CA2492353A1 - Method and means for mounting a wind turbine on a tower - Google Patents

Method and means for mounting a wind turbine on a tower Download PDF

Info

Publication number
CA2492353A1
CA2492353A1 CA002492353A CA2492353A CA2492353A1 CA 2492353 A1 CA2492353 A1 CA 2492353A1 CA 002492353 A CA002492353 A CA 002492353A CA 2492353 A CA2492353 A CA 2492353A CA 2492353 A1 CA2492353 A1 CA 2492353A1
Authority
CA
Canada
Prior art keywords
tower
carriage
wind turbine
guide rails
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
CA002492353A
Other languages
French (fr)
Inventor
Jeffrey O. Willis
Anthony J. Hansen
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Valmont Industries Inc
Original Assignee
Valmont Industries Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Valmont Industries Inc filed Critical Valmont Industries Inc
Priority to CA002492353A priority Critical patent/CA2492353A1/en
Publication of CA2492353A1 publication Critical patent/CA2492353A1/en
Abandoned legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D13/00Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
    • F03D13/20Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05BINDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
    • F05B2230/00Manufacture
    • F05B2230/60Assembly methods
    • F05B2230/61Assembly methods using auxiliary equipment for lifting or holding
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05BINDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
    • F05B2240/00Components
    • F05B2240/90Mounting on supporting structures or systems
    • F05B2240/91Mounting on supporting structures or systems on a stationary structure
    • F05B2240/916Mounting on supporting structures or systems on a stationary structure with provision for hoisting onto the structure
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/728Onshore wind turbines
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/50Manufacturing or production processes characterised by the final manufactured product

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Sustainable Energy (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Wind Motors (AREA)

Abstract

An apparatus for mounting a wind turbine on the upper end of a wind turbine tower is disclosed as well as the method of erecting the same. The tower is provided with a pair of spaced-apart guide rails positioned at one side thereof which extend from the lower end to the upper end of the tower. A carriage is movably mounted on the guide rails and has a platform pivotally mounted thereon adapted to support the wind turbine thereon. The carriage positions the wind turbine so that the spinner/hub and rotor blades may be secured thereto while the wind turbine is at the lower end of the tower and provides a means for slidably moving the wind turbine from the carriage to the upper end of the tower when the carriage has been winched to the upper end of the tower.

Description

METHOD AND MEANS FOR MOUNTING A WIND TURBINE ON A TOWER
CROSS-REFERENCE TO RELATED APPLICATION
This is a continuation application of Petitioners' earlier application Serial No.
091829,362 filed April 9, 2001, entitled "METHOD AND lvIEANS FOR fvIOUNTING A
~~ WIND TURBINE ON A TOWER" which is a divisional application of Petitioners' U.S.
earlier application Serial No. 091563,612 filed May 2, 2000, entitled "METHOD
AND
MEANS FOR MOUNTING A WIND TURBINE ON A TOWER" and which issued as U.S.
Patent No. 6,278,198 on August 21, 2001.
BACKGROUND OF THE INVENTION
to I, 1. FIELD OF THE INVENTION
This invention relates to a method and means for mounting a wind turbine on the upper end of a supporting tower and more particularly to a method and means wherein ~I the turbine is winched up the length of the tower on a carriage which rolls along a track j ~ or guide rail positioned at one side of the 'tower. ' I ~

I.
i1 ~i
2. DESCRIPTION OF THE RELATED ART
z VVind turbines are becoming more popular in the producticn of electrical energy.
I
The wind turbine normally comprises a rotor-driven generator mounted atop a tower which may reach heights cf 70 meters or more. The tower is normally first erected and d of the tower b means the mnd turbne is then normally mounted on the upper en y of an s extremely large crane. The customary method of mounting the wind turbine on the upper end of the tower is quite expensive in that the extremely large crane used for positioning the wind turbine on the tower is very expensive and it is costly to have such a crane on site during the erection procedure. Thus, it is advantageous to be able to io Ii mount the wind turbine on the upper end of the tower without the use of the extremely large crane.
SUMMARY OF THE INVENTION
The wind turbine assembly of this invention comprises a vertically disposed tower is ~ having upper and lower ends with the tower having a guide rail means positioned at one side of the tower which extends between the lower and upper ends thereof. A
turbine support or carriage is provided which has a pivotal platform mounted thereon adapted to have the wind turbine mounted thereon. The carriage is initially supported on a wheeled frame means such as a truck, trailer or the tike. The truck is positioned so that the carriage may be transferred from the truck to the lower end of the guide rail means.
