CA2162433C - Tool condition monitoring system - Google Patents

Tool condition monitoring system

Info

Publication number
CA2162433C
CA2162433C CA002162433A CA2162433A CA2162433C CA 2162433 C CA2162433 C CA 2162433C CA 002162433 A CA002162433 A CA 002162433A CA 2162433 A CA2162433 A CA 2162433A CA 2162433 C CA2162433 C CA 2162433C
Authority
CA
Canada
Prior art keywords
tool
power consumption
consumption signal
crossings
monitoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CA002162433A
Other languages
French (fr)
Other versions
CA2162433A1 (en
Inventor
Joel W. Jones
Ya Wu
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tri Way Machine Ltd Canada
Original Assignee
Tri Way Machine Ltd Canada
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tri Way Machine Ltd Canada filed Critical Tri Way Machine Ltd Canada
Publication of CA2162433A1 publication Critical patent/CA2162433A1/en
Application granted granted Critical
Publication of CA2162433C publication Critical patent/CA2162433C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Testing And Monitoring For Control Systems (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

A tool monitoring system monitors the condition of an electrically powered tool performing a cyclical operation. The tool monitoring system operates generally in two modes: learning mode and monitor mode. In learning mode, the tool monitoring system gathers statistical data on the power consumption of tools of the selected tool type during learning cycles. A power threshold is generated based upon the statistical data. The tool monitoring system then counts the number of crossings by each of the learning cycles of the power threshold and generates statistical data regarding the number of crossings. Preferably, the mathematical operation of wavelet packet transform is used to calculate the power threshold. Feature wavelet packets of the power consumption signal of the tool are calculated. The power consumption signal is then reconstructed from the feature wavelet packets and used to determine the power threshold. In monitor mode, the tool monitoring system counts the number of crossings of the power threshold by the power consumption signal of a tool in operation. The tool monitoring system identifies a worn tool when the number of crossings increases to a certain number relative to the crossings by the learning cycles.

Description

-
2 1 62433 TOOL CONI)ITION MON~OI~ING SYSTl~M

BACKGROUND OF THE INVENTION
The present invention relates to a tool monitoring system for monitoring the condition of an electric motor dnven tool pe~rorll~ing a cyclical operation.
Tool condition monitoring is one of the major concerns in modern machining operations, especially in machining operations for mass production. Failure to 10 detect tool failure and wear leads to poor product quality and can even damage machine tools. On the other hand, a false detection of tool failure or wear may cause an unnecessary interruption of an entire production. Both can result in significant monetary loss.
Known tool monitoring systems include systems for "on-line tool condition 15 monitoring." In on-line tool condition monitoring, the tool is monitored for defects after each cut or cycle. These tool monitoring systems typically use optical sensors or laser optical sensors which measure the geometry of the tool after each cut.
However, on-line tool condition monitoring can only detect catastrophic failure of a tool after a cut and cannot monitor the gradual wear of a tool or predict the tool's 20 failure. Further, these systems are vulnerable to chips, coolant, and environmen~l noises.
Other known methods for tool condition monitoring attempt to predict tool condition based on various sensor signals such as cutting force, acoustic emission, and vibration. However, sensors for monitoring cutting force are too expensive to 25 use with multiple stations and multiple spindles. Acoustic emission and vibration sensors require additional wiring and are vulnerable to various noises.

Some monitoring systems monitor power consumption (or motor current) of the tool. As the tool wears (or if it fails) its power consumption changes.
However, the power signals are complicated and the power signals to provide a reliable, accurate indication of it has proven difficult to use. The power signal does 5 contain some "noise" due to factors other than tool condition. Typically, these systems sets a range of signal that a monitored signal should fall within. When the monitored signal is outside this range, a worn tool or failure is indicated.
One major problem with monitoring the power consumption of the motor is that occasional spikes are experienced in a machine tool even under normal 10 condition. The spikes can falsely indicate that the tool is worn. However, if the threshold is increased to prevent false signals, a worn tool may go undetected.

