CA2310323A1 - Computer-implemented product valuation tool - Google Patents

Computer-implemented product valuation tool Download PDF

Info

Publication number
CA2310323A1
CA2310323A1 CA002310323A CA2310323A CA2310323A1 CA 2310323 A1 CA2310323 A1 CA 2310323A1 CA 002310323 A CA002310323 A CA 002310323A CA 2310323 A CA2310323 A CA 2310323A CA 2310323 A1 CA2310323 A1 CA 2310323A1
Authority
CA
Canada
Prior art keywords
values
component
product
value
products
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
CA002310323A
Other languages
French (fr)
Inventor
Vibhu K. Kalyan
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
I2 Technologies Inc
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of CA2310323A1 publication Critical patent/CA2310323A1/en
Abandoned legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/02Reservations, e.g. for tickets, services or events
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/02Reservations, e.g. for tickets, services or events
    • G06Q10/025Coordination of plural reservations, e.g. plural trip segments, transportation combined with accommodation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/087Inventory or stock management, e.g. order filling, procurement or balancing against orders
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • G06Q30/0201Market modelling; Market analysis; Collecting market data
    • G06Q30/0206Price or cost determination based on market factors
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/06Buying, selling or leasing transactions
    • G06Q30/0601Electronic shopping [e-shopping]
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q40/00Finance; Insurance; Tax strategies; Processing of corporate or income taxes
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q40/00Finance; Insurance; Tax strategies; Processing of corporate or income taxes
    • G06Q40/04Trading; Exchange, e.g. stocks, commodities, derivatives or currency exchange
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/18Legal services; Handling legal documents
    • G06Q50/188Electronic negotiation

Abstract

A method of valuing products based on demand probabilities. Products are designed by identifying product components, and combining the components in various combinations to provide standard and non-standard products. Components are valued using an algorithm that considers demand probability as well as known prices of standard products. The component values are added to determine product values and may be used to make pricing and order fulfillment decisions.

