CA2288367C - Hydraulic expansion pre-straining of heat exchanger tubing - Google Patents

Hydraulic expansion pre-straining of heat exchanger tubing Download PDF

Info

Publication number
CA2288367C
CA2288367C CA 2288367 CA2288367A CA2288367C CA 2288367 C CA2288367 C CA 2288367C CA 2288367 CA2288367 CA 2288367 CA 2288367 A CA2288367 A CA 2288367A CA 2288367 C CA2288367 C CA 2288367C
Authority
CA
Canada
Prior art keywords
tube
tubes
once
steam generator
expansion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CA 2288367
Other languages
French (fr)
Other versions
CA2288367A1 (en
Inventor
Jun Tang
Roderick J. Mcgregor
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BWXT Canada Ltd
Original Assignee
Babcock and Wilcox Canada Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Babcock and Wilcox Canada Ltd filed Critical Babcock and Wilcox Canada Ltd
Priority to CA 2288367 priority Critical patent/CA2288367C/en
Publication of CA2288367A1 publication Critical patent/CA2288367A1/en
Application granted granted Critical
Publication of CA2288367C publication Critical patent/CA2288367C/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D53/00Making other particular articles
    • B21D53/02Making other particular articles heat exchangers or parts thereof, e.g. radiators, condensers fins, headers
    • B21D53/08Making other particular articles heat exchangers or parts thereof, e.g. radiators, condensers fins, headers of both metal tubes and sheet metal
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B1/00Methods of steam generation characterised by form of heating method
    • F22B1/02Methods of steam generation characterised by form of heating method by exploitation of the heat content of hot heat carriers
    • F22B1/023Methods of steam generation characterised by form of heating method by exploitation of the heat content of hot heat carriers with heating tubes, for nuclear reactors as far as they are not classified, according to a specified heating fluid, in another group
    • F22B1/026Methods of steam generation characterised by form of heating method by exploitation of the heat content of hot heat carriers with heating tubes, for nuclear reactors as far as they are not classified, according to a specified heating fluid, in another group with vertical tubes between to horizontal tube sheets

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Sustainable Energy (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Heat Treatment Of Articles (AREA)
  • Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)
  • Monitoring And Testing Of Nuclear Reactors (AREA)

Abstract

A method of hydraulically prestraining the tubes of a once-through steam generator by welding the tubes to their respective tubesheets poor to the application of hydraulic expansion to produce tensile stresses which shorten the tubes an equal and predetermined amount to increase the margin to buckling and increase the natural frequency of the tubes reducing flow induced vibration.

Description

Case 6075 HYDRAULIC EXPANSION PRE-STRAINING OF
HEAT EXCHANGER TUBING
FIELD AND BACKGROUND OF THE II~VENTI~C~N
The invention relates generally to heat exchangers and more 1 o particularly to the pre-treatment of tubes for such heat exchangers.
DESCRIPTION OF THE PRIOR ART
The once-through steam generators or heat exchangers, associated with nuclear power stations and which transfer the reactor-produced heat from the primary coolant to the secondary coolant that drives the plant turbines may be as long as 75 feet and have an outside diameter of about 12 feet. Vlfithin one of these heat exchangers, tubes through which the primary coolant flows may be no more than 5/8 inch in outside diameter, but have an effective length of as long as 52 feet between the tube-end mountings and the imposing faces of the tubesheets Typically, there may be a bundle of more than 15,000 tubes in one of these heat exchangers.
In the construction of a once-through steam generator, a plurality of these small diameter long length tubes are configured in a square array where they are welded at their top and bottom ends to a tubesheet to mat«tain this array in the once-through steam generator.
The original once-through steam generators were fabricated using a sequence where tubes, prior to welding to both tubesheets, were individually electrically heated such that cooling of the hot tubes after welding to the tubesheet resulted in tensile strains. This fabrication Case 6075 method is not recommended since in the thermal method of tube prestraining used on the original once-through steam generator the tubes were heated individually until the desired thermal strain was achieved and then seal-welded in place- Thus, for the first seal welded tubes, the desired prestrain was achieved exactly. As the procedure progressed, the previously welded tubes cooled and started to load the secondary shell and the tubesheets. In response, these components deflected in the direction of the load and effectively decreased the length of the subsequently welded tubes. This mechanism introduced an unwanted, 1 o unconuolled and undefined tensile strain in these tubes. Excessive tensile stress was dettimental to the tube life. In addition, thermal prestraining is an expensive and time consuming process.
Since both the tubes and the shell of the once-through steam generator are restrained by the tubesheets at both ends, interaction stresses develop during operation due to the relative deformation of the steam generator shell and the tubes- These interaction stresses come from several sources. (1) Both the primary and secondary pressures elongate the secondary shell of the vessel between the two tubesheets;
(2) the combined action of the primary and secondary pressures changes the tube radius which, in turn. causes a length change of the tube ("Poisson effect'), or a stress from resisting that change; (3) The tube temperature varies along its length and is different from the lengthwise temperature distribution of the secondary shell. This causes differential expansion of the two; (4) the tubes have a higher coefficient of thermal expansion than the secondary shell which causes a differential expansion;
(5) tubesheet bowing, created by primary and secondary pressures combined with induced shell and head deflection loads; and (6) the tube preload introduced during manufacturing.
In the case of the once-through steam generator, tube buckling is caused by deformation controlled loads and Thus Is not a catastrophic primary stress failure mode. However, analysis of a tube shows that tube touching would occur very soon after the tube assumed a bowed shape.