SUMMARY OF THE INVENTION
The present invention provides a real-time tool monitoring system for 15 monitoring the condition of an electric motor driven tool performing a cyclical operation.
In the inventive tool monitoring system, an accurate dynamic threshold is generated by monitoring the actual power consumption of a machine tool of the selected tool type while the machine tool performs a plurality of m~chining cycles.
20 The power consumption signal of the machine tool is decomposed into its time-frequency components an,d reconstructed based upon certain selected components in order to reduce the effects of noise. In the present invention it is also recognized that the power consumption signal of a machine tool in normal condition will include a number of spikes in each machine tool cycle. Accordingly, the tool monitoring system monitors the number of times the power consumption signal crosses a selected threshold, rather than indicating an alarm after a single crossing of a larger threshold.
The tool monitoring system of the present invention generally operates in two modes: learning mode and monitoring mode. In the learning mode, the tool monitoring system measures the power consumption signals of a certain number of samples (say 20, 50 or 100 samples) of the selected tool type as the tool performs the selected cyclical task. The tool is known to be a new tool or in a normal condition. The tool monitoring system then uses a mathematical technique known as wavelet packet transform to break the power consumption signal into components.
The system selects the components that contain the bulk of the information about the overall signal, when using wavelet transforms, the selected components are the "feature wavelet packets." The selected components contain sufficient information about the original signal but not unnecessary or unwanted components such as noise.
The feature wavelet pacl~ets of the power consumption signals of the learning cycle are then calculated.
The tool monitoring system then uses these feature wavelet packet to develop thresholds. In one method, the system calculates the inverse wavelet packet transform of the feature wavelet packets to reconstruct the power consumption signal of each learning sample. A power threshold, having an upper limit and a lower limit, is then generated based upon the reconstructed power consumption signals of the learning cycle. The power threshold is a function of time relative to the
-3-machine tool cycle. The power threshold is not the extremes of the signal, but rather some statistic functions of the signals. The signals of learning cycle will cross the threshold some number of times. The tool monitoring system then counts the number of crossings of the power threshold by the learning cycle power S consumption signals and calculates their statistical properties.
In monitoring mode, the tool monitoring system continuously measures the power consumption signal of the tool performing the cyclical task. The tool monitoring system counts the number of crossings of the power threshold by the monitoring power consumption signal and compares the number of crossings to the 10 statistical data regarding the number of crossings gathered from the learning mode.
The tool monitoring system generates an alarm when the number of crossings of the power threshold by the power consumption signal increases to some prede~ermined amount relative to the number of crossings experienced in the learning mode.

BRIEF DESCRIPTION OF THE DRAWINGS
The above, as well as other advantages of the present invention, will become readily apparent to those skilled in the art from the following detailed description of a preferred embodiment when considered in the light of the accompanying drawings in which:
Figure 1 illustrates a tool monitoring system according to the present invention, monitoring the'power consumption of a machine tool machining a series of workpieces.

2 1 62~33 Figure 2 illustrates the power signal from one cycle of the machine tool as received by the tool monitoring system of Figure 1.
Figure 3 is a flow chart of the tool monitoring system of Figure I in its learning mode.
Figure 4 is the wavelet packet transform of the signal of Figure 2.
Figure 5 is a reconstructed power consumption signal of Figure 2, reconstructed from the feature wavelet pacl~ets selected from Figure 4.
Figure 6 is a power threshold based upon several reconstructed power consumption signals of the learning cycles.
Figure 7 is a flow chart of the tool monitoring system of Figure 1 in monitor mode.

DETAILED DESCRIPTION OF THE PRE~FERRED EMBODIMENlr Figure 1 shows a tool monitoring system 10 according to the present invention including a current transducer 12 connected to an analog-to-digit~l converter 14 and a CPU 16. The tool monitoring system 10 is shown moniloling a machine tool 18 having an electric motor 20 driving a tool 22. For purposes ofillustration, the machine tool 18 is shown machining a series of workpieces 24 being moved along a conveyor system 26. As will become apparent, the tool monitoring system 10 of the present invention can be used with any selected tool type using an electric motor and performing a repetitive, cyclical task.
In operation, the motor 20 and tool 22 are repeatedly loaded to cut each worl~iece 24, and then the conveyor system 26 positions another workpiece 24 to the machine tool 18. The current transducer 12 continuously indicates the power consumphon of the motor 20 by sending a power consumption signal to the analog-to-digital converter 14, which converts the power consumption signal into a format readable by the CPU 16. The analog-to-digital converter 14 sends a digital signal S representing the amplitude of the power consumption signal at a series of current time segments. The digitized power consumption signal is stored in the CPU 16 and associated with its particular time segment, relative to the machine tool cycle.Figure 2 shows one cycle of the power consumption signal 28 of the machine tool 18 of Figure 1, as received by the CPU 16. The machining operation is in the form of a cycle starting from tool engagement and ending with tool withdrawal. At the beginning of the cycle, the tool 22 is not engaging the workpiece 24 and thepower consumption signal 28 is at idling power 30. During the initial engagement 32 of the tool 22 with the workpiece 24, the power consumption signal 28 rises. When the tool 22 is fully engaged in the workpiece 24, the power consumption signal 28 reaches full engagement consumption 34. At full engagement 34, the power consumption signal 28 reaches a level and remains relatively unchanged, though there are fluctuations caused by various noise, such as cutting a hard spot in the workpiece 24. Due to this fl~lct l~tinn, it has been difficult to use a power signal to accurately predict tool condition. A high "spike" in the - 20 signal from an unworn tool might be sometimes interpreted as a worn tool. The present invention overcomes this problem. After completion of m~chining the toolis withdrawn. During withdrawal 36 the power consumption signal 28 decreases steadily and finally returns to idling power 38.

