Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
CA000382867A
Other languages
French (fr)
Inventor
Bernard Verbaan
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NATIONAL INSTITUTE FOR METALLURGY
Original Assignee
NATIONAL INSTITUTE FOR METALLURGY
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NATIONAL INSTITUTE FOR METALLURGY filed Critical NATIONAL INSTITUTE FOR METALLURGY
Application granted granted Critical
Publication of CA1179966A publication Critical patent/CA1179966A/en
Expired legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/20Recycling

Landscapes

  • Manufacture And Refinement Of Metals (AREA)

Abstract

ABSTRACT
A process for treating zinc sulphide materials wherein the sub-divided material is firstly leached, under pressure at less than 119C, with a sulphate leach solution low in sulphuric acid and having a high iron content together with zinc and impurities in a manner causing iron to precipitate and subsequently leaching the residue and redissolving the iron precipitate with spent electrolyte containing regenerated sulphuric acid resulting from the treatment of the leach liquor obtained from the first leach step and wherein the leach solution from the subsequent leach step constitutes the starting leach solution for the first leach step. The second leach step is carried out in two stages; a first leach stage conducted at elevated pressure and elevated temperature (less than 119C) in the presence of oxygen and a second stage at atmospheric pressure and without the supply of free oxygen to the leach solution.

Description

11799~i~

This invention relates to a process for leaching zinc containing sulphide minerals in order to recover metal values contained therein and at least some of the sulphide values in the form of elemental sulphur.

In our South African Patent No. 80/0224 issued on March 26, 1980, we described a process wherein zinc sulphide containing material may be subjected to a two-stage leach prccess. In the first stage the ground material is leached, under pressure, with an aqueous solution having a high iron content and a low acid content. In the second stage the partly leached material together with precipitated iron, is leached with spent electrolyte which has a high acid content. Both leaching stages are carried out at an elevated temperature which is below the melting point of sulphur (i.e. 119C), and pressure, the partial pressure of oxygen being one of the important factors.

',,~

1179~6 The process as described in South African Patent No. 80/0224 has the disadvantage that an excess of zinc bearing sulphide mineral must be present to achieve acceptable leaching rates under elevated pressure. It is thus necessary to separate the un-leached sulphide mineral from the final residue which contains a mixture of sulphides, gangue, elemental sulphur and any iron precipitate present, in order to recycle the unleached zinc sulphide mineral back to the first stage leach. It is also necessary to separate the elemental sulphur from the final multi-component residue mixture.

The present invention represents an improvement of the process described in South African Patent No.
15 80/0224, and enables metal values to be recovered from zinc bearing sulphide minerals in such a way that the necessity to separate unleached sulphide mineral from a multi-component residue, in order to recycle unleached mineral may be eliminated.

Thus an object of this invention is to provide a process of the general type described wherein an excess of sulphide mineral is not necessary in order / . . .

11'7~ i6 to achieve high dissolutions whilst also retaining the advantages of the process of our said earlier patent.

In accordance with this invention there is provided a process for the treatment of zinc sulphide containing materials comprising the steps of: (i) contacting in a first leaching stage at a temperature of from 70C to 119C at an elevated oxygen partial pressure of between 100 and 1000 kPa and under oxidising conditions, a sub-divided zinc sulphide containing material with an aqueous leach solution which has dissolved therein zinc and impurities, from 5 to 50g/Q iron, together with ar maximum of between 1 g/Q and 20 g/Q sulphuric acid to dissolve zinc and other soluble metals in the zinc sul-phide containing material by the oxidative action of ferric ions formed by the contemporaneous oxidation of ferrous ions to their ferric state and cause precipita-tion of iron; (ii) separating the solids and leach liquor resulting from such first leaching stage; (iii) subjecting the leach liquor obtained in step (ii) to any required purification steps follows by electrowinning of zinc therefrom to leave a spent electrolyte having regenerated sulphuric acid therein; (iv) contacting, in a second leaching stage, and at elevated temperature of from 70C
to ll9~C and at an elevated oxygen partial pressure of between 100 and 1000 kPa and under oxidising conditions, 1 31 `7~9~

