CA1140281A - Method for dewatering the sludge layer of an industrial process tailings pond - Google Patents

Method for dewatering the sludge layer of an industrial process tailings pond

Info

Publication number
CA1140281A
CA1140281A CA000338892A CA338892A CA1140281A CA 1140281 A CA1140281 A CA 1140281A CA 000338892 A CA000338892 A CA 000338892A CA 338892 A CA338892 A CA 338892A CA 1140281 A CA1140281 A CA 1140281A
Authority
CA
Canada
Prior art keywords
sludge
sand
layer
pond
tailings
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
CA000338892A
Other languages
French (fr)
Inventor
Raymond N. Yong
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suncor Energy Inc
Original Assignee
Suncor Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=4115496&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=CA1140281(A) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Suncor Inc filed Critical Suncor Inc
Priority to CA000338892A priority Critical patent/CA1140281A/en
Priority to AU63481/80A priority patent/AU6348180A/en
Priority to ZA00806453A priority patent/ZA806453B/en
Priority to GB8034382A priority patent/GB2061907B/en
Priority to IN1229/CAL/80A priority patent/IN153273B/en
Priority to JP15242380A priority patent/JPS5681182A/en
Priority to DE19803041087 priority patent/DE3041087A1/en
Application granted granted Critical
Publication of CA1140281A publication Critical patent/CA1140281A/en
Expired legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10CWORKING-UP PITCH, ASPHALT, BITUMEN, TAR; PYROLIGNEOUS ACID
    • C10C3/00Working-up pitch, asphalt, bitumen
    • C10C3/007Working-up pitch, asphalt, bitumen winning and separation of asphalt from mixtures with aggregates, fillers and other products, e.g. winning from natural asphalt and regeneration of waste asphalt
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/52Treatment of water, waste water, or sewage by flocculation or precipitation of suspended impurities
    • C02F1/5263Treatment of water, waste water, or sewage by flocculation or precipitation of suspended impurities using natural chemical compounds
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F11/00Treatment of sludge; Devices therefor
    • C02F11/12Treatment of sludge; Devices therefor by de-watering, drying or thickening

Abstract

In order to compress the sludge layer of an industrial process tailings pond beyond the density which it will naturally reach after treatment by the addition of hydrolyzed starch flocculant, sand is distributed over the sludge layer as a water permeable surcharge which, by weight, further compacts the sludge to obtain additional dewatering. The hydrolyzed starch flocculant provides improved shear strength and permeability characteristics to the sludge layer such that it can support the sand surcharge.

Description

~14UZ~3~

CROSS-REFERENCE TO RELATED APPLICATIONS
-This specification includes material in common with:
Canadian patent application Serial No. 338j920, entitled "Treat-ment of Tailings Pond Sludge" by Raymond N. Yong; Canadian patent application Serial No. 338,919, entitled "Dike Building Material Comprising Sand and Treated Sludge" by Raymond N. Yong; and Canadian patent application Serial No. 338j921, entitled "Method for Surcharging with Sand the Sludge Layer of a Tar Sands Tail-~- ings Pond" by John O. L. Roberts. All these related applications are assigned to the same assignee as this application and were filed on even date herewith.

