CA2455376A1 - Hanger for insulated concrete system and method of installation thereof and method of installing a retrofit hanger in an insulated concrete system - Google Patents

Hanger for insulated concrete system and method of installation thereof and method of installing a retrofit hanger in an insulated concrete system Download PDF

Info

Publication number
CA2455376A1
CA2455376A1 CA002455376A CA2455376A CA2455376A1 CA 2455376 A1 CA2455376 A1 CA 2455376A1 CA 002455376 A CA002455376 A CA 002455376A CA 2455376 A CA2455376 A CA 2455376A CA 2455376 A1 CA2455376 A1 CA 2455376A1
Authority
CA
Canada
Prior art keywords
hanger
plate
hanging
wall
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
CA002455376A
Other languages
French (fr)
Inventor
Patrick Timony
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
1599717 ONTARIO Ltd
Original Assignee
1391038 Ontario Ltd.
Patrick Timony
1599717 Ontario Ltd.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 1391038 Ontario Ltd., Patrick Timony, 1599717 Ontario Ltd. filed Critical 1391038 Ontario Ltd.
Priority to CA002455376A priority Critical patent/CA2455376A1/en
Priority to US11/037,354 priority patent/US20050155307A1/en
Publication of CA2455376A1 publication Critical patent/CA2455376A1/en
Abandoned legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/26Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of wood
    • E04B1/2604Connections specially adapted therefor
    • E04B1/2612Joist hangers
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • E04B2/86Walls made by casting, pouring, or tamping in situ made in permanent forms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/388Separate connecting elements
    • E04B2001/389Brackets

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

There is described a hanger for hanging an object from a composite wall. The composite wall has a concrete core, a foam outer wall and a second outer wall.
The hanger comprises: a first plate having an embedded portion for retention within the concrete core and a hanging portion extending from the foam outer wall for connection to the object. The embedded portion having an edge in addition to its distal edge, the edge being substantially transverse to the longitudinal axis of the first plate. A
method for installing the hanger is also described. The hanger is particularly well suited for hang a joist.