The carriage is initially positioned on the lower end of the guide rail in a vertically disposed position. Cnce the carriage has been mounted on the lower end of the guide ,~~ rail. the platform cf the ~~arriage is pivotally moved to a hori~ontalty disposed position to I _ _-~.__..... . _ ..

a I
!.
ii f' II
~~~ enable the turbine to be mounted thereon with the turbine being generally horizontally disposed. After the turbine has been secured to the platform, the platform is pivoted so that the wind turbine is substantially vertically disposed with the main shaft (rotor shaft) thereof being positioned at the upper portion of the wind turbine. The spinnerlhub and rotor blades are then secured to the main shaft with the rotor blades being disposed in a horizontally disposed condition. A winch means then winches the carriage, with the wind turbine thereon, to the upper end of the tower. When the carriage reaches the upper end of the tower, the platform is again pivoted to cause the wind turbine to be again disposed in a substantially horizontally disposed position. The wind turbine is 1o I
then slidably moved horizontally onto the upper end of the tower at which time the wind turbine is detached from the platform sled and is securely fashioned to the upper end of the tower. The carriage is then lowered to the lower end of the tower and is removed from the guide rails and placed onto the truck so that the carriage may be used for the is erection of other wind turbine assemblies. An alternative method is also disclosed.
In the alternative method, the carriage is initially supported on a wheeled frame means such as a truck, trailer or the like as in the previously described method. The truck is positioned so that the carriage may be transferred from the truck to the tower end of the guide rail means. The carriage is initially positioned on the lower end of the guide rail in a vertically disposed position. Once the carriage has been mounted on the lower end of the guide rail, the platform of the carriage is pivotally moved to a horizontally disposed position to enable the turbine to be mounted thereon with the ~
turbine being generally horizontally disposed and with the turbine being positioned so J

that the main shaft of the turbine extends towards one side of the tower.
After the turbine has beer secured to the platform, the carriage is winched upwardly on the tower a distance greater than the rotor-swept areG. The spinnerr'hub and rotor blades are then secured to the main shaft with the rotor blades being disposed in a vertically disposed condition. The winch means then winches the carriage, with the wind turbine thereon, s I
to the upper end of the tower. When the carriage reaches the upper end of the tower, the wind turbine is then siidably moved horizontally onto the upper end of the tower at which time the wind turbine is detached from the platform sled and is securely fashioned to the upper end of the tower. The carriage is then lowered to the lower end of the io tower and is removed from the guide rails and placed onto the truck so that the carriage may be used for the erection of other wind turbine assemblies. In the alternative method, the wind turbine always remains in a horizontally disposed position, thereby eliminating any problems with liquids draining from the gearbox, generator, etc.
15 iI It is a principal object of the invention to provide an improved method of erecting a wind turbine assembly.
A further object of the invention is to provide a method of positioning a wind turbine on the upper end of a wind turbine tower wherein the need of an extremely large crane is eliminated.
Stiil another object of the invention is to provide a wind turbine assembly wherein ~';I the turbine tower has a guide rail at one side thereof to accommodate a carriage to be ', vertically moved upwardly thereon with the carriage supporting the wind turbine.
i I

Still another object of the invention is to provide an improved method and means for erecting a wind turbine assembly which is less dangerous than the prior art methods of erecting the same.
A, further object of the invention is to provide an improved tower for wind turbines.
These and other objects will be apparent to those skilled in the art.