Case 6075 Therefore, the load Which causes tubes to touch is considered as the limit load on the tube in compression.
A sight manufacturing tube prestrain of about 1l8 inch over the length of the tube is considered beneficial to reduce compressive loads on the tubes under all operating conditions. This has the added benefit of preventing stress softEning and the resultant reduction in tube natural frequency for flow induced vibration considerations.
1o In view of the foregoing it is seen that an improved method of prestraining the tubes Qf a Qnce-thro4gh steam generator was needed which would not sNbject the tubes to interaction stresses during welding.
~ 5 BRIEF SUMMARY OF THE IN~JENTION
The present invention solves the prior art once-through steam generator or heat exchanger assembly problems and other problems by providing a method of prestressing the once-through steam generator 2 o tubes in which the tubes of the once=through steam generator are prestrained to the desired level using the hydraulic expansion of the tubes in the tubesheet. Prior to performing the tube joint hydraulic expansion, path ends of the tubes are welded to their respective tubesheet_ The subsequent tube radial expansion within the hydraulic expansion zone 2 s creates the desired axial preload_ It has been demonstrated both analytically and experimentally that tensile stresses are developed during the hydraulic expansion of tubes which are restrained at both ends_ The obtained stresses are of the desired magnitude to increase margin to buciding and increase tube natural frequency to thus increase the margin 3o to detrimental flow induced vibration.
Optimized selection of the final total tube stress is controlled by controlling the length of hydraulic expansion in the upper tubesheet. The main advantage is that the developed prestrain is independent of the tube
3 case sops load prior to the expansion. Therefore, the achieved pre-set of a given tube will be independent of the state of the other tubes resulting in the desired uniform foreshortening of each tube.
A tensile prestrain of 1l8 inch over the tube length will assure that all cubing stress limits will be met and the tubes will be at a very low tensile stress of approximately 3 ksi during full power operation. This tensile presirain is achieved by controlling the hydraulic expansion process.
~o 1n view of the foregoing it will be seen that one aspect of the present invention is to provide a prestraining method for onc~through steam ganerxater tube assemblies which will be constant for all the individua~ tubes.
Another aspect ~s to provide a prestraining method for once-through steam generator tubes once they are assembled into a once-through steam generator tube array.
z o These and other aspects of the present invention will be more fully understood from the following description of the invention when considered along with the accompanying drawings.
BRIEF DESCRiPT~~N OF TIDE iDRAIMII~GS
Figure 1 is a vertical elevation view in full section of a once-through steam generator embodying the principles of the invention;
3o Figure 2 is a perspective view of a test stand used to develop once through steam generator tubing hydraulic stress verification data.
Figure 3 is an end view of the Figure 2 test stand.
4 Case 8075 Figure 4 is an expanded view of strain gauge location on two tubes of the Figure 2 test stand Figure 5 depicts test results of a full tube length expansion strain.
Figure 6 depicts test results of half tube length expansion strain.
1 o DETAtI-Ep DESCRIPTION OF THE PRE~E~iREp EMBODIMENT
The present invention is described in connection with a once-thro~rgh atGam generator for a nuclear power plant, although these principles are generally applicable to shell and tube heat exchangers in any number of diverse fields of activities. Thus, as shown in Figure 1 for the purpose of illustration, a once-through steam generator unit 10 comprising a vertically elongated cylindrical pressure vessel or shell 11 closed at its opposite ends by an upper head member 12 and a lower head member 13.
The upper head include$ an upper tubesheet 14, a primary coolant inlet 15, a manway 16 and a handhole 17. The manway 16 and the handhale 17 are used for inspection and repair during times when the once-through steam generator unit 10 is not in operation. The lower head 13 includes a drain 18, a coolant outlet 20, a handhole 21, a manway 22 and a lower tubesheet 23.
The once-through steam generator 10 is supported on a conical or cylindrical skirt 24 which engages the outer surface of the lower head 13 3 o in order to support the generator unit 10 above structural flooring 25.
As hereinbefore mentioned, the overall length of a typical once-through generator unit of the sort under consideration is about 75 feet between the flooring 25 and the upper extreme end of the primary coolant
5 Case 6075 inlet 15. The overall diameter of the unit 10 moreover, is in excess of 12 feet.
Within the pressure vessel ~ 1, a lower cylindrical tube shroud wrapper or baffle 26 encloses a bundle of heat exchanger tubes 27, a portion of which is shown illustratively in Figure 1 In a once-through steam generator unit of the type under consideration moreover, the number of tubes 27 enclosed within the baffle 26 is in excess of 15,000, each of the cubes 27 having an outside diameter (OD) of 5/8 inch. It has 1 o been found that Alloy 690 is a preferred tube material for use in once-through steam generators of the type described. The individual tubes 27 in the bundle each are anchored in respective holes formed in the upper and lower tubesheets 14 and 23 through seal welding the tube ends at the tubesheets. To support the tubes 27 in their proper positions, and array of drilled and broached substantially flat support plates 45 is positioned transverse to the longitudinal axes of the tubes 27 and the axes of the pressure vessel 11.