Description

- WO 99/26168 PCT/US98~24977 COMPUTER-IMPLEMENTED PRODUCT VALUATION TOOL
TECHNrCAr, FrEL D OF THE INVENTION
This invention relates to computer-implemented enterprise management tools, and more particularly to a computer-implemented method of calculating product values, with the values varying in accordance with demand forecasts, as well as lead times and delivery times when appropriate.
BACKGROUND OF THE INV .NE__TTnN
One of the unique challenges of any manufacturing enterprise is pricing of its end products. Traditionally, these prices are computed on the basis of a cost-plus measure and some measure of the ability of the customer to pay.
In recent years, computer-implemented enterprise management tools have been developed to assist in management decisions. These tools often include pricing tools, intended to assist in the pricing process.
Although product pricing methods have been developed for airlines, such tools are not necessarily suitable for manufacturers. For example, many manufacturers (referred to as "material intensive manufacturers) have limited materials (components) rather than capacity. Demand is probabilistic and is not in a particular order for different prices, as is the case with airline travel.
SUMMARY OF THE INVEN,~'ION
One aspect of the invention is a computer-implemented method of valuing products. Products are valued in terms of their components. Typically, products are either non-standard or standard, depending on the particular combination of components. Products having a known price are considered standard products. Demand probability values are assigned to each of the products. A component value is obtained for each component, by performing the following steps: (a) assuming a beginning value for each component; (b) for a first component, calculating prorated values, such that for products using that component, a prorated value is calculated on that component by calculating the difference between the product price and a value of the product's other components (c) calculating a component value as a function of the prorated values and the demand probability values (d) repeating steps (b) and (c) for all components; (e) determining whether the component values converge; and (f) if any component value does not converge, using the calculated component values as the beginning component value and repeating steps (b) through (e) for that component; and calculating a value for each product by adding the component value of each component of that product.
An advantage of the invention is that it provides a method of pricing product options in a manner that considers probabilistic demand. Prices can be set so as to accommodate the opportunity cost of critical components.
Non-standard products can be designed and priced by considering prices for standard products, availability of critical components, and probability of demand for standard products.
The method can be extended to price lead time terms for ordering products. It can also be extended to price products in accordance with varying delivery times, a method that is particularly useful for make-to-order manufacturers.
BRIEF DESCRIPTION ~ DRAWINGS
FIGURE 1 illustrates a method of pricing products in terms of their components, using probabilistic demand calculations in accordance with the invention.
FIGURES 2A and 2B illustrate how component values, product prices, and product demand probabilities can be graphically represented in three dimensions.
FIGURE 3 represents the pricing process in terms of its inputs and outputs.
FIGURE 4 illustrates MAV values as a function of available supply.
FIGURE 5 illustrates the revenue displaced by charging MAV for a quantity Q.
FIGURE 6 illustrates a process of determining MAV for lead time pricing.
FIGUREs 7 and 8 illustrate MAV as a function of order size, Q, and lead time, LT, respectively.
FIGURE 9 illustrates a price-demand curve for a product, and compares maximum revenue at a single price to total potential revenue at multiple prices.
FIGURE 10 illustrates how expected revenue for a make-to-order manufacturer can be calculated from a binary tree.
DETA'rr.ED DES~RTpTTON OF THE INVENTION
The following description is directed to a computer-implemented tool that implements a "value management " (V~) pricing method. T:~is pricing tool is a synthesis of taro other computer-implemented business management tools:
yield management practice, such as is used by airlines to price tickets, and tools for decision support across supply chains, such as are commercially available from i2 Technologies Inc. The present invention is a novel combination of these two software applications, and can be beneficial in a number of areas, such as pricing, product design and product control. In general, the invention can be implemented as program code and data, which are executed on a computer system and provide results to a user both as stored and displayed data.
Va_1_Le Management for ProdL~t Pricing Value management may be used as a pricing solution that balances supply with demand. As explained below, the prices of components that make up a product are determined based on probabilistic demand and available supply. More specifically, using statistical forecasts for standard products (SP) that consume known amounts of some underlying materials, called critical components (CC), together with known prices for the SPs, the values of the CC's are calculated based on their available supply at the time of the calculation. The CC values are calculated using an iterative process.
For purposes of this description, the following parameters are defined:
N number of different CC's that are used in building various products At, the amount available of the ht" component li - 1, 2,... N
M number of standard products being offered for sale __ Pk the offered price for the kt'' product, k = 1, 2 , ... M
Fk(x) cumulative density function (CDF) for the ktn product 5 Sk ordered set of components used to build the kth product, referred to herein as the component set (CS) Qrx consume per of rt" component in Sk, r = 2, 2, ...
Ck, referred to herein as the component 14 usage set (CUS) The pricing problem assumes a limited availability of CC's, and a number of non-standard products (NSPs) that can be built using varying amounts and combinations of CC's along with SP's. The task is how to determine values for non-SPs, which are not predefined, unlike SPs whose prices are known as part of the inputs? Also, should any order for a product (SP or NSP) be satisfied so long as there are the resources (CC's) to make it? In other words, is the pricing policy to be first-come first-serve (FCFS) for any product order? Or is control to be exercised, whereby an order may be accepted or rejected based on some criteria?
A distinction is made between price and value. Price of a SP is an input that serves as a starting amount that the customer is willing to pay for the product and has an associated probability distribution that specifies the probability of various levels of unconstrained demands (irrespective of availability of CC's or any constraining factor). Value on the other hand is the customer's willingness to pay for a product balanced with the supply of the product. For purpose of this description, the difference is that "value" is computed by explicitly applying the supply and demand law on the inputs that consist of, in addition to others, available supply and WO 99/261b8 PCT/US98/24977 demand, while "price" is used as an independent variable to determine value. At times the two terms may be used interchangeably, but the context should make clear which meaning is in force. "Price" is also used in the context of the price that is asked of a customer, which need not be the computed value. Rather, value serves as a reference that can be used for price negotiation.
Determining values for all possible combinations of CCs would be a difficult and intractable problem. Instead the pricing method focusses on individual CC's and determines their values. As explained below, to determine the value of any product, it is first determined what CC's the product consumes and the amount consumed per unit (consume per). Then the values of the CCs consumed are calculated and added to arrive at a value for the product.
The problem is thereby reduced to that of determining the values for the CC's.
Optimal prices for components are a function of controlling the sale of the product. FCFS is one type of control (or no-control). Another control is setting explicit allocations for various products, but this may be impractical when there are a large number of products and not all of them are predefined. The following control strategy is suitable for use with the present invention.
2 5 I f Vi i s the value o f it" component, then MAV P= ~ Q PV s .iESP
where Sp is the set of components used by product p (not necessarily a standard product), MAVP is the minimum acceptable value for product p, and Qp is the consume per value for product p for component i. An alternative to a FCFS policy is a control policy that permits a product p to WO 99/26168 PCT/US98I2~4977 be sold if its price is greater than MAVP. This control policy is referred to herein as MAV control (MAVC).
Assuming a MAVC pricing control policy, the pricing problem may be solved as an optimization problem, in which the task is to maximize the total expected revenue, R(V, A), to come at time t, where:
V = (V1, Vz, ...VN) - vector of component values at time t A = (Al, Az, ...AN) - vector of available supply of components at time t P ° (P1, Pz, ..-PM) - vector of SPs with prices at time t F = ( Fl (x) , F2 (x) , ...FM (x) - vector of CDF' s for each of the M products, where x = 0, 1, 2,..., and represents demand-to-come at time t S = { S1, Sz, ...SM} - ordered set of components, CS, for each SP, where Sk = { L1, Zz, ... Li ~k~ ) , Ll< Lz ...~ Li~k~
Q = CUS = f Qzix ~ Qrzx ~ ...Qai ~x~ x j If solved in its most general form, the pricing problem is nonlinear and complex. Even without introducing the time variable t, it is difficult. It has a discrete variable, x, and a continuous variable, V, making it a mixed integer non linear program.
The pricing problem can be simplified by making several assumptions: assume x is continuous, an assumption that is good for large values of x; drop the dependence on t, solve a static problem at a given value of t, and. model the effect of varying t by repeatedly revising the solution in real time; when possible model Fk(x) as a known distribution, for example, a normal distribution. The latter assumption allows specification of the demand distribution by only a few parameters. For a normal distribution, the assumption permits distribution to be specified as the mean and the standard deviation of each demand. If needed, a truncated form of the distribution can be used to disallow negative values.
FIGURE 1 illustrates the steps of a heuristic method that provides optimal values of component prices, V. Step 11 is initializing an increment counter value, k. Step 12 is assuming a set of beginning values for the components.
Step 13 is selecting a first component, such that c = 1.
Step 14 involves calculating a value, w, that represents the prorated value of a product on a component.
Given a price p for a standard product, a vector V of component values, and its CS given by S, its prorated value, w, on a component c (belongs to its CUSy, is:
"'_~-~ Qy'~iQ
lE$;irC
, where Q~ is consume per for the product for component c.
A property of this proration is that if for converged values of V, w is greater than V~, then it follows that:
.1ES
which is equivalent to p being an acceptable price.
An interpretation of Equation (ly is that the value the product brings for component c is its price minus the value displaced from all the other components it uses.
Dividing the displaced revenue by the consume per for c gives the value per unit of component.
Step 15 is calculating a new component value, give-known prices of products and their associated demand probability distributions. Typically, the "known" prices are those of standard products that use the component. Fcar the description of the process, we assume the calculation of Step 15 to be use a process referred to herein as ALG.

