cleaning process. After a cavitation cycle the use of water or other efficient medium for propagating pressure pulses is replaced by an efficient foamed cleaning fluid. This cleaning cycle would then fluidize and transport the small coal fragments out of the wellbore and enable unrestricted evolution of gas from the coal formation. The use of pressure pulses is superior to a conventional steady-pressure process because the pulsing will cause the foam gas cells to periodically compress and expand. During compression, the foam will invade the porosity of the formation debris. During expansion the foam will dilate the bed of formation debris, facilitating its entrainment in the flowing stream. This fluidization process is required for efficient borehole cleaning and is enhanced by pressure pulses.

Application of pressure pulses can be used to enhance hydraulic fracturing. Hydraulic fracturing is accomplished by injecting a fracture fluid into the wellbore at high flow rates and pressures to create the fracture, and further injecting a proppant, such as sand, in the fracture fluid. The fracture that is created becomes filled with the proppant, which prevents the fracture from closing. This high conductivity channel enables both water and gas to flow at a high rate from the coal formation into the wellbore. Important parameters of the hydraulic fracture include the fracture conductivity and the fracture geometry. The artificial fractures have a capacity to conduct the produced fluids.
Fractures with the regular geometrical characteristics will connect to a vast number of natural cracks, penetrating the reservoir and coupling with the well. Applying pressure pulses to the formation, either before the fracture treatment, during the pad stage of the facture treatment, during injecting a proppant in the fracture fluid, or during the entire fracturing treatment, may have the following effects.

The cracks (cleats) in the coal bed arranged longitudinally that are intersected by the fracture become dilated and misaligned, thereby increasing their permeability and ability to feed the fracture.

The coal formation fabric along the fracture face undergoes tensile and shear failure. Coal becomes rubblized and the resulting fracture is wider than a fracture created by normal processes. The wider fracture has higher hydraulic conductivity than a more narrow fracture. Possibly, the fracture will not require proppant to maintain the fracture faces separate. Eliminating proppant from a channel will increase the channel porosity (if the channel does not close due to effective stress), thereby increasing hydraulic conductivity of the fracture. The fracture may propagate more easily because the pressure pulses have the effect of fatigue breakdown of the rock.

To create pressure pulses in these methods for intensification of natural gas production from coal beds the following several pressure pulse generator variants can be employed. A downhole hydrodynamic generator can be employed that creates pressure oscillations when fluid is pumped through the generator. Some mechanism to temporarily block and release the fluid flow creates oscillations. The mechanism can include mechanical valves, swirl type inertial valves, rotating ports that discharge fluid upon alignment and block flow upon misalignment. In a fully mechanical pressure generator, shock waves are created by two objects striking each other. An electrodynamic pulse generator utilizes electric discharge to create strong shock wave. Use could be also made of water hammering generators, and combustion pulse generators.

Pressure pulse generators that can be used in methods according to the present invention are disclosed in the following patents: US patents Nos. 4,164,978 (1978);
4,164,4978 (1978); 4,702,315 (1987); 3,863,717 (1975);
4,456,068 (1984); 3,520,362 (1970); 3,768,520 (1973);
5,197,543 (1993); 5,662,165 (1997); 5,718,289 (1998);
6,467,542 (2000); 6,015,010 (2000); 6,405,797 (2000);
6,241,019 (2000); RU patent documents Nos. 16074 (1962);
1165801 (1985); 2084705 (1993); 2085721 (1997); 2100571 (1992); 2085721 (1994); 2175718 (1997); 2193649 (2002);
1143150 (1994); 2231631 (2002); 2221141 (2004); 2176728 (2000); 2200832 (2001); 2128770 (1994); 2191896 (2002);
2003111855 (2004); 1434831 (1999) 1639127 (1987); 2087756 (1994); 2066746 (1996); 94023110 (1994); 2193649 (2002);
2186953 (2000); 2243364 (2002); 2003111855 (2004); 2175058 (1999); 2186953 (2000); 2111348 (1994); 2078200 (1994);
2175058 (1999); 2186953 (2000); 2111348 (1994); 2078200 (1994) and the aforementioned publication "Research Activities", 1975, p.61.

The preferred, but non-limiting embodiment for the claimed methods includes the use of downhole pressure pulses to generate pulses in production well. The downhole generators which can be used in methods according to the present invention include e.g. a generator described in US patent No.

6,015,010 for producing a shock wave in a borehole including a pumping unit arranged at the wellhead, a tubing string extending downwardly into the production casing of the well, a hollow cylinder assembly connected with the bottom of the tubing string, and a pair of plungers arranged within the cylinder assembly and connected with the pumping unit with sucker rods and a polish rod for compressing liquid contained within the cylinder assembly and discharging the compressed liquid into the production casing, thereby generating a shock wave. The cylinder assembly includes a hollow upper cylinder, a hollow lower cylinder arranged below the upper cylinder, a crossover cylinder arranged between the upper and lower cylinders, and a compression cylinder containing a compression chamber arranged between the crossover cylinder and the upper cylinder. The lower cylinder has a larger inner diameter than the upper cylinder inner diameter, and the lower plunger has a larger diameter than the upper plunger. In addition, the lower cylinder is adapted to receive the lower plunger and the upper cylinder is adapted to receive the upper plunger. When the plungers are displaced upwardly in the cylinder assembly, the lower plunger travels into the compression chamber and the upper plunger travels out of the compression chamber. Due to the lower plunger having a greater diameter than the upper plunger, the volume of the compression chamber is reduced and the liquid contained therein becomes compressed. When the pumping unit reaches the top of its stroke, the lower plunger allows the compressed liquid contained in the compression chamber to be discharged into the well. At this moment the stored pressure is suddenly released and a very amplitude shock is created in the welibore, with amplitude on the order of 200 to 250 bars.

