CA2507105A1 - Casing degasser tool - Google Patents
Casing degasser tool Download PDFInfo
- Publication number
- CA2507105A1 CA2507105A1 CA002507105A CA2507105A CA2507105A1 CA 2507105 A1 CA2507105 A1 CA 2507105A1 CA 002507105 A CA002507105 A CA 002507105A CA 2507105 A CA2507105 A CA 2507105A CA 2507105 A1 CA2507105 A1 CA 2507105A1
- Authority
- CA
- Canada
- Prior art keywords
- casing
- degasser
- tool
- production
- production piping
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000007789 sealing Methods 0.000 claims abstract description 30
- 229930195733 hydrocarbon Natural products 0.000 claims abstract description 22
- 150000002430 hydrocarbons Chemical class 0.000 claims abstract description 22
- 239000012530 fluid Substances 0.000 claims description 33
- 238000000034 method Methods 0.000 claims description 19
- 230000008569 process Effects 0.000 claims description 16
- 238000004891 communication Methods 0.000 claims description 8
- 238000012360 testing method Methods 0.000 claims description 6
- 230000000740 bleeding effect Effects 0.000 claims description 4
- 230000008878 coupling Effects 0.000 claims description 4
- 238000010168 coupling process Methods 0.000 claims description 4
- 238000005859 coupling reaction Methods 0.000 claims description 4
- 238000005086 pumping Methods 0.000 claims description 3
- ZPUCINDJVBIVPJ-LJISPDSOSA-N cocaine Chemical compound O([C@H]1C[C@@H]2CC[C@@H](N2C)[C@H]1C(=O)OC)C(=O)C1=CC=CC=C1 ZPUCINDJVBIVPJ-LJISPDSOSA-N 0.000 claims 1
- 230000002706 hydrostatic effect Effects 0.000 description 4
- 239000005060 rubber Substances 0.000 description 4
- 230000015572 biosynthetic process Effects 0.000 description 3
- 230000008901 benefit Effects 0.000 description 2
- 239000000314 lubricant Substances 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000008961 swelling Effects 0.000 description 2
- 239000004215 Carbon black (E152) Substances 0.000 description 1
- 102100035353 Cyclin-dependent kinase 2-associated protein 1 Human genes 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 239000004927 clay Substances 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 238000007872 degassing Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000011152 fibreglass Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000035699 permeability Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/12—Packers; Plugs
- E21B33/126—Packers; Plugs with fluid-pressure-operated elastic cup or skirt
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B34/00—Valve arrangements for boreholes or wells
- E21B34/06—Valve arrangements for boreholes or wells in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/0021—Safety devices, e.g. for preventing small objects from falling into the borehole
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Sealing Material Composition (AREA)
- Loading And Unloading Of Fuel Tanks Or Ships (AREA)
Abstract
A casing degasser tool (CDT) is provided which is adapted to be inserted into production piping such as casing, slotted liners, or production tubing for use during well completion. The CDT comprises a body having a top end, a bottom end and an outer surface, at least one sealing element surrounding a portion of the outer surface of the body and a connection means located at or near the top end of the body for connecting a wire line or other pulling device to the CDT
to assist in positioning the CDT within the production piping and for pulling the CDT
through the length of the production piping. The CDT can be used when adding joints of production piping to prevent hydrocarbons from flowing to the surface of the well.
to assist in positioning the CDT within the production piping and for pulling the CDT
through the length of the production piping. The CDT can be used when adding joints of production piping to prevent hydrocarbons from flowing to the surface of the well.
Description
CASING DEGASSER TOOL
This application claims the benefit of U.S. Provisional Application No.
60/521,523, filed May 13, 2004.
FIELD OF THE INVENTION
The present invention relates to an apparatus and method useful for well completion of a wellbore containing hydrocarbons. In particular, the present invention relates to an apparatus adapted to be inserted into production piping, such as casing, slotted liners, or tubing, to control the flow of fluids from the reservoir through the production piping during well completion operations and further relates to a process using said apparatus for running joints of production piping into a wellbore to form a completed well.
BACKGROUND OF INVENTION
Current technology uses kill fluids to stop the flow of reservoir fluids (e.g.
hydrocarbons) so that well completion operations such as running production piping in the wellbore or installing a wellhead assembly at surface can be accomplished without the presence of hydrocarbons. Conventional kill fluids known in the art are typically aqueous liquids such as water or weighted fluids such as drilling mud. The kill fluid applies a hydrostatic pressure against the reservoir fluid, which typically is greater than the pressure exerted by the reservoir fluid attempting to intrude into the wellbore.
H:\IVrPortbl\DMSLegal\BRIDGERI\1790030_1.DOC
This overbalanced hydrostatic pressure, however, can cause damage to reservoirs, in particular, to reservoirs containing swelling clays or reservoirs having a pressure well below the hydrostatic pressure of the kill fluid being used.
Hydrocarbon reservoirs with high permeability and porosity can also be damaged with the use of kill fluids.
The present invention provides an apparatus and method for carrying out completion activities without the need to kill the flow of hydrocarbons by means of kill fluids.
SUMMARY OF THE INVENTION
A casing degasser tool (CDT) is provided which is adapted to be inserted into production piping such as casing, slotted liners, or production tubing.
One CDT embodiment comprises a body having a top end, a bottom end and an outer surface, and at least one expandable sealing element surrounding a portion of the outer surface of said body. The expandable sealing element can be formed from a material such as expandable rubber, rubber and steel, fiberglass or other composite material, and can be expanded such that it provides a fluid tight seal with the inside wall of the production piping. For example, the sealing element can be an inflatable ring wherein the inflatable ring expands or contracts by pumping fluids into or out of the inflatable ring.
In another embodiment, the CDT comprises at least one sealing element surrounding a portion of the outer surface of said body, wherein each sealing element has a fixed dimension, which dimension depends upon the inner H:~LIrPortbHDMSLegaI~BR>DGERI~1790030_1.DOC
diameter of the completion piping for which it is designed. Thus, in this embodiment, the sealing element dimension can vary for each type of production tubing but will still provide a fluid tight seal when the CDT is inserted therein. Hence, it is understood that the sealing element of the CDT can come in different sizes to ensure that the CDT always fits snuggly inside the production piping having a range of different inside diameters.
