CA2177623A1 - Method of determining inflow rates from underbalanced wells - Google Patents
Method of determining inflow rates from underbalanced wellsInfo
- Publication number
- CA2177623A1 CA2177623A1 CA002177623A CA2177623A CA2177623A1 CA 2177623 A1 CA2177623 A1 CA 2177623A1 CA 002177623 A CA002177623 A CA 002177623A CA 2177623 A CA2177623 A CA 2177623A CA 2177623 A1 CA2177623 A1 CA 2177623A1
- Authority
- CA
- Canada
- Prior art keywords
- gas
- liquid
- well
- rate
- pressure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title abstract 2
- 239000007788 liquid Substances 0.000 abstract 7
- 239000012530 fluid Substances 0.000 abstract 3
- 230000015572 biosynthetic process Effects 0.000 abstract 2
- 230000000903 blocking effect Effects 0.000 abstract 1
- 230000001143 conditioned effect Effects 0.000 abstract 1
- 230000003750 conditioning effect Effects 0.000 abstract 1
- 230000001419 dependent effect Effects 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/06—Measuring temperature or pressure
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01F—MEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUID LEVEL; METERING BY VOLUME
- G01F1/00—Measuring the volume flow or mass flow of fluid or fluent solid material wherein the fluid passes through a meter in a continuous flow
- G01F1/05—Measuring the volume flow or mass flow of fluid or fluent solid material wherein the fluid passes through a meter in a continuous flow by using mechanical effects
- G01F1/34—Measuring the volume flow or mass flow of fluid or fluent solid material wherein the fluid passes through a meter in a continuous flow by using mechanical effects by measuring pressure or differential pressure
Landscapes
- Physics & Mathematics (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Fluid Mechanics (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Geophysics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- General Physics & Mathematics (AREA)
- Measuring Fluid Pressure (AREA)
- Pipeline Systems (AREA)
Abstract
A method is provided for determining the inflow rates of gas and liquid upon completion of an underbalanced well. The casing is placed, blocking fluid communication between the well and the formation. A tubing string is run in, forming an annular space and a tubing bore. The well is conditioned by removing sufficient liquids to create an underbalanced state and leaving a gas-filled space above any residual liquid. The volume of the gas-filled space in the annular space and the tubing bore is determined. The well is perforated, opening communication between the well and the formation.
Pressure within the tubing bore and annulus is measured as a function of time.
The rate of change of pressure is dependent upon the nature of the incoming fluid; be it gas or liquid. From the above, the rate of incoming fluid can be established as a function of the volume of the gas-filled space and the rate of change of pressure. The inflow rates of solely gas or solely liquid may be determined whether substantially all the liquid is removed during conditioning or only some of the liquid is removed.
Pressure within the tubing bore and annulus is measured as a function of time.
The rate of change of pressure is dependent upon the nature of the incoming fluid; be it gas or liquid. From the above, the rate of incoming fluid can be established as a function of the volume of the gas-filled space and the rate of change of pressure. The inflow rates of solely gas or solely liquid may be determined whether substantially all the liquid is removed during conditioning or only some of the liquid is removed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CA002177623A CA2177623C (en) | 1996-05-29 | 1996-05-29 | Method of determining inflow rates from underbalanced wells |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CA002177623A CA2177623C (en) | 1996-05-29 | 1996-05-29 | Method of determining inflow rates from underbalanced wells |
Publications (2)
Publication Number | Publication Date |
---|---|
CA2177623A1 true CA2177623A1 (en) | 1997-11-30 |
CA2177623C CA2177623C (en) | 2001-08-07 |
Family
ID=4158302
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CA002177623A Expired - Fee Related CA2177623C (en) | 1996-05-29 | 1996-05-29 | Method of determining inflow rates from underbalanced wells |
Country Status (1)
Country | Link |
---|---|
CA (1) | CA2177623C (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110863818A (en) * | 2018-08-08 | 2020-03-06 | 中国石油化工股份有限公司 | Description method and device for residual oil/gas distribution |
CN114198095A (en) * | 2020-08-31 | 2022-03-18 | 中国石油天然气股份有限公司 | Shaft failure data acquisition and analysis method and device and storage medium |
-
1996
- 1996-05-29 CA CA002177623A patent/CA2177623C/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110863818A (en) * | 2018-08-08 | 2020-03-06 | 中国石油化工股份有限公司 | Description method and device for residual oil/gas distribution |
CN110863818B (en) * | 2018-08-08 | 2023-08-29 | 中国石油化工股份有限公司 | Description method and device for residual oil/gas distribution |
CN114198095A (en) * | 2020-08-31 | 2022-03-18 | 中国石油天然气股份有限公司 | Shaft failure data acquisition and analysis method and device and storage medium |
CN114198095B (en) * | 2020-08-31 | 2023-08-22 | 中国石油天然气股份有限公司 | Shaft failure data acquisition and analysis method and device and storage medium thereof |
Also Published As
Publication number | Publication date |
---|---|
CA2177623C (en) | 2001-08-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2416116A1 (en) | Method and apparatus for formation damage removal | |
CA2322075A1 (en) | Packer with equalizing valve and method of use | |
CA2284997A1 (en) | Downhole monitoring method and device | |
WO2003064811A3 (en) | Sand control screen assembly and treatment method using the same | |
CA2105722A1 (en) | Procedure and production pipe for production of oil or gas from an oil or gas reservoir | |
ES8206735A1 (en) | Downhole mixing valve | |
CA2303489A1 (en) | Production fluid control device for oil/gas wells | |
DK1390603T3 (en) | Apparatus and method for limiting the flow of formation water to a borehole | |
CA2447308A1 (en) | Method and apparatus for cleaning a fractured interval between two packers | |
CA2371420A1 (en) | Apparatus and method for controlling fluid flow in a wellbore | |
EP0773343A3 (en) | Extreme overbalanced perforating and fracturing process using low-density, neutrally buoyant proppant | |
CA2247834A1 (en) | Computer controlled downhole safety valve system | |
GB2384506A (en) | Method and apparatus for completing wells with expanding packers for casing annulus and formation isolation | |
EP1306518A3 (en) | Sand control screen assembly having an adjustable flow rate and associated methods of completing a subterranean well | |
CA2231613A1 (en) | Downhole system and method for determining formation properties | |
CA2403866A1 (en) | Tubing hanger with annulus bore | |
EP0709543A3 (en) | Downhole casing filling and circulating apparatus and method | |
CA2031569A1 (en) | Method and means for introducing treatment fluid into a subterranean formation | |
CA2361284A1 (en) | Flow-operated valve | |
CA2320903A1 (en) | Apparatus and method for downhole fluid phase separation | |
CA2138401A1 (en) | Process and tool for laying underground collector mains for liquids and gases | |
CA2349300A1 (en) | Method for removal of undesired fluids from a wellbore | |
US5635636A (en) | Method of determining inflow rates from underbalanced wells | |
CA2168053A1 (en) | Packer inflation system | |
AU2001292458A1 (en) | Downhole valve device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
EEER | Examination request | ||
MKLA | Lapsed |