WO 99/26168 PCTIUS98/?Af77 The ALG process is described herein by example. Three products and two critical components are assumed.
Product Component Component Price Forecast Set U~a,e Set P1 Prob.{demand=1}=pl {1,2} {1,1}
P2 Prob.{demand=1}=p2 {1} {1}
P3 Prob.{demand=1}=p3 {2} {1}
The available supply of each component is 1. 012 is the probability that demand for product 1 (price P1) arrives before that of product 2. 021 is the probability that demand for product 2 arrives before that for product 1, or 021 - 1 - 012. Similarly, 013 is the probability that demand for product 1 arrives before that of product 3. It is assumed these probabilities can be computed as:
012 = p1/ (p1 + p2 ) 021 = p2/ (pl + p2 ) 013 = pl/(pl + p3) 023 = p2/ (pl + p3) As explained below, the component value calculations use values representing both the probability that demand will materialize, i.e., pl, p2, p3, and the probability that demand will arrive in a certain order, i.e., 012, 021, 013, 023.
Where the two component values are V1 and V2, the initial estimate of component values is V11 and V21. Set k and r to 1.
Prorated values on component 1 from each product using it are calculated as:
Product Prorated on Component 1 1 P11 = P1 - V2r WO 99/26168 PCf/US98/Z4977 The component 1 value is computed by letting MV1 -p*MAX(P11, P2), where p = pl or p2 depending on whether the first or the second term is maximum, respectively. Then, MV2 = 012(pl*P11 + (1 - pl)*p2*P2) + 012*(p2*P2 + (1 -5 p2) *pl*P11) The new value for component 1 is:
Vlk = MAX(MV1, MV2) Prorated values on component 2 are calculated as:
Product Prorated on Component 2 10 l P12 = P1 - Vlk . The component 2 value is computed by letting MV1 -p*MAX(P12, P3), where p = p1 or p3 depending on whether the first or the second term is maximum, respectively. Then, MV2 = 021(pl*P12 + (1 - pl)*p3*P3) + 022*(p3*P3 + (1 -p3)*pl*P11) The new value for component 2 is:
V2r = MAX(MV1, MV2) If Vlk and V2r have converged, the AhG process is ended. Otherwise, the proration and ALG steps are repeated by incrementing k and r. The converged values are the "values", or the prices for the two components.
The following table illustrates the results (component values V1 and V2) of the calculations above for various input values (P1 and P2 prices and demand probabilities).
Due to a convergence criterion of 0.5, the values have a precision of ~0.5.
P1 (S) ~1 P2 (S) ~2 P3 (S) p3 _ V1 (S) V2 (S?
2500 .5 1500 .5 1500 .5 1090.9 1090.9 2500 .9 1500 .5 1500 .5 1244.8 1244 -2500 .5 1500 .8 1500 .5 1351.8 993.09 WO 99/26168 PCT/US98~24977 2500.5 1500 .5 1500 .8 993.1 1351.8 2500.5 2000 .5 1500 .5 1309 1009.1 2500.5 1500 .5 2000 .5 1009 1309.1 These component values represent values for a given time horizon, i.e., one day, for which demand distributions and other inputs are specified.
FIGURES 2A. and 2B illustrate how component values, product prices, and product demand probabilities can be graphically represented in three dimensions. A component values is identified as a MAV (minimum acceptable value) as calculated above. FIGURE 2A illustrates the MAV for component 1 and the price and demand probability for product 2; FIGURE 28 illustrates the data for component 2.
For purposes of the method of FIGURE 1, demand distributions can be modeled as normal, poisson or binary or some known distribution, which require only a limited number of parameters. For normal, only mean and standard deviation is required. The pricing calculations can be modified to accommodate various distributions.
For the inputs to the process, some pricing information, such as an elasticity curve, is needed. These input prices are for SPs only, and may be prices that a business is already comfortable with or obtained from price-demand curves. As explained above, these prices are used to arrive at component values, which in turn can be used to price NSPs based on supply and demand. The component values represent a mapping of forecasted SP
demand (with uncertainty) and SP prices ono a limited supply of components. In fact, if SPs were repriced based on these component values, the result would be a lower value since the average revenue for a probabilistic demand for a fixed price is less than the price. However, when wo ~n6i6s Pc rms9srr~~~
selling an NSP, it should be determined how much revenue is being displaced that could have been made at the SP prices and probabilistic demand. Also, when using the component values to negotiate prices, the pricing process may consider factors such as competitive prices and costs.
Calculated component values can be the basis of a variety of pricing decisions. For example, a component that has a 0 component value indicates an oversupply of the component or a lack of demand -- two sides of the same coin since oversupply is with respect to demand only. If all components have 0 component values that means there are no critical components. But this does not imply a selling price of $0. This situation also suggests potential oversupply or lack of demand. If it is known that a new product is going to be introduced that will adversely affect the current line of products, the affected component values may drop to a very low value, indicating that the current line should be quickly unloaded.
The above-described component value calculation provides a minimum acceptable value (MAV) for a component, which differs for different production days. An enhanced process can implemented to take all component values as inputs across a time horizon and perform a smoothing operation, to obtain uniform component values for each component across the time horizon. The physical meaning of this operation is that material supply is moved forward in time. Each component then has the same MAV for all future time horizons. As a by product of this step, it is conceivable than this inventory movement could be used to adjust the supply alignment with the suppliers, given enough lead time. Assume a manufacturer has a certain supply arrangement of materials for each day over the next several days. After calculating component values, a new arrangement can be designed, optimized with respect to supply and demand. The plan may be changed repeatedly, as often as the calculation of component values is carried out.
The process described above to calculate pricing for a three-product two-component case can be generalized to include more complex situations. Examples of complexities are: inclusion of available supplies of components to be greater than 1; more complex continuous probability distributions for demand of products: consume per of components greater than 1; multiple time horizons, where component values that differ over various time horizons will are smoothed so only one value is seen over all horizons generalization to volume orders (similar to group bookings for airlines); and inclusion of demand and/or price curves for products instead of a static value.
FIGURE 3 illustrates the pricing process in terms of its inputs and outputs. The inputs are: unconstrained demand distribution of each SP for each time horizon of interest, price offered for each SP, component list for each SP, the consume~er of each component for each SP, the available supply of each critical component for each time horizon of interest, volume of order, pricing and demand curves as a function of time (if known). The outputs are:
value for each critical component for each time horizon, and optionally, a smoothed value for each critical component over all time horizons of interest.
Va_1_Le Mana~reme_n_t for Lead Tim Pry; i nr~
The above-described value management (VM) pricing process can be extended to determine pricing based on varying lead time requirements of the customer.
environment in which lead time pricing might operate is one WO 99/26168 PCT/US98l24977 in which a manufacturer is negotiating a price with a customer. For example, the manufacturer might be attempting land an order of, say 50,000 personal computers (PC's). The customer typically wants various options, configurations and each option or configuration in specific quantities delivered over a specified time period. The customer does not want the complete order delivered at the same time. Rather, it wants the flexibility to call anytime during the specified time period to draw against this bulk order, each time the quantity requested not exceeding an agreed upon number, Q. But once the order is placed, the delivery should occur within LT weeks.