BRIEF DESCRIPTION OF THE DRAWINGS
Figure 1 is a side view of the wind turbine assembly of this invention;
Figure 2 is a side view of the wind turbine assembly of Figure 1 as seen from the right of Figure 1;
m Figure 3A is a side view of the tower and illustrating the carriage supporting the wind turbine being supported on a trailer at the lower end of the tower;
Figure 3B is a somewhat enlarged partial view of Figure 3A;
Figure 4 is a view similar to Figure 3B except that the carriage is being moved !~ from the trailer to the guide rail;
Figure 5 is a view similar to Figure 4 except that the carriage has been completely removed from the trailer and has been mounted on the carriage;
Figure 6 is a view similar to Figure 5 except that the platform of the carriage is being pivoted to a horizontal position;
Figure 7 is a view similar to Figure 6 except that the platform of the carriage has been pivoted to a horizontal position and the wind turbine is being lowered towards the platform;

I
I
i~
y Figure 8 is a view similar to Figure 7 except that it illustrates the turbine positioned on the platform of the carriage;
Figure 9 is a view similar to Figure 8 except that it illustrates the carriage platform and the turbine being moved to a vertically disposed position;
II Figure 10 is a view similar to Figure 9 except that the carriage platform and wind turbine have been moved to a vertically disposed position;
Figure 11 is a view similar to Figure 10 but which illustrates the spinnerlhub and rotors being lowered towards the wind turbine;
Figure 12 is a view sirniiar to Figure 11 except that the spinner/hub and rotor to blades have been mounted on the wind turbine;
Figure 13 is a view scene on lines 13-13 of Figure 12;
Figure 14 is a side view illustrating the carriage and wind turbine having been moved to the upper end of the tower;
Figure 15 is a view similar to Figure 14 except that the carriage platform is being pivoted from its vertically disposed position to its horizontal position;
Figure 16 is a view similar to Figure 15 except that the carriage platform and turbine have been moved to a horizontally disposed position;
Figure 17 is a view sirnilar to Figure 16 except that the turbine is illustrated as Zo having been slidably moved from the carriage platform to the upper end of the tower;
Figure 18 is a view similar to Figure 17 except that the carriage platform is ~I, illustrated as being pivotally moved 'owards a vertically disposed position;

Figure 19 is a view similar to Figure 18 except that the carriage is illustrated as being lowered towards the ground;
Figure 20 is a view similar to Figure 19 except that the carriage is being illustrated as being moved onto the trailer;
Figure 21 is a partial side view illustrating the connection of the winch means with the carriage while the carriage is mounted on a trailer;
Figure 22 is a sectional view illustrating the relationship of the tower, guide rail means and carriage;
Figure 23 is a partial side view illustrating the carriage platform in a vertically io disposed position; and Figure 24 is a partial side view illustrating the carriage platform having been moved to the upper end of the tower with the broken lines illustrating the movement of a portion of the carriage platform towards the upper end of the tower.
i5 II DESCRIPTION OF THE PREFERRED EMBODIMENT
The wind turbine. assembly of this invention is referred to generally by the reference numeral 10 and includes a tower 12 which may have a height of up to seventy meters or more. A support structure 14 is in the form of a battered leg structure 14A
and 14B is provided at one side of the tower 12 for stability purposes. Legs 14A and 14B are connected to the tower 12 by braces 15._ The numeral 16 refers to a conventional wind turbine including a housing 18 which houses various components of II
the wind turbine 16 such as a cooling system, generator, gearbox, and a main shaft i, extending therefrom Into ~Nhich a spinnerihub 20 is mounted including rotor blades 22.
=7 ' The 4vind turbine 16 includes a conventional base portion 24 which is secured to the upper end of the tower 12. To this point, the wind turbine assembly 10 is generally cf conventionGl prior art construction except for the battered leg structure which stabilizes the to4ver 12, distributes the load on the tower 12, and enables the tower 12 to be ~I constructed of a lighter weight material.
The tower 12 is provided with a guide rail means 26 which in this case comprises a pair of vertically disposed and horizontally spaced guide rails 28 and 30 positioned at one side of the tower 12 with the guide rails 28 and 30 extending between the lower and upper ends of the tower 12. Although it is preferred that a pair of guide rails 28 and 30 ~, be provided, it is possible that any number of guide rails could he provided, if desired.
Further, the guide rails 28 and 30 could be positioned on the opposite sides of the tower 12 and could take shapes other than that disclosed. For example, guide rails could be T-shaped if desired.
i~ The numeral 32 refers generally to a carriage which is adapted to move along the ~7 guide rails 28 and 30 and which includes a platform 52 adapted to have the wind turbine 16 secured thereto and which includes means for pivoting the platform 52 approximately ninety degrees with respect to the carriage, as will be described in mare detail hereinafter. It is preferred that the carriage 32 be removabiy positioned on a wheeled frame such as a truck or trailer 36 having a pair of spaced-apart guide rails 38 provided thereon which are adapted to mate with or register with the lower ends of the guide rails 28 and 30 so that the carriage 32 may be rnoved from its position on the ~rvheeled frame means 36 onto the guide rails 28 and 30.
i3 ~; i ..
Ii i I.