The body further comprises a connection means located at or near the top end of the body for connecting a wire line or other pulling device to the CDT
to assist in positioning the CDT within the production piping and for pulling the CDT through the length of the production piping.
In one embodiment, the body further comprises an inner cavity extending through the bottom end of the body so that the bottom end of the body is in fluid communication with the inside of the production piping when the CDT is inserted therein. In this embodiment, the body may further comprise a pressure relief fitting and/or a pressure gauge fitting.
The pressure relief fitting has one end in fluid communication with said inner cavity and an opposite end for connecting a pipe or hose thereto to bleed off hydrocarbons to the surface when necessary during a well completion operation. A flow prover can also be connected to the pressure relief fitting instead of a pipe or hose to test for well production capability at the completion of running the production piping. The pressure relief fitting further comprises a H:\NrPortbl\DMSLegal\BR1DGERI\1790030_ I .DOC
sealing means for keeping the pressure relief fitting sealed until the pipe, hose or flow prover is connected thereto.
Similarly, the pressure gauge fitting has one end in fluid communication with said inner cavity and an opposite end for connecting a pressure gauge or other instrumentation package thereto for measuring downhole pressure. The pressure gauge fitting further comprises a sealing means for keeping the pressure gauge fitting sealed until the pressure gauge or other instrumentation package is connected thereto.
A process of running joints of production piping into a wellbore that contains flowing hydrocarbons, which uses the CDT of the present invention, is also provided. The process comprises placing the CDT inside a first joint of production piping, said production piping having a top end and a bottom end, and lowing the production piping into the wellbore bottom end first. The CDT
is preferably positioned near the top end of the first joint of production piping and at least one sealing element is in frictional engagement with the inside wall surface of the production piping to provide a fluid tight seal.
The process further comprises adding a second joint of production piping, said second joint of production piping also having a top end and a bottom end, to the first joint of production piping by coupling the bottom end of said second production piping to the top end of the first production piping with coupling means known in the art. A wire line or other pulling device is then attached to the CDT by first passing it through the second joint of production piping and then H:~NrPortbl~DMSLegaI~BRIDGER1\1790030_L.DOC
attaching it to the connection means located at or near the top of the body of the CDT.
Finally, the CDT is pulled through the top end of the first joint of production piping, through the bottom end of said second joint of production piping and into the second joint of production piping. The wire line or other pulling device that is connected to the top end of the body of the CDT is then removed and the process is repeated until all joints of production piping have been coupled together.
To aid in the pulling of the CDT through the production piping, a lubricant such as pipe thread dope may be added to the inside surface of the production piping.
In another embodiment of the process, the CDT can simply remain positioned in the first joint of production piping at all times during the addition of each new joint of production piping and the CDT pulled through all production piping at once when the well is completed.
In one embodiment, when the running of the production piping is complete (i.e., all of the joints of production piping have been connected together), well production capability can be tested by connecting a flow prover to the pressure relief fitting of the CDT. The CDT can then be removed by means of the wire line or other pulling device that is connected to the CDT.
In another embodiment, the process of running production casing into wellbore further comprises periodically checking the downhole pressure by H:WrPortbl\DMSLegal\BRIDCiERI\1790030_1.DOC
means of a pressure gauge attached to the pressure gauge fitting of the CDT.
In another embodiment, the process further comprises bleeding built up pressure from the wellbore, should the downhole well pressure starts to become a concern, by attaching a hose or pipe to the pressure release fitting of the CDT.
The pressure then can be bled down by attaching the opposite end of the hose or pipe to a blewie line and allowing the built up hydrocarbons in the well to flow into a flare stack, a tank or a pit.
This invention may have one or more of the following advantages over the use of kill fluids to stop the flow of hydrocarbons during completion operations:
(1 ) time and money can be saved because there is no need to use kill fluids;
This application claims the benefit of U.S. Provisional Application No.
60/521,523, filed May 13, 2004.
FIELD OF THE INVENTION
The present invention relates to an apparatus and method useful for well completion of a wellbore containing hydrocarbons. In particular, the present invention relates to an apparatus adapted to be inserted into production piping, such as casing, slotted liners, or tubing, to control the flow of fluids from the reservoir through the production piping during well completion operations and further relates to a process using said apparatus for running joints of production piping into a wellbore to form a completed well.
BACKGROUND OF INVENTION
Current technology uses kill fluids to stop the flow of reservoir fluids (e.g.
hydrocarbons) so that well completion operations such as running production piping in the wellbore or installing a wellhead assembly at surface can be accomplished without the presence of hydrocarbons. Conventional kill fluids known in the art are typically aqueous liquids such as water or weighted fluids such as drilling mud. The kill fluid applies a hydrostatic pressure against the reservoir fluid, which typically is greater than the pressure exerted by the reservoir fluid attempting to intrude into the wellbore.
H:\IVrPortbl\DMSLegal\BRIDGERI\1790030_1.DOC
This overbalanced hydrostatic pressure, however, can cause damage to reservoirs, in particular, to reservoirs containing swelling clays or reservoirs having a pressure well below the hydrostatic pressure of the kill fluid being used.
Hydrocarbon reservoirs with high permeability and porosity can also be damaged with the use of kill fluids.
The present invention provides an apparatus and method for carrying out completion activities without the need to kill the flow of hydrocarbons by means of kill fluids.
SUMMARY OF THE INVENTION
A casing degasser tool (CDT) is provided which is adapted to be inserted into production piping such as casing, slotted liners, or production tubing.
One CDT embodiment comprises a body having a top end, a bottom end and an outer surface, and at least one expandable sealing element surrounding a portion of the outer surface of said body. The expandable sealing element can be formed from a material such as expandable rubber, rubber and steel, fiberglass or other composite material, and can be expanded such that it provides a fluid tight seal with the inside wall of the production piping. For example, the sealing element can be an inflatable ring wherein the inflatable ring expands or contracts by pumping fluids into or out of the inflatable ring.