.
~., .
- BACKGROUND 0~ THE INVENTION

Tar sands (which are also known as oil sands and bitu-minous sands) are sand deposits which are impregnated with dense, viscous, petroleum. Tar sands are found throughout the world, often in the same geographical areas as conventional petroleum. The largest deposit, and the only one of present commercial importance, is in the Athabasca region in the north-east of the province of Alberta, Canada. This deposit is be-lieved to contain perhaps 700 billion-one trillion barrels oi bitumen. For comparison, 700 billion barrels is just about equal to the world-wide reserves of conventional oil, 60% of which is found in the Middle East. While much of the Athabasca deposit is not economically recoverable on a commercial scale with current technology, nonetheless, a substantial portion is situated at, or very near, the surface where it may fairly readily be mined and processed into synthetic crude oil, and this procedure is being carried out commercially on a very large scale by Great Canadian Oil Sands (now Suncor Inc. - Oil Sands Division) and Syncrude near Fort Mc~urray, Alberta.
Athabasca tar sands is a three-component mixture of bitu-men, mineral and water. Bitumen is the valuable component for the extraction of which tar sands are mined and processed. The bitumen content is variable, averaging 12wt% of the deposit 9 but ranging from zero to 18wt%. Water typically runs 3 to 6wt%
of the mixture, and generally increases as the bitumen content decreases. The mineral content is relatively constant, ranging from 84 to 86wt%.
While several basic extraction methods to separate the bitumen from the sand have been known for many years, the "hot water" process is the only one of present commercial significance ., and is employed by both GCOS and Syncrude. The hot water pro-cess for achieving primary extraction of bitumen from tar sand consists of three ma~or process steps (a fourth step, final ex-traction, is used to clean up the recovered bitumen from down-stream processing). In the first step, called conditioning, tar sand is mixed with water and heated with open steam to form a ~- pulp of 70 to 85wt% solids. Sodium hydroxide or other reagents are added as required to maintain pH in the range of 8.0-8.5.
In the second step, called separation, the conditioned pulp is diluted further so that settling can take place. The bulk of the sand-size mineral rapidly settles and is withdrawn as sand tailings. Most of the bitumen rapidly floats (settles upwardly) to form a coherent mass known as froth which is recoYered by skimming the settling vessel. A third stream, called the mid-dlings drag stream, may be withdrawn fro~ the settling vessel . and subjected to a third processing step, scavaging, to provide incremental recovery of suspended bitumen.
The mineral particle size and type distribution is par-ticularly significant to the operation of hot water process and to sludge accumulation. The terms "sand", "silt", "clay" and "fines" are used in the specification as a simplified approxima-tion of mineral particle size wherein sand is siliceous material which will not pass 325 mesh screen, silt will pass 325 mesh, but is larger than 2 microns and clay is material smaller than
2 microns, includ1ng some siliceous material of that size. Fines includes both silt and clay, but excludes sand. It should be again noted that these designations are simplified approximations.
For an elegant and in-depth discussion of particle size and type in tar sands sludges, reference may be taken to the article en-titled "Mineral Particle Interaction Control of Tar Sand Sludge Stability" by Yong and Sethi which appears in The Journal of Canadian Petroleum Technology, Volume 17, Number 4 (October-December .
1978).
-3-)2~1 As previously indicated, conditioning tar sands for the recovery of bitumen consists of heating the tar sands/water feed mixture to process temperature (180 -200F), physical mixing of the puIp to uniform composition and consistency, and the consumption~(by chemical reaction) of the caustic or other reagents added. Under these conditions, bitumen is stripped from the individual sand grains and mixed into the pulp in the form of discreet droplets of a size on the same order as that of the sand grains. The same process conditions, it turns out, are also ideal for accomplishing deflocculation of the fines, particularly the clays, which occur naturally in the tar sand feed. Deflocculation, or dispersion, means breaking down the naturally occuring aggregates of clay particles to produce a slurry of individual particles. Thus, during conditioning, a large fraction of the clay particles become well dispersed and ; mixed throughout the pulp.
Those skilled in the art will therefore understand that the conditioning process, which prepares the bitumen resource for efficient recovery during the succeeding process steps, also prepares the clays to be the most difficult to deal with in the tailings disposal operation.
The second process step, called separation, is actually the bitumen recovery step since separation occurs during the conditioning step. The conditioned tar sand pulp is first screened to remove rocks and unconditionable lumps of tar sands and clay, and the reject material, "screen oversize", is discarded.
The screened pulp is then further diluted with water to promote two settling processes: globules of bitumen, essentially mineral-free, float upwardly to form a coherent mass of froth on the surface of the separation cells; and, at the same time, mineral particles, particularly the sand-sized mineral, settle downwardly q -ll~V'~