Given these conditions and given the capacity to fill the order, lead time pricing method determines answers to the following issues: What price to quote to the customer for each option (each option is a particular type of PC
requiring certain components to build it) based on Q? How does this price vary as a function of LT? What is the maximum frequency of customer orders. that should be negotiated? Is there an economic value that can be assigned to this frequency?
The lead time pricing method focuses on the value of the constrained resource (materials) based on the projection of future sales of SPs that can be made from the materials, the advertised prices for the SPs, and the available supply of materials. In the method described above in connection with FIGURE 1, it was shown how, given an available supply of constrained materials, and probabilistic demand of SPs and their prices, the values of the critical components can be computed.
The component values (MAVs) calculated in accordance with FIGURE 1 are marginal values, that is, the valt~-e obtainad from the last unit of the available supply of each component. However, when the consumed supply of a component for an order is much greater than 1, the expected revenue that is displaced in generally not marginal value times the quantity consumed. This is because in a limited 5 supply and high demand situation, each additional unit of supply costs more than the previous one.
FIGURE 4 illustrates a typical MAV curve as a function of the supply of a critical component. The curve is usually monotonically decreasing although its slope 10 decreases at either end and is maximum somewhere close to the middle. The area under the curve is the expected revenue from the available supply of the component. When the demand is much less than the supply, the MAV approaches 0. Because demand is probabilistic, "demand less than 15 supply" is meant in a probabilistic sense. Generally, it is mean + 3*standard deviation, which covers, for a normal distribution, close to 99.99$ of possible demand values.
The curve of FIGURE 4 illustrates how MAV varies as a function of supply of material for a particular time horizon, i.e., one day. As stated above, MAV can be thought of as the value of the last unit of supply. The price to charge for a quantity Q for that day is not Q*MAV
because MAV increases as each unit of supply is consumed.
For Q less than some threshold, it may be acceptable to charge MAV as the price for each unit, but for larger Q
such a price is unacceptable.
FIGURE 5 illustrates the revenue displaced by pricing a component at MAV for a quantity Q. The total area under the curvy is the total potential revenue from a supply S of the component. The shaded area represents the displaced revenue. The displaced revenue is not simply the MAV at S
because as Q is removed (S decreases), the MAV increases=-- WO 99126168 PGT/US98l24977 The floor for the negotiating price per unit of product for that component should be equal to:
Revenue Displaced/Q
For a product having multiple components, a MAV versus supply curve for each component must be considered.
As stated above in connection with FIGURE 1, the pricing process can be interpreted in terms of displaced revenue. In FIGURE 5, the displaced revenue could be calculated by integrating the curve between S and S - Q.
However a simpler variation uses the MAV process described in connection with FIGURE 1 to obtain a total potential revenue from a given supply, S. Then revenue from the MAVs for S - Q is similarly calculated. The difference in revenues between the two cases approximates the area of the curve between S and S - Q, and thus approximates the revenue displaced by the MAVs for Q. In other words, the formula for MAVs is applied with the displaced revenue coming from solving the MAV problem twice. For a product having multiple components, the MAVs are calculated for each components and the component revenues added, thereby obtaining revenues for the product.
In the method of FIGURE 1, there was no mention of lead time. The quantity Q was that for a particular horizon, say a day. That is, all of Q were going to be produced during the day in question. In reality, a customer will often agree to limit orders for a total of Q
over a contract period of, say a year. Each time the customer calls, the maximum quantity will be QmaX~ However delivery will be ehpected within a time period, LT.
The value management pricing process can be used to determine what the negotiating price should be for a specified lead time. For purposes of this description, thE-following assumptions are nade: the orders for QmeX will come randomly and uniformly distributed within the period of contract; a subsequent order will only come after a current order has been fulfilled; the time it takes to manufacture the order is equal to LT ,i.e., delivery is instantaneous; the horizon for MAV's is daily.
With regard to the above assumptions, the assumption of uniform order distributions is to simplify analysis --other order distributions can be handled. The second assumption can be relaxed and generalized so as to become a negotiating variable with the customer. The third assumption is easy to relax, by adding another offset to the manufacturing period. The fourth assumption can be generalized such as to include multiple days' horizon or several horizons within a day.
FIGURE 6 illustrates a method of determining MAV for lead time pricing. The method assumes a MAV curve such as that of FIGUREs 4 and 5, which may be obtained using the pricing process of FIGURE 1. Step 61 is randomly selecting a sample of N order points over the contract period with equal probability. In Step 62, for a first order point, consider the next LT days and set Qdaily - Qmax~LT. In Step 63, determine the displaced revenue. In Step 64, repeat for all the sample points. In Step 65, calculate the average displaced revenue. The result of the average is a floor on the negotiating price for the quantity Q, referred to herein as ~rVnegotiation ~ For a product having multiple components, the process of FIGURE 6 is repeated for each component and the results added together.
FIGURES 7 and 8 il~ustrate MAV as a function of maximum order size, Q, and of lead time, LT, respectively.
The MAV values are those calculated using the process of FIGURE 6. __ As part of negotiations, a manufacturer could insist on granting no more than a certain number of orders, Qmaxfreqi drawn against the total order over the contract period.
Each order is a disruption on manufacturing operations, which the manufacturer would like to minimize. The order frequency is tied to Q",ax, in that a higher number generally reflects a lower frequency. But there is nothing preventing the customer from making a large number of small orders and still be within the contract unless Qmaxfreq is agreed upon. To accommodate order frequency, the process can include additional steps: First, assume a worst case of Q",ax occurring Q",~freq times even though Qmax x Qmaxfreq may be greater than the total order quantity, Q. Next, set the total displaced revenue t0 be R,rax = MAVnegot x Qmax x Qmaxfreq~
The new negotiated price is MAVnegotiation-maxfreq = Rmax ~Q~ ThlS
method overestimates revenue and spreads it over a smaller quantity Q to take into account the higher allowed frequency. A related quantity to maximum frequency could be the minimum gap between subsequent orders. It can be converted into a corresponding maximum frequency to calculate the price quote.
Va_1_ ~ Mana~reme_n_t for Mike-to-Ord pr; r;
Make-to-order manufacturers (MTOs) are characterized by low inventory and cycle time. Many hi-tech manufacturers such as computer system integrators fall into this category. They cater to retailers as well as to individual customers, taking orders by telephone or online.
MTOs tend to not produce a product until it is ordered.
Usually MTOs advertise their items at a fixed price, with a maximum delivery time. At times, they may deliver sooner if the customer. However, conventionally, the prime charged is the same, barring any volume discounts.