In another embodiment, the CDT comprises at least one sealing element surrounding a portion of the outer surface of said body, wherein each sealing element has a fixed dimension, which dimension depends upon the inner H:~LIrPortbHDMSLegaI~BR>DGERI~1790030_1.DOC
diameter of the completion piping for which it is designed. Thus, in this embodiment, the sealing element dimension can vary for each type of production tubing but will still provide a fluid tight seal when the CDT is inserted therein. Hence, it is understood that the sealing element of the CDT can come in different sizes to ensure that the CDT always fits snuggly inside the production piping having a range of different inside diameters.
The body further comprises a connection means located at or near the top end of the body for connecting a wire line or other pulling device to the CDT
to assist in positioning the CDT within the production piping and for pulling the CDT through the length of the production piping.
In one embodiment, the body further comprises an inner cavity extending through the bottom end of the body so that the bottom end of the body is in fluid communication with the inside of the production piping when the CDT is inserted therein. In this embodiment, the body may further comprise a pressure relief fitting and/or a pressure gauge fitting.
The pressure relief fitting has one end in fluid communication with said inner cavity and an opposite end for connecting a pipe or hose thereto to bleed off hydrocarbons to the surface when necessary during a well completion operation. A flow prover can also be connected to the pressure relief fitting instead of a pipe or hose to test for well production capability at the completion of running the production piping. The pressure relief fitting further comprises a H:\NrPortbl\DMSLegal\BR1DGERI\1790030_ I .DOC
sealing means for keeping the pressure relief fitting sealed until the pipe, hose or flow prover is connected thereto.
Similarly, the pressure gauge fitting has one end in fluid communication with said inner cavity and an opposite end for connecting a pressure gauge or other instrumentation package thereto for measuring downhole pressure. The pressure gauge fitting further comprises a sealing means for keeping the pressure gauge fitting sealed until the pressure gauge or other instrumentation package is connected thereto.
A process of running joints of production piping into a wellbore that contains flowing hydrocarbons, which uses the CDT of the present invention, is also provided. The process comprises placing the CDT inside a first joint of production piping, said production piping having a top end and a bottom end, and lowing the production piping into the wellbore bottom end first. The CDT
is preferably positioned near the top end of the first joint of production piping and at least one sealing element is in frictional engagement with the inside wall surface of the production piping to provide a fluid tight seal.
The process further comprises adding a second joint of production piping, said second joint of production piping also having a top end and a bottom end, to the first joint of production piping by coupling the bottom end of said second production piping to the top end of the first production piping with coupling means known in the art. A wire line or other pulling device is then attached to the CDT by first passing it through the second joint of production piping and then H:~NrPortbl~DMSLegaI~BRIDGER1\1790030_L.DOC
attaching it to the connection means located at or near the top of the body of the CDT.
Finally, the CDT is pulled through the top end of the first joint of production piping, through the bottom end of said second joint of production piping and into the second joint of production piping. The wire line or other pulling device that is connected to the top end of the body of the CDT is then removed and the process is repeated until all joints of production piping have been coupled together.
To aid in the pulling of the CDT through the production piping, a lubricant such as pipe thread dope may be added to the inside surface of the production piping.
In another embodiment of the process, the CDT can simply remain positioned in the first joint of production piping at all times during the addition of each new joint of production piping and the CDT pulled through all production piping at once when the well is completed.
In one embodiment, when the running of the production piping is complete (i.e., all of the joints of production piping have been connected together), well production capability can be tested by connecting a flow prover to the pressure relief fitting of the CDT. The CDT can then be removed by means of the wire line or other pulling device that is connected to the CDT.
In another embodiment, the process of running production casing into wellbore further comprises periodically checking the downhole pressure by H:WrPortbl\DMSLegal\BRIDCiERI\1790030_1.DOC
means of a pressure gauge attached to the pressure gauge fitting of the CDT.
In another embodiment, the process further comprises bleeding built up pressure from the wellbore, should the downhole well pressure starts to become a concern, by attaching a hose or pipe to the pressure release fitting of the CDT.
The pressure then can be bled down by attaching the opposite end of the hose or pipe to a blewie line and allowing the built up hydrocarbons in the well to flow into a flare stack, a tank or a pit.
This invention may have one or more of the following advantages over the use of kill fluids to stop the flow of hydrocarbons during completion operations:
(1 ) time and money can be saved because there is no need to use kill fluids;
(2) in low and under pressure reservoirs there is less formation damage as compared to the damage caused as a result of the hydrostatic weight of the kill fluid;
(3) in dehydrated and clay swelling reservoirs there are no fluids to cause damage;
(4) it provides an alternative method to using a snubbing unit;
(5) it allows reverse circulated center discharge drilled wells to be completed without having to kill the well;
(6) wellbores can be safely bled down prior to the installation of the wellhead without using kill fluids;
H:~IVrPortbI~DMSLegaI~BRIDGER1\1790030_LDOC 7 (7) well production capability can be tested by connecting a flow prover to the pressure relief fitting at the completion of running the production piping; and (8) slotted casing and liners can be run into the wellbore without the need to kill the well.
BRIEF DESCRIPTION OF DRAWINGS
Figure 1 is a schematic of the casing degasser tool of the present invention.
Figure 2 is a schematic of the casing degasser tool inside a joint of production piping.
DETAILED DESCRIPTION
Figure 1 schematically illustrates an embodiment of the present invention.
Casing degasser tool 15 comprises a body 7 having a closed top end 2, an open bottom end 4 and an inner cavity 8. Disposed around the outside surface 13 of body 7, at or near bottom end 4, are a plurality of sealing elements 11, formed from a material such as rubber or the like. When casing degasser tool 15 is placed inside a joint of production piping, sealing elements 11 provide a fluid tight seal with the inside wall of the production piping.
Sealing elements 11 may also be made of expandable rubber and the like so that sealing element 11 can be expanded by means of pumping fluid or air therein or by means of an electric current. This assists in the frictional engagement of the sealing element with the inside wall of the production piping H:NIrP~tbI~DMSLegaABR>DGfiRI\1790030_1.DOC
to ensure a fluid tight seal. Further, the sealing element can then be contracted slightly to facilitate the pulling of the casing degasser tool 15 through the production piping.