spent electrolyte resulting from step (iii~ above with the solids resulting from step (ii) above to cause redissolu-tion of iron precipitates and the further dissolution of zinc and metal impurities from the residue of the zinc S sulphide containing materials by the oxidative action of ferric ions resulting from the dissolution of iron pre-cipitate and also formed by the co-temporaneous oxidation of ferrous ions to the ferric state, said second leaching stage being terminated only when at least sufficient ferric ions are present to complete the leaching of the zinc sulphide containing material; (v) carrying out a third leaching stage with the solids and liquids of the second leaching stages still in contact but under substan-tially ambient pressure, in the absence of free oxygen and at temperatures of up to the boiling point of the solution;
(vi) separating the solids and leach solution resulting from step (v) and; (vii) utilising the leach solution resulting from step (vi) as at least the major portion of the aqueous leach solution employed in step (i).

Further features of the invention provide for conditions in step (i) to be controlled such that the iron is precipitated predominantly in the form of goethite which is easily acid soluble in step (iv), for iron to be removed at an overall rate at which it is introduced into 117~9~6 the system by way of the zinc containing material; and for the zinc containing material to be a finely ground zinc sulphide containing mineral or ore such as sphalerite, for example.

1 1'75~9~i~

Still further features of the invention provide for the iron added to the system by way of the zinc sul-phide containing material to be removed from the liquid resulting from the solid-liquid separation (step 2) following the first leaching stage and for such removal to be effected by the addition of low grade oxidic manganese ore as an oxidant and neutralising agent or, alternatively, by the addition of conventional oxidising and neutralising agents.

Where such a manganese agent is employed the manganese and zinc can then be removed simultaneously in the form of manganese dioxide and electrolyte zinc by a process as is fully described in the Complete Specification of our issued South African Patent No.
80/1590 issued on May 28, 1980. In such a process the manganese added to a system is electrolytically recovered as manganese dioxide simultaneously with some zinc in a irst electrolytic cell in which conditions are partic-ularly favourable for the recovery of manganese dioxide.
A second electrolytic recovery follows for the main bulk of the zinc. Further details of the process may be obtained by referring to the said Complete Specification.

11799~6 The advantages of the improvements brought about by the present invention will become more apparent in the following description of the process. In this description reference will be made to the accompanying S drawing which is a process flow diagram.

The basic steps of the process, which are dis-cussed more fully below, are as follows :-The concentrate or other material may require grinding and this is carried out in a grinding step1. The material i5 then mixed with the leaching solution at step 2 wherein ferric ions tend to be reduced to the ferrous state prior to being subjected to oxidising conditions at elevated temperature and pressure at step 3 to conduct the first leaching stage.

The solids and liquid are separated at step 4 and the solids contacted with regenerated sulphuric acid emanating from the zinc recovery circuit. This takes place at elevated temperature and pressure under oxi-dising conditions and constitutes the second leaching / . . .

11799~

g stage indicated as step 5. The following non-oxidative third leaching stage is conducted at ambient pressure and is indicated as step 6.

The subsequent liquid/solid separation is known as step 7 followed by treatment at step 8 of the solids to recover elemental sulphur from the gangue. The liquid, now low in acid is recycled to the first leach-ing stage (step 3) optionally after partial oxidation at step 9 to remove or consume acid if this is necessary.

The liquid from the first liquid/solid separa-tion of step 4 is subjected at step 10 to the removal of iro~ added to the circuit by way of the incoming concentrate and precipitated iron is removed at step 11. The resultant liquid is purified at step 12 such as by the addition of zinc dust and solids are removed at step 13.

The zinc containing solution is then ready for electrowinning which, where manganese is added to the circuit, takes place in a ~irst electrolytic step 14 in which manganese dioxide and zinc are removed simultaneously followed by the main zinc removal and . . .

~:1799~

--1 o second electrolytic step 15 whence regenerated acid (spent electroyte) is fed to the second leaching stage.

The starting material may be any suitable zinc sulphide containing material but in this specification a zinc manganese and iron containing sulphidic flo-tation concentrate will be used by way of an example.
The concentrate enters the process at step 1. Finer grinding of the mineral may prove to be advantageous as it could result in acceleration of leaching rates, and a decrease in leaching retention times and hence in a decrease in the size and cost of the leaching equipment. On the other hand step 1 may not be necessary and the flotation concentrate may possibly be used as received. The concentrate is then pulped with leaching solution usually at between 70C and 90C in step 3 to produce a slurry with conveniently having a 5:1 to 7:1 liquid : solid ratio. The amount of concentrate actually slurried ` 20 per unit volume of leach solution will be such as to permit the desired amount of zinc to be dissolved per unit volume of solution.