A method of intensification of natural gas production from the coal beds, comprising exposure of the coal bed to pressure pulsing can be accomplished by applying low frequency high-amplitude pressure pulses to the coal bed to cause fracturing in the bed structure. The method is performed in the following manner.

To prepare the wellbore for the operation, the pressure pulse generator is run into the wellbore to approximately the treatment zone and the wellbore is loaded with an incompressible fluid, if needed, in order to efficiently couple the formation to the pressure pulse generator and transmit pressure pulses to the formation. Then the pressure pulse generator is adjusted to create pressure pulses of desired frequency and amplitude. The low frequency waves, preferably close to resonant frequency of formation, should be used in the treatment for down to a few meters penetration depth. References on selection of proper frequency and amplitude of pressure pulses for a particular type of formations might be found in many patents, e.g. EP patent No.
0512331 (1992); US patent No. 4,164,4978 (1978); RU patents Nos. 1165801 (1985) ; 2084705 (1993) ; 2085721 (1997) ; 2100571 (1992); 2085721 (1994); 2175718 (1997); 2193649 (2002).

Time of treatment is defined empirically depending on rock properties and regime of treatment. Recommendations on the operation duration might be also found in the aforementioned patents.

After termination of the pressure pulsing, dewatering is run, if needed, using a pump to remove excessive water from well, or to dewater the well completely. Then, the well may be cleaned, if needed, from spalled material by any known method, e.g. by injecting expanding agents (nitrogen, foam, or energized liquid).

The aforementioned steps may be repeated for the desired number of cycles. If required, the generator is removed and production equipment is installed to start gas production.

A method of intensification of natural gas production from the coal beds can comprise exposure of the coal bed to pressure pulsing to enhance cavitation in the coal bed.

To perform this method, the wellbore is prepared for the operation by running the pressure pulse generator, such as a fluid-driven generator, into the wellbore to approximately the treatment zone, and the wellbore is loaded with an incompressible fluid, if needed, in order to efficiently couple the formation to the pressure pulse generator and transmit pressure pulses to the formation. The pressure pulse generator is adjusted to create pressure pulses of desired is frequency and amplitude. Regime and time of treatment are chosen as mentioned above. One may operate fluid discharge pressure pulse generators without resonator, so that a pulsing jet produces cutting action on the formation. Then pressure is increased in the well above the pore pressure by injecting fluids such as nitrogen, foam, or energized liquid, which may be performed through said generator. The wellbore is rapidly depressurized, this resulting in production of rubblized coal pieces. A surface valve is opened to a "blooie pit". The well is then cleaned if needed by circulating energized fluid or foam across the treated interval to aid fluidization and transport the rubblized formation to the surface.

In case of another cavitation cycle, the wellbore is refilled with an incompressible fluid and the aforementioned steps are repeated until no additional formation material is produced during the depressurization process. If required, the generator is removed and production equipment is installed and production is started.

Application of pressure pulses can be used to enhance the process of cleaning the borehole from coal pieces. To this end, after a cavitation cycle fluids are switched from water or other efficient medium for propagating pressure pulses to an efficient foamed cleaning fluid. During compression, the foam will invade the porosity of the coal bed debris and fluidize the debris, facilitating thereby its entrainment in the flowing stream. This fluidization process is required for efficient borehole cleaning and is enhanced by pressure pulses.

The method combines application of pressure pulses and injection of cleaning fluid. For fluid driven generators the cleaning fluid is pumped through the generator. For generators placed in nearby wells, pulsing is continued while injecting cleaning fluid in the treated well. Circulation of cleaning fluids is finished if no more spalled material is produced on to surface.

The pulse pressure treatment can be used to enhance hydraulic fracturing.

The method involves preparing the wellbore for the operation by running the pressure pulse generator into the wellbore to approximately the treatment zone, and loading the wellbore with an incompressible fluid, if needed, in order to efficiently couple the coal formation to the pressure pulse generator.

Preparation is carried out for injecting a fracture fluid into the formation and the pressure pulse generator is adjusted to create pressure pulses of desired frequency and amplitude. Regime and time of treatment are chosen as mentioned above.

Hydraulic fracturing of the coal bed is accomplished by the steps of injecting into the wellbore a fracture fluid at high flow rates and pressures to create the fracture, further injecting a proppant in the fracture fluid to prevent closing the fracture created, and finally injecting the fracture fluid without proppant for washing the well. Pressure pulsing is applied to the coal bed either before creating the fracture, or during injecting the fracture fluid to create the fracture, or during injecting a proppant in the fracture fluid, or during finally injecting the fracture fluid for washing the well or during some or all said steps. The selected regime of pressure pulsing at different steps of hydraulic fracturing affects the resulting fracture geometry.