At or near top end 2 is connection means 1 to which a wire line or other pulling devices known in the art can be attached for positioning the casing degasser tool 15 within the joint of production piping and for pulling the casing degasser tool 15 through the joint of production piping.
The top end 2 of body 7 further comprises pressure relief fitting 5 having threaded end 9, which is in fluid communication with the inner cavity 8.
Pressure relief fitting 5 comprises a sealing means (not shown), which seals the pressure relief fitting 5 until a pipe, or hose (shown as pipe 19 in Figure 2) is connected to pressure relief fitting 5 by thread means. The pressure relief fitting 5 and pipe or hose connected thereto are used to bleed off hydrocarbons from the wellbore to the surface of the well, when necessary during a well completion operation. It is understood that a flow prover (not shown) or other instrumentation can also be connected to the pressure relief fitting 5 by thread means for testing well production capability after well completion.
Casing degasser tool 15 further comprises pressure gauge fitting 3 having threaded end 10, which is in fluid communication with the inner cavity 8.
Pressure gauge fitting 3 comprises a sealing means (not shown), which seals the pressure gauge fitting 3 until a pressure gauge or other instrumentation package is attached thereto by thread means for measuring downhole pressure.
H:~NrPortbl~DMSl,egaI~BRIDGER1\1790030_LDOC
Figure 2 schematically illustrates casing degasser tool 15 when it is situated inside production piping 21 and said production piping 21 is situated within a wellbore. Sealing elements 11 of casing degasser tool 15 are shown in frictional engagement with the inside wall 23 of production piping 21 to create a tight fluid seal. Reservoir hydrocarbons 13 are thus prevented from flowing out of production casing 21 by sealing element 11. Further, top end 2 of casing degasser tool 15 is closed so as to prevent the flow of hydrocarbons through the inner cavity 8 of casing degasser tool 15. Finally, pressure gauge fitting 3 and pressure relief fitting 5 are also in the sealed position, unless pipe, tubing, l0 pressure gauges and other instrumentation are connected thereto, and thus hydrocarbons cannot escape therethrough.
A surface control system comprising a surface blowout preventor (not shown) can also be used in combination with the present invention. A surface blow out preventor will prevent the flow of any hydrocarbons that may escape on the outside of the production piping through the annulus formed between the outer wall of the production piping and the wellbore wall during well completion.
Once a new joint of production piping is added to existing production piping 21, wire line 6 is fed through the new joint of production piping and through production piping 21 and attached to connection means 1. Casing degasser tool 15 is then pulled first through the top of production piping 21 and then through the bottom of the new joint of production casing so as to position casing degasser tool 15 preferably in the upper portion of the new piece of production casing. It is understood that during the addition of each joint of H:~NrPortbl~DMSL.egaI~BRIDGER1\1790030_ I .DOC 10 production casing, wire line 6 is first removed and then reattached to pull the casing degasser tool 15 into the newly added joint of production piping.
In the alternative, casing degasser tool 15 can remain situated in the first joint of production piping until all subsequent joints of production piping have been added. Wire line 6 is then threaded through all interconnected joints of production piping and attached to connection means 1. Casing degasser tool 15 is then pulled through all joints of production piping upon well completion.
To facilitate the movement of the casing degasser tool 15 through production piping, sealing element 11, if expandable, may be slightly contracted to allow casing degassing tool 15 to move more freely through the production piping. In the alternative, if sealing element 11 is not expandable, a lubricant such as pipe thread dope may be added to the inside surface of each joint of production piping to facilitate the movement of the degasser tool 15 through the production piping.
Pressure of formation 27 is monitored by connecting a proper pressure gauge (not shown) to pressure gauge fitting 3. When necessary to bleed off pressure from formation 27, hose or pipe 19 is connected to pressure relief fitting 5 and hydrocarbons 13 are flared through a blewie line (not shown) attached to the opposite end of pipe 19 or put into tank or pit (not shown).
In the alternative, a flow prover (not shown) can be connected to pressure relief fitting 5 at the completion of running the production piping to test for well production capability.
H:\NrPortbl\DMSL.egal\BRIDGERI\1790030_1.DOC 1 1 While the foregoing is directed to one embodiment of the present invention, other and further embodiments of the invention may be devised without departing from the basic scope thereof. It is intended that the appended claims cover all such modifications and variations as fall within the true spirit and scope of the invention.
H:~NrPortbl~DMSL.egaI~BRI17GERI11790030_1.DOC 12
H:~IVrPortbI~DMSLegaI~BRIDGER1\1790030_LDOC 7 (7) well production capability can be tested by connecting a flow prover to the pressure relief fitting at the completion of running the production piping; and (8) slotted casing and liners can be run into the wellbore without the need to kill the well.
BRIEF DESCRIPTION OF DRAWINGS
Figure 1 is a schematic of the casing degasser tool of the present invention.
Figure 2 is a schematic of the casing degasser tool inside a joint of production piping.
DETAILED DESCRIPTION
Figure 1 schematically illustrates an embodiment of the present invention.
Casing degasser tool 15 comprises a body 7 having a closed top end 2, an open bottom end 4 and an inner cavity 8. Disposed around the outside surface 13 of body 7, at or near bottom end 4, are a plurality of sealing elements 11, formed from a material such as rubber or the like. When casing degasser tool 15 is placed inside a joint of production piping, sealing elements 11 provide a fluid tight seal with the inside wall of the production piping.
Sealing elements 11 may also be made of expandable rubber and the like so that sealing element 11 can be expanded by means of pumping fluid or air therein or by means of an electric current. This assists in the frictional engagement of the sealing element with the inside wall of the production piping H:NIrP~tbI~DMSLegaABR>DGfiRI\1790030_1.DOC
to ensure a fluid tight seal. Further, the sealing element can then be contracted slightly to facilitate the pulling of the casing degasser tool 15 through the production piping.
At or near top end 2 is connection means 1 to which a wire line or other pulling devices known in the art can be attached for positioning the casing degasser tool 15 within the joint of production piping and for pulling the casing degasser tool 15 through the joint of production piping.
The top end 2 of body 7 further comprises pressure relief fitting 5 having threaded end 9, which is in fluid communication with the inner cavity 8.