. .

The leach solution entering step 2 will typically contain between 5 and 50g/~ dissolved iron;
between 1g/~ and 15glR sulphuric acid but preferably as low as possible and less than about 5g/~ acid;
between 70g/~ and 120g/~ dissolved zinc, but pre-ferably about 90g/~ zinc, and between 5g/~ and 20g/~
dissolved manganese but preferably about 15g/~ to 20g/~ manganese.

In step 2, ferric ions present in the leach solution will rapidly reduce to their ferrous state.
This is an advantage since it has been found, and it is known by those skilled in the art that the flocculation, settling and filtration characteristics of the iron precipitate produced in step 3 are improved when the ferric ion concentration is maintained at low levels.

The slurry from step 2 proceeds to step 3, where the first leaching stage takes place at a temperature of between say 70C and 119C, and preferably at 90C to 100C with an oxygen overpressure of between 100kPa and 1000kPa, but preferably between 300kPa and 500kPa. In step 3, soluble sulphide metals such as zinc, manganese or iron dissolve, and iron is /-~., ~ ~'7~6 precipitated simultaneously until the dissolved iron remaining in solution equals that which is capable of being dissolved from the concentrate throughout the entire process so that removal of this residual iron in step 10 will result in a mass balance of the dissolved iron throughout the circuit.

The solution at the end of the first leach in step 3 will contain typically less than 5g/~ of free sulphuric acid, typically 120 to 160g/~ dissolved zinc, 5 to 15g/~ dissolved iron (depending on the amount of soluble iron originally present in the concentrate); and typically 10 to 25g/~ dissolved manganese, (depending on the amount of manganese dissolved in step 3).

The slurry from step 3 is dewatered in step 4.
In batch laboratory experimentation it ~Jas found that flocculation of the slurry was assisted by prior mixing of the pulp with say two parts of previously prepared filtered leach liquor with same solution composition as the slurry solution composition, to one part of fresh slurry. (In a continuous operation such dilution would probably occur automatically in 117~

the feed well of a thickening apparatus). The flocculated solids are permitted to settle, after which the supernatant liquor is decanted and the flocculated, settled solids are filtered.

The leach li~uor filtrate from step 4 proceeds to step 10 where the re~aining dissolved iron is re-moved at between 70 to 100C by simultaneously treating the solution with a neutralising agent ~such as zinc oxide calcine,zinc oxide dross or zinc dust), and an oxidant (such as air or oxygen). It has been found that a ground oxidic manganese ore can be used to simultaneously oxidise and behave as a neutralising agent and so enable the dissolved iron to be precipitated from solution. The removal of part or all of the residual dissolved iron by such an oxidic manganese ore, could result in the necessity to use significantly less zinc oxide, zinc dross or zinc dust in step 10, and result in the recovery of the e~tra manganese ions introduced into the solution, as valuable battery grade manganese dioxide in step 14.

The solution from step 10 is flocculated and filtered in step 11, and the filter cake is disposed of after suitable washing to recover soluble values . . .

1~79~6 therefrom. The filtrate from step 11 containing up to 180g/~ zinc, and up to 30g/~ manganese and at a pH greater than 2,0 is subjected to several further purification steps at between 70C and 90~C
as typified by step 12; to reduce contaminants such as iron, cobalt, copper, cadmium, etc. to very low levels by use of processes well known to those skilled in the art. The purified solution from step 12 is filtered as denoted by step 13 and proceeds to the optional electrolytic step 14 for simultaneous electro recovery of part of the zinc at a cathode, and sufficient manganese as manganese dioxide at an anode to maintain a manganese ion balance throughout the process. The solution enters the first electro-winning step 14 direct from the purification steps and thus initially contains a very low acid concentration and high zinc concentration.

During the first electrolysis step 14 sulphuric acid is regenerated, one mole of acid being formed for each mole of zinc or manganese which is electro deposited. The process for the simultanecus electro-winning of zinc and manganese has been fully expounded in our said South African Patent No. ~0/1590.