An embodiment of the method comprises hydraulic fracturing steps without a proppant. The possibility of this embodiment has been explained above.

Upon completion of the fracturing job, if required, the generator is removed and production equipment is installed and production is started.

Some particular examples of implementing the methods in accordance with the invention will be described below.

To determine the appropriate pressure pulse generator frequency for the various applications in the above methods, the following algorithms are employed that will be referred to as "Algorithm" in the following examples.

Algorithm 1 comprises using experimental data that indicates that the effective tensile and shear crack formation occurs within a range of pulse frequency (number of pulses per second) of between 0.1 to 500 Hz.

Algorithm 2 comprises installing, before the treatment, a measuring device in an observation well to measure characteristics of formation vibrations. The measuring device should be coupled to the productive interval of interest. Then a pressure pulse generator is installed in a nearby well and activated so that it produces pressure pulses; the frequency of the pressure pulse generator is incremented; the formation movement in the observation well is recorded, and the most effective frequency is selected through evaluation of the measured formation vibrations in the observation well corresponding to specific frequencies in the nearby well.

Algorithm 3 comprises writing a system of equations for a linearly elastic porous medium representing the formation surrounding the wellbore; solving the equations for the condition that the formation is exposed to a periodic pressure pulse or a pressure shock; estimating the zone of tensile and shear failure in the formation surrounding the wellbore, and selecting the pressure pulsing frequency and amplitude that maximize the extent of the failure zone.

Algorithm 4 comprises writing a system of equations for a linearly elastic porous medium representing the formation surrounding the wellbore; solving the equations for the condition that the formation is exposed to a periodic pressure pulse or a pressure shock; estimating the zone of tensile and shear failure in the formation surrounding the hydraulic fracture, and selecting the frequency and amplitude that maximize the extent of the failure zone.

A pressure pulse generator employed in the Examples presented below is disclosed in US Patent No. 6,015,010; the generator is mechanical and creates pressure pulses by up and down strokes of pump rods of the pumping jack operating on surface, and is capable to produce a hydraulic impact in the wellbore with amplitude of 200-250 bars.

Example 1 Application of pressure pulsing to coal formation to enhance efficiency of cavitation (a) A well penetrates a coal formation containing adsorbed methane gas at a depth of approximately 800 meters. The production interval is 10 meters thick, has a porosity of 2%, effective permeability of 25 mD, temperature is 25 C, reservoir pressure is 50 bars, Young's modulus is 0.5 million psi, and Poisson's ratio is 0.34.

The Algorithm is used to determine that it will be suitable to treat this well using a generator that generates 50 bar pressure pulses at a 60 Hz frequency.

The well is filled with a 4 wto KCI brine to control pressure. A workover unit is used to remove the sucker rod pump, pump rods, and production tubing and tubing packer. The pressure pulse generator is attached to the production tubing and the production tubing is run back into the wellbore.
Injection of treatment fluid for the near wellbore region begins when the generator reaches the depth corresponding to the top of the production interval. Filtered solution (of the same 4 wt% KCI concentration) is injected through the generator. Injected liquid flowing through the generator periodically pressurizes an accumulator. During pressurization, the accumulator receives some of the injected fluid, and the net injection rate into the formation is less than the average and the bottom hole injection pressure falls.
Once the accumulator is filled, it builds an overpressure which initiates a rapid discharge of the stored liquid. This discharge causes the net injection rate into the formation to exceed the average rate, and the bottom hole injection pressure increases. By this periodic oscillation mechanism, the required pressure pulse amplitude and frequency is generated. The injection is continued until the "break-down"
pressure or fracture pressure of the formation is reached.
This hydraulic fracture pressure is the pressure at which a hydrostatic column of fluid will initiate a fracture at the wellbore. The pressure pulses generated by the generator periodically exceed the fracture pressure. As the injected fluid flows into the formation, a pressure gradient is developed in the near wellbore region. This pressure gradient, coupled with the periodic pressure pulses leads to tensile failure of the rock in the near wellbore region. These pressure pulses disaggregate the matrix blocks of the coal formation, effectively shattering the coal seam along the network of face and butt cleats. This pressure pulse treatment continues for 15 minutes to several hours.

At the end of pressure pulsing, the brine is displaced into the formation with foamed nitrogen (a mixture of 7001 by volume nitrogen and 30% by volume water containing viscosifier and surfactant to stabilize the foam structure; volume percentage is measured at the bottom hole conditions) . The foamed nitrogen injection continues in an effort to pressurize the near wellbore formation to a pressure much greater than the reservoir pressure. The foam is able to easily penetrate the weakened, disaggregated coal formation. After the complete foam volume is injected (the volume should be sufficient to fill the entire production interval to a radial depth of 3 meters), the wellbore is rapidly depressurized.
Depressurization mobilizes the weakened, rubblized coal, and those coal fragments are conveyed out of the formation through the well into a "blooie pit." This depressurization continues until no more coal and nitrogen gas are produced. The process enlarges the wellbore radius and cleans pores in the rock immediately around the wellbore. A total of 2 to 10 or more treatment cycles including pressure pulsing, foam pressure charging, and vigorous well depressurization steps may be carried out over a period of a few hours to one or more days.
The act of applying pressure pulses significantly enhances the efficiency of the coal rubblization process and the subsequent cavity creation process.