and are removed from the bottom of the separation cell as tail-ings. The medium through which these two settling processes take place is called the middlings. The middlings consists primarily of water with suspended fine material and bitumen particles.
The particle sizes and densities of the sand and of the bitumen particles are relatively fixed. The parameter which influences the settling processes most is the viscosity of the middlings, and viscosity is directly related to fines content.
Characteristically, as the fines content rises above a certain threshold, which varies according to the composition of the fines, middlings viscosity rapidly reaches high values with the effect that the settling processes essentially stop. In $his operating condition, the separation cell is said to be "upset".
Little or no oil is recovered, and all streams exiting the cell have about the same composition as the feed. Thus, as feed fines content increases, more water must be used in the process to maintain middlings viscosity within the operable range.
The third step of the hot water process is scavenging.
The feed fines content sets the process water requirement through the need to control middlings viscosity which is governed by the clay/water ratio. It is usually necessary to withdraw a drag stream of middlings to maintain the separation cell material balance, and this stream of middlings can be scavenged for re-covery of incremental amounts of bitumen. Air flotation is an effective scavenging method for this middlings stream.
Final extraction or froth clean-up is typically accomp-lished by centrifugation. Froth from primary extraction is diluted with naphtha, and the diluted froth is then subjected to a two-stage centrifugation. This process yields an essentially pure diluted bitumen oil product. Water and mineral removed from ".

~14U'~81 the froth during this step constitutes an additional tailings stream which must be disposed of.
In the terminology of extractive processing, tailings is the throw-away material generated in the course of extracting the valuable material from an ore. In tar sands processing, tailings consists of the whole tar sand ore body plus net ad-ditions of process water less only the recovered bitumen product.
Tar sand tailings can be subdivided into three categories; viz:
(1) screen oversize, (2) sand tailings (the fraction that settles rapidly), and (3) tailings sludge (the fraction that settles slow-ly). Screen oversize is typically collected and handled as a separate stream.
Recently, in view of the high level of ecological con-sciousness in Canada, United States, and elsewhere, technical interests in tar sands operation, as well as other diverse ore handling operations, has begun to focus on tailings disposal.
The concept of tar sands tailings disposal is straightforward.
If one cubic foot of tar sands is mined, a one cubic foot hole is left in the ground. The ore is processed to recover the bitu-men fraction, and the remainder, including both process materialand the gangue, constitutes the tailings that are not valuable and are to be disposed of. In tar sands processing, the main process material is water, and the gangue is mostly sand with some silt and clay. Physically, the tailings (other than over-size) consist of a solid part (sand tailings) and a more or less fluid part (sludge). The most satisfactory place to dispose of these tailings is, of course, in the existing one cubic foot hole in the ground. It turns out, however, that the sand tailings alone from the one cubic foot of ore occupy just about one cubic foot. The amount of sludge is variable, depending on ore quality and process conditions, but averages about 0.3 cubic feet. The tailings simply will not fit back into the hole in the ground.