11799~i6 Needless to say, if only relatively small amounts of manganese are dissolved throughout the process, alternative means for controlling the dissolved manganese at desired levels exist, of which those skilled in the art would be aware.

The purified solution from step 13, or optionally from step 14 proceeds to step 15 where sufficient zinc is electrowon to maintain a zinc balance throughout the circuit by m~ans of a conventional zinc electro-winning process.

The solution, or so-called return electrolyte from step 15 containing typically 140 - 180g/~
sulphuric acid, 40 - 60g/~ zinc iron and 5 -20g/~
manganese ions proceeds to the second leaching stage at step 5 where it is contacted at typically between . 70C and 119C but preferably at 90C - 100C with the - filtered solids from step 4 which contain unleached sulphide mineral, elemental sulphur and precipitated iron.

In step 5 much of the iron precipitate is ~ rapidly dissolved by the acid in the return electro-.~ /

-1:179~6 lyte to form dissolved ferric ions in solution, and this results in a rapid decrease in the sulphuric acid concentration of the solution. The ferric ions produced by the dissolvèd iron precipitate react with the sulphides present to dissolve the sulphides and form ferrous ions. However, since oxygen at an oxygen overpressure of between 100 - 1000kPa, and preferably, at about 300 - 500kPa is present, the ferrous ions are continuously oxidised to their ferric state, thus consuming acid and permitting dissolution of the sulphides by the ferric ions to proceed.
Dissolution of the sulphides virtually to completion could conceivably be attained under pressure conditions in step 5, but this is not necessary and the retention time in step 5 can, as provided by the invention, be shortened considerably.

This second leaching stage can be terminated when the leach solution contains at least stoichiometri-cally sufficient ferric ions to permit dissolution of the sulphides to proceed substantially to completion without any elemental oxygen being present. At this stage the liquid/solid mixture proceeds to the third leaching stage at step 6.

'99~6 It is desirable that conditions be adjusted so that at the end of leaching step 6 the sulphuric acid concentration be as low as possible without precipitation of the ferric ions actually taking S place and should be less than about 15g/~.

The temperature in step 6 should be between 70C and the boiling point of the solution, but preferably above 90C. Leaching in step 6 should be permitted to proceed until economically negligible further reduction in the ferric ion concentration with time, due to leaching is detected. It is desirable that the ferric ion concentration at the end of step 6 be minimised, yet be such that realistic rates of leaching of the residual soluble sulphides be attained.

The leach slurry from step 6 is filtered in step 7 to produce a filter cake containing unleached sulphides, elemental sulphur, gangue and some acid insoluble iron precipitates (e.g. such as plumbo-jarosite, if soluble lead was present in the originalconcentrate).

.

J 17~ 6 The elemental sulphur may be recovered from this filter cake in step 8 by methods known to those skilled in the art. Optionally, methods exist for the recovery of the elemental sulphur directly from the leach solution after step 6. The filtrate from step 7 should now be at a composition similar to that previously described for the solution entering the first leaching stage step 2. If the sulphuric acid concentration in the solution emanating from step 7 is undesirably high (e.g greater than about 15g/~) it is possible to reduce this acid level to a point at which hydrolysis of the ferric species is just avoided by the oxidation of ferrous ions to their ferric state using air, oxygen or ground oxidic manganese ore.
If air or oxygen is used, it is probable that an oxygen over-pressure of say 100kPa to 500kPa will be required to reduce the retention time in step 9 to acceptable limits.

The reason for reducing the acid concentration in step 9 and the ferric ion concentration in step 2 is to improve the flocculation and filtration charac-teristics of the iron precipitate produced in step 3, as it is well known to those skilled in the art that the production of goethite-type iron precipitates in . . .

the temperature range of 70C - 119C is favoured by higher pH's and low~ ferric ion concentrations.