Description

Gowlings Ref: T8467966US1 FINAL VERSION
Applicant/Inventor: Patrick Timony Title: Hanger for Insulated Concrete System and Method of Installation Thereof and Method of Installing a Retrofit Hanger in an Insulated Concrete System Assignee: 1391038 Ontario Ltd.
JURISDICTION: Canada DATE: January 19, 2004 TOR LAW15585157 vl BACKGROUND OF THE INVENTION
FIELD OF THE INVENTION
[0001] In one of its aspects, the present invention relates to a hanger for an insulated concrete system. In another of its aspect, the present invention relates to a method of installing a hanger in an insulated concrete system. In yet another of its aspects, the present invention relates to a method of installing a retrofit hanger in an insulated concrete system.
DESCRIPTION OF THE PRIOR ART
(0002] Hangers are known for insulated concrete systems formed of composite walls having exterior foam panels and an interior cement core.
[0003] For example, United States patent 5,228,261 [Watkins] teaches a joist hanger having a U-shaped body. A plurality of nailing apertures are formed in the forward end of this U-shaped joist hanger for receiving nails to secure a joist thereto. A
pair of support apertures are formed in the rearward end of the U-shaped joist hanger through which conventional reinforcing bars are journalled in horizontal orientation.
A slot extending forwardly from the rearward edge of the base of the U-shaped hanger receives a vertical reinforcing bar.
[0004] The joist hanger taught in Watkins is installed by cutting a U-shaped slot into an exterior foam panel at a pre-determined position. Rods are loosely installed through locating apertures between the front and rearward edge of the U-shaped bracket; these rods limit the extent of insertion of the bracket into the U-shaped slot.
Reinforcing bars are then positioned between the foam panel walls and journalled through support apertures. Concrete is then poured between the foam panel walls and allowed to cure, thereby fixing the reinforcing bars and the rearward end of the hanger in position within the wall. The rods are then removed from the locating apertures. The joist is then rested within the projecting forward end of the bracket and nails or other fasteners are installed through the nailing apertures.
[0005] Disadvantages exist with regard to the above-described system. The U-shape of the bracket requires that, for proper installation, U-shaped slots of a pre-determined size must be cut in the foam wall at predetermined positions. In addition, retaining the U-shaped bracket requires that reinforcing bars be journalled through apertures in the rear end of the bracket, which thereby constrains the arrangement of reinforcing bars.
[0006] United States Patent 4,889,310 issued to Boeshart ("Boeshart") teaches ties for a concrete form system having opposed polystyrene panels that form a pair of parallel, spaced apart walls. At least one of the polystyrene walls has a smooth inner face to allow the panel to be removed after formation of the concrete wall. The ties are used to interlock the two vertical panels in order to form the concrete wall. Each tie has a pair of spaced apart paddle members which retain the thickness of the panel therebetween.
Once the concrete wall has been formed, the outer paddle is removed by applying a blow thereto. In one embodiment, the tie uses an enlarged outer paddle disposed outwardly of the outward face of the panels. This enlarged paddle may have fastener apertures and may be connected to vertical whalers. The tie taught by Boeshart is designed for holding two polystyrene panels together to permit forming and does not provide sufficient support to hang objects from a face of the wall once formed.
[0007] Accordingly, it would be desirable to have a hanger system which overcomes the above-mentioned disadvantages of the prior art. It would be further desirable to have a retrofit hanger system useful in an insulated concrete system.
SUMMARY OF THE INVENTION
[0008] It is an object of the present invention to provide a novel hanger system, particularly for hanging a joist) that obviates or mitigates at least one of the above-mentioned disadvantages of the prior art.
[0009] Accordingly, in one of its aspects, the present invention provides a hanger for hanging an object from a composite wall, the composite wall having a concrete core, a foam outer wall and a second outer wall, the hanger comprising:
a first plate having an embedded portion far retention within the concrete core and a hanging portion extending from the foam outer wall for connection to the object;
the embedded portion having an edge in addition to its distal edge, the edge being substantially transverse to the longitudinal axis of the first plate.
[0010] Accordingly, in another of its aspects, the present invention provides a method for installing a hanger on a composite wall formed from a foam wall and a second wall defining a cavity fillable with concrete, the hanger including a first plate having an embedded portion and a hanging portion, wherein the embedded portion comprises an edge in addition to its distal edge, the edge being substantially transverse to the longitudinal axis of the first plate, the method comprising the steps o~
(a) cutting a slit through the foam wall so that the slit extends to a hanging position;
(b) sliding the first plate in the slit to the hanging position, wherein the embedded portion of the first plate extends into the cavity and the hanging portion extends from the composite wall;
(c) pouring concrete into the cavity and allowing it to cure to form the composite wall.
[0011) In yet another of its aspects, the present invention provides a method of hanging a hanger from a foam wall of a composite wall having a cured concrete core and at least one foam outer wall, the hanger comprising a substantially L-shaped bracket having a retaining portion and a hanging portion for connection to an object to be hung, the hanging portion disposed at substantially a 90 degree angle to the retaining portion, the method comprising the steps of (a) forming a cavity at a hanging position in the foam wall to accommodate the retaining portion;
(b) securing the retaining portion to the concrete core.
BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Embodiments of the present invention will be described with reference to the accompanying drawings, wherein like reference numerals denote like parts, and in which:

Figure 1 illustrates a perspective view of a partially assembled embodiment of the present hanger.
Figure 2 illustrates a side cross-section view of a partially assembled embodiment of the present hanger.
Figure 3 illustrates a perspective view of a partially assembled embodiment of the present hanger.
Figure 4 illustrates a perspective view of an assembled embodiment of the present hanger.
Figure 5 illustrates a side cross-section view of an embodiment of the present hanger.
Figure 6 illustrates a side view of an embodiment of a plate of the present hanger.
Figure 7 illustrates a perspective view of an embodiment of a plate of the present hanger.
Figure 8 illustrates a perspective view of an embodiment of a partially assembled retrofit bracket of the present invention.
Figure 9 illustrates a side cross-section view of an installed plate of an embodiment of a retrofit bracket of the present invention.
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0013) With reference to Figures 1 through 5, there is illustrated a hanger 100 of an embodiment of the present invention for use in an insulated concrete form system 105.
Insulated concrete form system 105 includes a composite wall 110. Composite wall 110 is formed using a pair of outer walls 115a and 115b, at least one of which, and preferably both of which, are formed of rigid foam. The type of foam is not particularly restricted and is within the purview of a person skilled in the art. The rigid foam may be a polyurethane foam, a phenolic foam, or a polyethylene foam. Preferably, the rigid foam is polystyrene foam. Foam wall 115 may be an integral structure or may be formed from foam panels.
[0014] Prior to forming of composite wall 110, outer walls 115a and 115b form a cavity 120 finable With concrete. Composite wall 110 may also comprise reinforcing bars 125a, 125b, 125c, 125d and 125e. The reinforcing bars may be vertical or horizontal and are installed in cavity 120 prior to pouring of the concrete. Preferably, reinforcing bars 125a, 125b, 125c, 125d and 125e are formed from steel. The number and arrangement of reinforcing bars is not particularly restricted and is Within the purview of a person skilled in the art. It should be clearly noted that, in the illustrated arrangement, reinforcing bar 125a is optional.
[0015] Hanger 100 consists of a plate 130. In a preferred embodiment, hanger consists of a pair of plates 130a and 130b. Plates 130a and 130b may be attached by one or more members (not shown). Plates 130a and 130b are preferably formed of metal and, more preferably, are formed of stamped metal sheet. Preferably, the metal is steel such as galvanized steel (preferably 22 gauge) or another cold rolled metal. Plates 130a and 130b are inserted into slits 135a and 135b cut into an outer wall 115b. Slits 135a and 135b are cut to approximately the height at which the installer wishes to hang an object 138.
[0016] The objects for which hanger 100 is suitable are not particularly restricted and are within the purview of a person skilled in the art. Hanger 100 is particularly suitable for the hanging of joists and, in particular, floor joists for an interior floor. Hanger 100 is also suitable for other purposes including hurncane truss tie down anchorage, anchorage or fastening an exterior or interior applied framed partition wall to a composite wall, hanging an exterior or interior applied roof truss to a composite wall, and mounting exterior floor joists for, for example, an exterior deck application. The uses of hanger 100 are not particularly restricted and are within the purview of a person skilled in the art.
Hanger 100 is particularly suitable for hanging weight bearing structural members.
[0017) Preferably, the ultimate load capacity of a single concrete insert plate (130a or 130b) is at least about 2000 lbs, more preferably at least about 3000 lbs, even more preferably at least about 4000 lbs. The most preferred ultimate load capacity is about 5,000 lbs. When combined in pairs and applying anticipated shear load to the assembly with the bearing bracket attached as described below, the entire assembly is expected to attain a factored rated load capacity (in total) substantially same, respectively, as the ultimate load capacity referred to above. This specification will vary for each required bearing condition, depending on the load anticipated and may be readily determend [0018] With reference to Figures 1 through 7, plates 130a and 130b have an embedded portion I40, which extends into the cavity 120 for retention therein upon pouring and curing of concrete core I50. Plate 130 further has a hanging portion 160 for connection to object 138. Hanging portion 160 extends out from composite wall 110.
The plate axis extending from embedded portion 140 to hanging portion 160 will be referred to herein as the longitudinal axis, although this label is not intended to limit the size or shape of plate I30. Embedded portion 140 has an edge transverse to the longitudinal axis. This edge is in addition to the distal (or most embedded) edge of embedded portion 140. This edge helps retain embedded portion 140 in concrete core 150. The edge may form part of slots or cut-outs, such as slots 155a, 155b, 155c and 155d about the periphery of plate 130. In a preferred embodiment, embedded portion 140 forms part of an aperture 145 therein which improves retention of embedded portion 140 within concrete core 150.
[0019] In a preferred embodiment, slots 155a, 155b, 155c, and 155d are shaped and sized to accommodate horizontal reinforcing bars, such as reinforcing bar 125e. The number of slots 155a, 155b, 155c, and 155d is not particularly restricted and is within the purview of a person skilled in the art.
[0020] Hanger 100 further comprises a support 165. Support 165 is preferably a U-shaped bracket. Preferably, support 16S if formed of metal. More preferably, support 165 is formed of stamped metal sheet. Preferably, the metal is steel such as galvanized steel (preferably 22 gauge) or another cold rolled metal. Support 165 is sized to hold at least a part of object 138, such as an end portion of a joist. The size of support 165 is not particularly restricted and is within the purview of a person skilled in the art. Support 165 is securable to hanging portion 160 of plate 130. Preferably support 165 is inserted between and secured to hanging portions 160a and 160b of plates 130a and 130b.