'Z81 The historical literature covering the hot water process for the recovery of bitumen from tar sands contains little in the way of a recognition that a net accumulation of sludge would occur. Based on analysis of field test unit operations which led to the Great Canadian Oil Sands plant design near Fort McMurray, Alberta, the existence of sludge accumulation was predicted.
This accumulation came to be called the "pond water problem."
Observations during start-up and early commercial operations at Fort McMurray (1967-1969) were of insufficient precision to con-firm the prediction. Since 1969, commercial operating data haveconfirmed the accumulation in GCOS' tailings disposal area of a sludge layer of fines material and water which settles and com- -pacts only very slowly, if at all, after a few years. For a number of reasons, this sludge layer, in common with similar sludge layers observed in tailings ponds associated with mining and extracting processes of many kinds, is particularly important and difficult to deal with.
At the GCOS plant, for dike building, tailings are con-veyed hydraulically to the disposal area and discharged onto the top of a sand dike which is constructed to serve as an impound-ment for the pool of fluid contained inside. On the dike, the sand settles rapidly, and a slurry of fines, water, and minor amounts of bitumen flows into the pond interior. The settled sand is mechanically compacted to strengthen the dike as it is built to a higher level. The slurry which flows into the pond's interior commences stratification in settling over a time scale of months to years.
Overboarding is ~he operation in which tailings are dis-charged over the top of the sand dike directly into the liquid pool. Rapid and slow settling processes occur, but their dis-tinction is not as sharp as in dike building, and no mechanical compaction is carried out. The sand portion of the tailings settles rapidly to form a gently sloping beach extending from the discharge position towards the pond interior. As the sand settles, fines and water commence long-term settling in the pond.
The exceedingly complex behavior and characteristics of tailings ponds have only recently come to be understood beyond the simplistic categorization of various zones such as clarified water, transition, and sludge/slime. Since a tailings pond employed in conjunction with the hot water process for processing tar sands is fairly typical, the following characteristics of the layers or zones in such a tailings pond is a good general example.
Tailings from the hot water process containing a dilute suspension of fine materials in water, together with sand, are discharged to the tailings pond. The formation of sludge by settling of these tailings is attributable primarily to the presence of dispersed clay minerals. Many of the factors which determine the rate at which the clay minerals settle and the characteristics of the sludge formed are set within the tailings discharge. These include initial clay concentration ., (clay/water ratio), relative proportions of various clay mineral species, particle size, condition of clay surfaces and pore water chemistry.
Experience and laboratory analysis indicate that all these factors vary significantly from time to time depending on the composition of the tar sands feed and the process conditions.
Typically, tailings are discharged over the beach (either directly or from dike construction) where most of the sand settles.
The run-off flows continuously into a fluid pool or pond from which water is simultaneously withdrawn as recycle to the tar sands extraction process. Here, additional important determinants of r settling behavior are imposed. These include rate of inflow and outflow in relation to surface area and clarified ~ water volume, pond depth, and degree of agitation of pond con-- tents, either through inflows and outflows or via thermal or by wind effects. While initial temperature is inherent in the tailings streams, temperatures in the pond are obviously deter-mined by numerous other factors as well.
Experience and laboratory analyses indicate that when a partly settled sludge remains undisturbed for between several months and about two years in a deep pond, it separates into two distinct layers, a virtually clear water layer on top and a sludge layer beneath. The density of the sludge layer increases gradually with depth due mainly to the presence of more sand and silt particles. These settle either not at all or very slowly because of the significant yield strength of stagnant sludge.
The clay/water ratio increases only slightly with depth in the upper part of the pond and scarcely at all in the lower part.
After one or two years, little further change in sludge volume : occurs. Consolidation at the bottom of the pond is so slow that detection of consolidated material is difficult. Sludge formed in this manner is virtually unchanging over periods of years or decades and for practical purposes may be regarded as terminal sludge.
An active pond involving continuous inflow and outflow is more complex. Experience and laboratory tests indicate that, following discharge to the pond, clay particles undergo an aging process varying in length from a few days to many weeks. Prior - to completion of the aging process, the clay particles do not begin to settle. However, once they commence to do so, the pro-cess proceeds quite rapidly according to the principles of Stokes Law until a clay/water ratio of about 0.13/1 is reached at which other factors evidently predominate over Stokes Law. In the upper-_g_ 8~

most part of a well managed pond, these effects result in a moreor less clear water layer at the top underlaid by a layer of ` relatively dilute sludge more or less sharply differentiated ; from it. This may be termed the sedimentation zone; its volume is determined by the rate of clay inflow and the average aging time required. If the water layer is permitted to become too small in relation to the clay inflow, water outflow and aging time, the upper part of the pond becomes overloaded, the clear water layer virtually disappears and the sedimentation zone be-comes much larger since clay is then recycled through the process.
GCOS operated under such conditions or on the edge of them through much of the early years.
Sludge in the lower part of a deep active pond~which has been in operation for some years is similar to that from an inac-tive pond; i.e., it may be regarded as terminal sludge. The space below the sedimentation zone and above the terminal sludge may be regarded as a transition zone lacking clear boundaries at top and bottom. It is characterized by a gradual increase in clay/water ratio with depth and owes its existence to the long time needed to attain the terminal sludge condition. Its thickness is pri-marily a function of the average clay inflow rate in relation to volume.
; In summary, an active pond normally has a well-defined clear water layer at the top which can, however, disappear if overloading occurs. Beneath this is sludge which increases in density with depth. There are generaliy no clearly defined boun-daries within this sludge except on occasion a layer of separated bitumen near the interface between water and sludge. IIowever, the sludge may be considered as consisting of three zones each involving successively larger orders of magnitude of time scale for measurable dewatering to occur, and each characterized by the 8~