Pressure relief fitting 5 comprises a sealing means (not shown), which seals the pressure relief fitting 5 until a pipe, or hose (shown as pipe 19 in Figure 2) is connected to pressure relief fitting 5 by thread means. The pressure relief fitting 5 and pipe or hose connected thereto are used to bleed off hydrocarbons from the wellbore to the surface of the well, when necessary during a well completion operation. It is understood that a flow prover (not shown) or other instrumentation can also be connected to the pressure relief fitting 5 by thread means for testing well production capability after well completion.
Casing degasser tool 15 further comprises pressure gauge fitting 3 having threaded end 10, which is in fluid communication with the inner cavity 8.
Pressure gauge fitting 3 comprises a sealing means (not shown), which seals the pressure gauge fitting 3 until a pressure gauge or other instrumentation package is attached thereto by thread means for measuring downhole pressure.
H:~NrPortbl~DMSl,egaI~BRIDGER1\1790030_LDOC
Figure 2 schematically illustrates casing degasser tool 15 when it is situated inside production piping 21 and said production piping 21 is situated within a wellbore. Sealing elements 11 of casing degasser tool 15 are shown in frictional engagement with the inside wall 23 of production piping 21 to create a tight fluid seal. Reservoir hydrocarbons 13 are thus prevented from flowing out of production casing 21 by sealing element 11. Further, top end 2 of casing degasser tool 15 is closed so as to prevent the flow of hydrocarbons through the inner cavity 8 of casing degasser tool 15. Finally, pressure gauge fitting 3 and pressure relief fitting 5 are also in the sealed position, unless pipe, tubing, l0 pressure gauges and other instrumentation are connected thereto, and thus hydrocarbons cannot escape therethrough.
A surface control system comprising a surface blowout preventor (not shown) can also be used in combination with the present invention. A surface blow out preventor will prevent the flow of any hydrocarbons that may escape on the outside of the production piping through the annulus formed between the outer wall of the production piping and the wellbore wall during well completion.
Once a new joint of production piping is added to existing production piping 21, wire line 6 is fed through the new joint of production piping and through production piping 21 and attached to connection means 1. Casing degasser tool 15 is then pulled first through the top of production piping 21 and then through the bottom of the new joint of production casing so as to position casing degasser tool 15 preferably in the upper portion of the new piece of production casing. It is understood that during the addition of each joint of H:~NrPortbl~DMSL.egaI~BRIDGER1\1790030_ I .DOC 10 production casing, wire line 6 is first removed and then reattached to pull the casing degasser tool 15 into the newly added joint of production piping.
In the alternative, casing degasser tool 15 can remain situated in the first joint of production piping until all subsequent joints of production piping have been added. Wire line 6 is then threaded through all interconnected joints of production piping and attached to connection means 1. Casing degasser tool 15 is then pulled through all joints of production piping upon well completion.
To facilitate the movement of the casing degasser tool 15 through production piping, sealing element 11, if expandable, may be slightly contracted to allow casing degassing tool 15 to move more freely through the production piping. In the alternative, if sealing element 11 is not expandable, a lubricant such as pipe thread dope may be added to the inside surface of each joint of production piping to facilitate the movement of the degasser tool 15 through the production piping.
Pressure of formation 27 is monitored by connecting a proper pressure gauge (not shown) to pressure gauge fitting 3. When necessary to bleed off pressure from formation 27, hose or pipe 19 is connected to pressure relief fitting 5 and hydrocarbons 13 are flared through a blewie line (not shown) attached to the opposite end of pipe 19 or put into tank or pit (not shown).
In the alternative, a flow prover (not shown) can be connected to pressure relief fitting 5 at the completion of running the production piping to test for well production capability.
H:\NrPortbl\DMSL.egal\BRIDGERI\1790030_1.DOC 1 1 While the foregoing is directed to one embodiment of the present invention, other and further embodiments of the invention may be devised without departing from the basic scope thereof. It is intended that the appended claims cover all such modifications and variations as fall within the true spirit and scope of the invention.
H:~NrPortbl~DMSL.egaI~BRI17GERI11790030_1.DOC 12
Claims (15)
1. A casing degasser tool adapted to be inserted into a joint of production piping, the production piping having an inner wall, for preventing the flow of hydrocarbons through the production tubing during well completion, comprising:
(a) a body having a top end, a bottom end and an outer surface;
(b) at least one sealing element surrounding the outer surface of the body; and (c) a connection means located at or near the top end of the body for connecting a wire line or other pulling device to the casing degasser tool;
whereby when the casing degasser tool is inserted into the production piping, the sealing element is in frictional engagement with the inner wall of the production piping.
(a) a body having a top end, a bottom end and an outer surface;
(b) at least one sealing element surrounding the outer surface of the body; and (c) a connection means located at or near the top end of the body for connecting a wire line or other pulling device to the casing degasser tool;
whereby when the casing degasser tool is inserted into the production piping, the sealing element is in frictional engagement with the inner wall of the production piping.
2. The casing degasser tool as claimed in claim 1 wherein the sealing element is expandable.
3. The casing degasser tool as claimed in claim 1 wherein the sealing element comprises an inflatable ring.
4. The casing degasser tool as claimed in claim 3 wherein the inflatable ring expands or contracts by pumping fluids into or out of the inflatable ring.
5. The casing degasser tool as claimed in claim 1 wherein the body further comprises an inner cavity extending through the bottom end of the body so that the inner cavity is in fluid communication with the production piping.
6. The casing degasser tool as claimed in claim 5 wherein the body further comprises a pressure relief fitting having one end in fluid communication with the inner cavity and an opposite end adapted to be fitted to a pipe or hose for bleeding off the hydrocarbons.
7. The casing degasser tool as claimed in claim 5 wherein the body further comprises a pressure gauge fitting having one end in fluid communication with the inner cavity and an opposite end adapted to be fitted to a pressure gauge for measuring downhole pressure or a flow prover for testing well production capability.