[0021] In a preferred embodiment, hanging portion 160 comprises a plurality of apertures 170 and support 165 comprises a plurality of corresponding apertures 175.
Securing means 180 are inserted through apertures 170 and corresponding apertures 175 once support 165 is in position between hanging portions 160a and 160b. The plurality of apertures 170 and corresponding apertures 175 permit the hanging height of object 138 to be adjusted post-insertion of plates 130a and 130b and the pouring and curing of concrete core 150. Further, apertures 170 and corresponding apertures 175 permit the installer to accommodate moderate discrepancies in the heights of plates 130a and 130b after setting of concrete core 150. The specific number and arrangement of apertures 170 and corresponding apertures 175 is not particularly restricted and is within the purview of a person skilled in the art. The arrangement of apertures 170 and corresponding apertures 175 may be such that support 165 may be secured so as to hang object 138 on an angle.
[0022] In a preferred embodiment, plate 130 further comprises an outer projection 185. Outer projection 185 extends at substantially a 90 degree angle from plate 130 and when plate 130 is in a hanging position, abuts an exterior surface of outer wall 115a.
Outer projection 185 may project from either face of plate 130. In another embodiment, plate 130 may comprise a plurality of similarly structured outer projections.
In another embodiment, in addition or in the alternative to outer projection 185, plate 130 may contain one or more inner projections 190. Inner projection 190 extends at substantially a 90 degree angle from plate 130 and when plate 130 is inserted in a hanging position, abuts an interior surface of outer wall 115a, and concrete core 150. As will be evident to a person skilled in the art, inner projection 190 comprises an edge transverse to the longitudinal axis and present in addition to the distal edge of the embedded portion.
Inner projection 190 may project from either face of plate 130. The number of outer projections 185 and inner projections 190 is not particularly restricted and is within the purview of a worker skilled in the art. In a preferred embodiment, outer projections 185 and inner projections 190 are formed by punching out portions of plate 130.
Preferably, plate 130 comprises an outer projection. Preferably, when a pair of plates 130a are used they include outer proj ections offset relative to each other.
[0023] In a preferred embodiment, hanger I00 is installed by first cutting slits 135a and 135b through foam wall 115b to a desired hanging position, prior to pouring of concrete core 150. Plates 130a and I30b are then slid into slits 135a and 135b to a desired hanging position. Reinforcing bars 125 may then be positioned between outer walls 115a and I 15b. Concrete core 150 is then poured and allowed to cure.
[0024] Object 138 is then positioned within support 165. Support 165 is positioned between hanging portions 160a and 160b of plates 130a and 130b so that one or more of apertures 170 align with one or more corresponding apertures I75. Securing means 180 are inserted through these aligned apertures to secure plate 130 to support 165.
Preferably, securing means 180 are further forced into object 138 thereby securing plate 130, support 165 and object 138 to each other. The number and type of securing means 180 used is not particularly restricted and is within the purview o.f a person skilled in the art, though, in some applications, suitable securing means should include screws only to provide adequate compression of the elements together, thereby effectively reducing the shear forces on parts 180.
[0025] With reference to Figure 5, it should be noted that object 138 can translated such that the bottom thereof is below the bottom edge of securing plate 130 (i.e., this can be seen, for example in Figure 4).
[0026] When hanger 100 is used in a hurricane tie application, plates 130a and 130b are wet set into concrete core 150 at the top of a finished poured composite wall 110 parallel to truss or rafter placement. Once concrete core 150 is cured, the truss or rafter is secured in position between plates 130a and 130b. Support 165 may then be used as a tie down element by being slid downward upside down over the top of the truss or rafter member. Securing means 180 may then be used to secure plate 130 to support 165 and the truss or rafter.
[0027] When hanger 100 is used in a partition anchorage application, one or more of plates 130 can be used. The number of plates necessary for a partition anchorage application is within the purview of a person skilled in the art. Generally, a series of two or three plates 130 or pairs of plates 130a and 130b are required for a standard 8 or 9 foot high partition. Prior to pouring of concrete core 150, slits are made into foam wall 115b on one or both sides of where the partition will be installed. Plates 130 are then inserted through these slits. Once the concrete is poured and cured, partition members, such as wood and steel partition members, can be secured to the hanging portions) 160 of insert plates) 130 through apertures 170. If a single series of plates 130 are used, the partition can be pre-assembled and tilted up into place against plates 130. Drywall finishes can then be installed as per normal installation practices directly over the insert plates.
Preferably, a series of opposing pairs of plates 130a and 130b are used in a partition anchorage application.
[002$] With reference to Figures 8 and 9, there is illustrated a retrofit bracket 195 of another embodiment of the present invention for use in insulated concrete form system 205. In this embodiment, parts identified in the first embodiment are here numbered in the two-hundreds, however, when the same numbers appear as second and third digits, they denote a part corresponding to the part having the same digits in the first embodiment.
