CA2551712C - Void form for constructing post-tensioned foundation piles - Google Patents

Void form for constructing post-tensioned foundation piles Download PDF

Info

Publication number
CA2551712C
CA2551712C CA2551712A CA2551712A CA2551712C CA 2551712 C CA2551712 C CA 2551712C CA 2551712 A CA2551712 A CA 2551712A CA 2551712 A CA2551712 A CA 2551712A CA 2551712 C CA2551712 C CA 2551712C
Authority
CA
Canada
Prior art keywords
pile
void form
post
wall
anchor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CA2551712A
Other languages
French (fr)
Other versions
CA2551712A1 (en
Inventor
Josef Alter
Horst Aschenbroich
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Horst Aschenbroich
Original Assignee
Con Tech Systems Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Con Tech Systems Ltd filed Critical Con Tech Systems Ltd
Priority to CA2551712A priority Critical patent/CA2551712C/en
Publication of CA2551712A1 publication Critical patent/CA2551712A1/en
Application granted granted Critical
Publication of CA2551712C publication Critical patent/CA2551712C/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/58Prestressed concrete piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

A void form for use in constructing pile foundations is placed between the pile and the pile cap before the pile is post-tensioned. Once the pile has been tested and tensioned to design load, the void form is filled with a hardenable material to provide continuous vertical support to the foundation.

Description

TITLE OF INVENTION
VOID FORM FOR CONSTRUCTING
POST-TENSIONED FOUNDATION PILES
TECHNICAL FIELD OF THE INVENTION
This invention relates to a void form for constructing a post-tensioned foundation pile with a pile cap, and to a method of constructing a post-tensioned foundation pile with ground anchors and a pile cap, using a void form.

BACKGROUND OF THE INVENTION

It is known to use foundation piles to support tall or massive structures, to distribute the structure's load to the ground. The foundation material is selected according to factors such as the soil characteristics around the structure, the climate and the groundwater table. An inappropriate foundation may sink or settle, weakening the structure and ruining it for its intended use.

Taller or broader structures have an additional consideration, in that they are subject to lateral and uplifting forces, such as wind. Such forces, combined with the weight of the structure, impart alternating compressive and tensile stresses on the foundation piles. Some examples of such structures are bridge supports, power lines and wind turbines.

To support the structure against compressive stresses, concrete foundation piles are commonly used, as concrete is very strong under compression. Anchoring piles support the structure against tensile stresses. Pre-stressed (either pre- or post tensioned) concrete piles often provide the best combination of strength against alternating compressive and tensile stresses. Steel bar or strand anchors are commonly used to pre-stress a concrete pile. Pile caps may then be installed over the top of the pile or group of piles, to act as a footing for the structure. Continuity between the pile cap and the pile is preferable, to ensure the loading of the structure is distributed evenly to the ground below.

U.S. Patent No. 4,043,133 to Yegge discloses a typical method of constructing a post-tensioned foundation pile. A pile hole is drilled into the ground for each pile, and a sheathed tendon is inserted into the hole. Concrete is poured around the sheath to near the top of the hole and is allowed to cure, thus anchoring the bottom of the tendon within the pile hole. The tendon is stressed with a tensioning jack placed on a jacking pad above the top of the pile, leaving some space between the top of the pile and the bottom of the pad. Application of tension to the tendons will compress the soil under the jacking pad and shrink the space between the pad and the pile. Once it has been assured that the entire pile will support the required stresses, the tension on the tendons is released, a concrete pile cap is poured, and the tendon is re-stressed to the design load and anchored to the pile cap. As an alternative embodiment, Yegge contemplates pouring the pile cap before tensioning the tendons, and using the pile cap to support the tensioning jack, instead of the jacking pad. In that case, any voids between top of the pile and the bottom of the pile cap would have to be filled after tensioning. However, Yegge does not disclose any means to do so. In addition, without visual confirmation of the amount and location of any compression of the soil, it would be difficult to ensure the voids are all completely full. Any empty space would tend to weaken the foundation, as the pile cap would be able to further settle or sink onto the top of the pile.

U.S. Patent Publication No. U.S. 2004/0131428 to Henderson discloses a more complex pile anchor foundation and related construction method. Like Yegge,
2 Henderson contemplates leaving a gap between the top of the pile and the bottom of the pile cap, which may be left empty or filled with a compressible material, such as foam.
However, again there is no way to confirm that the void is fully compressed (if left empty) or that the foam fully fills the void and has not shifted during formation of the pile cap or during post-tensioning. Further, under high compressive loads, compressible foam will eventually compress to its minimum size and will be unable to respond to tensile forces. This will eventually cause failure of a structure subject to alternating compressive and tensile loads.