8. A process for running joints of production piping into a wellbore containing flowing hydrocarbons, comprising:
(a) positioning a casing degasser tool as claimed in any of claims 1 to 7 inside a first joint of production piping, the first joint of production piping having a top end, a bottom end and an inner wall, such that the sealing element of the casing degasser tool is in frictional engagement with the inner wall of the first production piping;
(b) lowering the first joint of production piping into the wellbore bottom end first;
(c) adding a second joint of production piping, the second joint of production piping having a top end, a bottom end and an inner wall, to the first joint of production casing by coupling the bottom end of the second joint of production piping to the top end of the first joint of production piping with coupling means;
(d) attaching a pulling device to the connection means of the casing degasser tool; and (e) pulling the casing degasser tool through the top end of the first joint of production piping, through the bottom end of the second joint of production tubing and into the second joint of production piping, so that the sealing element is in frictional engagement with the inner wall of the second joint of production piping.
(a) positioning a casing degasser tool as claimed in any of claims 1 to 7 inside a first joint of production piping, the first joint of production piping having a top end, a bottom end and an inner wall, such that the sealing element of the casing degasser tool is in frictional engagement with the inner wall of the first production piping;
(b) lowering the first joint of production piping into the wellbore bottom end first;
(c) adding a second joint of production piping, the second joint of production piping having a top end, a bottom end and an inner wall, to the first joint of production casing by coupling the bottom end of the second joint of production piping to the top end of the first joint of production piping with coupling means;
(d) attaching a pulling device to the connection means of the casing degasser tool; and (e) pulling the casing degasser tool through the top end of the first joint of production piping, through the bottom end of the second joint of production tubing and into the second joint of production piping, so that the sealing element is in frictional engagement with the inner wall of the second joint of production piping.
9. The process as claimed in claim 8 further comprising checking the downhole pressure by means of a pressure gauge attached to the pressure gauge fitting of the casing degasser tool.
10. The process as claimed in claim 8 further comprising bleeding built up pressure from the wellbore by attaching a hose or pipe to the pressure release fitting of the casing degasser tool and allowing the hydrocarbons to flow into a flare stack, a tank or a pit.
11. The process as claimed in claim 8 further comprising testing well production capability by means of a flow prover attached to the pressure gauge fitting of the casing degasser tool.
12. A process for running joints of production piping into a wellbore containing flowing hydrocarbons, comprising:
(a) positioning a casing degasser tool as claimed in any of claims 1 to 7 inside a first joint of production piping to be lowered into the well bore, the first joint of production piping having an inner wall, such that the sealing element of the casing degasser tool is in frictional engagement with the inner wall of the first production piping;
(b) lowering the first joint of production casing into the wellbore;
(c) adding additional joints of production piping to the first joint of production piping until all the joints of production piping have been added;
(d) attaching a pulling device to the connection means of the casing degasser tool; and (e) pulling the casing degasser toot through the joints of production piping to the surface of the well.
(a) positioning a casing degasser tool as claimed in any of claims 1 to 7 inside a first joint of production piping to be lowered into the well bore, the first joint of production piping having an inner wall, such that the sealing element of the casing degasser tool is in frictional engagement with the inner wall of the first production piping;
(b) lowering the first joint of production casing into the wellbore;
(c) adding additional joints of production piping to the first joint of production piping until all the joints of production piping have been added;
(d) attaching a pulling device to the connection means of the casing degasser tool; and (e) pulling the casing degasser toot through the joints of production piping to the surface of the well.
13. The process as claimed in claim 12 further comprising checking the downhole pressure by means of a pressure gauge attached to the pressure gauge fitting of the casing degasser tool.
14. The process as claimed in claim 12 further comprising bleeding built up pressure from the wellbore by attaching a hose or pipe to the pressure release fitting of the casing degasser tool and allowing the hydrocarbons to flow into a flare stack, a tank or a pit.
15. The process as claimed in claim 12 further comprising testing well production capability by means of a flow prover attached to the pressure gauge fitting of the casing degasser tool.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US52152304P | 2004-05-13 | 2004-05-13 | |
US60/521,523 | 2004-05-13 |
Publications (1)
Publication Number | Publication Date |
---|---|
CA2507105A1 true CA2507105A1 (en) | 2005-11-13 |
Family
ID=35452197
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CA002507105A Abandoned CA2507105A1 (en) | 2004-05-13 | 2005-05-11 | Casing degasser tool |
Country Status (2)
Country | Link |
---|---|
US (1) | US20050252661A1 (en) |
CA (1) | CA2507105A1 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070062693A1 (en) * | 2005-09-21 | 2007-03-22 | Vetco Gray Inc. | System, method, and apparatus for degassing tool for coal bed methane gas wells |