[0029) Retrofit bracket 195 comprises a retrofit plate 230. In a preferred embodiment, retrofit bracket 195 comprises two retrofit plates 230a and 230b.
Retrofit plate 230 has a retaining portion 203, which comprises one or more retaining apertures 207a and 207b to accommodate concrete securing means 209a and 209b. Preferably these securing means are concrete fasteners. In a preferred embodiment, concrete fasteners 209a and 209b are expansion (e.g., lag-type) anchors. Suitable screws are Tap-ConTM screws. Retrofit bracket 195 further comprises hanging portion 260.
Hanging portion 260 comprises a plurality of apertures 270.
[0030] Retrofit bracket 195 further comprises a support 265. Support 265 is preferably a U-shaped bracket. Support 265 is sized to accommodate an object Support 265 has a plurality of corresponding apertures 275. Support 265 is securable to hanging portion 260 of retrofit plate 230. Preferably, support 265 is inserted between and secured to both hanging portions 260a and 260b. Apertures 270 and corresponding apertures 275 permit the height of object 238 to be adjusted post fastening of retrofit plates 230a and 230b to composite wall 210. Further, apertures 270 and corresponding apertures 275 permit an installer to accommodate moderate discrepancies in the heights of retrofit plates 230a and 230b after they are fastened to composite wall 210.
[0031] To install retrofit bracket 195, a portion of foam wall 215b sized and shaped to accommodate retaining portion 203 is cut away at a desired hanging position.
Retaining portion 203 is then fastened to concrete core 250. Generally, fastening of retaining portion 203 to concrete core 250 will require that holes be drilled in concrete core 250 corresponding to retaining apertures 207a and 207b. Retaining portion 203 is then positioned adjacent concrete core 250 so that retaining apertures 207a and 207b align with the drilled holes. Concrete securing means 209a and 209b are then forced through retaining apertures 207a and 207b to secure retaining portion 203 to concrete core 250.
(0032] Support 265 is positioned between hanging ends 260a and 260b of retrofit plates 230a and 230b so that one or more of apertures 270 align with one or more of corresponding apertures 275. Object 238 is positioned within support 265.
Either before or after it is positioned between retrofit plates 230a and 230b. In an alternate embodiment, support 265 may be secured to a single plate 230. Securing means 280 are inserted through these aligned apertures to secure retrofit plate 230 to support 265.
Preferably, securing means 280 are further forced into object 238 thereby securing retrofit plate 230, support 265 and object 238 to each other. The number and type of securing means 280 used is not particularly restricted and is within the purview of a person skilled in the art. Suitable securing means 280 include screws and nails.
[0033) While supports 165, 265 and the objects 138, 238 to be hung have been shown as separate elements, those skilled in the art will recognize that the support could be inherent or integral with the object to be hung.
1o [0034] While hanging portions 160, 260 connect to objects 138, 238 the forth of connection is not particularly restricted, and is within the purview of a person skilled in the art. For example, the connection may be by way of securing means such as screws, by friction fit or by gravity.
[0035] The manufacture of various elements of the present system will now be discussed.
[0036] Concrete Form Insert Plate (130): Preferably, this component is fed, stamped and bent in a two-stage operation which involves galvanized steel plate being supplied in a coil at the precise cut width of the component. The component is first fed forward into the manufacturing from when it is stamped to create the holes and outer notches and is cur from the coil. The second stage of the process involves another part of the die fitting to the component to break press the protruding tab to its final position about 90° to the plane of the plate. The component is then ejected from the die to start the next component.
[0037] Bearing Bracket (or support 165): Preferably, this component can vary in width to suit a variety of different objects, as described in the specification. The manufacturing process is similar to above in two stages. Preferably, galvanized steel coil is supplied in the width of the component. It is first fed from the coil and is stamped to the required size from galvanized steel coil sheet. At the same time as being stamped, the material is also slightly perforated in a designated grid pattern that is designed to line up with the pre-stamped holes of the concrete form insert plate. The perforations are such that, rather than being stamped as clear holes, the material is in fact only deformed to a point of piercing and left in place within the part (similar to a cheese grater) - this facilitates creation of a friction fit with the joist or other member being hung. The stamped component is then break-formed to a U shape with opposing 90°
bends such that the side to which the perforations are pointing towards are now facing each other ready to contact the object they are designed to be fastened to. This forming is all completed within another component of the same forming die. The component is then ejected from the machine ready to form the next component.
m [0038) Retrofit Bracket or plate 230: Contrary to the other two components, it is preferred to manufacture this component from heavier gauge galvanized steel sheet which is stamped and break formed to required shape in a single step. The includes not only the 90° angle of the component but also the reinforcing "crimps"
down the axis of the angle in three locations with arrow shaped indentations to providing the required increased resistance to loading.
(0039) While this invention has been described with reference to illustrative embodiments, the description is not intended to be construed in a limiting sense. Thus, various modifications of the illustrative embodiments, as well as other embodiments of the invention, will be apparent to persons skilled in the art upon reference to this description. It is therefore contemplated that the appended claims will cover any such modifications or embodiments.