predominance of differing dewatering parameters. These three zones may be termed respectively a sedimentation zone, a trans-ition zone and a terminal sludge zone.
Thus, (1) tar sands contain clay mineral, (2) in the hot water extraction process, most of the clays become dispersed in the process streams and traverse the circuit, exiting in the tailings, (3) the amount of process water input is fixed by the clay content of the feed and the need to control viscosity of the middlings stream, (4) the amount of water required for mid-dlings viscosity control represents a large volume relative tothe volume of the ore itself, and (5) upon disposal, clays settle only very, very slowly; thus, the water component of tailings is only partially available for reuse via recycle. That which can-not be recycled represents a net accumulation of tailings sludge.
The pond water problem, therefore, is to devise long-term, economically and ecologically acceptable means to eliminate, minimize, or permanently dispose of the accumulation of sludge.
; Experience has demonstrated that the problem requires a multi-faceted approach toward its solution, and the present invention is directed at achieving one aspect of the solution: a more thoroughly dewatered sludge layer which, as a consequential re-- sult, obtains a greater quantity of clarified water for recircu-lation into the process if necessary in the particular system.
Flocculation of the tailings stream in order to improve the settling characteristics of an industrial process tailings pond has been proposed and practiced in the prior art. In floccu-lation, individual particles are united into rather loosely-bound agglomerates or flocs. The degree of flocculation is controlled by the probability of collision between the particles and their tendency toward adhesion after collision. Agitation increases the probability of collision, and adhesion tendency is increased by the addition of a flocculant.

`
11~ 81 Reagents act as flacculants through one or a combination of three general mechanisms: (1) neutralization of the electrical repulsive forces surrounding the small particles which enables the van de Waals cohesive force to hold the particles together once they have collided; (2) precipitation of voluminous flocs, such as metal hydroxides, that entrap fine particles; and (3) bridging of particles by natural or synthetic, long-chain, high-molecular weight polymers. These polyelectrolytes are believed to act by absorption (by ester formation or hydrogen bonding~ of hydroxyl or amide groups on solid surfaces, each polymer chain bridging between more than one solid particle in the suspension.
A remarkable number of flocculants have been employed in the prior art to obtain precipitation of particles in tailings ponds of various industrial processes as well as in sewage treat-: ment facilities. However, a distinct step forward in the art has been achieved by the use of hydrolyzed corn and potato starch flocculants as described in co-pending Canadian application S.N. 275,214, filed March 31, 1977 and entitled "Destabilization of Sludge with Hydrolyzed Starch Flocculants" and by the use of wheat starch flocculants as set forth in co-pending Canadian ap-plication S.N. 308,619, filed August 2, 1978, and also entitled "Destabilization of Sludge with Hydrolyzed Starch Flocculants".
These specific hydrolyzed starch flocculants, particularly taking into account the economics of carrying out flocculation on a large scale, enjoy high performance characteristics for their ability to bring about rapid precipitation to a substantially terminal settled condition. This characteristic is especially valuable for use in those processes, such as the hot water process for obtaining bitumen from tar sands, in which there is a critical need to recycle clarified water from the tailings pond back into ~ ;