U.S. Patent No. 4,060,994 to Chitis discloses a method of constructing a post-tensioned foundation pile, with an additional support footing at the bottom of the pile. A
hole is drilled into the ground, into which an anchoring bar is inserted, and concrete is cast in the hole around the anchor. Once the concrete is sufficiently cured, it may be pre-stressed by applying tension to the anchoring bar. Chitis further discloses providing additional support at the base of the pile, in the form of an expandable chamber at the bottom of the anchoring bar. Once the concrete has cured, grout may be injected into the chamber, forcing the chamber to expand into the surrounding soil until it breaks. This releases grout into the ground about the bottom of the pile, compressing the surrounding ground and providing additional support. The chamber may be scavenged and grout re-injected until the chamber breaks again. The process may be repeated until all of the available space about the bottom of the pile is filled with grout. Once the grout is set, it stabilizes the bottom of the pile.

It is therefore an object of the invention to provide a method of constructing a foundation pile which can be post-tensioned and tested effectively, prior to use.

It is a further object of the invention to provide a form which will not interfere with the desired movement of the pile cap and pile during post-tensioning, but will still
3 eliminate voids in the post-tensioned pile, thereby providing continuous foundational support for a structure once construction is complete.

It is a further object of the invention to provide a method of constructing a foundation pile which is stable and supportive of a massive structure which is subject to uplifting or bending forces.

It is an object of the present invention to provide an improved structure to construct a post tensioned pile cap that overcomes the foregoing disadvantages and limitations.

These and other objects of the invention will be appreciated by reference to the summary of the invention and to the detailed description of the preferred embodiment that follow.

SUMMARY OF THE INVENTION

According to one aspect of the invention, there is provided a compressible and fillable hollow chamber or "void form" between the top of a concrete pile and the bottom of a pile cap, thus providing continuity and stability between the cap and the pile, without interfering with the movements of the pile or pile cap while the pile is post-tensioned.

Hollow tubes extending to the hollow chamber may be used to fill the chamber with grout or any other flowable, hardenable material. The filled chamber provides a continuous solid surface between the pile and the pile cap, allowing for proper transfer of the loads borne by an overground structure into the ground. The filled chamber also prevents further settlement of the pile cap onto the top of the pile.
4 In one aspect, the invention comprises a void form for a post-tensioned pile comprising an upper wall and a lower wall, each having an outer peripheral edge and an inner peripheral edge; an outer wall joining the outer peripheral edges of the upper wall and the lower wall; an inner wall joining the inner peripheral edges of the upper wall and the lower wall; all of the walls defining a chamber; and at least two apertures in the upper wall, each adapted to receive a tube. The outer wall may be perpendicular to the upper and lower walls, or may comprise upper and lower sloped sections meeting at a ridge between the upper and lower walls. The upper wall may be convex.

In another aspect, the invention comprises a method of constructing a post-tensioned pile, comprising the steps of placing an anchored pile within an anchor hole;
placing a void form on top of the anchored pile; placing a pile cap on top of the void form; post-tensioning the anchored pile across the void form and the pile cap to a pre-determined load; and filling the void form with hardenable material, which may be a material such as grout.

In a further aspect, the invention may comprise the further step of placing a compressible ring around the void form.

In a further aspect, the invention may comprise the further step of leaving a top portion of an anchor in said anchored pile protruding through said pile cap. A
recess may be left in the pile cap about the top portion of the anchor; and the recess may be filled with hardenable material after post-tensioning the anchored pile.

In yet a further aspect, the method of the invention may be used with a bar anchor or a strand anchor effective for anchoring the anchored pile.
5 In another aspect, the invention comprises the use of a void form to construct a post-tensioned pile, comprising the steps of placing an anchored pile within an anchor hole; placing the void form on top of the anchored pile; placing a pile cap on top of the void form; post-tensioning the anchored pile across the void form and the pile cap to a pre-determined load; and filling the void form with hardenable material The foregoing was intended as a broad summary only and of only some of the aspects of the invention. It was not intended to define the limits or requirements of the invention. Other aspects of the invention will be appreciated by reference to the detailed description of the preferred embodiment and to the claims.