CN108798630B (en) * | 2018-04-28 | 2021-09-28 | 中国矿业大学 | Cave pressure relief mining simulation test system for tectonic coal in-situ coal bed gas horizontal well |
Family Cites Families (75)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2609836A (en) * | 1946-08-16 | 1952-09-09 | Hydril Corp | Control head and blow-out preventer |
US2997107A (en) * | 1958-02-24 | 1961-08-22 | Oil Recovery Corp | Well packer confining means |
US3075589A (en) * | 1958-08-18 | 1963-01-29 | Gas Drilling Services Co | Dual passage drilling stem having selfcontained valve means |
US3416618A (en) * | 1966-10-28 | 1968-12-17 | Dresser Ind | Shrouded bit |
US3795283A (en) * | 1972-06-15 | 1974-03-05 | Shuttle Mountain Holdings Co L | Apparatus for drilling and sampling rock formations |
US3792429A (en) * | 1972-06-30 | 1974-02-12 | Mobil Oil Corp | Logging-while-drilling tool |
US3770006A (en) * | 1972-08-02 | 1973-11-06 | Mobil Oil Corp | Logging-while-drilling tool |
US3918520A (en) * | 1974-09-30 | 1975-11-11 | Chevron Res | Wire line inflatable packer apparatus |
US3920090A (en) * | 1975-02-26 | 1975-11-18 | Dresser Ind | Control method and apparatus for pressure, vacuum or pressure-vacuum circulation in drilling system |
US4055224A (en) * | 1975-07-01 | 1977-10-25 | Wallers Richard A | Method for forming an underground cavity |
US4100528A (en) * | 1976-09-29 | 1978-07-11 | Schlumberger Technology Corporation | Measuring-while-drilling method and system having a digital motor control |
US4187920A (en) * | 1977-11-23 | 1980-02-12 | Tri-State Oil Tool Industries, Inc. | Enlarged bore hole drilling method and apparatus |
DE2854461C2 (en) * | 1978-12-16 | 1983-03-10 | Wirth Maschinen- und Bohrgeräte-Fabrik GmbH, 5140 Erkelenz | Countersink hammer |
CA1117865A (en) * | 1979-11-15 | 1982-02-09 | Fred S. Ditto | Flow plug |
US4509606A (en) * | 1980-10-29 | 1985-04-09 | Walker-Neer Manufacturing Co., Inc. | Axial return hammer |
US4391328A (en) * | 1981-05-20 | 1983-07-05 | Christensen, Inc. | Drill string safety valve |
US4461448A (en) * | 1981-06-25 | 1984-07-24 | Hydril Company | Well blowout preventer, and packing element |
US4463814A (en) * | 1982-11-26 | 1984-08-07 | Advanced Drilling Corporation | Down-hole drilling apparatus |
US4534426A (en) * | 1983-08-24 | 1985-08-13 | Unique Oil Tools, Inc. | Packer weighted and pressure differential method and apparatus for Big Hole drilling |
US4647002A (en) * | 1983-09-23 | 1987-03-03 | Hydril Company | Ram blowout preventer apparatus |
US4832126A (en) * | 1984-01-10 | 1989-05-23 | Hydril Company | Diverter system and blowout preventer |
US4739844A (en) * | 1984-04-02 | 1988-04-26 | Becker Drills, Inc. | Hammer drill bit and sub-assembly |
US4705119A (en) * | 1985-09-16 | 1987-11-10 | Institut Gornogo Dela So An Sssr | Annular air-hammer apparatus for drilling holes |
GB2181473B (en) * | 1985-10-04 | 1989-02-01 | Tone Boring Co | Air pressure impact drilling apparatus |
GB8531627D0 (en) * | 1985-12-23 | 1986-02-05 | Shell Int Research | Drilling borehole |
US4671359A (en) * | 1986-03-11 | 1987-06-09 | Atlantic Richfield Company | Apparatus and method for solids removal from wellbores |
US4681164A (en) * | 1986-05-30 | 1987-07-21 | Stacks Ronald R | Method of treating wells with aqueous foam |
SE454283B (en) * | 1986-09-02 | 1988-04-18 | Inst Gornogo Dela Sibirskogo O | ANNUAL AIR HAMBLE DEVICE FOR DRILLING |
US4744420A (en) * | 1987-07-22 | 1988-05-17 | Atlantic Richfield Company | Wellbore cleanout apparatus and method |
CA1325969C (en) * | 1987-10-28 | 1994-01-11 | Tad A. Sudol | Conduit or well cleaning and pumping device and method of use thereof |
JPH01128266A (en) * | 1987-11-13 | 1989-05-19 | Pioneer Electron Corp | Method for controlling drive device for writable disk |
US5174394A (en) * | 1988-03-31 | 1992-12-29 | Philipp Holzmann Aktiengesellschaft | Apparatus for cleaning layers of earth |
US5020611A (en) * | 1989-06-09 | 1991-06-04 | Morgan Alan K | Check valve sub |
US5006046A (en) * | 1989-09-22 | 1991-04-09 | Buckman William G | Method and apparatus for pumping liquid from a well using wellbore pressurized gas |
CA2007070C (en) * | 1990-01-03 | 1996-01-23 | Kirk Mcbride Sinclair | Dry pneumatic system for hard rock shaft drilling |
FR2658559B1 (en) * | 1990-02-22 | 1992-06-12 | Pierre Ungemach | DEVICE FOR INJECTING INTO A WELL OF CORROSION OR DEPOSITION INHIBITORS USING AN AUXILIARY INJECTION TUBE. |
BE1004505A3 (en) * | 1990-07-10 | 1992-12-01 | Smet Marc Jozef Maria | Device for making a hole in the ground. |
FR2683590B1 (en) * | 1991-11-13 | 1993-12-31 | Institut Francais Petrole | MEASURING AND INTERVENTION DEVICE IN A WELL, ASSEMBLY METHOD AND USE IN AN OIL WELL. |
US5285204A (en) * | 1992-07-23 | 1994-02-08 | Conoco Inc. | Coil tubing string and downhole generator |
US5404946A (en) * | 1993-08-02 | 1995-04-11 | The United States Of America As Represented By The Secretary Of The Interior | Wireline-powered inflatable-packer system for deep wells |
NO303296B1 (en) * | 1997-02-14 | 1998-06-22 | Tech Line Oil Tools As | Inflatable downhole gasket with pressure compensator |
US5473158A (en) * | 1994-01-14 | 1995-12-05 | Schlumberger Technology Corporation | Logging while drilling method and apparatus for measuring formation characteristics as a function of angular position within a borehole |
US5435395A (en) * | 1994-03-22 | 1995-07-25 | Halliburton Company | Method for running downhole tools and devices with coiled tubing |
US5396966A (en) * | 1994-03-24 | 1995-03-14 | Slimdril International Inc. | Steering sub for flexible drilling |
US5411105A (en) * | 1994-06-14 | 1995-05-02 | Kidco Resources Ltd. | Drilling a well gas supply in the drilling liquid |
US6263987B1 (en) * | 1994-10-14 | 2001-07-24 | Smart Drilling And Completion, Inc. | One pass drilling and completion of extended reach lateral wellbores with drill bit attached to drill string to produce hydrocarbons from offshore platforms |
US5575451A (en) * | 1995-05-02 | 1996-11-19 | Hydril Company | Blowout preventer ram for coil tubing |