In this example 830,0g of a dry flotation concentrate assaying Zn - 50,9%; Fe - 9,1%;
Mn - 2,5%; Pb - 0,47~; S(total - 30,8%);
Cu - 0,14%; Cd - 0,08%; Co -0,01~; Si 2 -
2,19% was rod milled until 100,0% of the con-centrate passed through a 45,0~m screen. The size distribution of this milled product, when measured in a WARMAN CYCLOSIZER was as follows :-. I
Size in Microns % Greater than j 44 i i 41 0,8
3~ 6,1 23 24,8 : . 16 42,7 12 54,2 I _ i * Trade mark 117g~

This 850,0g of dry milled concentrate was added to 5,0~ leach solution which initially contained 97,0g/~
ZN; 18,6g/~ Mn; 38,9g/~ Fe ; 0,5g/~ Fe ; and 9,6g/~ H2 S04 . The reaction in the first leaching stage was allowed to proceed for 45,0 mins at 100,0C with a 500kPa oxygen overpressure. After 45,0 mins. the leach solution contained 11,3g/~ Fe and about 121,0g/~ Zn and 19,96g/~ Mn~ The leach solids were flocculated and filtered but not weighed and assayed.

All the leach solids referred to above were then added to 5,0~ simulated return electrolyte con-taining 50,6g/~ Zn; 21,9g/~ Mn; 146,0g/~ H2 SO4 .
The second leaching stage reaction was permitted to proceed for 30,0 minutes at 100,0C with a 500kPa oxygen overpressure. At this point the solution contained 22,2g/~ Fe ; 11,8g/~ Fe ; and 19,2g/~
H2 S04 and the pressure was diminished to atmospheric and the supply of oxygen terminated. The ferric species present in the leaching solution was then permitted to effect leaching for a further 9~hours without oxygen present to allow dissolution of the sphalerite to continue. This constituted the third ' :

1~799~

leaching stage. The final leach solution assayed 25,7g/~ Fe ; 7,2g/~ Fe ; 14,8 g/~ H2SO4; 108,1g/~
Zn and about 24,8g/~ Mn. Table 2 below summarises the change with time of the ferric ion, ferrous ion and S sulphuric acid concentration, the percentage zinc remaining in the leach residue, and the calculated total zinc extraction in respect Gf the third leaching stage.
The final leach solids which were filtered, washed and dried, weighed 257,0g and assayed 0,62% Zn; <0,2% Mn and 8,8% Fe. The overall percentage of zinc, manganese and iron leached in this example were thus about 99,5%; 97,0% and 74,0% respectively.

Time Fe3+ Fe2+ H2 S04 Zn in re- Total dis-(mins) g/~ g/~ g/~ i solution of 0 22,2 11,8 19,2 15,50 88,11 19,0 15,4 15,4 12,20 90,96 15,1 19,0 14,8 9,05 93,71 12,5 21,3 15,0 6,46 95,55 150 10,6 23,2 14,8 5,50 96,24 210 9,1 24,4 15,0 3,34 97,73 282 8,7 25,4 15,0 2,76 98,15 380 7,6 25,3 14,9 1,67 98,89 S&0 7,2 25,7 14,& 0,62 99,50 li~79~ 6 The flotation concentrate described in Example 1 was used in this example "as received" from the flotation cells without further milling. This concentrate was coarse (relative to that used in the first example), as only 36,7~ of the concentrate passed through a 45~m screen. The size distribution of this material, when measured on a Warman Cyclosizer was as follows :-Size in % Greater Microns than 29,3 61,52 22,8 71,21 16,4 79,80 11,1 84,41 8,5 100 935,0g of this concentrate containing about 10,0 moisture was added to 5,0~ leach solution whichinitially contained 98,0g/~ Zn; 18,5g/~ Mn;

li'~9 ( -23-38,9g/~ Fe ; 0,5g/~ Fe ; and 9,6g/~ H2SO4. The first leach stage reaction was allowed to proceed for 50 minutes at 100,0C with a 500,0kPa oxygen overpressure.
After 50 minutes the leach solution contained 8,9g/~
Fe ; 1,0g/~ Fe ; 3,0g/~ H2SO4 and about 137,0g/~
Zn and 20,5g/~ Mn. The leach solids were flocculated and filtered, but not weighed and assayed.