Carriage 32 includes a pair of projecting frame members 40 and 42 having recessed portions 44 and 46 formed therein, respectively, which are adapted to receive the guide rails 2t3 and 30 and which are also adapted to receive the guide rails 38 when the carriage 32 is mounted on the wheeled frame means 36. It is preferred that the recessed areas 44 and 46 be provided with a plurality of slides or rollers 48 provided s thereon to facilitate the sliding movement of the carriage 32 with respect to the guide rails 28 and 30. Generally speaking, carriage 32 includes a frame means 50 having the platform 52 pivotally secured thereto and which is movable therewith by means of power cylinder 54 or some other mechanism. It is preferred that a slide mechanism 56 io be slidably mounted on platform 52 to enable the slide mechanism 56 to. be moved from the position illustrated in Figure 24 to a position towards tower 12 to enable the turbine 16 to be moved from the carriage to the upper end of the tower 12 as will be more fully described hereinafter. Slide 56 includes means for having the wind turbine 16 is ~~ selectively secured thereto.
The numeral 58 refers to a winch which is preferably positioned at the lower end of the tower 12 and which has a winch cable 60 extending therefrom. Winch cable 60 preferably extends around pulley 62 and thence upwardly to the upper end of the tower 12 wherein it extends over pulleys 64 and 66. Winch cable 60 then extends downwardly, as seen in Figure 21, for connection to the carriage 32.
The tower 12 is first erected in conventional fashion, except for the structure 14, I
~Nith the guide rails 28 and 30 being provided thereon as previously described. When it .
1~~ ;s desired '~.o mount the turbine .6 on the upper end of the tower 12, the vNheeled frame means 36 is positioned adjacent the lower end of the tower 12 so that the guide rails 38 1 i1 mate with the lower ends of the guide rails 28 and 30. The winch cable 60 is then i connected to the carriage 32 and the winch 58 is actuated so that the cable 60 pulls the carriage 32 from the wheeled frame means 32 onto the lower ends of the guide rails 28 i and 30, as illustrated in Figures 4 and 5. When the carriage 32 has been positioned on the lower end of the guide rails 28 and 30, as illustrated in Figure 5, the platform 52 is pivotally moved from the vertically disposed position of Figure 5 to the position of Figure 6 and then to the position of Figure 7. At that time, the wheeled frame means 36 may be moved away from the lower end of the tower 12. When the platform 52 is in the io position of Figure 5, a small crane is then used to lower the wind turbine 16 onto the slide 56 to which it is securely fastened, as illustrated in Figure 8. The platform 52 is then pivotally moved from the position of Figure 8 to the position of Figure 9 and then to the position of Figure 10 wherein the wind turbine 16 is substantially vertically disposed.
is When the wind turbine 16 is in the position of Figures 10 and 11, the spinnerlhub 20 with the rotor blades 22 attached thereto is lowered onto the main shaft of the wind turbine 16 by means of a small crane or the like. It should be noted that the rotor blades 22 may be secured to the spinnerlhub 20 after the spinner/hub 20 has bean mounted on the wind turbine 16. Figure 12 illustrates the spinner/hub 20 and the rotor blades 22 mounted on the wind turbine 16. Figure 13 is a top view illustrating the wind turbine 16 in the position of Figure 12.
When the spinner/hub 20 and rotor blades 22 have been mounted on the wind ~~ turbine 16, the carriage ~2 ~Nith the ~Nind turbine 16 mounted thereon is winched to the .5 I
il i~
upper end of the tower 12 by means of the 4vinch 58. When the carriage 32 has been z winched to the position of Figure 14, the platform 52 is pivotally moved from its vertically disposed position to the position of Figure 15 and then to the position of Figure 16. The slide 56 is then moved towards the upper end of the tower 24, as indicated by the dashed arrow in Figure 24; so that the wind turbine 16 may be removed from the slide 56 and secured to the upper end of the tower 24. When the turbine 16 has been secured to the upper end of the tower 12, as illustrated in Figure 18, the platform 52 is pivotally moved from its horizontally disposed position to the position of Figure 18 and then to a vertically disposed position. The carriage 32 is then lowered on the guide rails ZO
28 and 30 to the lower end of the tower. The wheeled frame means 36 is then positioned adjacent the lower end of the tower so that the guide rails 38 thereof register once again with the guide rails 28 and 30, The carriage 32 is then moved from the guide rails 28 and 30 onto the guide rails 38 of the wheeled frame means 36 so that the z5 ~ carriage 32 is positioned on the wheeled frame means 36. The wheeled frame means 36 and the carriage 32 may then be moved to another location wherein another wind turbine assembly 10 is to be erected.