The inventive tool monitoring system 10 is generally based upon the observation that the machine tool 18 will consume more power to perform the same work when it reaches a worn condition. As will be explained in detail below, the tool monitoring system 10 according to the present invention generally operates in 5 two modes: a learning mode and a monitoring mode. In learning mode, the tool monitoring system 10 preferably receives data from several sample cycles of machine tools 18 of the selected tool type. Information related to the power consumption during each cycle run by each machine tool 18 is stored to develop expected signal ranges, or thresholds. Then in monitoring mode, the tool 10 monitoring system 10 compares the power consumption signal of a machine tool 18 with data gathered in the learning mode and signals an alarm when the tool monitoring system 10 detects that the tocl 22 is worn. The determination is made by comparing the signal to the expected learning cycle, signal ranges, or thresholds.
Since the thresholds are developed by samples, they are more accurate than prior 15 art "selected" thresholds.
Figure 3 shows a flow chart for the learning mode 40 of the tool monitoring system 10 of Figure 1. In learning mode 40, numerous le~rning cycles of a plurality of tool 22 of the selected tool type are run in 42. The tool 22 is selected to be a new tool or in normal condition. The power consumption signals 28 of the 20 learning cycle are ~igiti7ed by the analog-to-digital converter 14 and stored in the CPU 16 in 44.
The CPU 16 then selects feature components of the power consumption signal 28 in 46. In one preferred embodiment, wavelet transforms are used to break the signal into components, as explained below. In 46, the samples of the learning cycle are decomposed into different time-frequency components. The feature wavelet packets are selected from the co~l~ponents to represent the main information about the original power consumption signal 28, thereby the unwanted components of the power consumption signal 2~, i.e. noise are filtered out from the signal.In 50, the CPU 16 reconstructs the power consumption signal 28 of each learning cycle from the selected feature wavelet packets by the inverse of the function used to break the original power signal into components. The reconstructed power consumption signal 28 then contains sufficient information from the original power consumption signal 28, but with reduced noise. Notably, while only some of the learning cycles need be used to select the feature wavelet packets in step 46, preferably all of the learning cycles are used to develop data at step 50. The more cycles utilized, the more accurate the system.
In 52, the CPU 16 generates a power threshold based upon statistical data calculated at 50 from the learning cycles. The power threshold is a function of time over the machine tool cycle and includes an upper limit and a lower limit. the upper and lower limits are not the extremes of the signal, but rather some statistic function of the signal. The learning cycle signals will occasionally exceed these thresholds.
In 54, the CPU 16 compares the power threshold to the power consumption signals of the learning cycles. The CPU 16 col~pales each power consumption signal to the power threshold at each time segment and counts the number of crossings by each power consumption signal. The crossings of the lower limit of 2 ~ ~2433 the power threshold can be counted separately from the crossings of the upper limit of the power threshold, or as a separate number.
In 56, the CPU 16 calculates the statistic properties of crossings of the power consumption signals of the learning cycles. If the upper limit crossings are counted 5 separately from lower limit crossings, the two means would also be calculated separately. The means and variances will be compared to the monitored signals.
Since the system compares expected numbers of crossings, rather than looking for a single crossin~, the occurrence of a few "spikes" in a monitored signal will not lead to a false indication that a tool is worn.
As mentioned, in the preferred embodiment, the power consumption signal 28 is broken into its components using wavelet packet transforms. Wavelet transform is a signal processing teehnique. The wavelet transform decomposes a signal into various components at different time scales and frequency bands, all of which form a surface in time-frequency plane. Both the time scale and the length 15 of the frequency band can be changed, hence the characteristics of a signal can be magnified upon different resolutions.