ll~U'~

the process. However, experience has indicated that the simple use of these hydrolyzed starch flocoulants, or for that matter any other known flocculant, resuIts in very little, if any, im-provement on the ultimate degree of dewatering of the sludge layer. That is, the terminal status of the sludge layer is just about the same as wouId be obtained over a much longer period of time by natural settling processes, and this terminal condition is unsatisfactory in that it includes too much water, is too vol-uminous, and is too unstable.
Nonetheless, it is not accurate to say that all character-istics of a sludge layer obtained as a result of flocculants by the aforementioned hydrolyzed starch flocculants is the same as that achieved naturally or by the use of other flocculants. In point of fact, certain very desirable characteristics to the sludge layer are obtained from the use of the hydrolyzed starch flocculants which are not achieved by natural settling or by the use of any other flocculant presently known, and it is on the appreciation and use of these characteristics that the present invention is based. More particularly, it has been found that the permeability and shear strength characteristics of the sludge layer are both very much increased; as a result, previously im-possible dewatering techniques may be employed to compact and stabilize the sludge layer and to extract additional amounts of clarified water therefrom.
It has ~een proposed in the past, as another approach to alleviating pond water problems, to store the fines in the inter-stices between the sand grains in the material employed for dike building. Such a process is disclosed in Canadian patent 1,063,956, issued October 9, 1979, and entitled "Method of Sludge Disposal Related to the Hot ~ater Extraction of Tar Sands"
and corresponding U.S. patent 4,008,146, issued February 15, 1977.

Z~311 ' The experience with the procedure described in that reference is that the height to which the dike can be built is somewhat limited; however, it has now been discovered that if the sludge mixed with the sand to prepare ; the dike building material has been treated with the aforementioned ; hydrolyzed starch flocculants, the strength of the resultant material is ., ; notably increased such that the dike can be built higher, thereby not only permitting a deeper tailings pond, but also storing more sludge in the interstices between the sand grains comprising the dike.

,:
SUMMARY OF THE INVENTION

; It is a broad object of this invention to minimize the volume of sludge stored in an industrial process tailings pond.
In another aspect, it is an object of this invention to provide means for surcharging the sludge layer of an industrial process tailings pond with a layer of sand thereby effecting a porous piston for compressing, and thus dewatering, the sludge layer.
In a more specific aspect, it is an object of this invention to provide means for controlling the sludge layer of an industrial process tailings pond by treating the sludge with hydrolyzed starch flocculant to increase its shear strength and permeability characteristics and subsequentlv distributing a layer of sand over the sludge layer such that the sand layer functions as a heavy porous piston which compresses, and thus dewaters, the sludge layer.

DESCRIPTION OF THE DRAWINGS

The subject matter of the invention is particularly pointed out and distinctly claimed in the concluding portion of the 1~4V~l specification. The invention, however, both as to organization and method of operation, may best be understood by reference to the following description taken in conjunction with the accompanying drawing of which:
Figure 1 is a somewhat simp]ified block diagram of a hot water process for converting bituminous tar sands into bituminous froth for subsequent upgrading to synthetic crude oil;
Figure 2 is a partial cross-sectional view which illustrates, conceptually and simplistically, the distribution of water and sludge in a tailings pond associated with the apparatus illustrated in Figure l;
Figure 3 is a view similar to Figure 2 and shows -the results of prior art attempts to surcharge the sludge layer of a tailings pond with sand;
Figure 4 illustrates the effect of surcharging the sludge layer of the tailings pond with sand after the sludge layer has been treated with specific hydrolyzed starch flocculants;
Figure 5 illustrates the effect obtained by alternating layers of surcharging sand with sludge previously treated with specific hydrolyzed starch flocculants;
Figure 6 illustrates the effect of internal surcharging obtained by mixing sand with sludge which has been or is simultaneously treated with specific hydrolyzed starch flocculants;
Figure 7 illustrates the effect of employing a combination of internal and external surcharging techniques with sludge which has been treated with specific hydrolyzed starch flocculants;
Figure 3 illustrates a general approach for increasing the amount of fines stored in the interstices between adjacent sand grains in a dike;
Figure 9 illustrates an exemplary specific method for adding hydrolyzed starch flocculant to the tailings of a tar sands hot water process;

1140;~81 ; Figure 10 illustrates a method for the addition of hydrolyzed starch flocculants to sludge, accompanied by sand inclusion, found in the tailings system of a tar sands hot water process;
Figure 11 illustrates a combination of the techniques illustrated in Figures 9 and 10 by which a more rapid recovery of clarified water may be obtained; and Figures 12a, 12b, 12c, and 12d illustrate a sequence of operations by which external sand surcharge to the sludge layer of a tailings pond located in a cold environment can be obtained.