The turbine 16 may be installed or mounted on the upper end of the tower in a somewhat different way such as will now be described. As in the previously described method, when it is desired to mount the turbine 16 on the upper end of the tower 12, the wheeled frame means 36 is positioned adjacent the lower end of the tower 12 so that !~ the guide rails 38 mate with the lower ends of the guide rails 28 and 30.
The winch ~~ cable 60 is then connected to the carriage 32 and the vNinch 58 is actuated so that the ', __ ,1 ... ~. ~~..__ . _ ~ _~_ cable 60 pulls the carriage 32 from the wheeled frame means 36 onto the lower ends of the guide rails 28 and 30. When the carriage 32 has been positioned on the lower end of the guide rails 28 and 30, the platform 52 is pivotally moved from the vertically disposed position of Figure 5 to the position of Figure 6 and then to the position of Figure 7. At that time, the wheeled frame means 36 may be moved away from the lower end of the tower 12. When the platform 52 is in the position of Figure 5, the carriage 32 is then winched upwardly along the guide rails 28 and 30 until the carriage has reached a height which is greater than the rotor-swept area. The wind turbine 16 is then positioned on the platform 52 of the carriage 32 by means of a small crane with the io wind turbine 16 being horizontally disposed and with the main shaft thereof e;rtending laterally from one side of the tower. The spinnerlhub 20 with the rotor blades attached thereto are then secured to the main shaft of the wind turbine 16 with the rotor blades being vertically disposed.
~~ When the spinnerlhub 20 and the rotor blades 22 have been mounted on the ?o wind turbine 16, the carriage 32 with the wind turbine 16 mounted thereon is winched to the upper end of the tower 12 by means of the winch 58. When the carriage 32 has been winched to the upper end of the tower, the slide 56 is then moved towards the upper end of the tower 24 so that the wind turbine 16 may be removed from the slide 56 and secured to the upper end of the tower 24. When the turbine 16 has been secured to the upper end of the tower 12, the carriage 32 is then lowered on the guide rails 28 and 30 to the lower end of the tower, as in the previously described method.
1~

The advantage of the alternate method is that the wind turbine is always in a 1 fj horizontally disposed position. In some cases, if the wind turbine was vertically disposed and components of the turbine have been previously filled with lubricating fluids, cooling fluids, etc., some leakage could possibly occur. By maintaining the wind II turbine in the horizontally disposed condition, leakage problems are eliminated.
Although the preferred method of moving the wind turbine to the upper end of the tower is with a winch, it is possible that other means could be utilized. For example, some form of ratcheting mechanism could be utilized. A rack and pinion gear arrangement which is motor-driven could also be used.
lo Thus it can be seen that a novel apparatus has been provided for mounting a wind turbine on the upper end of a wind turbine tower involving the use of a carnage which is movably mounted on guide rails provided on the tower and wherein the need for an extremely large crane is eliminated. The relationship of the carriage 32 with 15 II respect to the guide rails 28 and 30 ensures that undesirable horizontal movement between the carriage 32 and the guide rails 28 and 3D will be prevented while permitting the desirable vertical movement of the carriage 32 on the guide rails 28 and 30.
It can therefore be seen that a novel apparatus and method has been provided which accomplishes at least all of its stated objectives.
?o

Claims

We claim:

1.
In combination:
a vertically disposed wind turbine tower extending upwardly from the ground and having upper and lower ends;
said tower being comprised of a tubular member;
at least a first ground engaging battered leg having upper and lower ends;
at least a second ground engaging battered leg having upper and lower ends;
said upper ends of said first and second battered legs being secured to said tower between the upper and lower ends of said tower;
said first and second battered legs extending downwardly and outwardly from said tower in a diverging relationship with respect to each other for anchored ground engagement.

2.
The combination of claim 1 wherein a plurality of horizontally disposed braces are secured to and extend between said first and second battered legs.

3.
The combination of claim 1 wherein a plurality of horizontally disposed braces are secured to and extend between each of said battered legs and said tower.

4.
The combination of claim 3 wherein a plurality of horizontally disposed braces are secured to and extend between said first and second battered legs.