The lower baffle or wrapper 26 is aligned within the pressure vessel 2 0 11 by means of pins (not shown). The lower baffle 26 is secured by bolts (not shown) to the tower tubesheet 23 or by welding to lugs (not shown) projecting from the lower end of the pressure vessel 11. The lower edge of the baffle 26 has a group of rectangular water ports 30 or, alternatively, a single full circumferential opening (not shown) to accommodate the inlet 2 5 feedwater flow to the riser chamber 19. The upper end of the baffle 26 also establishes fluid communication between the riser chamber 19 within the baffle 26 and annular downcorner space 31 that is formed between the outer surface of the lower baffle 26 and the inner surface of the cylindrical pressure vessel 11 through a gap or steam bleed port 32.
A support rod system 28 is secured at the uppermost support plate 458, and consists of threaded segments spanning between the lower tubesheet 23 and the lowest support plate 45A and thereafter between all support plates 45 up to the uppemnost support plate 458.
6 Case 6075 A hollow torpid shaped secondary coolant feedwater inlet header 34 circumscribes the outer surface of the pressure vessel 11. The header 34 is in fluid communication with the annular downcomer space 31 through an array of radially disposed feedwater inlet nozzles 35. As shown by the direction of the FIG. 1 arrows, feedwater flows from the header 34 into the once-.through steam generating unit 10 by way of the nozzles 35 and 36. The feedwater is discharged from the nozzles downwardly through the annular downcomer 31 and through the water 1 o ports 30 into the riser chamber 19. Within the riser chamber 19, the secondary coolant feedwater flows upwardly within the baffle 26 in a direction that is counter to the downward flaw of the primary coolant within the tubes 27. An annular plate 37, wedded between the inner s4~face of the pressure vessel 11 and the outer surface of the bottom edge of an upper cylindrical baffle or wrapper 33 insures that feedwater entering the downcomet 31 will flow downwardly toward The water ports 3p in the direction indicated by the arrows. The secondary fluid absorbs heat from the primary fluid through the tubes 27 in the bundle and rises to steam within the chamber 19 that is defined by the baffles 26 and 33.
The 4pper baffle 33, also aligned with the pressure vessel 11 by means of alignment pins (not shown), is fixed in an appropriate position because it ~s welded to the pressure vessel 11 through the plate 37, immediately below steam outlet nozzles 40. The upper baffle 33, furthermore, enshrouds about one third of the tube bundle.
An auxiliary feedwater header 41 is in fluid communication with the ~Jpper portion of the tube bundle through one or more nozzles 42 that penetrate The pressure vessel 11 and the upper baffle 33. This auxiliary 3 o feedwater system is used, for example, to fill the once-through steam generator 10 in the unlikely event that there is an interruption in the feedwater flow from the header 34. As hereinbefore mentioned, the feedwater, or secondary coolant that flows upwardly through the tube bank 27 in the direction shown by the arrows rises into steam. In the
7 Case 6075 illustrative embodiment, moreover, this steam is superheated before it reaches the top edge of the upper baffle 33. This superheated steam flows in the direction shown by the arrow, over the top of the baffle 33 and downwardly through an annular outlet passageway 43 that is formed between the outer surface of the upper cylindrical baffle 33 and the inner surface of the pressure vessel 17 .
The steam in the passageway 43 leaves the generating unit 10 through steam outlet nozzles 40 which are in communication with the passageway 43. in this foregoing manner, the secondary coolant is raised from the feed water inlet temperature through to a superheated steam temperature at the outlet nozzles 40. The annular piste 37 prevents the steam from mixing with the incoming feedwater in the downcomer 31 _ The primary coolant, in giving up this heat to the secondary coolant, flows from a nuclear reactor (not shown) to the primary coolant inlet 15 in the upper head 12, through individual tubes 27 in the heat exchanger tube bundle, into the lower head 13 and is discharged through the outlet 20 to complete a loop back to the nuclear reactor which generates the heat from which useful work is ultimately extracted.
Referring now to the drawings generally and Figures 2 and 3 in particular, it will be noted that a test stand or rig 50 has been designed to investigate two areas of special interest. (1) Explore the effects of tube insertion into a once-through steam generator configuration and (2) quantify residual strain during axially constrained hydraulic expansion of the tubes 27 alone.
The capability to accurately and analytically predict the hydraulic expansion mechanics was confirmed using finite element modeling as will 3 o be discussed later.
Generally, for once-through steam generator tube applications, the expansion takes place at each end of the straight tube which has both ends fastened by seal welds at the tubesheet. An expansion in a U-bend
8 Case 8075 or free ended straight tupe results in contraction of the free end of the tube. This contraction is in proportion to the length of the expansion in accordance with the Poisson effect. For a 26 inch expansion length, this axial movement has been observed to be approximately 1/8 inch.