- WO 99I26t68 PCT/US98/24977 Another aspect of the present invention is directed to how MTOs can benefit from value management (VM). As explained above, a basic idea behind VM is components can be valued in terms of probabilistic demand. These values can be used to define products that provide greater value and to arrive at a product control policy. The net effect of the product design and a product control policy can be significant gains in profit margins.
FIGURE 9 illustrates a linear price-demand curve for a product, P. As explained below, when only a single price is to be charged, the curve can be used to determine an optimal price. The curve can also be used to determine a total potential revenue that could be realized (theoretically) if multiple prices were charged.
L5 Suppose a MTO manufacturer sells P at a fixed price of $800. At $1600, the demand is almost 0, and at 0, the demand is high (limit it to 100). From this information, the single price at which total revenue is maximum can be determined. If any (price, demand) pair on the curve is chosen as (r,d), the total revenue, R, is:
R = rd and the equation for the line is:
r = and + c , where m = -1600/100 and c = 1600. Multiplying both sides by d, then:
R = d(md + c) - md2 + do . and taking the derivative:
dR/dd = 2md + c . To maximize R, the derivative is set to zero, thus:
0 = 2md + c d = -c/2m = 1600/32 = 50 -r = -16(50) + 1600 = 800 WO 99126168 PCT/US98n4977 The realized revenue from the single price of $800 is 800*50 = $40,000.
However, the total revenue "potential" (one that would result from charging different prices for different 5 demands) is 100*1600/2 - $80,000. Thus, a single price that maximizes revenue ($800) is only half the total potential revenue that could be realized from different prices for different products. The potential revenue is:
(-c/2m) (md + c) 10 - -cd/2-cz/2m The maximum revenue is:
Rmax = -c (-c/ (2m) ) /2-cz/2m - -c2 . 4m The potential revenue is cb - 2 = -c/2m = 2 (R",ax,, hence 1S the result.
If the goal is to maximize profit (revenue - cost), then under the assumption of fixed cost, equations for profit can similarly be derived as follows:
p = r-z 20 -md+ c - z +md+ (c-z) where p is the profit per unit of product, the new intercept is m - z in place of c, and z is the fixed cost per unit of product. Total profit P is:
P=rd-dz =d (md+c) -dz The maximum profit (for a single price) occurs at d=-(c-z)/2m and the corresponding maximum profit is:
Pmex = - (~-zJ 2/4m.
The total potential profit is:
3 0 -c/m Pit= I (mx+ ( c-z) ) dx=mx2/2 ~o~im+ ( c-z) xl o°im - c2/2m- (c-z) c/m=-c2/2m+cz/m=- (c-z) 2/2m+z2/2m - 2Pmax+Z2/2m WO 99126168 PCTIUS98lZ4977 . The second term is negative because m is negative. As z increases, the potential profit compared to that for single price (optimum) decreases. For reasonable values of z, the potential increase in profit is substantial.
One aspect of the invention is realizing, for a MTO
manufacturer, the potential profit opportunity described above. Suppose the item is a personal computer, which the MTO sells that for a price of $800, with a delivery time of 3 weeks. However, if the customer wants it the next day it could be done but for a price of $1200. Another price-delivery pair might be ($1100, 1 week). Once these products have been designed, there is a need for product control. The manufacturer does not want to simply fill the demand for various products as it comes in, but would rather deny some in the hope that there will be later demand. To make an objective evaluation, there needs to be a forecast of demand for the products out in future.
Thus, there are two levels of benefits. A first involves redesigning product and delivery times. A second involves forecasts of demand and an effective product control (PC) policy. Value management is fully realized by taking advantage of both levels of benefits. Product design is insufficient because of limited capacity (capacity includes both assets and materials), and without product control, the MTO may end up not realizing higher paying demand if demand at lower prices is high and comes first.
Assume that the process of product design yields the following products for a laptop manufacturer:
Laptop = P P (1 day delivery) 1200 P P (1 week delivery) 1100 P P (3 week delivery) 800 Based on a price-demand curve such as that of FIGURE 9, demand values can be assigned as single deterministic numbers. But in reality, demands are stochastic and are better characterized by a probability distribution. A
better approach is to assign demand values for different "buckets" of prices. To this end and as a simple example, assume that the demand is 1 unit with a probability of .5. That is, there is a 50g chance the demand of 1 may not materialize. The demand probability table looks like:
Probability of the demand ZQ Product Price (S) jmaterializing P1(1 day delivery) 1200 1 .5 P2 (1 week delivery) 1100 1 .5 P3(3 week delivery) 800 1 .5 It is assumed that each laptop needs 1 unit of some scarce material. The PC is assumed to be first-come first serve (FCFS).
Appendix A compares expected revenues with and without product design (PD) for various values of available capacity (AC), measured as the units of the scarce material available for a particular time unit, say, one day, of manufacturing. "AP" is asking price (explained below), and "ER" is expected revenue. For the non-PD case, there are 3 items with the same price of $800. For the PD case, the 3 products are P1 ($1200), P2 ($1100) and P3 ($800). By definition, the order in which they arrive is P3, P2 and P1. The same labels indicate the corresponding price, and the context will make clear what the label means. The control policy is assumed to be FCFS .
The following are the general formulas for AC = 3, 2 and 1, with sl, s2 and s3 denoting the corresponding probabilities (assumed to be .5 in this case). Also, ql - 1 - sl, q2 = 1 - s2 and q3 = 1 - s3. ER (n) is the expected revenue for available capacity of n.
FormL1_a for Ex;?ected Reve_n_oe under FCFS
1 s3P3 + q3(s2P2 + q2s1P1) 2 s3(P3 + s2P2 + q2s1P1) + q3(s2(P2 + slP1) +
q2s1P1) 3 s3 (P3 + s2 (P2 + slP1) + q2s1P1) + q3 (s2 (P2 +
slP1) + q2s1P1) Here P1, P2 and P3 denote prices.
In Appendix A, the units of capacity (and the resulting APs) are for a given time horizon, i.e., one day.