GB2318598B (en) * | 1995-06-20 | 1999-11-24 | B J Services Company Usa | Insulated and/or concentric coiled tubing |
GB9513657D0 (en) * | 1995-07-05 | 1995-09-06 | Phoenix P A Ltd | Downhole flow control tool |
CA2167491C (en) * | 1995-07-25 | 2005-02-22 | John G. Misselbrook | Safeguarded method and apparatus for fluid communication using coiled tubing, with application to drill stem testing |
US6196336B1 (en) * | 1995-10-09 | 2001-03-06 | Baker Hughes Incorporated | Method and apparatus for drilling boreholes in earth formations (drilling liner systems) |
US6065550A (en) * | 1996-02-01 | 2000-05-23 | Gardes; Robert | Method and system for drilling and completing underbalanced multilateral wells utilizing a dual string technique in a live well |
US5720356A (en) * | 1996-02-01 | 1998-02-24 | Gardes; Robert | Method and system for drilling underbalanced radial wells utilizing a dual string technique in a live well |
US6457540B2 (en) * | 1996-02-01 | 2002-10-01 | Robert Gardes | Method and system for hydraulic friction controlled drilling and completing geopressured wells utilizing concentric drill strings |
US6047784A (en) * | 1996-02-07 | 2000-04-11 | Schlumberger Technology Corporation | Apparatus and method for directional drilling using coiled tubing |
AUPO062296A0 (en) * | 1996-06-25 | 1996-07-18 | Gray, Ian | A system for directional control of drilling |
US6209665B1 (en) * | 1996-07-01 | 2001-04-03 | Ardis L. Holte | Reverse circulation drilling system with bit locked underreamer arms |
US6458531B1 (en) * | 1996-10-09 | 2002-10-01 | Iowa State University Research Foundation | Leptin receptor gene as a genetic marker for leanness in pigs |
US5881813A (en) * | 1996-11-06 | 1999-03-16 | Bj Services Company | Method for improved stimulation treatment |
US5892460A (en) * | 1997-03-06 | 1999-04-06 | Halliburton Energy Services, Inc. | Logging while drilling tool with azimuthal sensistivity |
US6189617B1 (en) * | 1997-11-24 | 2001-02-20 | Baker Hughes Incorporated | High volume sand trap and method |
US6405809B2 (en) * | 1998-01-08 | 2002-06-18 | M-I Llc | Conductive medium for openhold logging and logging while drilling |
US6325159B1 (en) * | 1998-03-27 | 2001-12-04 | Hydril Company | Offshore drilling system |
US6213201B1 (en) * | 1998-04-13 | 2001-04-10 | Alan I. Renkis | Tight sands gas well production enhancement system |
US6209663B1 (en) * | 1998-05-18 | 2001-04-03 | David G. Hosie | Underbalanced drill string deployment valve method and apparatus |
US6192985B1 (en) * | 1998-12-19 | 2001-02-27 | Schlumberger Technology Corporation | Fluids and techniques for maximizing fracture fluid clean-up |
US6341654B1 (en) * | 1999-04-15 | 2002-01-29 | Weatherford/Lamb, Inc. | Inflatable packer setting tool assembly |
US6250383B1 (en) * | 1999-07-12 | 2001-06-26 | Schlumberger Technology Corp. | Lubricator for underbalanced drilling |
US6377050B1 (en) * | 1999-09-14 | 2002-04-23 | Computalog Usa, Inc. | LWD resistivity device with inner transmitters and outer receivers, and azimuthal sensitivity |
US6359438B1 (en) * | 2000-01-28 | 2002-03-19 | Halliburton Energy Services, Inc. | Multi-depth focused resistivity imaging tool for logging while drilling applications |
US6536539B2 (en) * | 2000-06-30 | 2003-03-25 | S & S Trust | Shallow depth, coiled tubing horizontal drilling system |
GB2365463B (en) * | 2000-08-01 | 2005-02-16 | Renovus Ltd | Drilling method |
GB2368079B (en) * | 2000-10-18 | 2005-07-27 | Renovus Ltd | Well control |
US6668933B2 (en) * | 2000-10-23 | 2003-12-30 | Abb Vetco Gray Inc. | Ball valve seat and support |
US6481501B2 (en) * | 2000-12-19 | 2002-11-19 | Intevep, S.A. | Method and apparatus for drilling and completing a well |
-
2005
- 2005-05-11 US US10/908,418 patent/US20050252661A1/en not_active Abandoned
- 2005-05-11 CA CA002507105A patent/CA2507105A1/en not_active Abandoned
Also Published As
Publication number | Publication date |
---|---|
US20050252661A1 (en) | 2005-11-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9644448B2 (en) | Apparatus and method for isolating a section of a pipe riser bore in the course of riser renewal | |
US7635026B2 (en) | Methods and devices for forming a wellbore with casing | |
US5503014A (en) | Method and apparatus for testing wells using dual coiled tubing | |
US4030354A (en) | Testing of ram and annular blowout preventers | |
DK2785965T3 (en) | An annular barrier system with a flow pipe | |
US20130319671A1 (en) | Method and Device for Plugging of a Subsea Well | |
BRPI0613612A2 (en) | method for creating and testing an annular barrier | |
US6390194B1 (en) | Method and apparatus for multi-diameter testing of blowout preventer assemblies | |
EP2333233A2 (en) | Wellhead test tool and method | |
US6430990B1 (en) | Pipe testing apparatus | |
US8474543B2 (en) | Method and apparatus for controlling the flow of fluids from a well below the surface of the water | |
US4328866A (en) | Check valve assembly | |
US9109430B2 (en) | Blow-out preventer, and oil spill recovery management system | |
US3827486A (en) | Well reentry system | |
US20050252661A1 (en) | Casing degasser tool | |
US6302214B1 (en) | Apparatus and method for inflating packers in a drilling well | |
CN109681138B (en) | Method for lifting and discharging halogen pipes | |
EP3638879B1 (en) | Method and system for integrity testing | |
RU171305U1 (en) | Autonomous plugging packer system | |
US8997872B1 (en) | Cap assembly for use with a tubing spool of a wellhead | |
US11248432B2 (en) | Method and apparatus for suspending a well | |
RU2728754C2 (en) | Hydraulic device and method of detection and sealing of holes or cracks in oil well tubing | |
RU2614998C1 (en) | Method of deep gas well equipment with tubing string composition | |
US20100314122A1 (en) | Method and system for subsea intervention using a dynamic seal | |
JP2733000B2 (en) | Hydraulic packer and expansion / contraction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FZDE | Discontinued |