BRIEF DESCRIPTION OF THE DRAWINGS

The preferred embodiment of the invention will be described by reference to the drawings in which:

Fig. 1 is a plan view of an embodiment of the void form according to the present invention;

Fig. 2 is a sectional view taken along line 2-2 of Fig. 1;

Fig. 3 is a plan view of an alternate embodiment of the void form according to the present invention;

Fig. 4 is a sectional view taken along line 4-4 of Fig. 3;
6 Fig. 5 is a perspective view of a pile and the void form according to the present invention;

Fig. 6 is a sectional view of a pile and the void form according to the present invention;

Fig. 7 is a sectional view of a pile and the void form according to the present invention, capped with a pile cap;

Fig. 8 is an enlarged sectional view of the top section of a pile having a bar anchor;
and Fig. 9 is an enlarged sectional view of the top section of a pile having a strand anchor.

DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT
OF THE INVENTION

Figures 1 and 2 show an embodiment of the void form 10 of the present invention.
Void form 10 is preferably made of a compressible material, such as a hard plastic, which can be formed into a hollow chamber that matches the shape of a pile. The exact outer and inner diameter dimensions of the void form 10, defined by outer wall 12 and inner wall 14, are selected based on the size of the pile, and of the anchor which will be used to post-tension the pile. In order to properly fill a void between a pile and a pile cap, void form 10 should have an outer diameter which is at least as large as the outer diameter of the pile. The inner diameter should be selected to closely match the outer diameter of any sheath or casing which is placed around the anchor.
7 The void form 10 has upper wall 16, which may be slightly convex, and lower wall 18, which is preferably flat and substantially parallel to upper wall 16.
The convex shape of upper wall 16 ensures air initially trapped in the void form 10 may escape as grout fills the hollow chamber 24 of void form 10, as will be discussed later.
Upper wall 16 and lower wall 18 may be separated by approximately 2", depending on the diameter of the pile on which the void form will be applied, the type of soil, and the loading conditions. This approximate thickness allows for some compression of the void form 10 during the post-tensioning process, as will be discussed later, while still leaving room for grout. The void form may be thicker than 2", but it is preferable to avoid an excessive amount of grout.

The void form 10 includes at least one aperture 20, through which grout may be inserted, and a second aperture 22, which through which air trapped in the void form may escape as grout fills the hollow chamber 24 of void form 10. The outer surface 15 of hollow chamber 24 is preferably otherwise continuous and unapertured, such that the annular hollow chamber 24 forms a closed chamber, apart from apertures 20, 22.
The convex shape of upper wall 16, which allows air to reach the uppermost point at the aperture 22, assists the escape of trapped air. Void form 10 preferably has extending nipples on each of apertures 20, 22, so that tubes 26, 28 (not shown) may be easily and securely connected to void form 10; however, it will be understood that any suitable means to securely connect void form 10 and tubes 26, 28 may be used.

Void form 10 may be formed with outer wall 12 substantially perpendicular to upper wall 16 and lower wall 18, as shown in Figs. 1 and 2, or it may have a substantially non-perpendicular outer wall 12. For example, in the alternate embodiment shown in Figs. 3 and 4, outer wall 12 comprises upper and lower sloped sections meeting at a ridge 17 between upper wall 16 and lower wall 18.
8 Figs. 5 and 6 show the void form 10 in place on a constructed pile 30. The method of constructing the pile 30 is similar to those disclosed in the prior art previously discussed. Essentially, anchor hole 32 is made in the ground 34, such as by drilling, to the desired diameter and depth under the ground 34. Anchor 36 is placed in drill hole 32.
Anchor 36 may be a bar or strand anchor, as would be most appropriate for the circumstances. One or more centralizers 38 (shown only in Fig. 6) may be used to ensure anchor 36 is properly placed within anchor hole 32. Sleeve 40, of any appropriate material, such as PVC, may be used along any part of anchor 36 to provide a free stress length, which will allow anchor 36 to be properly post-tensioned. The anchor hole 32 is then filled with concrete 42, preferably to approximately level with ground 34. If required, a casing 44, made of a material such as steel pipe, may also be placed around the top of the anchor, to help protect the finished pile against lateral stresses.