In the first row is the expected revenue for values of available capacity under the assumption that the same revenue ($800) is received from even those customers who would have paid a higher price. The expected revenue (ER) from the last single product for a given capacity is the difference between the ER for the AC minus the ER from one less AC, resulting in the AP. The value of each additional unit of capacity goes down as AC increases, everything else remaining same. The additional value of a unit of capacity is related to PC, as will be explained velow.
FIGURE 10 illustrates how the expected revenue for a MTO manufacturer (different prices for different delivery times for the same product) can be graphically represented WO 99/26168 PCT/US98l24977 as a binary tree. The formulas for ER are the same as set out above.
No forecasts are needed for first-come first-serve (FCFS) as a PC policy, but are used for other PCS. The following discussion explains how using a PC policy other than FCFS adds additional revenue opportunity. Prices are called "values", understanding that it is assumed that the cost is zero. That is not true, but for the purposes of example, the assumption is that price is the same as value, and when cost data is available adjustments can be made.
Appendix B sets out APs and ERs, assuming a PC (non FCFS). The PC is that at any given time, for various units of capacities for particular time horizons (days for example), for each row (product), calculate the ER from those resources (capacities) if it is decided to accept an order. For AC = 1, PC(3W), the ER is $825 as opposed to $850 if only PC(1W) were accepted. Thus for optimal control, PC(3W) for AC = 1 should be rejected. $850 is the asking price for AC = 1. This is the minimum price (value) to accept. At AC = 1, PC(3W) ($800) is rejected since its ER is less than the AP. However as the AC increases, the value of the added capacities goes down. For AC = 2, any order is accepted: the AP (ER(2) - ER(1) under optimal control) is $550 and is less than the ER for the lowest product offering. AP goes even lower at AC = 3 ($150) and ultimately to 0 at AC = 4.
The asking price (AP) for a.given value of AC is the maximum expected revenue for this last unit of capacity.
Thus for AC = 1, AP = $850 with the control policy being to reject PC (3W) . As stated above, AP is a function of PC.
Comparing the results of Appendices A and B, for AC = 1, the AP for the non-FCFS PC policy is $850 versus $825 fc~r FCFS. At AC = 2, it is higher for FCFS simply because it was sub optimal for AC - 1. At AC = 3, the two are the same and the two controls become the same operationally.
Generally a PC policy is needed when there is limited capacity with respect to demand.
5 Typically, business practice does not allow for varying prices for the same physical item since the customer does not perceive added value. However by recognizing that there is an underlying higher paying customer demand that can be tapped by tying delivery time 10 to the product, more revenue is extracted. A control mechanism assigns allocations to each product based on the available capacity for the time horizon (day, week or whatever is appropriate) under consideration. In the example, all capacity is available for an order of PC(1D), 15 and then there is some fraction of the capacity available to PC(1W), and a lower fraction to PC(3W). Because the calculations assume one order at a time, the calculations may change if the order quantity is large.
The following steps can be taken to make a significant 20 positive impact on revenue and profit. First, analyze underlying demand to obtain a relationship between price charged and demand. The result is a product design (PD) scheme. Design history databases for help in demand forecasts. Institute business process flows that employ a 25 product control scheme. This will result in computer implemented methods and screens for order processors that will provide visibility into future plant/manufacturing facility status and also what products will be made available in what quantities. Various computer-implemented supply management tools could be used, each corresponding to one of the steps. The modules could be, for example, Demand Analyzer, Forecasting Engine and Optimizer modules;
such as those available from i2 Corporation.
The above examples include simplifying assumptions to illustrate numerically the PC and PD process. However, there may be some real world realities that need to be addressed. If the order quantity is more than a given threshold, the PC scheme will have to be made more sophisticated since the calculated AP is for the last unit of capacity and may change as orders come in. If the MTO
manufacturer has other suppliers, the complete upstream supply chain may have to be considered and its reliability factored in depending upon the relationship between the two. The downstream chain may also be important. If there are multiple items and capacity units (say more than one work center or materials) the VM model needs to be generalized. Once the multiple items have been mapped into multiple products, the problem is conceptually similar to one item that has been productized. The multiple resources can be handled by arriving at an AP for each resource (constrained or not -in which case it could be small or 0).
If the sum of the utilized resources' AP is less than the value being obtained then the product can be made available.
It should also be noted that the PC relies on the availability of unconstrained demand, i.e., demand that exists for a product regardless of whether it will be available or not. In reality the recorded history will only have actual realized demand (or constrained demand).
This can place additional burdens on the forecasting algorithms since they use the histories to forecast.
Other Embodiment Although the present invention has been described in detail, it should be understood that various changes;
substitutions, and alterations can be mads hereto without WO 99/2b168 PCT/US98/24977 departing from the spirit and scope of the invention as defined by the appended claims.
Appendix A
F'.~x~~ected RevenLe fqr FCFS for VarlOLS AC' s Product ER ( 1 ) AP ER ( 2 ) AP ER ( 3 ) AP
P (No pDl .5*800+.5* 700 .5*(800+400+200) X00 .5*(800+.5* 100 (.5*800 + .5*.5*800) + (800 +.400) + 200) +
= 700 .5*(.5*1800+400) .5*(.5*(800 + 400) +
+ 200) = 1100 200) = 1200 P (PD) .5*800+.5*(.5*1100+. 825 .5*(800+B50)+.5*( 575 .5*(800+.5* 150 5*/.5*1200)) = 825 .5*/1100+600)+.5( (1100+600) + 300) +
.5*1200)) .5*(.5*(1100+600)+
= 1400 300) = 1550 Appendix B
Erected RevenL with P for VarlOLS AC' Product AC=1 ER AP AC=2 ER AP AC=3 ER AP AC=4 ER AP