In the ~ ed 20 embodiment of the present invention, the CPU 16 calculates a discrete wavelet transform, specifically ~he wavelet packet transform. The wavelet transforrn is defined as follows:
Where the wavelet bases is:
B

Ws~t)]= J .~)lY!(t r)d~

Y~sr(t)=~

The wavelet transform can be considered as signal decomposition. It decomposes a signal f(t) into a family of wavelet bases, and the weighting coefficients, W~f(t)], represent the amplitudes at given location t and frequency s. The wavelet transform is a time-frequency function which describes the information of f(t) in various time S windows and frequency bands. It forms a three-dimensional figure against time-frequency plane. As a result, wavelet transform is capable of capturing non-stationary signals such as frequency variation and m~gnitllde undulation.
The properties of wavelet transforms are determined by wavelet base functions. A number of wavelet base functions have been developed. When a 10 wavelet base function, ~( ), is specified, its family, y6,r(t), is called the wavelet bases.
For digital signals, discrete wavelet transforms can be used. In discrete wavelet transforms the frequency parameter, s, is taken as an integer power of two, i.e., s=2j, j=l, 2, . . .; and the time parameter, t, is taken as a series of integer 15 k (i.e. t ~ k= 1,2, . . .); that is:

~,~(t)=2~ k), j, k=l, 2, . . .

One of the most commonly used discrete wavelet transform is binary orthogonal wavelet transform. Let Aj[-] and Dj[-] be a pair of operators. At jth resolution, Aj[f(t)] is an approximation of the signal f(t) and Dj[f(t)] represents the information loss, or the detail signal ~5]. It has been verified ~4]:
Aj[f(t)] =f(t)*~j(t) Dj~f(t)] =f(t)*~j(t) S where, ~j(t) is a smooth scaling orthogonal bases, ~j(t) is an orthogonal wavelet bases, and "*" denotes convolution. Furthermore, ~j(t) and ~j(t) are correlated through a pair of quadrature mirror filters h(t) and g(t) defined below:
(t)=h(t)*~j l(t) ~j(t) = g(t) *~j-l (t) In one embodiment of the present invention, a pair of 4th-order filters are used as defined below:

t=0 t= 1 t=2 t=3 h(t) 0.48296 0.83692 0.22414 -0.12941 g(t) 0.12941 0.22414 -0.83652 0.48296 From the above equations, the discrete binary wavelet transform is then obtained:
Aj[f(t)] =h(t)*A~I[f(t)]

Djlf(t)] =g(t)*Aj l[f(t)~
20 or Aotf(t)] =f(t) Aj[f(t)] =~;"h(k-2t)Aj ,tf(t)]
Dj[f(t)~=~,,g(k-2t)A; Itf(t)]
where, t=l, 2, . . ., N, j=1, 2, . . ., J, and J=log2N.

Since the wavelet transform is a complete representation of the signal, the original signal f(t) can be reconstructed by means of inverse wavelet transform or the reconstruction formula below:
Aj[f(t)] =2{~"h(k-2t)Aj+l[f(t)] +~,~g(k-2t)*Dj+,[f(t)]}
5 where, j=J-l, J-2, . . ., 1., O.
Let operators H and G be the convolution sum defined below:
H = ~,~h(k-2t) G = ~,~g(k-2t) Then, Aj[f(t)]=HAj l[f(t)]
Dj[f(t)] =GAj ,[f(t)]
It is seen that the binary wavelet transforms uses H and G only on the approximation Aj l[f(t)] but not on the detail signal Dj ,tf(t)]. If the operators H and G are applied on both Aj l[f(t)] and Dj ,[f(t)], then, it results in the wavelet packet 15 transform. The wavelet packet transformation can be computed by the recursive algorithm below:

Po(t)=~t) P2~ (t)=HPj il(t) P2ji=GPj_l(t) where P~t) is the ith packet on the jth resolution, t- 1,2, . . . ,2~ 1,2, . . .2j, j = 1, 2, . . .
J, J=log2N.
The original signal f(t) can be reconstructed by the inverse wavelet transform below:

PJ~t) 2t~P-~.+l (t) GP~.+l(t)]

where, j=J-l, J-2, . . ., 1, 0; i=2j, 2j-~, . . ., 2, 1, and the operators H and G are the conjugate of H and G:
H = ~kh(t-2k) G = ~g(t-2k) Returning to the learning cycle as shown in Figure 3, at step 46, the CPU
16 calculates all of the wavelet packets to select the feature wavelet packages. As will be shown wavelet packet transforms result in breaking a complex signal into a number of components, with only a few of the components carrying the bulk of the signal information.
Figure 4 shows the wavelet transform 60 of the power consumption signal 28 of Figure 2. As can be seen from the figure, the wavelet transform 60 calculated to a first resolution 62 is decomposed into a first packet 64 and a second packet 66.
The first packet includes~most of the information, while the second packet generally includes background noise. At a second resolution 68, the wavelet transform 60 comprises four packets. At each resolution, the wavelet packets contain the complete information for the original signal. In one embodiment, the CPU 16 calculates the wavelet transform 60 to at least its fifth resolution 70, which comprises 32 packets. From this calculation, one can determine that at the fifth resolution, the first packet, Psl(t) represents the trapezoid trend and the 11th packet, 5 P5ll(t) represents the dynamic wave. These two wavelet packets may then be selected as the feature wavelet packets. The feature wavelet packets can be selected by taking the wavelet packets containing the most inforrnation, or the most energy.
Increasing the number of wavelet packets selected increases the accuracy to which the components represent the original signal, however, the more packets that are 10 sele~ted the more complicated the calculation becomes. The number of wavelet packets can be increased until the desired accuracy is achieved.
In step 50, the CPU 16 performs the inverse wavelet packet transform on the feature wavelet packets, while setting the other packets to zero. Setting the other packets to zero elimin~t~s noise from the signal. The reconstructed signal 76 of one lS of the learning cycles, shown in Figure 5, therefore comprises the principal components of the power consumption signal 28, without the unwanted components such as various noises.
In step 52, the CPU 16 generates a power threshold 78, as shown in Figure 6, which is based upon statistical plOp~ ies from the reconstructed power 20 consumption signals 76 from the learning cycles. The mean and standard deviation of the reconstructed power signals 76 are calculated at each time segment relative to the machine tool cycle. Therefore, both the mean power consumption signal and the standard deviation are functions of time over one machine tool cycle. The power threshold includes an upper limit 80 and a lower limit 82, which are both functions of time over the machine tool cycle. The thresholds are selected to be some function of the mean and standard deviation of the learning cycles signals. In this embodiment upper limit 80 and lower limit 82 are preferably calculated as plus 5 and minus a certain number of standard deviations from the mean of the reconstructed power consumption signals 76 of the learning cycles.
In step 54, the CPU 16 compares the power consumption signal 76 from the learning cycles with the power threshold 78. One of the power consumption signals 76 from the learning cycles is shown in Figure 6. In practice, the power 10 consumption signals from numerous learning cycles would be compared with the power threshold 78. Notably, the signal in Figure 6 is shown crossing the thresholds. The CPU 16 counts the number of crossings by the power consumption signals 28 of the learning cycles of the upper limit 80 and lower limit 82 of the power threshold 78. The CPU 16 then de~ermines the mean number of crossings 15 by the learning cycle signals in step 56. The upper limit 80 crossings can be counted separately from the lower limit crossings 82, or a composite number.
After creating a power threshold 78 and statistical data from crossings of the power threshold in learning mode 40, the tool monitoring system 10 enters the monitoring mode 84, shown in Figure 7. In monitor mode 84, the tool monitoring 20 system 10 is again connected to a machine tool 18 of the selected tool type as shown in Figure 1. Preferably, the same CPU 16 is used in both the learning mode 40 and monitor mode 84, however, it is recognized that the power threshold 78 data could be downloaded to a different l~PU for the monitor mode. Moreover, it is preferred that the learning mode be performed at the actual work station where the CPU will be monitoring. Using the actual workstation for the learning mode will insure that any individual characteristics of the motor, tool mounts, etc. will be accounted for in the thresholds.
In monitor mode 84, as shown in Figure 7, the CPU 16 keeps a counter, "Crossings", which is initially set to zero in step 86. The CPU 16 monitors the power consumption signal 28 of the machine tool 18 while the machine tool 18 performs its repetitive cyclical machining operations in 88.
In step 91, the CPU 16 compares the power consumption signal of the machine tool 18 to a catastrophic threshold. The catastrophic threshold is chosen to be much larger than the power threshold 78. It can be based upon the data gathered in the learning mode 40 or can be determined beforehand. The catastrophic threshold is selected to be so high, as to only be met when there is a severe failure. If the power consumption signal 28 crosses the catastrophic threshold at any time, the CPU 16 signals an alarm in step 92 which immediately ceases the machining operation and disengages the motor 20 and spindle 22.
In step 94, the CPU 16 monitors whether the power consumption signal 28 fails to rise above the idling power 30 in the time segments of the cycle corresponding to the initial engagement of the tool with the workpiece 24. This indicates that the workpiece 24 is missing or that the tool 22 is broken. If so, the CPU 16 signals an alar~ 92. This threshold can be based upon the data gathered in the learning mode 40 or can be determined b~forehalld.