All the leach solids referred to above were then added to 5,0~ simulated return electrolyte con-taining 50,6g/~ Zn; 21,9g/~ Mn and 146,0g/~ H2SO4 and zero dissolved iron. The second leach stage reaction was permitted to proceed for 110,0 minutes at 100,0C
with 500,OkPa oxygen o~erpressure. At this point the solution contained 28,2g/~ Fe +; 6,2g/~ Fe + and 13,2g/~ H2 S04, and because of the ferric species present, the leaching was permitted to proceed by way of the third leach stage for a further 5,0 hours at 100,0C without oxygen present (i.e no oxygen overpressure) to allow dissolution of the sphalerite to continue. The final solution assayed 17,2g/~
Fe ; 16,6g/~ Fe ; 11,0 g/R H2SO4; 95,0g/~ Zn and about 24,1g/~ ~n. The final leach solids which were filtered, washed and dried, weighed 247,7g . . .

?~

(dry) and assayed 3,6% Zn; 0,3% Mn; 8,4% Fe and 60,4% elemental sulphur.

The overall percentages of zinc, manganese and iron leached in this example were thus about 98,0%
96,5~ and 73,0% respectively. It will thus be noted that the coarse material leached extremely well only not quite as well as the finely milled concentrate.

This example serves to illustrate the optional use of an oxidic manganese ore as a neutralising and oxidising agent to remove dissolved iron from a leach solution.

180,0g of a pyrolusite-type oxidic manganese ore (assaying Mn - 24,9%; Fe - 15,6% and having 85,2%
passing through a 53,0~m screen) was added to 5,0 solution assaying Zn - 150,0g/~; Fe - Og/~;
Fe - 9,6g/~; H2SO 4 - 9,8g/R; Mn - 20,3g/R which was at 90,0C and was vigorously stirred. Table 4 summarises the change with time of the Mn , Fe and H2 S04 concentrations, and the pH. It is observed . . .

li799~

that the total acid and iron concentrations drop to about 2,4g/~ and 1,0g/~ respectively in only two hours.

_ Time Mn2+ Fe2+ Fe3+ H2 S04 pH
(mins) g/~ gi~ g/~ g/~ __ 0 20,3 9,6 0 9,8 0,5 22,1 3,4 2,0 0 1,57 25,4 2,3 1,4 1,0 1,48 25,3 1,6 1,3 1,0 1,40 26,3 1,0 1,1 2,0 1,36 27,3 0,2 1,0 2,2 1,29 . 120 28,3 0 1,0 2,4 1,24 180 27,3 0 1,0 2,6 1,22 Use of 180,0g oxidic manganese ore to remove iron from 5,0~ solution at 90,0C which initially contained 150,0g/~ zinc ions.

Production of iron precipitates demonstrating improved flocculation and filtration characteristics was favoured by somewhat slower rates of iron removal.

11799f~

This is another example of the use of oxidic manganese to remove dissolved iron from typical zinc leach solution. Sixteen grams of a high grade manganese dioxide (assaying 74~ as MnO2) was added per litre of solution which initially contained 12,1g/~ Fe and 1,4g/~ Fe . After 60 minutes stirring at 90C the solution contained less than 0,1g/~ Fe and 2r5g/~ Fe . After a further 50 minutes 14,7 grams of zinc dioxide calcine was added to the solution and after 40 minutes the solution contained no Fe and about 0,6g/~ Fe 850g of dry flotation concentrate was leached without additional milling in steps 2 and 5. This example gives the results of leaching the residue contained in the solution obtained at the end of step 5 in step 6 at a constant temperature of 90C. The conditions and results are summarised in Table 5.
. . .

1179~

Time Fe Fe3+ H2 S04 % Zn in ~ Dissolu-(mins' g/~ g/~ g/~ residue tion of Zn 0 6,0 32,8 11,2 __ 92,2 30 9,5 29,2 11,4 __ 94,6 10014,1 24,4 11,8 9,2 97,7 16016,7 21,9 12,8 7,0 98,2 24018,4 20,4 13,6 5,0 98,7 26019,4 20,6 13,2 3,9 99,0 It is observed that the percentage dissolution of zinc increases with time to a very high value, in-dicating that relatively high dissolutions of zinc can be obtained when leaching flotation concentrate which has not been ground finer. Only additional time is required and this must be weighed up relative to the cost of milling.

This example is similar to example 5, except in that the temperature of the leach solution in step 6 was permitted to decrease with time from 97C to 70C.

. . .

85Gg of dry flotation concentrate was leached without additional milling in steps 2 and 5. Table 6 summarises the conditions and results of leaching the residue in the solution obtained at the end of step 5.