/Value PC (1D)/.5* 600 .5* 600 .5*120 600 .5* 600 1200 1200 1200 0 = 1200 =

PC (1W)/.5* 850 B50 .5* 115 .5*(11 115 5* 115 1100 1100 (1100+
p 00+600 0 (1100+ p +.5*600 600)+. )+.5*6 600) +

- 5*600 00 .5*600 PC (3W)/.5* 825 .5* 140 550 .5*(BO 155 150 .5* 155 0 800 800 (800+ p 0+1150 0 (800+1 0 +

.5*850 850) )+.5*1 150) - +.5* 150 +.5*

Claims (19)

WHAT IS CLAIMED IS:
1. A computer-implemented method of valuing products, comprising the steps of:
identifying a set of product components;
designing a set of products from said components;
assigning a price to each said product;
assigning demand probability values, such that a probability value is associated with each of said products;
calculating component values, such that a component value is obtained for each of said components, by performing the following steps: (a) assuming a beginning value for each of said components: (b) for a first said component, calculating prorated values, such that for products using that component, a prorated value is calculated on that component by calculating the difference between the product price and a value of the product's other components; (c) calculating a component value as a function of said prorated values and said probability values; (d) repeating steps (b) and (c) for all said components; (e) determining whether said component values converge; and (f) if any component value does not converge, using the calculated component values as the beginning component value and repeating said steps (b) through (e) for that component; and calculating a value for each said product, based on the results of the preceding step, by adding the component value of each component of that product.
2. The method of Claim 1, wherein step (d) is performed by multiplying a probability values times prorated values.
3. The method of Claim 1, wherein step (d) is performed by obtaining a sum of products of probability values and prorated values.
4. The method of Claim 1, wherein said probability values include both the probability of demand for a product and the probability that demand will arrive in a certain order vis a vis other products.
5. The method of Claim 1, wherein said method is performed to value non-standard products and said assigning step is performed by assigning prices of standard products.
6. A computer-implemented method of pricing an order for a product based on varying lead times during a specified time period, comprising the steps of:
calculating a set of values for said product over a range of available supplies of said product:
determining a size Q of said order;
selecting a set of order points during said time horizon, each said order point having a lead time LT to the next order point;
for a first order point, calculating an incremental production quantity as Q/LT, and calculating revenue displaced by said incremental production quantity using said set of product values;
repeating said calculating step for each said order point;
calculating an average displaced revenue; and calculating the price for said order, using the results of the preceding step.
7. The method of Claim 6, wherein said product has multiple components and further comprising the steps of repeating all steps for each component and adding the results.
8. The method of Claim 7, wherein said set of minimum acceptable values is calculated by (a) assuming a beginning value for each of said components (b) for a first said component, calculating prorated values, such that for each product using that component, a prorated value is calculated on that component by calculating the difference between the product price and a value of the product's other components; (c) calculating a component value as a function of said prorated values and said probability values; (d) repeating steps (b) and (c) for all said components; (e) determining whether said component values converge; and (f) if any component value does not converge, using the calculated component values as the beginning component value and repeating said steps (b) through (e) for that components and (g) adding the values of each component.
9. The method of Claim 6, wherein said displaced revenue is calculated by integrating a curve representing said set of product values.
10. The method of Claim 6, wherein said displaced revenue is calculated as the difference between a total potential revenue determined by said product values for all S and the total potential revenue for S - Q.
11. A computer-implemented method of pricing make-to-order products, comprising the steps of:
designing a set of products, each having an associated delivery time and price:
assigning a demand probability value to each of said products;
calculating an expected revenue from said products for at least two available capacities, said expected revenue being a function of said demand probability values and said prices:
calculating an asking price for each of said products as the difference between its expected revenue from successive available capacities.
12. The method of Claim 11, wherein said expected revenue is calculated as a sum of products of said probability values and said prices.
13. The method of Claim 11, wherein said expected revenue is calculated from a binary tree representing said probability values and said prices.
14. The method of Claim 11, wherein said expected revenue is calculated for each product in accordance in response to a product control policy.
15. The method of Claim 11, further comprising the step of comparing said asking price for different products at a given capacity.
16. A computer-implemented tool for valuing manufactured products, comprising:
means for designing a set of products, each said product having one or more components: and means for calculating values of said products by assigning demand probability values, such that a probability value is associated with each of said products;
then by calculating component values, such that a component value is obtained for each of said components, by performing the following steps: (a) assuming a beginning value for each of said components; (b) for a first said component, calculating prorated values, such that for each product using that component, a prorated value is calculated on that component by calculating the difference between the product price and a value of the product's other components; (c) calculating a component value as a function of said prorated values and said probability values (d) repeating steps (b) and (c) for all said components; (e) determining whether said component values converge; and (f) if any component value does not converge, using the calculated component values as the beginning component value and repeating said steps (b) through (e) for that components and then by calculating a value for each said product, based on the results of the preceding step, by adding the component value of each component of that product.
17. The method of Claim 16, wherein said means for designing provides each said product with an associated lead time and wherein said means for calculating further uses lead time values and said component values to determine product values.
18. The method of Claim 16, wherein said means for designing provides each said product with an associated delivery time and wherein said means for calculating further uses delivery time values and said component values to determine product values.
19. The method of Claim 16, further comprising means for implementing a product control policy, and further comprising the step of using said product values to determine whether to accept orders for products.
CA002310323A 1997-11-19 1998-11-19 Computer-implemented product valuation tool Abandoned CA2310323A1 (en)

Applications Claiming Priority (7)

Application Number Priority Date Filing Date Title
US6613497P 1997-11-19 1997-11-19
US6613697P 1997-11-19 1997-11-19
US6613397P 1997-11-19 1997-11-19
US60/066,134 1997-11-19
US60/066,136 1997-11-19
US60/066,133 1997-11-19
PCT/US1998/024977 WO1999026168A2 (en) 1997-11-19 1998-11-19 Computer-implemented product valuation tool

Publications (1)

Publication Number Publication Date
CA2310323A1 true CA2310323A1 (en) 1999-05-27

Family

ID=27370921

Family Applications (1)

Application Number Title Priority Date Filing Date
CA002310323A Abandoned CA2310323A1 (en) 1997-11-19 1998-11-19 Computer-implemented product valuation tool

Country Status (7)

Country Link
US (1) US7660736B2 (en)
EP (1) EP1031097A2 (en)
JP (1) JP2001523866A (en)
KR (1) KR20010032291A (en)
AU (1) AU1798099A (en)
CA (1) CA2310323A1 (en)
WO (1) WO1999026168A2 (en)