Void form 10 is then placed on top of the concrete. Preferably, void form 10 is placed before concrete 42 sets, to ensure good contact is made between the top surface of concrete 42 and the lower wall 18 of void form 10. Tubes 26, 28 may be attached to void form 10 at this point, or may have previously been attached. A ring 43 (shown only in Fig. 5) of compressible material, such as Styrofoam , may be placed around the void form 10 to compensate for any variation in the diameter of the pile 30 when the anchor hole 32 was excavated. Ring 43 will typically only be used if the pile 30 diameter exceeds the outer diameter of void form 10, as it will allow movement of the pile 30 during post-tensioning and will still permit proper load transfer about the periphery of the pile 30 once post-tensioning is complete. Attachments 45 (also shown only in Fig. 5), such as cable ties, duct tape or similar wrapping, may be used to fasten tubes 26, 28 to the outside of anchor 36, to support tubes 26, 28, to keep tubes 26, 28 free from kinks or bends, and to ensure tubes 26, 28 can easily be located and used during subsequent stages.
9 Referring now to Fig. 7, pile cap 46 may then be placed over pile 30 and void form by any appropriate method. A recess 48 left in pile cap 46 over the top of anchor 36 will permit later post-tensioning of the anchor 36. The ends of tubes 26, 28 also protrude through the pile cap 46. Once pile cap 46 has been placed and finished, the anchor 36 5 may be tensioned to the desired test load, and locked off at the specified design load.
When the anchor has been tensioned, and the pile is therefore properly post-tensioned, grout or other hardenable material may be used to fill recess 48, securing and protecting the top of anchor 36 from the elements and other stresses.
10 During the tensioning process, void form 10 is compressed vertically due to upward forces from the pile 30 and downward forces from the pile cap 46. Void form 10 may compress as much as %2" from each force, and may not compress evenly throughout its area, but the vertical forces do not completely collapse chamber 24. Nor does void form 10 interfere with the movements of pile 30 and pile cap 46. It is therefore assured that the pile has been post-tensioned to the desired test and design loads.

Grout or other strong, hardenable material may then be pumped into void form 10, through tube 26, until chamber 24 is filled. Tube 28 allows air to escape, and will also provide visual confirmation when chamber 24 is completely filled with grout.
The present invention therefore eliminates any voids in the vertical direction, ensuring continuous support throughout the depth of the pile 30.

Figs. 8 and 9 show the two embodiments of the void form 10 in place in a pile 30.
In either case, the process to construct the pile is the same.

The void form 10 is versatile and may be used with either a bar anchor 52 (as shown in Fig. 8) or a strand anchor 54 (as shown in Fig. 9). Figs. 8 and 9 also show a different method of post-tensioning the anchor. In this embodiment, the anchor head 49 protrudes above the pile cap 46, and may be post-tensioned by applying force against bearing plate 50 on the top surface of the pile cap 46. Otherwise, the process for constructing the pile is the same as the embodiment discussed above.

It will be appreciated by those skilled in the art that other variations to the preferred embodiment described herein may be practised without departing from the scope of the invention, such scope being properly defined by the following claims.
11

Claims (12)

1. A void form adapted to receive and contain a hardenable material for use between a post-tensioned pile and a pile cap, comprising:

an. upper wall and a lower wall, each having an outer peripheral edge and an inner peripheral edge;

an outer wall joining the outer peripheral edges of said upper wall and said lower wall;

an inner wall joining the inner peripheral edges of said upper wall and said lower wall;

said walls defining an annular chamber; and at least two apertures in said upper wall, each adapted to receive a tube, said walls being otherwise unapertured so as to define a closed chamber for receiving, containing and retaining a hardenable material.
2. The void form of claim 1 wherein said outer wall is perpendicular to said upper and lower walls.
3. The void form of claim 1 wherein said outer wall comprises upper and lower sloped sections meeting at a ridge between said upper and lower walls.
4. The void form of claim 1 wherein said upper wall is convex.
5. A method of constructing a post-tensioned pile, comprising the steps of:
placing an anchored pile within an anchor hole;

placing an annular void form defining a closed chamber for receiving, containing and retaining a hardenable material on top of said anchored pile;
placing a pile cap on top of said void form;

post-tensioning said anchored pile across said void form and said pile cap to a pre-determined load; and filling said void form with said hardenable material.
6. The method of claim 5, wherein said hardenable material comprises grout.
7. The method of claim 5, comprising the further step of placing a compressible ring around the void form.
8. The method of claim 5, comprising the further step of leaving a top portion of an anchor in said anchored pile protruding through said pile cap.
9. The method of claim 8, comprising the further steps of:

leaving a recess in said pile cap around said top portion of said anchor; and filling said recess with hardenable material after post-tensioning said anchored pile.
10. The method of claim 5 comprising the further step of providing a bar anchor effective for anchoring said anchored pile.
11. The method of claim 5 comprising the further step of providing a strand anchor effective for anchoring said anchored pile.
12. Use of an annular void form defining a closed chamber for receiving, containing and retaining a hardenable material to construct a post-tensioned pile, wherein said void form is placed on an anchored pile, under a pile cap, and said void form is filled with the hardenable material after said anchored pile, said void form and said pile cap are post-tensioned.
CA2551712A 2006-07-05 2006-07-05 Void form for constructing post-tensioned foundation piles Active CA2551712C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CA2551712A CA2551712C (en) 2006-07-05 2006-07-05 Void form for constructing post-tensioned foundation piles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CA2551712A CA2551712C (en) 2006-07-05 2006-07-05 Void form for constructing post-tensioned foundation piles

Publications (2)

Publication Number Publication Date
CA2551712A1 CA2551712A1 (en) 2008-01-05
CA2551712C true CA2551712C (en) 2012-06-05

Family

ID=38878490

Family Applications (1)

Application Number Title Priority Date Filing Date
CA2551712A Active CA2551712C (en) 2006-07-05 2006-07-05 Void form for constructing post-tensioned foundation piles

Country Status (1)

Country Link
CA (1) CA2551712C (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9783950B2 (en) 2014-10-07 2017-10-10 Allan P. Henderson Retrofit reinforcing structure addition and method for wind turbine concrete gravity spread foundations and the like
US11661718B2 (en) 2018-07-25 2023-05-30 Terracon Consultants, Inc. Concrete pier foundation with lateral shear reinforcing loops and methods of constructing the same
US11365523B2 (en) 2018-11-13 2022-06-21 Terracon Consultants, Inc. Methods for constructing tensionless concrete pier foundations and foundations constructed thereby
US11885092B2 (en) 2019-01-31 2024-01-30 Terracon Consultants, Inc. Reinforcement structures for tensionless concrete pier foundations and methods of constructing the same
US11274412B2 (en) 2019-01-31 2022-03-15 Terracon Consultants, Inc. Reinforcement structures for tensionless concrete pier foundations and methods of constructing the same
CN113123332B (en) * 2021-04-13 2022-09-02 中国建筑技术集团有限公司 Post-tensioned slow-setting main reinforcement pressure type uplift action pile and preparation method thereof

Also Published As

Publication number Publication date
CA2551712A1 (en) 2008-01-05

Similar Documents

Publication Publication Date Title
US7618217B2 (en) Post-tension pile anchor foundation and method therefor
US9045878B2 (en) Cementitious foundation cap with post-tensioned helical anchors
CA2845460C (en) Continous strand hoop reinforcement for concrete foundations
US11274412B2 (en) Reinforcement structures for tensionless concrete pier foundations and methods of constructing the same
US4043133A (en) Structure and method of constructing and test-loading pile anchored foundations
CA2205502C (en) Tensionless pier foundation
KR101100438B1 (en) Basic Structure Construction Method of Tower Structure
CA2651259C (en) Post-tension pile anchor foundation and method therefor
JP5403254B2 (en) Steel tower foundation reinforcement structure and method
CN107386310A (en) A kind of building supporting construction and its implementation applied to slope terrain
CN107653886B (en) Building supporting structure applied to foundation pit topography and implementation method thereof
CA2551712C (en) Void form for constructing post-tensioned foundation piles
US20080008539A1 (en) Void form for constructing post-tensioned foundation piles
KR101853185B1 (en) Pile grouting device for enhanced friction of skin
CN210766868U (en) Reinforcing structure for existing gravity retaining wall
JP2001303592A (en) Method for installing and fixing block
KR101195551B1 (en) PHC Pile for Support of Tensile Force and Construction Method of Foot Reinforcement Using the Same
CN219825226U (en) Prestressed precast pile for foundation pit enclosure
JPH0355612B2 (en)
US11885092B2 (en) Reinforcement structures for tensionless concrete pier foundations and methods of constructing the same
US12247370B2 (en) High-capacity threaded bar micropile and caisson reinforcement compression spacer
JPH0336315A (en) Pile for concurrently serving as earth anchor
JP2008223431A (en) Seismic construction method of structure, construction method of structure, seismic structure of structure, anchor, and installation method of anchor
JPH0868054A (en) Horizontal ground constructing method using expanded resin block
JP2002146784A (en) Ground anchoring method using existing pile

Legal Events

Date Code Title Description
EEER Examination request