The CPU 16 then determines whether the power consumption signal 28 crosses the power threshold 78 in 96. If the power consumption signal 28 crosses the power threshold 78, the CPU increments the counter, Crossings, in step 98. In step 100, during a cutting cycle, as soon as the counter indicates that the number 5 of crossings by the power consumption signal 28 of the power threshold 78 is more than of crossings caIculated in the learning mode, the CPU 16 indicates an alarm 92. Since the crossings are counted during a cutting cycle, the number of crossings can be compared to statistical data from the learning mode before the end of the cycle, i.e. the number of crossings can be compared for selected fractions of the 10 cutting cycle.
In 102, if the CPU 16 detects that the machine tool 18 has not completed a cycle, the CPU 16 retum to step 88 to monitor the next time segment of the power consumption signal. If the end of a cycle is detected, then the number of crossings, which is stored in "Crossings", is stored with a predetermined number of previous 15 numbers of crossings.
In step 106, the CPU evaluates the trend of the number of crossings by the power consumption signal 28. If the number of crossings is increasing steadily over the previous predetermined number of cycles, this would indicate that the machine tool 18 is worn and h~(ling towards failure. The CPU 16 may intliç~t~ an alarm 20 92.
If the end of a cycle is detected in 102, and the trend of crossings does not indicate tool wear in 106, the counter, Crossings, is reset in step 86 and the tool monitoring system 10 monitors the next cycle.

Note that all of the steps above require only one addition and comparison, therefore they can be performed within the time interval of two monitoring sample points, so that it can be used for real-time monitoring. Moreover, the present tool monitoring system 10 accurately predicts tool failure by selecting a threshold and 5 dealing with the effects of various noises in several ways. The tool monitoring system monitors only selected components of the power consumption signal to elimin~te the effects of unwanted noise. In recognizing that the power consumption signal of a tool in normal condition will have a number of spikes, the tool monitoring system monitors the number of crossin~s of the chosen power threshold, 10 rather than indicating an alarm after a single crossing of a larger power threshold.
Further, by basing the threshold on statistical data from the power consumption signal from learning cycles, the power threshold is an accurate function of time over the machining cycle.
It should be understood that this invention can be broadly utilized in a 15 number of distinct fashions. As one example, the learning cycle could be performed with the first several cycles of each new tool. Thus, the system could be placed in a new tool, and can recalculate its thresholds with the first several cycles, which will be known to be operations on a new tool. With such a system, there is also the alternative for including in the memory of the controller an çst;m~te of what the 20 thresholds typically arrived at for the particular type of tool. Thus, when the tool begins to set its own t~resholds based on its actual learning cycle, it wiIl be modified from this predicted threshold. Moreover, these predicted thresholds are utilized during the first several cycles to predict catastrophic failure, as described above.
With re~ard to the actual monitoring of the tool during its cyclical operation, it is anticipated that the actual monitored signals will not need to be broken into 5 components. That is, the actual raw signals can simply be compared to the power thresholds in a real-time fashion. This greatly simplifies the calculation and required times to determine when a tool is worn. In such a system, some simple adjustment of the thresholds as calculated from the learning cycles may be necessary to include the effect of the removed information from the learning cycles. This 10 adjustment may be as simple as adding some fixed amount to the thresholds to account for that which was removed to create the thresholds.
Alternatively, it may also be preferable to take only components of the signal that is being monitored and compare those components to the thresholds. That is, the actual monitoring of the tool may utilize the same method steps that were used 15 to create the thresholds in its learning cycle.
In accordance with the provisions of the patent statutes, the present invention has been described in what is considered to represent its ~lefelled embodiment.
However, it should be noted that the invention can be practiced otherwise than as specifically illustrated and described without departing from its spirit or scope.