A well cleaning operation is performed by injection and circulation of the foamed fluid through the wellbore in order to dilate and carry out the slurry away from the wellbore. The circulation occurs by injecting fluid down a coiled tubing lowered to the top of the production interval, and then in rather small measured increments, the coiled tubing is lowered progressively to the lowest extreme of the well. Periodically the coiled tubing depth is held constant to insure that debris is thoroughly removed from one segment of the wellbore. Coiled tubing cleaning continues until the lowest extreme of the well is tagged. Then the coiled tubing is removed from the wellbore, continuing circulation. After removal of the coiled tubing, the pump rods and pump reinstalled. The well is put back onto production.

(b) An embodiment of Example 1 is carried out similarly to embodiment (a) except that the well cleaning operation is modified.

Similarly to the described embodiment (a), the well cleaning operation is performed at the end of the pressurizing and depressurization cycles. Circulation occurs by injecting fluid down a coiled tubing lowered to the top of the production interval, and then in rather small measured increments, the coiled tubing is lowered progressively through any fill that has accumulated. Periodically the coiled tubing depth is held constant to insure that debris is thoroughly removed from one segment of the welibore before proceeding deeper into the wellbore. Coiled tubing cleaning continues until the lowest extreme of the well is tagged. In this embodiment, the foam cleaning is enhanced during this treatment by operating a pressure pulse generator during foam circulation. The action of the pressure pulse generator is to cause foam bubbles to pulsate, alternatively becoming larger and smaller. During compression, the foam invades the porosity of the coal debris that resides in the wellbore. During expansion, the foam dilates the bed of coal debris, facilitating its entrainment into the flowing stream. The pressure pulse generator is installed at the end of the coiled tubing. It has the same pressure pulse generation mechanism and the same pulse amplitude and frequency as the generator used during the cavity completion treatment. The major difference is that the wellbore pressure is reduced during the cleaning operation to a level less than the formation hydraulic breakdown pressure and a level low enough to allow the fluids to be produced up the well. At the end of the cleaning operation the coiled tubing is removed from the welibore, continuing circulation. After removal of the coiled tubing, the production tubing is restored, pump rods and pump reinstalled, and the well is put back onto production.

Example 2 Application of pressure pulsing to coal formation to amplify hydraulic fracturing without proppant.

(a) A well penetrates a coal formation containing adsorbed methane gas at a depth of approximately 800 meters. The production interval is 10 meters thick, has a porosity of 20, effective permeability of 25 mD, temperature is 25 C, reservoir pressure is 50 bars, Young's modulus is 0.5 million psi, and Poisson's ratio is 0.34.

The Algorithm is used to determine that it will be suitable to treat this well using a generator that generates 75 bar pressure pulses at a 20 Hz frequency.

The well is filled with a 4 wto KCI brine to control pressure; the pressure pulse generator is installed, and treatment fluid injection begins when the generator reaches the depth corresponding to the top of the production interval.

During the hydraulic fracturing operation, a fracture fluid is injected down both the tubing and the tubing-casing annulus. Additives are incorporated into the fracture fluid so that it has increased viscosity. The composition in this treatment is 0.4 wt% polymer viscosifier, such as guar, 0.014 wt% boric acid, enough sodium hydroxide to raise the fluid pH
to 9.6, 0.003 wt% biocide, 0.2o surfactant to cause the coal surface to be hydrophobic (ethoxylated butoxylated alcohols) plus 0.25 wt% encapsulated oxidizer for fluid degradation.
This fluid will be called crosslinked gel.

Crosslinked gel injection begins down the annulus and the tubing simultaneously. The total injection rate increases slowly until the formation break-down pressure is reached. The injection rate is then increased from approximately 0.5 m3/min to a steady rate of 3 to 4 m3/min to extend the fracture a great distance away from the well. The flow rate of the crosslinked gel down the annulus is steady, whereas that discharged from the end of the tubing oscillates under the action of the downhole pressure pulse generator. The crosslinked gel flowing through the generator periodically pressurizes an accumulator. During pressurization, the accumulator receives some of the injected fluid, and the net injection rate into the formation is less than the average, and the bottom hole injection pressure falls. Once the accumulator is filled, it builds an overpressure, which initiates a rapid discharge of the stored liquid. This discharge causes the net injection rate into the formation to exceed the average rate, and the bottom hole injection pressure increases. By this periodic oscillation mechanism, the required pressure pulse amplitude and frequency is generated. During this treatment, crosslinked gel only is being injected: a total of 200 m3 of crosslinked gel is injected. The pressure pulse generator operates the entire time of injection. As the fracture fluid injection creates and extends a fracture away from the wellbore to a length of 300 to 400 feet, the pressure pulses act to cause tensile failure of the formation at the fracture face combined with shear failure in planes parallel to the fracture face. The pressure pulse induced cracks are orientated along the face and butt cleat network in the coal matrix, longitudinally and perpendicular to coal shims. These pressure pulses disaggregate the matrix blocks of the coal formation, effectively shattering the coal seam along the network of face and butt cleats. This combined hydraulic fracturing and pressure pulse treatment continues for approximately 1 hour as the entire fluid volume is injected into the formation.