CA002492353A 2005-01-11 2005-01-11 Method and means for mounting a wind turbine on a tower Abandoned CA2492353A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CA002492353A CA2492353A1 (en) 2005-01-11 2005-01-11 Method and means for mounting a wind turbine on a tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CA002492353A CA2492353A1 (en) 2005-01-11 2005-01-11 Method and means for mounting a wind turbine on a tower

Publications (1)

Publication Number Publication Date
CA2492353A1 true CA2492353A1 (en) 2006-07-11

Family

ID=36676886

Family Applications (1)

Application Number Title Priority Date Filing Date
CA002492353A Abandoned CA2492353A1 (en) 2005-01-11 2005-01-11 Method and means for mounting a wind turbine on a tower

Country Status (1)

Country Link
CA (1) CA2492353A1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2009279A1 (en) 2007-06-28 2008-12-31 Siemens Aktiengesellschaft Method for controlling of at least one element of a first component of a wind turbine, control device and use of the control device
NL2004987C2 (en) * 2010-06-28 2011-12-29 Ihc Holland Ie Bv LIFT DEVICE AND METHOD FOR POSITIONING A LOG OBJECT.
EP2532879A1 (en) * 2011-06-07 2012-12-12 Siemens Aktiengesellschaft Assembly and/or maintenance of a wind turbine
GB2620366A (en) * 2022-06-27 2024-01-10 Sense Wind Ltd Wind turbine tower and carriage

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2009279A1 (en) 2007-06-28 2008-12-31 Siemens Aktiengesellschaft Method for controlling of at least one element of a first component of a wind turbine, control device and use of the control device
CN101334000B (en) * 2007-06-28 2012-07-04 西门子公司 Method for controlling of at least one element of a first component of a wind turbine, control device and use of the control device
US8342801B2 (en) 2007-06-28 2013-01-01 Siemens Aktiengesellschaft Method for controlling of at least one element of a first component of a wind turbine, control device and use of the control device
NL2004987C2 (en) * 2010-06-28 2011-12-29 Ihc Holland Ie Bv LIFT DEVICE AND METHOD FOR POSITIONING A LOG OBJECT.
WO2012002809A1 (en) * 2010-06-28 2012-01-05 Ihc Holland Ie B.V. Lifting device and method for positioning of an unwieldy object
CN102985682A (en) * 2010-06-28 2013-03-20 Ihc荷兰Ie有限公司 Lifting device and method for positioning of an unwieldy object
CN102985682B (en) * 2010-06-28 2015-10-21 Ihc荷兰Ie有限公司 For locating lifting device and the method for heavy object
EP2532879A1 (en) * 2011-06-07 2012-12-12 Siemens Aktiengesellschaft Assembly and/or maintenance of a wind turbine
GB2620366A (en) * 2022-06-27 2024-01-10 Sense Wind Ltd Wind turbine tower and carriage

Similar Documents

Publication Publication Date Title
US6614125B2 (en) Method and means for mounting a wind turbine on a tower
US6888264B1 (en) Method and means for mounting a wind turbine on a tower
US6278198B1 (en) Method and means for mounting a wind turbine on a tower
US6505785B2 (en) Method and means for mounting a wind turbine on a tower
KR102640571B1 (en) Hoisting system for installing wind turbines
EP1846286B1 (en) Device for transporting structures on water
US8069634B2 (en) Lifting system and apparatus for constructing and enclosing wind turbine towers
CN101646831B (en) A lattice tower and an erection method for a wind generator with a lattice tower
CA2663754C (en) Lifting system and appartus for constructing and enclosing wind turbine towers
US20140212288A1 (en) High capacity elevator for wind turbine maintenance
CA2492353A1 (en) Method and means for mounting a wind turbine on a tower
CA2418021C (en) Method of constructing and erecting a tower
EP1677001A2 (en) System for removing the cover roof from a wind turbine
EP1681464A1 (en) Wind turbine tower assembly
EP1390616A1 (en) Method and means for mounting a wind turbine on a tower
DK201671003A1 (en) Method and apparatus for installing and servicing wind turbine generators
CN109072866B (en) Method of lifting components of a multi-rotor wind turbine
MXPA05000538A (en) Method and means for mounting a wind turbine on a tower.
WO2019216866A1 (en) Method of installing tall and super-tall towers
WO2014082684A1 (en) Lifting frame
CN102040169A (en) Collapsible tower
CN1815014A (en) Method and apparatus for mounting wind-driven turbine on tower
WO2023041130A1 (en) Method and system for handling components of an offshore wind turbine
CN117005751A (en) Auxiliary device suitable for building iron tower and application method thereof
DK2926000T3 (en) PROCEDURE FOR MOVING WINDOW COMPONENTS AND A TRANSPORT SYSTEM TO MOVE WINDOW COMPONENTS

Legal Events

Date Code Title Description
EEER Examination request
FZDE Dead