It is observed by comparing the results of Tables 3 and 4 that the effect of the decrease in temperature during step 5 of Table 6 is to increase the leaching time required to achieve a given percentage dissolution of zinc. It is intereating to note in Table 4 that the H2 S04 concentration decreases with time, and the total dissolved iron (Fe + Fe increases with time.

.
Time Temp Fe2+ Fe3+ H2SO~ % Zinc % dis (mins) C g/~ g/~ g/~ in res- solu-idue t on . -- _ 0 97,0 7,5 28,5 9,5 11,2 91,8 86,0 11,1 25,5 9,0 9,2 93,3 71,0 13,0 23,6 8,5 8,2 95,6 150 70,0 14,0 22,8 8,4 5,8 95,6 360 70,0 15,9 21,2 6,8 3,8 97,3 480 70,0 15,7 21,8 3,6 2,2 98,5 780 70,0 13,7 23,6 1,0 1,5 99,0 ~17~9~6 It is possible that as the temperature de-creases the solubility of ferric ions in solution increases thus permitting iron precipitate which had previously hydrolysed, to redissolve, thus con-suming acid and increasing the tot~l dissolved ironconcentration in solution. This phenomenon was not observed in Table 5, possibly because the temperature was maintained at gOC.

The invention therefor provides an effective and economic process for the leaching of zinc sulphide containing materials.

Claims (12)

Claims:
1. A process for the treatment of zinc sulphide containing materials comprising the steps of:-(i) contacting in a first leaching stage at a temperature of from 70°C to 119°C at an elevated oxygen partial pressure of between 100 and 1000 kPa and under oxidising conditions, a sub-divided zinc sulphide containing material with an aqueous leach solution which has dissolved therein zinc and impurities, from 5 to 50g/? iron, together with an current of between 1 g/? and 20 g/? sulphuric acid to dissolve zinc and other soluble metals in the zinc sulphide containing material by the oxidative action of ferric ions formed by the contemporaneous oxidation of ferrous ions to their ferric state and cause precipitation of iron;
(ii) separating the solids and leach liquor resulting from such first leaching stage;
(iii) subjecting the leach liquor obtained in step (ii) to any required purification steps follows by electrowinning of zinc therefrom to leave a spent electrolyte having regenerated sulphuric acid therein;
(iv) contacting, in a second leaching stage, and at elevated temperature of from 70°C to 119°C and at an elevated oxygen partial pressure of between 100 and 1000 kPa and under oxidising conditions, spent electrolyte resulting from step (iii) above with the solids resulting from step (ii) above to cause redissolution of iron precipitates and the further dissolution of zinc and metal impurities from the residue of the zinc sulphide containing materials by the oxidative action of ferric ions resulting from the dissolution of iron precipitate and also formed by the co-temporaneous oxidation of ferrous ions to the ferric state, said second leaching stage being terminated only when at least suf-ficient ferric ions are present to complete the leaching of the zinc sulphide containing material;
(v) carrying out a third leaching stage with the solids and liquids of the second leaching stages still in contact but under substantially ambient pressure, in the absence of free oxygen and at temperatures of up to the boiling point of the solution;
(vi) separating the solids and leach solution resulting from step (v) and;
(vii) utilising the leach solution resulting from step (vi) as at least the major portion of the aqueous leach solution employed in step (i).
2. A process as claimed in claim 1 in which the conditions in step (i) are controlled such that iron which precipitates does so predominantly in the form of goethite.
3. A process as claimed in claim 1 in which iron is present in the zinc sulphide containing material and iron is removed at the rate at which it is introduced into the system.
4. A process as claimed in claim 1 in which the zinc sulphide containing material is a finely ground ore.
5. A process as claimed in claim 3 in which iron is removed from the liquid resulting from the solid/liquid separation in step (ii) following the first leaching stage.
6. A process as claimed in claim 5 in which low grade oxidic manganese ore is employed as an oxidant and neu-tralising agent to effect removal of iron.
7. A process as claimed in claim 1 in which the spent electrolyte contains 140 to 1809/ sulphuric acid and 40 to 60 g/? zinc.
8. A process as claimed in claim 7 in which the spent electrolyte contains from 5 to 20 g/? manganese ions.
9. A process as claimed in claim 1 in which the leach solution entering step (i) contains from 70 to 120 g/?
zinc.
10. A process as claimed in claim 1 in which the leach liquor leaving step (i) contains from 5 to 15 g/? dissolved iron; from 120 to 160 g/? zinc and less than 5g/? sulphuric acid.
11. A process as claimed in claim 1 in which the leaching in steps (i) and (iv) is carried out under an oxygen overpressure of between 300kPa and 500kPa.
12. A process as claimed in claim 1 in which the leaching in steps (i) and (iv) is carried out from 90°C to 100°C.
CA000382867A 1980-08-14 1981-07-30 Leaching of zinc containing sulphide minerals Expired CA1179966A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
ZA804989 1980-08-14
ZA80/4989 1980-08-14