expansion in a fixed ended tube induces strain to the tube instead. What is not known is the influence of the expansion zone plastic defvmlation in the distribution of the strain i_e. the strain in the tube could be evenly distributed throughout the expanded and unexpanded tube or could accumulate m the plastically flowing region. An even distribution is 1 o expected based on theoretical material mechanics; however, the magnitude must be verified t4 be analytically predictable so that it may be considered in the residua) stress, flow induced vibration, and tubelshell interaction analyses of the once-through steam generator t4be design.
1 s The once-through steam generator proposed design consists of 5/8 inch OD, 0.038 inch wall Sumitomo Alloy 690TT on a 7/8 inch pitch-Tubesheets are sized at 22 inches thick each- Fifteen tube support probes exist over the bundle length.
2 o The test rig 50 shown in Figures 2 and 3 has tubelhole and pitch geometries Selected based on availability of equipment. The stand 50 includes two tubesheet blocks 51 and 52 gun drilled to a 0.93 inch triangular tube pitch, and two broached plates 53 and 54. The tubes 55, 56 and 57 are 11/16 inch OD, 0.040 inch wall Sumitomo Alloy 690 TT. The 2 5 broached plates 53 and 54 are of similar material and tube-to-hole clearance as the once-through steam generator broached plate 45, and holes 58 drilled to a 0.95 inch triangular tube pitch. The edge condition of the hole 58 is much rougher than the broached plate 45 hole to provide a conservative condition for tube aprasion assessment. The pitch of the 3 o drilled broached plates 53 and 54 for the test arrangement was larger than the pitch of the holes 59 of the tube sheet blocks 12 and 14. As such one central hole 59 was used to align the tube passage by typical production techniques with the surrounding holes 59 being progressively further out of alignment- The test holes were the aligned hole and an adjacent hole
9 Case 6075 that represents a 0.020 inch offset of the tube passage. A third hole in the periphery of the pattern was used to assess tubeability and entry abrasion for a conservative out-of tolerance offset . I_e., '0.050 inch misalignrnent_ The assembly was mounted between heavy structural beams 60 and 61 to approximate the rigidity of the tubesheet/pressure boundary assembly, and offer stiffness in excess of the tubes 55, 56 and 57 being investigated.
io The tubes 55, 56 and 57 were eddy current inspected for manufacturing burnish mark in full accordance with accepted testing procedures before insertion into the test rig 50.
The tube 55 was then inserted by normal practice into corresponding ideally aligned holes 58 and 59 while tube 56 was inserted into the holes 58 and 59 having a 0.020 inch displacement between the corresponding broached plate holes 5B and the tubesheet block holes 59.
A third tube 57 was inserted into a peripheral hole 59 wish ~-0.050 inch 2 0 offset relative to the corresponding Groached plate holes 58. The ends of the inserted tubes 55, 56 and 57 were tack expanded at each end in preparation for welding.
Ten strain gauges 62 were mounted and equally spaced across the 2 5 free span of tube 55 and tube 56 as shown at Figure 4. The tubes 55 and 56 were welded at their respective ends to t4besheet blocks 51 and 52.
Each of the gauges B2 was used to measure tube expansion in an axial or transverse direction at its respective location, and strain data was then recorded to assess any imparted strains from the welding operation.
3D Thereafter, Tube 55 was fuh depth hydraulically expanded, i.e_, 26 9/16 inch length, while the digital data acquisition system recorded the resulting strain development in the tube 55. After a cursory data review, the partial depth hydraulic expansion, i_e_, 13.25 inch length at the second tubesheet block 52 was performed with strain data recorded. The process was then Case 6D75 repeated for tube 55 at the full and partial depth hydraulic expansion as shown at Figures 5 and 6, respectively.
Eddy current evaluation was performed on the two completely assembledlinstrumented tubes 55 and 56 and the tube 57 which had been inserted into the 0.050 inch offset tube holes 58 and 59.
After two weeks, tube 55 was cut at a point ~8 inch from the first, i.e.. full depth hydraulically expanded, tubesheet block 51 and the strain 1 o relaxation was measured with a dial gauge.
A linear elastic plastic finite element model of the experimental test stand 50 was developed to provide comparative analytical predictions of the strain development with hydraulic expansion. The model was an 7.5 adaptation of the 3-D axisymmetric hydraulic expansion model developed for in-house Tube to Tubesheet Joint Qualification Programs_ Tubes 55 and 56 were inserted through exactly aligned and .020 inch offset corresponding 'holes 58 and 59 and passed through both 2 o tut~esheet holes 59 and broached plate holes 58 with no substantial resistance relative to U-tube steam generator tubing experience. Mild resistant 'stop and starts' were encountered by the tubes 55 and 56 as they were passed through the first tubeshset hole 59 which is a typical response to 'eyeball' estimation of a perpendicular entry alignment of the 2 5 tube at the peginning of its insertion. F-~cperience has shown that once the tube is sufficiently inserted. it guides itself and resistance is virtually eliminated.
Slight resistance was sensed on insertion of the t4be 57 through 3 o the corresponding 0.050 inch offset holes 58 and 59. However, this was well within the range of experience with pressurized once-through steam generator tube insertion. Manual thumb pressure on the tube end was sufficient to smoothly move the tube 57 into position.