Claims (26)

1. A hanger for hanging an object from a composite wall, the composite wall having a concrete core, a foam outer wall and a second outer wall, the hanger comprising:
a first plate having an embedded portion for retention within the concrete core and a hanging portion extending from the foam outer wall for connection to the object;
the embedded portion having an edge in addition to its distal edge, the edge being substantially transverse to the longitudinal axis of the first plate.
2. The hanger defined in claim 1, further comprising securing means for securing the hanging portion to the object.
3. The hanger defined in claim 1, further comprising a support configured to receive the object, the support being securable to the hanging portion.
4. The hanger defined in claim 3, further comprising securing means for securing the hanging portion to the support.
5. The hanger defined in claim 4, Wherein the support has an aperture formed therein for receiving the securing means.
6. The hanger defined in claim 3, wherein the support is a U-shaped bracket.
7. The hanger defined in claim 2, wherein the hanging portion has an aperture for receiving the securing means.
8. The hanger defined in claim 3, wherein the securing means secures the hanging portion, the support and the object together.
9. The hanger defined in claim 3, wherein the support and the hanging portion each have a plurality of apertures therein for receiving the securing means, the apertures arranged such that the support can be secured at a number of angles.
10. The hanger defined in claim 1, wherein the embedded portion has an aperture therein for improved retention in the concrete core.
11. The hanger defined in claim 1, wherein the embedded portion has slots about its periphery.
12. The hanger defined in claim 11, wherein the slots are sized to fit reinforcing bars.
13. The hanger defined in claim 1, wherein the first plate has a projection extending therefrom substantially parallel to the composite wall.
14. The hanger defined in claim 13, wherein the projection is adjacent the exterior of the foam wall.
15. The hanger defined in claim 13, wherein the projection is adjacent the concrete core.
16. The hanger defined in claim 1, wherein the hanger is formed of metal.
17. The hanger defined in any one of claims 1-16, wherein the hanger further comprises a second plate having an embedded portion for retention within the concrete core and a hanging portion extending from the composite wall, the object being connectable to both plates.
18. The hanger defined in claim 17 wherein the first plate and second plate are the same.
19. The hanger defined in claim 17 wherein the first plate and second plate are different.
20. The hanger defined in claim 17, further comprising a member connecting the first plate and second plate.
21. A method for installing a hanger on a composite wall formed from a foam wall and a second wall defining a cavity fillable with concrete, the hanger including a first plate having an embedded portion and a hanging portion, wherein the embedded portion comprises an edge in addition to its distal edge, the edge being substantially transverse to the longitudinal axis of the first plate, the method comprising the steps of:
(a) cutting a slit through the foam wall so that the slit extends to a hanging position;
(b) sliding the first plate in the slit to the hanging position, wherein the embedded portion of the first plate extends into the cavity and the hanging portion extends from the composite wall;
(c) pouring concrete into the cavity and allowing it to cure to form the composite wall.
22. The method defined in claim 21, further comprising the step of securing a support for receiving an object to be hung to the hanging portion.
23. The method defined in claim 21, further comprising the step of (d) sliding a second plate into a second slit before step (c) and positioning it substantially opposite the first plate, wherein an embedded portion of the second plate extends into the cavity and a hanging portion of the second plate extends from the composite wall.
24. The method defined in claim 23, further comprising the step of (e) positioning the support between the hanging portions of the first and second plates and securing the support to the hanging portions of the first and second plates.
25. A method of hanging a hanger from a foam wall of a composite wall having a cured concrete core and at least one foam outer wall, the hanger comprising a substantially L-shaped bracket having a retaining portion and a hanging portion for connection to an object to be hung, the hanging portion disposed at substantially a 90 degree angle to the retaining portion, the method comprising the steps of:
(a) forming a cavity at a hanging position in the foam wall to accommodate the retaining portion;
(b) securing the retaining portion to the concrete core.
26. The method defined in claim 25 further comprising the step of securing a support for receiving the object to the hanging portion.
CA002455376A 2004-01-19 2004-01-19 Hanger for insulated concrete system and method of installation thereof and method of installing a retrofit hanger in an insulated concrete system Abandoned CA2455376A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CA002455376A CA2455376A1 (en) 2004-01-19 2004-01-19 Hanger for insulated concrete system and method of installation thereof and method of installing a retrofit hanger in an insulated concrete system
US11/037,354 US20050155307A1 (en) 2004-01-19 2005-01-19 Hanger for insulated concrete system and method of installation thereof and method of installing a retrofit hanger in an insulated concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CA002455376A CA2455376A1 (en) 2004-01-19 2004-01-19 Hanger for insulated concrete system and method of installation thereof and method of installing a retrofit hanger in an insulated concrete system