Publications (1)

Publication Number Publication Date
CA1179966A true CA1179966A (en) 1984-12-27

Family

ID=25574875

Family Applications (1)

Application Number Title Priority Date Filing Date
CA000382867A Expired CA1179966A (en) 1980-08-14 1981-07-30 Leaching of zinc containing sulphide minerals

Country Status (3)

Country Link
AU (1) AU535613B2 (en)
CA (1) CA1179966A (en)
ZW (1) ZW19581A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5017346A (en) * 1987-05-13 1991-05-21 Ecolomics Inc. Process for treating zinc oxide bearing materials

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2532294B1 (en) * 1982-08-24 1985-07-19 Minemet Rech Sa PROCESS FOR THE SELECTIVE DISSOLUTION OF LEAD, NICKEL AND COBALT
AU569813B2 (en) * 1984-12-11 1988-02-18 Gold Fields Mining & Development Ltd. Precipitation of iron from zinc sulphate solutions in a pressure vessel, temp greater than 110c, time less than 30 30 mins.

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5017346A (en) * 1987-05-13 1991-05-21 Ecolomics Inc. Process for treating zinc oxide bearing materials

Also Published As

Publication number Publication date
AU535613B2 (en) 1984-03-29
ZW19581A1 (en) 1982-01-06
AU7362881A (en) 1982-02-25

Similar Documents

Publication Publication Date Title
US4004991A (en) Two-stage pressure leaching process for zinc and iron bearing mineral sulphides
US3949051A (en) Hydrometallurgical process for extracting copper from chalcopyrite or bornite concentrates
CA1212242A (en) Recovery of zinc from zinc-containing sulphidic material
US3976743A (en) Treatment of zinc plant residue
CA2160488C (en) Recovery of metals from sulphidic material
US4440569A (en) Recovery of zinc from zinc-containing sulphidic material
RU2023728C1 (en) Method of extracting zinc, copper, lead and silver from zinc-iron-containing sulfide stock
CA1235907A (en) Recovery of gold from refractory auriferous iron- containing sulphidic concentrates
US3867268A (en) Recovery of zinc from zinc sulphides by direct pressure leaching
CA1150062A (en) Hydrometallurgical treatment of copper-bearing hematite residue
US4545963A (en) Process for separately recovering zinc and lead values from zinc and lead containing sulphidic ore
CA2202289C (en) Recovery of zinc from sulphidic concentrates
EP0096499B1 (en) Recovery of zinc from zinc-containing sulphidic material
US4505744A (en) Recovery of zinc from zinc containing sulphidic material
US5126116A (en) Method for forming copper arsenate
US4274931A (en) Leaching process for zinc sulphide containing materials
US4330379A (en) Leaching of zinc containing sulphide minerals
CA1179966A (en) Leaching of zinc containing sulphide minerals
US3477927A (en) Hydrometallurgical process for treating sulphides containing non-ferrous and ferrous metal values
US4384940A (en) Chlorine leaching of nickel-cobalt-iron sulphides
US4240826A (en) Process for the recovery of arsenic as a zinc arsenate and its _utilization in the purification of zinc plant electrolytes
US4049514A (en) Zinc hydrometallurgical process
GB2114966A (en) Recovery of zinc from sulphidic material
CA1118214A (en) Process for the preparation of an aqueous solution of zinc sulphate for use in the electrolytic preparation of zinc, by means of the leaching of roasted material
US1847622A (en) Process of obtaining indium and zinc from ores containing the same

Legal Events

Date Code Title Description
MKEX Expiry