Claims (18)

THE EMBODIMENTS OF THE INVENTION IN WHICH AN EXCLUSIVE
PROPERTY OR PRIVILEGE IS CLAIMED ARE DEFINED AS FOLLOWS:
1. A method for monitoring the condition of an electrically powered tool of a selected tool type performing a cyclical task comprising the steps of:
a. using a tool to preform a cyclical task and measuring a power consumption signal of said tool as said tool performs said cyclical task;
b. decomposing said power consumption signal of said tool into components by converting said power consumption signal into time segments, each time segment having a digital value equivalent to the analog value of said signal at said time, and decomposing said time segments of said power consumption signal into different frequency components using a mathematical algorithm;
c. selecting feature components of said power consumption signal;
d. using said selected components of said power consumption signal to set a power threshold in a learning cycle;
e. using a tool to perform a cyclic task and monitoring its power consumption signal; and f. identifying a worn condition of the tool of step e. based upon a comparison of said power consumption signal with said predetermined power threshold of step d.
2. The method for monitoring Claim 1, wherein the selected components of monitoring said step c. are reconstructed prior to said step d.
3. The method for monitoring of Claim 1, wherein said step b. includes the step of applying said power consumption signal of said tool to a plurality of filters.
4. The method for monitoring of Claim 1, wherein the decomposition of the signal includes the step of calculating wavelet packet transforms of said power consumption signal.
5. The method for monitoring of Claim 1, wherein said power consumption signal of step e. is not decomposed prior to step f.
6. The method for monitoring of Claim 1, wherein said step f. includes the steps of counting the number of crossings of said power threshold by said power signal, and comparing the number of crossings to an expected number of crossings.
7. A method for monitoring the condition of an electric motor powered tool of a selected tool type comprising the steps of:
a. using a tool to perform a cyclical task, and measuring a power consumption signal of said tool as said tool performs a cyclical task;
b. generating a power threshold based upon said power consumption signal of said step a.;
c. using a tool to perform a cyclical task, and measuring the power consumption signal of said tool as said tool performs said cyclical task;
d. comparing said power consumption signal of step c. to said power threshold by counting the number of crossings of said power threshold by said power consumption signal of said tool in step a, and counting the number of crossings of said power threshold by said power consumption signal of said tool in step c; and e. signalling a worn condition of said tool of step c when said power consumption signal of step c. reaches a predetermined level relative to said power threshold, said predetermined level being defined by when said crossings of said tool of step c. exceed said crossings of said tool of step a. by a predetermined amount.
8. The method for monitoring of Claim 7, wherein both upper and lower thresholds are generated in said step b.
9. The method for monitoring of Claim 7, wherein extreme thresholds are also set outside of said upper and lower thresholds, and signalling a failure should said power consumption sinal of step c. exceed said extreme thresholds once.
10. The method for monitoring of Claim 7, wherein said tool signals of said step b. are generated using a plurality of sample cycles.
11. The method of monitoring of Claim 7, wherein said tools of steps a.
and c. are the same tool.
12. The method for monitoring of Claim 7, wherein said step b. includes the steps of:
converting said power consumption signal of said tool into time segments, each time segment having a digital value equivalent to the analog value of said signal at said time;
calculating wavelet packets of said power consumption signal of said tool; and reconstructing said power consumption signal of said tool by calculating inverse wavelet packet transform based on selected wavelet packets.
13. A method for monitoring the condition of an electric motor powered tool of a selected tool type comprising the steps of:
a. selecting a power threshold;
b. using a tool to perform a cyclical task, and measuring a power consumption signal of said tool as said tool performs said cyclical task;
c. counting the number of crossings of said power threshold by said power consumption signal of said tool; and d. signalling a worn condition of said tool when said crossings of said tool exceed said crossings of said learning cycle tool by a predetermined amount in a predetermined time frame.
14. The method for monitoring of Claim 13, wherein said step a.
includes the steps of:
measuring a power consumption signal of said learning cycle tool as it performs a cyclical task; and generating a power threshold based upon said power consumption signal of said learning cycle tool.
15. The method for monitoring of Claim 14, wherein said tools of steps a. and b. are the same tool.
16. A method for monitoring the condition of an electric motor powered tool of a selected tool type comprising the steps of:
a. using a first tool to perform a plurality of cyclical tasks, and measuring a power consumption signal of said first tool as said first tool performs said plurality of cycles of cyclical task;
b. decomposing said power consumption signal of each said cycle of said first tool into components;
e. selecting feature components of said components of said power consumption signal;
d. reconstructing said power consumption signal from said feature components;
e. generating a power threshold based upon said reconstructed power consumption signal of said first tool, said power threshold including an upper limit for said power consumption signal;
f. counting the number of crossings of said power threshold by said power consumption signal of said first tool while performing a plurality of cycles of said cyclical task;
g. using a second tool to perform said cyclical task, and measuring the power consumption signal of said second tool as said second tool performs said cyclical task;
h. counting the number of crossings of said power threshold by said power consumption signal of said second tool;
i. comparing the number of crossings of said power threshold by said second tool with the number of crossings of said power threshold by said first tool; and j. signalling a worn condition of said second tool when the number of crossings of said power threshold by said second tool exceeds the number of crossings of said power threshold of said first tool by a predetermined amount in a predetermined time frame.
17. The method for monitoring the condition of an electrically powered tool of Claim 16, wherein said steps b-d include the steps of:
calculating feature wavelet packets of said power consumption signal of said first tool; and reconstructing said power consumption signal from the inverse wavelet packet transform of the feature wavelet packets.
18. The method for monitoring the condition of an electrical power tool of Claim 16, wherein said first and second tools are the same tool.
CA002162433A 1995-08-04 1995-11-08 Tool condition monitoring system Expired - Fee Related CA2162433C (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US192695P 1995-08-04 1995-08-04
US60/001,926 1995-08-04