At the end of the crosslinked gel injection, the crosslinked gel is flushed to the bottom of the casing with 4%
KCl water containing only 0.2 wt% guar. Displacement is then transitioned to foamed 0.2a guar and KC1 solution being injected to lighten the hydrostatic column in the wellbore (bottom hole foam characteristics are 70% by volume nitrogen and 30% viscous water containing 0.2 wt% guar, and 0.1 to 1.0 volume o surfactant). Injection is stopped in the annulus once the crosslinked gel is entirely displaced into the formation (and the foamed uncrosslinked guar solution fills the entire annulus and tubing). Foam injection continues down the tubing.
An annulus valve is opened allowing the wellbore fluids to flow from the wellbore through a valve to a waste collection pit. During this flowback procedure, the bottomhole pressure in the wellbore is reduced to a level of approximately 5 to 10 bars and the injected fracturing fluid is recovered out of the well. During the flowback process, the disaggregated coal blocks reorientate in a manner that prevents the fracture and dilated cleats from closing entirely. The resulting fracture has high hydraulic conductivity.

A well cleaning operation is performed at the end of the flowback process in a manner similar to that in Example 1.

(b) A well penetrates a coal formation containing adsorbed methane gas at a depth of approximately 800 meters. The production interval is 10 meters thick, has a porosity of 2%, effective permeability of 25 mD, temperature is 25 C, reservoir pressure is 800 psi, Young's modulus is 0.5 million psi, and Poisson's ratio is 0.34.

The Algorithm is used to determine whether it will be suitable to treat this well using a tool that generates a 200 bar pressure shocks at a 0.1 Hz frequency.

In this embodiment, the method is accomplished similarly to the embodiment (a), except that the pressure pulse generator is lowered into the well to a position 5 meters above the top of the production interval, and the fluid used as a fracturing fluid comprises 4 wt% KC1 plus 0.5 to 3 volume o viscoelastic surfactant, plus 0.2 to 0.4 volume o of an organic surfactant of the type ethoxylated-butoxylated glycols having 1 to 5 ethylene oxide groups and 5 to 10 butylene oxide groups. This composition is a non-damaging viscoelastic surfactant solution. A well cleaning operation is performed without a pulse generator.

(c) A well penetrates a coal formation that contains adsorbed methane gas at a depth of approximately 800 meters.

The production interval is 10 meters thick, has a porosity of 2%, effective permeability of 25 mD, temperature is 25 C, reservoir pressure is 50 bars, Young's modulus is 0.5 million psi, and Poisson's ratio is 0.34.

The Algorithm is used to determine whether it will be suitable to treat this well using a generator, that generates a 70 bar pressure shocks at a 300 Hz frequency.

The method is carried out similarly to embodiment (a) except that the pressure pulse generator comprises a venturi that is built into the tool. The crosslinked gel flowing through the venturi produces cavitation. The collapse of gas bubbles in the expanding part of the venturi is the source of the pressure shocks. By this periodic oscillation mechanism, the required pressure pulse amplitude and frequency is generated. During this treatment, crosslinked gel only is being injected. A total of 200 m3 of crosslinked gel is injected. The pressure pulse generator operates the entire time. The pressure shocks generated by the tool are focused down the fracture and cause high stress concentrations as the bubbles collapse near the fracture walls. As the crosslinked gel creates and extends a fracture away from the wellbore to a length of 300 to 400 feet, the pressure shocks act to cause tensile failure of the formation at the fracture face combined with shear failure in planes parallel to the fracture face. As mentioned earlier, these pressure shocks disaggregate the matrix blocks of the coal formation, effectively shattering the coal seam along the network of face and butt cleats. This combined hydraulic fracturing and pressure pulse treatment continues for approximately 1 hour as the entire fluid volume is injected into the formation.

Example 3 Application of pressure pulsing to coal formation only during injection of fracture fluid with proppant to amplify hydraulic fracturing A well penetrates a producing coal formation containing adsorbed methane gas at a depth of approximately 800 meters.
The production interval is 10 meters thick, has a porosity of 2%, effective permeability of 25 mD, temperature is 25 C, reservoir pressure is 50 bars, Young's modulus is 0.5 million psi, and Poisson's ratio is 0.34.

The Algorithm is used to determine that it will be suitable to treat this well using a tool that generates 75 bar pressure pulses at a 20 Hz frequency.

The well is filled with a 4 wt% KCI brine to control pressure; the pressure pulse generator is installed in the wellbore and a treatment fluid injection begins when the generator reaches the depth corresponding to the top of the production interval.

During the hydraulic fracturing operation, fluid is injected down both the tubing and the tubing-casing annulus.
The fracture fluid in this treatment is the aforementioned crosslinked gel or a solution of viscoelastic surfactant. The hydraulic fracturing process is accomplished as in other examples, wherein the injected fluid flowing through the generator periodically pressurizes an accumulator. During pressurization, the accumulator receives some of the injected fluid, and the net injection rate into the formation is less than the average, and the bottom hole injection pressure falls. Once the accumulator is filled, it builds an overpressure, which initiates a rapid discharge of the stored liquid. This discharge causes the net injection rate into the formation to exceed the average rate, and the bottom hole injection pressure increases. By this periodic oscillation mechanism, the required pressure pulse amplitude and frequency is generated. During this treatment, 70 m3 of crosslinked gel is injected without proppant; this step is called the pad stage. The pressure pulse generator operates only during the pad stage. As the crosslinked gel creates and extends a fracture away from the wellbore to a length of 300 to 400 feet, the pressure pulses act to cause tensile failure of the formation at the fracture face combined with shear failure in planes parallel to the fracture face. This combined hydraulic fracturing and pressure pulse treatment continues for approximately 1 hour as the entire fluid volume is injected into the formation.