Publications (1)

Publication Number Publication Date
CA2455376A1 true CA2455376A1 (en) 2005-07-19

Family

ID=34744408

Family Applications (1)

Application Number Title Priority Date Filing Date
CA002455376A Abandoned CA2455376A1 (en) 2004-01-19 2004-01-19 Hanger for insulated concrete system and method of installation thereof and method of installing a retrofit hanger in an insulated concrete system

Country Status (2)

Country Link
US (1) US20050155307A1 (en)
CA (1) CA2455376A1 (en)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2430722C (en) * 2003-06-03 2011-01-11 Ganske Roger Support bracket to suspend sheet material for a wall
US7578101B2 (en) * 2004-05-27 2009-08-25 Roger Howard Ganske Support bracket to suspend sheet material for a wall
GB2443483B (en) * 2006-11-02 2011-09-21 Victor Joseph Wigley Improvements relating to timber support and restraint in buildings
US20080202059A1 (en) * 2007-02-27 2008-08-28 Mccollough Daniel D Floor joist hanger
GB2459935A (en) * 2008-05-16 2009-11-18 Victor Joseph Wigley Joist end sleeve and joist collar for protecting joists within external masonry
WO2010003211A1 (en) * 2008-07-11 2010-01-14 Saulro Inc. Panel interlocking system
US8051620B2 (en) * 2008-07-23 2011-11-08 Lavann ICF Hangers Inc. Joist hanger for ICF wall systems
US9765805B2 (en) * 2012-03-06 2017-09-19 Gary J. Pond Bracket assembly and systems
US9394680B2 (en) * 2013-12-14 2016-07-19 Simpson Strong-Tie Company Drywall joist hanger
US10024049B2 (en) 2013-12-31 2018-07-17 Columbia Insurance Company Hanger for fire separation wall
US9663938B2 (en) * 2015-08-21 2017-05-30 Columbia Insurance Company Hanger for bracing panel
US11225787B2 (en) 2018-06-06 2022-01-18 Simpson Strong-Tie Company, Inc. Drywall spacing joist hanger
US20240076866A1 (en) * 2021-01-15 2024-03-07 P & W Construction Materials and Consulting Ltd. Brackets for insulated concrete forms and methods of manufacturing and installation thereof