Publications (2)

Publication Number Publication Date
CA2162433A1 CA2162433A1 (en) 1997-02-05
CA2162433C true CA2162433C (en) 1998-05-05

Family

ID=21698460

Family Applications (1)

Application Number Title Priority Date Filing Date
CA002162433A Expired - Fee Related CA2162433C (en) 1995-08-04 1995-11-08 Tool condition monitoring system

Country Status (1)

Country Link
CA (1) CA2162433C (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108655826B (en) * 2018-06-25 2023-04-14 河北工业大学 Cutter abrasion visual inspection device and visual inspection method for numerical control turning

Also Published As

Publication number Publication date
CA2162433A1 (en) 1997-02-05

Similar Documents

Publication Publication Date Title
US5587931A (en) Tool condition monitoring system
US6308138B1 (en) Diagnostic rule base tool condition monitoring system
US5407265A (en) System and method for detecting cutting tool failure
El-Wardany et al. Tool condition monitoring in drilling using vibration signature analysis
Chen et al. Acoustic emission method for tool condition monitoring based on wavelet analysis
EP1405047B1 (en) Vibration analysis for predictive maintenance in machinery
JP2567124B2 (en) Machine tool monitoring device and monitoring method
US6260427B1 (en) Diagnostic rule tool condition monitoring system
Luo et al. Real-time condition monitoring by significant and natural frequencies analysis of vibration signal with wavelet filter and autocorrelation enhancement
US20060089744A1 (en) Method for managing machine tool data
Choi et al. Real‐time monitoring of tool fracture in turning using sensor fusion
EP1348296B1 (en) Control embedded machine condition monitor
Bahr et al. Sensor fusion for monitoring machine tool conditions
CN114800040B (en) Cutter wear monitoring method and system related to process-state data
EP0842006B1 (en) Tool condition monitoring system
Wang et al. Tool wear monitoring in reconfigurable machining systems through wavelet analysis
JPH06344246A (en) Abrasion detecting method for cutting tool
CN114523338A (en) Cutting tool wear state monitoring method based on noise analysis
CA2162433C (en) Tool condition monitoring system
Roth et al. Monitoring end-mill wear and predicting tool failure using accelerometers
CN110530495B (en) Cutting chatter monitoring method based on vibration analysis
Lee et al. Real-time tool breakage monitoring for NC turning and drilling
Chen et al. Monitoring and analysis of ultraprecision metal cutting with acoustic emission
Tansel Identification of the prefailure phase in microdrilling operations using multiple sensors
Dini et al. Tool condition monitoring in end milling using a torque-based sensorized toolholder

Legal Events

Date Code Title Description
EEER Examination request
MKLA Lapsed