After the pad, proppant is added to the remainder of the injected crosslinked gel. The proppant concentration begins at a low concentration and is progressively ramped up to a high concentration. In this treatment, the proppant concentration begins at 1 % by weight of fracture fluid and ends at 5011 by weight of fracture fluid. The fracture fluid/proppant slurry is only injected down the annulus. A total of 140 m3 of slurry is injected. The pressure pulse generator is not operated during slurry injection. The subsequent steps are carried out as in Example 2.

Example 4 Application of pressure pulsing to coal formation continuously during both pad and proppant injection stages of hydraulic fracturing (a) A well penetrates a producing coal formation that contains adsorbed methane gas at a depth of approximately 800 meters. The production interval is 10 meters thick, has a porosity of 2%, effective permeability of 25 mD, temperature is 25 C, reservoir pressure is 50 bars, Young's modulus is 0.5 million psi, and Poisson's ratio is 0.34.

The Algorithm is used to determine whether it will be suitable to treat this well using a tool that generates 75 bar pressure pulses at a 20 Hz frequency.

The well is filled with a 4 wto KC1 brine to control pressure; the pressure pulse generator is lowered into the wellbore. Treatment fluid injection begins when the tool reaches the depth corresponding to the top of the production interval.

Fluid is injected down both the tubing and the tubing-casing annulus. The composition in this treatment is the aforementioned crosslinked gel or a viscoelastic surfactant solution.

Injection of fracture fluid without proppant under pressure generator pulses is carried out as in Example 3.

This combined hydraulic fracturing and pressure pulse treatment continues for approximately 1 hour as the entire fluid volume is injected into the formation.

After the first injection stage, proppant is added to the remainder of the fracture fluid. The proppant concentration begins at a lo by weight of crosslinked gel and ends at 50% by weight of crosslinked gel. The fracture fluid/proppant slurry is only injected down the annulus. A total of 140 m3 of slurry is injected. The pressure pulse generator operates during the step of injecting the fracture fluid with a proppant also. The remainder of the process is accomplished as in the previous Examples.

Claims (4)

1. A method of intensification of natural gas production from the coal beds, comprising creation of a cavity in the coal bed by exposure of the coal bed to pressure pulsing which is created by cyclically increasing a pressure of the fluid in the well and depressurizing rapidly the fluid, wherein low frequency high-amplitude pressure pulses are applied while increasing the pressure of the fluid in the well.
2. The method of claim 1, wherein further comprising the step cleaning the well with using a foamy cleaning medium.
3. The method of claim 2, wherein a fluid driven generator is used for creation of the pressure pulses and the foamy cleaning medium is pumped through said generator.
4. The method of claim 2, wherein a generator for creation of the pressure pulses is placed in a nearby well, and the pressure pulsing of the coal bed is simultaneously accompanied with injecting the foamy cleaning medium in the treated well.
CA2579245A 2006-02-22 2007-02-21 Method of intensification of natural gas production from coal beds Expired - Fee Related CA2579245C (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
RU2006105514/03A RU2343275C2 (en) 2006-02-22 2006-02-22 Method of intensification of natural gas extraction from coal beds
RU2006105514 2006-02-22

Publications (2)

Publication Number Publication Date
CA2579245A1 CA2579245A1 (en) 2007-08-22
CA2579245C true CA2579245C (en) 2011-09-27

Family

ID=38426982

Family Applications (1)

Application Number Title Priority Date Filing Date
CA2579245A Expired - Fee Related CA2579245C (en) 2006-02-22 2007-02-21 Method of intensification of natural gas production from coal beds

Country Status (3)

Country Link
US (1) US20070193737A1 (en)
CA (1) CA2579245C (en)
RU (1) RU2343275C2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111520182A (en) * 2020-04-27 2020-08-11 中国矿业大学 Electric pulse fracturing and gas injection displacement synergistic regional gas extraction method