Case 6075
10 The eddy current evaluation showed no manufacturing burnish mark in any of the tubes before or after insertion and expansion, when subjected to eddy current test processes and criterion suitable to typical Baseline evaluations.
Visual evaluation indicated superficial discontinuity in the tube Surface finish on tubes 55 and 56. A mild burnish was visible on tube 57 which had no raised metal or discernible depth relative to calibrated scratch standards i.e_, <0.0005 inch.
NQ strains in the tube free span were detectable from the welding operation. In response to hydraulic expansion, the strain gauges showed strain desvelopment in the free span of both tubes SS and 56 that was uniform and consistent throughout. Finite element prediction of the expansion strain was shown as very close to that experimentally measured on tube 56 as shown in Figure 5. The strain levels as experimentally measured on tube 56 increased again by an expected 50%
in response to the second tubesheet expansion of half the length of the original as seen in Figure fi.

After two weeks, tube 55 was cut and the strain relaxation was measured with a dial gaNge. This was intended to investigate any unknown relaxation effects. The tube relaxed over 0.130 inch which is comparable to prediction by the finite element model-The development of the strains to predicted levels shows that the plastic expansion regions have not absorbed a disproportional share of the strain due to unexpected non-linearities. The strain is uniformly distributed throughout the expanded and free span regions. It is 3o repeatable, analytically predictable, controllable (by setting expansion length) and permanent under the conditions tested in this experiment.
No manufacturing burnish marks were detected by eddy current testing in spite of ahempts to create a worst case tube passage.