Family Cites Families (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US533659A (en) * 1895-02-05 Ceiling-supporter
US1728981A (en) * 1927-04-30 1929-09-24 Franklin N Ropp Joist hanger for concrete buildings
US1785790A (en) * 1928-08-14 1930-12-23 Franklin N Ropp Combination joist hanger and tie
US1785791A (en) * 1928-12-17 1930-12-23 Franklin N Ropp Combination joist hanger and tie
US2013101A (en) * 1934-03-30 1935-09-03 Inglee Lewis Furring clip
US2106084A (en) * 1936-11-09 1938-01-18 Reynolds Corp Joist suspension
US2176450A (en) * 1938-06-21 1939-10-17 George F Barnett Joist anchor and support
US2947119A (en) * 1956-09-18 1960-08-02 Jr Lawrence P Puckett Anchored tie-down device for rafters
US3000145A (en) * 1957-10-22 1961-09-19 Advance Metal Products Inc Truss anchor
US3267624A (en) * 1963-05-31 1966-08-23 Fenestra Inc Composite panel with concrete backer and hanging members
US3338520A (en) * 1965-08-16 1967-08-29 Charles C Dinger Rail anchor
US3423898A (en) * 1966-07-28 1969-01-28 Intern Enterprises Inc Roof framing system
US3481635A (en) * 1968-04-03 1969-12-02 Intern Enterprises Inc Universal roof bracket
US4192623A (en) * 1975-09-29 1980-03-11 Borg Carl W Adjustable joist hanger
US4223866A (en) * 1977-05-10 1980-09-23 Brown Company Adjustable bracket
US4124962A (en) * 1977-07-15 1978-11-14 Brown Company Joist hanger
US4148164A (en) * 1977-10-17 1979-04-10 Humphrey Gerald A Fascia board support
US4422279A (en) * 1981-09-04 1983-12-27 Powell John M Method for constructing a reinforced foundation
US5092096A (en) * 1990-12-13 1992-03-03 Cornell James C Temporary bridge joist support bracket
US5228261A (en) * 1991-10-15 1993-07-20 Watkins Robert P Floor joist hanger
US5442887A (en) * 1993-11-09 1995-08-22 Welsh; Holden A. Seat and anchor assembly for a roof truss and wooden joist
US5611189A (en) * 1995-01-20 1997-03-18 Fleck; Randy J. Apparatus for hanging fascia board
US6131358A (en) * 1997-08-29 2000-10-17 Wise; Michael A. Joist hanger and installation method
US6397552B1 (en) * 1999-07-23 2002-06-04 Michael Bourque Deck attachment bracket and method of attaching a deck to a building
US20060059846A1 (en) * 1999-10-19 2006-03-23 John Rice Bracket for concrete forms
US7254919B2 (en) * 2003-07-16 2007-08-14 United Steel Products Company Truss anchor

Also Published As

Publication number Publication date
US20050155307A1 (en) 2005-07-21

Similar Documents

Publication Publication Date Title
US20050155307A1 (en) Hanger for insulated concrete system and method of installation thereof and method of installing a retrofit hanger in an insulated concrete
US9038338B2 (en) Insulated concrete form wall having a bracket attaching a rim joist thereto
US6625947B1 (en) Insulated concrete wall system and method of making same
US8347581B2 (en) Adjustable masonry anchor assembly for use with insulating concrete form systems
US6151843A (en) Prefabricated wall panels connecting system
US6199336B1 (en) Metal wall framework and clip
US6164035A (en) Reinforced foam block wall
US6698710B1 (en) System for the construction of insulated concrete structures using vertical planks and tie rails
US5732524A (en) Truss anchor
US5642597A (en) Drywall mounting bracket
US5519977A (en) Joist reinforcing bracket
US20050011157A1 (en) Truss anchor
US20030029097A1 (en) Siding and overhang attachment system
CA2673813C (en) Joist hanger for icf wall systems
CA2652839C (en) Insulation system for cement walls
US6668502B2 (en) Ledger mould for building a ledger
US4674242A (en) Fastener stud for accommodation of drywall to inner wall and ceiling surfaces
US5887331A (en) Method of deck construction using polymer plastic lumber
US20060059846A1 (en) Bracket for concrete forms
US6845594B2 (en) Pre-manufactured joist and beam support for concrete walls
EP1352133A1 (en) A joist hanger
EP1889981B1 (en) Partition wall and method of construction
US20080202059A1 (en) Floor joist hanger
GB2156398A (en) Two-part joist-hanger
WO2000043610A1 (en) Building block retainer apparatus

Legal Events

Date Code Title Description
EEER Examination request
FZDE Discontinued