Families Citing this family (39)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090308599A1 (en) * 2008-06-13 2009-12-17 Halliburton Energy Services, Inc. Method of enhancing treatment fluid placement in shale, clay, and/or coal bed formations
US7882895B2 (en) * 2008-08-19 2011-02-08 Flow Industries Ltd. Method for impulse stimulation of oil and gas well production
US8082989B2 (en) 2008-08-19 2011-12-27 Flow Industries Ltd. Method for impulse stimulation of oil and gas well production
US10060241B2 (en) * 2009-06-05 2018-08-28 Schlumberger Technology Corporation Method for performing wellbore fracture operations using fluid temperature predictions
US9567819B2 (en) 2009-07-14 2017-02-14 Halliburton Energy Services, Inc. Acoustic generator and associated methods and well systems
CN101949300A (en) * 2010-09-14 2011-01-19 侯英翔 Inflation method for treating gas and other harmful gases produced during coal mining production process
CN102155253B (en) * 2011-01-26 2013-02-27 吕晓琳 Ground pumping and mining coal seam gas well reformation method based on recurrence frequency impact waves
WO2013005082A1 (en) * 2011-07-07 2013-01-10 Seeden Foundation Device and method for enhancing oil production by generating shock waves
RU2477799C1 (en) * 2011-07-21 2013-03-20 Александр Владимирович Шипулин Method for hydraulic treatment of coal bed
MX2014000772A (en) * 2011-07-28 2014-05-01 Schlumberger Technology Bv System and method for performing wellbore fracture operations.
CN102352769A (en) * 2011-10-21 2012-02-15 河南煤业化工集团研究院有限责任公司 Integrated mining method for commonly mining coal and gas of high mine
RU2495999C1 (en) * 2012-05-10 2013-10-20 Общество С Ограниченной Ответственностью "Волго-Уральский Центр Научно-Технических Услуг "Нейтрон" Method and device for oil and gas well operation intensification (versions)
RU2513805C1 (en) * 2012-12-25 2014-04-20 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Национальный минерально-сырьевой университет "Горный" Method to increase permeability of coal bed via wells drilled from mines
RU2524583C1 (en) * 2013-03-25 2014-07-27 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Национальный минерально-сырьевой университет "Горный" Intensification of natural gas extraction from coal seams via wells
RU2540709C1 (en) * 2013-12-10 2015-02-10 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Национальный минерально-сырьевой университет "Горный" Method of shock wave destruction of coal seam through wells drilled from excavation
CN103758498B (en) * 2014-01-26 2016-04-06 安徽理工大学 A kind of method and device improving drilling gas extraction efficiency
CN104213896A (en) * 2014-09-01 2014-12-17 中国石油大学(北京) Fracturing and cavern integrated completion method for coal-bed gas reservoir
CN104563990B (en) * 2015-01-06 2018-04-20 中国矿业大学 One kind bores blanking integration and heat injection cooperative reinforcing coal bed gas extraction method
CZ306022B6 (en) * 2015-06-23 2016-06-22 Watrad, Spol. S R.O. Device to generate hydraulic pressure and to generate hydraulic impacts within a water-bearing environment in boreholes
WO2017075139A1 (en) * 2015-10-27 2017-05-04 Intellectual Property Counsel Enhanced hydraulic fracturing of geological formations
CN105422069B (en) * 2015-11-30 2017-08-25 中国矿业大学 A kind of high methane projecting coal bed " brill blanking " couples release anti-reflection method
WO2018102882A1 (en) * 2016-12-09 2018-06-14 The University Of Queensland Method for dewatering and operating coal seam gas wells
US11028679B1 (en) 2017-01-24 2021-06-08 Devon Energy Corporation Systems and methods for controlling fracturing operations using monitor well pressure
US11365617B1 (en) 2017-01-24 2022-06-21 Devon Energy Corporation Systems and methods for controlling fracturing operations using monitor well pressure
CN107013200B (en) * 2017-04-18 2023-12-12 山西晋城无烟煤矿业集团有限责任公司 Single-well multilayer multi-dragging nitrogen vibration fracturing process
CN110273664A (en) * 2018-03-14 2019-09-24 柴乔森 Gas production device contained by coal seam with circulating mash gas extraction pump
CN108868871B (en) * 2018-05-18 2024-03-29 河南能源化工集团研究总院有限公司 Method for quickly balancing stress after hydraulic punching
RU2693212C1 (en) * 2018-05-22 2019-07-01 Владимир Игоревич Жданов Hydrocarbons production intensification method from formations
CN109779610B (en) * 2019-02-01 2022-09-06 西安闪光能源科技有限公司 Method for measuring effective action radius of anti-reflection drilling hole based on controllable shock wave technology
RU2707825C1 (en) * 2019-04-23 2019-11-29 Федеральное государственное автономное образовательное учреждение высшего образования "Национальный исследовательский технологический университет "МИСиС" Coal bed degassing intensification method
CN109915199B (en) * 2019-05-05 2024-05-07 河南理工大学 Progressive permeability-increasing coal seam reinforced gas extraction device and use method thereof
CN111535791B (en) * 2020-05-08 2022-09-20 中煤科工集团西安研究院有限公司 Efficient gas extraction method for broken soft low-permeability coal seam well upper and lower combined fracturing area
CN112253070B (en) * 2020-10-10 2023-08-15 中煤科工集团西安研究院有限公司 Method for sectional seam making, coal washing and outburst elimination of thick coal seam top-bottom linkage horizontal well
CN112377242B (en) * 2020-11-16 2022-05-13 中煤科工集团重庆研究院有限公司 Method for synchronously extracting and displacing gas in soft coal seam by repeated hydraulic fracturing
US11859490B2 (en) 2021-08-19 2024-01-02 Devon Energy Corporation Systems and methods for monitoring fracturing operations using monitor well flow
CN114856512B (en) * 2022-06-14 2023-04-18 六盘水师范学院 Method for extracting gas from salinity crystallization permeability-increasing coal seam
CN115110938B (en) * 2022-07-15 2023-07-14 中国矿业大学 Pulse hydraulic fracturing method based on optimal frequency control
CN115614017A (en) * 2022-11-23 2023-01-17 中国矿业大学(北京) Hydraulic fracturing device and method for coal bed permeability increase high-pressure sand-carrying pulse monitoring
CN117432461B (en) * 2023-12-15 2024-03-19 太原理工大学 Drilling gas pulse type extraction device and extraction method