Case 6075 From the foregoing test results it is seen that hyd~a4lic pre-stressing of once-through steam generator tubes is possible when done according to the developed empirical data.
It will be understood that certain modifications and improvements obvious to people of ordinary skill in this art area were deleted herein for the sake of conciseness and readability. It is intended, however that all such be included in the scope of the following claims-to

Claims (5)

CLAIMS:
1. A method of pre-straining a small diameter, long length tube to increase buckling margin and reduce induced vibration comprising tying down both ends of the tube to a secure plate and applying a hydraulic pressure to the inside surface of the tube to produce a desired radial expansion resulting in a desired tube shortening.
2. A method as set forth in Claim 1 wherein the tube is a once-through steam generator tube.
3. A method as set forth in Claim 2 wherein tying down of tube ends includes the welding of the tube ends to tubesheets located at these ends.
4. A method as set forth in Claim 3 including a plurality of once-through steam generator tubes aligned into an array and having their ends welded to the tubesheets located at the ends of the tubes.
5. A method of pre-straining a tube without heating the tube, comprising:
securing a first end of the unheated tube to an associated first tube sheet;
securing a second end of the unheated tube to an associated second tube sheet; and hydraulically expanding one of the first and second ends of the unheated tube into its associated tube sheet to produce a preselected tensile prestrain that is uniformly distributed throughout the tube.
CA 2288367 1999-11-02 1999-11-02 Hydraulic expansion pre-straining of heat exchanger tubing Expired - Lifetime CA2288367C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CA 2288367 CA2288367C (en) 1999-11-02 1999-11-02 Hydraulic expansion pre-straining of heat exchanger tubing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CA 2288367 CA2288367C (en) 1999-11-02 1999-11-02 Hydraulic expansion pre-straining of heat exchanger tubing

Publications (2)

Publication Number Publication Date
CA2288367A1 CA2288367A1 (en) 2001-05-02
CA2288367C true CA2288367C (en) 2004-01-13

Family

ID=4164548

Family Applications (1)

Application Number Title Priority Date Filing Date
CA 2288367 Expired - Lifetime CA2288367C (en) 1999-11-02 1999-11-02 Hydraulic expansion pre-straining of heat exchanger tubing

Country Status (1)

Country Link
CA (1) CA2288367C (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115440401B (en) * 2022-08-16 2024-09-10 核动力运行研究所 Direct-current steam generator for lead-bismuth stack

Also Published As

Publication number Publication date
CA2288367A1 (en) 2001-05-02

Similar Documents

Publication Publication Date Title
MacDonald et al. Steam generator tube failures
US11448393B2 (en) Tube support system for nuclear steam generators
US6357114B1 (en) Hydraulic expansion pre-straining of heat exchanger tubing
KR20140035977A (en) Anti-vibration bar clamping tool
Chatterjee et al. A probabilistic physics-of-failure approach to prediction of steam generator tube rupture frequency
Flesch et al. Leak-before-break in steam generator tubes
CA2288367C (en) Hydraulic expansion pre-straining of heat exchanger tubing
Jo et al. Fluidelastic instability analysis of operating nuclear steam generator U-tubes
Lee et al. High temperature design and damage evaluation of a helical type sodium-to-air heat exchanger in a sodium-cooled fast reactor
CA2673904A1 (en) Tube support system for nuclear steam generators
Maus et al. The He/He heat exchanger—Design and semitechnical testing
Mathews The early operation of the helical once-through boilers at Heysham 1 and Hartlepool
Ryu et al. Effects of support structure changes on flow-induced vibration characteristics of steam generator tubes
De Santis et al. Steam Generators for Nuclear Power Plants
Abdallah et al. Sensitivity study of APR-1400 steam generator primary head stay cylinder and tube sheet thickness
Duda et al. An analysis of the steam superheater coil operation depending on different methods of coil support
Jo et al. Life estimation of PWR steam generator U-tubes subjected to foreign object-induced fretting wear
Sano et al. Operating experiences with 1 MW steam generator
Choa et al. Integrity Evaluation of the UIS Bottom Plate in PGSFR regarding the Thermal Striping
Smith Steam generators
Blumer et al. Mechanical design of the hot steam headers of the THTR-300 steam generators
Park et al. Structural design and evaluation of a steam generator in PGSFR
Bartholomé et al. Experimental and theoretical investigations of KWU on leak-before-break behaviour and its application on excluding of breaks in nuclear piping of KWU-plants
de Clercq et al. The development of sodium-heated steam generators in the Netherlands
Vadlamani et al. Choking flow of subcooled liquid in steam generator tube wall cracks

Legal Events

Date Code Title Description
EEER Examination request
MKEX Expiry

Effective date: 20191104