Families Citing this family (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7376578B1 (en) 1997-11-19 2008-05-20 I2 Technologies Us, Inc. Computer-implemented product valuation tool
KR20010032291A (en) 1997-11-19 2001-04-16 샌제이브 사이두 Computer-implemented product valuation tool
KR20010053593A (en) * 1998-07-22 2001-06-25 샌제이브 사이두 Computer-implemented value management tool for an asset intensive manufacturer
FR2805064B1 (en) * 2000-02-14 2003-01-24 France Telecom SYSTEM FOR MANAGING A PRODUCT SALES CHAIN
US7346538B2 (en) * 2001-08-20 2008-03-18 International Business Machines Corporation System and method for business analysis and planning
WO2006063077A2 (en) * 2004-12-08 2006-06-15 Oracle International Corporation Systems and methods for optimizing total merchandise profitability
US20080235073A1 (en) * 2007-03-19 2008-09-25 David Cavander Automatically prescribing total budget for marketing and sales resources and allocation across spending categories
AU2008290256A1 (en) * 2007-08-21 2009-02-26 Aqua Index Ltd. Water as commodity for financial investment
CN101971145A (en) * 2007-11-29 2011-02-09 市场份额合伙人有限责任公司 Automatically prescribing total budget for marketing and sales resources and allocation across spending categories
US8244571B2 (en) * 2008-10-31 2012-08-14 Marketshare Partners Llc Automated specification, estimation, discovery of causal drivers and market response elasticities or lift factors
CA2716166A1 (en) * 2008-02-21 2009-08-27 Marketshare Partners Llc Automatically prescribing total budget for marketing and sales resources and allocation across spending categories
US20100036700A1 (en) * 2008-08-06 2010-02-11 Marketshare Partners Llc Automatically prescribing total budget for marketing and sales resources and allocation across spending categories
WO2010017502A1 (en) * 2008-08-08 2010-02-11 Marketshare Partners Llc Automatically prescribing total budget for marketing and sales resources and allocation across spending categories
US20110010211A1 (en) * 2008-08-15 2011-01-13 David Cavander Automatically prescribing total budget for marketing and sales resources and allocation across spending categories
KR20110049858A (en) * 2008-08-15 2011-05-12 마켓셰어 파트너스 엘엘씨 Automated decision support for pricing entertainment tickets
US20110178828A1 (en) * 2010-01-15 2011-07-21 National Tsing Hua University Sale decision method and sale request evaluation method
US8571920B2 (en) * 2010-10-05 2013-10-29 Xerox Corporation Optimal list-price mechanism design for multi-level device click-through in targeted print or electronic communication
US20140372174A1 (en) * 2013-06-12 2014-12-18 MEE - Multidimensional Economic Evaluators LLC Multivariate regression analysis
US11282009B2 (en) 2017-05-23 2022-03-22 Uatc, Llc Fleet utilization efficiency for on-demand transportation services

Family Cites Families (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU5342890A (en) * 1989-03-21 1990-10-22 Morris Epstein Integrated electronic parts warehousing and distribution system and method
US5712985A (en) 1989-09-12 1998-01-27 Lee; Michael D. System and method for estimating business demand based on business influences
US5191523A (en) 1989-11-06 1993-03-02 Prism Group, Inc. System for synthesizing travel cost information
US5255184A (en) 1990-12-19 1993-10-19 Andersen Consulting Airline seat inventory control method and apparatus for computerized airline reservation systems
US5270921A (en) 1990-12-19 1993-12-14 Andersen Consulting Virtual fare methods for a computerized airline seat inventory control system
GB2249416B (en) * 1990-12-31 1994-08-17 Ruego Dev Co A data processing system.
JPH0567119A (en) 1991-07-12 1993-03-19 Hitachi Ltd Merchandise analyzing system
EP0843858A4 (en) * 1995-04-13 2003-06-11 Eldat Comm Ltd Sales promotion data processor system and interactive changeable display particularly useful therein
US5615109A (en) 1995-05-24 1997-03-25 Eder; Jeff Method of and system for generating feasible, profit maximizing requisition sets
JPH0973491A (en) * 1995-09-08 1997-03-18 Hitachi Ltd Component inventory planning support system
US5897620A (en) 1997-07-08 1999-04-27 Priceline.Com Inc. Method and apparatus for the sale of airline-specified flight tickets
JP3767954B2 (en) 1996-11-07 2006-04-19 富士通株式会社 Demand forecasting device
US5797127A (en) 1996-12-31 1998-08-18 Walker Asset Management Limited Partnership Method, apparatus, and program for pricing, selling, and exercising options to purchase airline tickets
US6032123A (en) 1997-05-12 2000-02-29 Jameson; Joel Method and apparatus for allocating, costing, and pricing organizational resources
CA2289474A1 (en) 1997-05-21 1998-11-26 Khimetrics, Inc. A method for incorporating psychological effects into demand models
KR20010032291A (en) 1997-11-19 2001-04-16 샌제이브 사이두 Computer-implemented product valuation tool
US7376578B1 (en) * 1997-11-19 2008-05-20 I2 Technologies Us, Inc. Computer-implemented product valuation tool
KR20010053593A (en) 1998-07-22 2001-06-25 샌제이브 사이두 Computer-implemented value management tool for an asset intensive manufacturer
US6263315B1 (en) 1998-11-02 2001-07-17 Pricing Research Corporation Revenue management system and method

Also Published As

Publication number Publication date
JP2001523866A (en) 2001-11-27
US20070078790A1 (en) 2007-04-05
KR20010032291A (en) 2001-04-16
AU1798099A (en) 1999-06-07
US7660736B2 (en) 2010-02-09
EP1031097A2 (en) 2000-08-30
WO1999026168A3 (en) 1999-08-26
WO1999026168A2 (en) 1999-05-27

Similar Documents

Publication Publication Date Title
US7660736B2 (en) Computer-implemented product valuation tool
US7552095B2 (en) Computer-implemented product valuation tool
US6826538B1 (en) Method for planning key component purchases to optimize revenue
US5974403A (en) Power trading and forecasting tool
Kleywegt et al. The dynamic and stochastic knapsack problem with random sized items
Carr et al. The inverse newsvendor problem: Choosing an optimal demand portfolio for capacitated resources
Ball et al. Available to promise
US6266655B1 (en) Computer-implemented value management tool for an asset intensive manufacturer
Bonser et al. Procurement planning to maintain both short-term adaptiveness and long-term perspective
WO2002042981A1 (en) System and method for a dynamic auction with package bidding
Owen et al. Price and assortment optimization for reusable resources
US7774226B2 (en) Accepting bids under uncertain future demands
Urban Supply contracts with periodic, stationary commitment
Baker et al. Service package switching in hotel revenue management systems
Liang Integrated manufacturing/distribution planning decisions with multiple imprecise goals in an uncertain environment
Anandasivam et al. A heuristic approach for capacity control in clouds
Upasani et al. Incorporating manufacturing lead times in joint production-marketing models: a review and some future directions
Herbots et al. Single-pass and approximate dynamic-programming algorithms for order acceptance and capacity planning
Seifbarghy et al. A comprehensive fuzzy multiobjective supplier selection model under price brakes and using interval comparison matrices
Kalyan Dynamic customer value management: asset values under demand uncertainty using airline yield management and related techniques
Hall et al. Cooperative and noncooperative games for capacity planning and scheduling
Svrcek Modeling airline group passenger demand for revenue optimization
Kimes Yield management
MXPA00004967A (en) Computer-implemented product valuation tool
Jahandideh Dynamic Revenue and Project Management

Legal Events

Date Code Title Description
FZDE Discontinued