Family Cites Families (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3744017A (en) * 1970-05-06 1973-07-03 Sanders Associates Inc Directional hydrophone
US3768520A (en) * 1972-04-06 1973-10-30 Westinghouse Electric Corp Fluidic high pressure hydraulic pulsator
FR2214037B1 (en) * 1973-01-16 1975-10-31 Schlumberger Ltd
US4164978A (en) * 1978-02-21 1979-08-21 Winton Corporation Oil extraction method
US4456068A (en) * 1980-10-07 1984-06-26 Foster-Miller Associates, Inc. Process and apparatus for thermal enhancement
US4702315A (en) * 1986-08-26 1987-10-27 Bodine Albert G Method and apparatus for sonically stimulating oil wells to increase the production thereof
US4995463A (en) * 1990-06-04 1991-02-26 Atlantic Richfield Company Method for fracturing coal seams
US5147111A (en) * 1991-08-02 1992-09-15 Atlantic Richfield Company Cavity induced stimulation method of coal degasification wells
US5197543A (en) * 1992-03-16 1993-03-30 Oryx Energy Company Horizontal well treatment method
US5271465A (en) * 1992-04-27 1993-12-21 Atlantic Richfield Company Over-pressured well fracturing method
RU2063507C1 (en) * 1992-12-28 1996-07-10 Акционерное общество закрытого типа "Биотехинвест" Method for gas production from a seam with a trap
US5411098A (en) * 1993-11-09 1995-05-02 Atlantic Richfield Company Method of stimulating gas-producing wells
US5474129A (en) * 1994-11-07 1995-12-12 Atlantic Richfield Company Cavity induced stimulation of coal degasification wells using foam
NO325157B1 (en) * 1995-02-09 2008-02-11 Baker Hughes Inc Device for downhole control of well tools in a production well
US5718289A (en) * 1996-03-05 1998-02-17 Halliburton Energy Services, Inc. Apparatus and method for use in injecting fluids in a well
GB9706044D0 (en) * 1997-03-24 1997-05-14 Davidson Brett C Dynamic enhancement of fluid flow rate using pressure and strain pulsing
US6015010A (en) * 1997-09-10 2000-01-18 Applied Seismic Research Corporation Dual tubing pump for stimulation of oil-bearing formations
US6609668B1 (en) * 2001-01-30 2003-08-26 Cavitation, Inc. Cavitation and cleaning tool
US6467542B1 (en) * 2001-06-06 2002-10-22 Sergey A. Kostrov Method for resonant vibration stimulation of fluid-bearing formations

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111520182A (en) * 2020-04-27 2020-08-11 中国矿业大学 Electric pulse fracturing and gas injection displacement synergistic regional gas extraction method

Also Published As

Publication number Publication date
RU2343275C2 (en) 2009-01-10
RU2006105514A (en) 2007-09-10
US20070193737A1 (en) 2007-08-23
CA2579245A1 (en) 2007-08-22

Similar Documents

Publication Publication Date Title
CA2579245C (en) Method of intensification of natural gas production from coal beds
US7559373B2 (en) Process for fracturing a subterranean formation
US5147111A (en) Cavity induced stimulation method of coal degasification wells
US8061427B2 (en) Well product recovery process
US7882895B2 (en) Method for impulse stimulation of oil and gas well production
US8082989B2 (en) Method for impulse stimulation of oil and gas well production
US8684076B2 (en) Method and apparatus for enhancement of fracture fluid clean-up with periodic shock waves
US11846166B2 (en) Integrated methods for reducing formation breakdown pressures to enhance petroleum recovery
US7757770B2 (en) Method of stimulating a coalbed methane well
US5474129A (en) Cavity induced stimulation of coal degasification wells using foam
RU2231631C1 (en) Method of development of an oil pool
US20090120633A1 (en) Method for Stimulating a Well Using Fluid Pressure Waves
WO2020172074A1 (en) Flow management in existing wells during adjacent well hydraulic fracturing
US5199766A (en) Cavity induced stimulation of coal degasification wells using solvents
Behrmann et al. Underbalance or extreme overbalance
CA2517497C (en) Well product recovery process
RU2383720C1 (en) Procedure of well bottomhole zone treatment
Bakker et al. The New Dynamics of Underbalanced Perforating
RU2085721C1 (en) Method for treating down-hole zone of bed
RU2566343C1 (en) Method for pulse-wave treatment of productive formation, and device for its implementation
RU2555977C1 (en) Hydrocarbon stimulation production technique
WO2013095195A1 (en) Method for hydrodynamic stimulation of the bottom region of a seam
RU2726685C1 (en) Pulsed hydraulic fracturing method
CA2518692A1 (en) Well product recovery process
RU2217464C1 (en) Method to block a productive stratum

Legal Events

Date Code Title Description
EEER Examination request
MKLA Lapsed

Effective date: 20160222