DETAILED DESCRIPTION OF THE INVENTION

Referring now to Figure 1, bituminous tar sands are fed into the system through a line 1 and passed to a conditioning drum or muller 18. Water and steam are introduced into the muller through another line 2. The total water so introduced in liquid and vapor form is a minor amount based on the weight of the tar sands processed. The tar sands, heated and conditioned with steam and water, pass through a line 3 to a screen 29. The purpose of the screen 29 is to remove from the pulp any debris such as rock or oversized lumps of clay as indicated generally at 30. The oversize material is discarded at a suitable site.
The conditioned pulp passes through a line 31 to a feed sump 19 which serves as a zone for diluting the pulp with additional water before it enters a separation zone 20.
The diluted pulp is continuously flushed from the feed sump 19 through a line 4 into the separation zone 20. The settling zone within the separator 20 is relat1vely quiescent so that bitu-minous froth rises to the top and is withdrawn through a line 5 while the bulk of the sand component settles to the bottom as a tailings layer which is withdrawn through line 6. It will be understood, of course, that the tailings streams can be trans-ferred individually, with or without downstream treatment, as indicated by the alternate lines 23, 24 and optional treatment processes 70, 80.
' A relatively bitumen-rich middlings stream is withdrawn through line 8 to maintain the middlings layer between the froth and the sand layer at a functional viscosity. This middlings material is transferred to a flotation scavenger zone 21 where an air flotation operation is conducted to bring about the for-mation of additional bituminous froth which passes from the scavenger zone 21 through line 9, in conjunction with the pri-mary froth from the separation zone 20 passing through line 5, to a froth settler zone 22. A bitumen-lean water stream is removed ~rom the bottom of the scavenger zone 21 through line 10.
In the froth settler zone 22, some further bitumen-lean water is withdrawn from the froth and removed through line 11 to be mixed with the bitumen-lean water stream from the flotation scav-enger zone and the sand tailings stream from the separaticn zone 20. The bitumen from the settler 22 is removed through line 12 for further treatment, typically final extraction.
Bitumen-lean water from the froth settler 22, the scavenger zone 21, and the separation zone 20, all of which make up an ef-fluent discharge stream carried by line 7, are discharged into a tailings pond 15 which has a clarified water layer 26 and a sludge layer 27. The sand included in the tailings stream quickly settles in the region 14, and the fines-containing water flows into the body of the pond 15 where settling takes place. Water from the clarified water layer 26 may be withdrawn by a pump 28 for recycle through a line 17 to be mixed with fresh makeup water and charged into the hot water process.

~l~V'~81 Refering now to Figure 2, the sludge layer 27 of the tailings pond 15 is overlayed with a clariEied water layer 26. (As previously noted, this is a considerable simplification, but is adequate and appropriate for an understanding of the present invention.) The sand bottom 23 of the pond defines the lower limit of the sludge layer 27 which, as previously discussed, increases in mineral-to-water ratio from top to bottom. The characteristics of the sludge layer 27 so formed is unacceptably and insufficiently dewatered and compacted to minimize the pond volume required to contain the sludge and to obtain a stable sludge structure.
It has been proposed in the past to "surcharge" a sludge layer with a layer of sand whereby the sand acts as a permeable piston to compress the sludge and force water out of it. All attempts to carry out this surcharging concept have met with complete failure or have been performed under conditions which yield only marginal, if any, benefits under very limited conditions. See, by way of example, U.S. Patent
4,036,752, issued July 19, 1977, and entitled "Dewatering Clay Slurries."
What has been observed in practice, when such techniques have been attempted in large, relatively deep tailings ponds, is illustrated in Figure 3. As a layer of sand 24 is broadcast over the sludge layer 27, the sand layer is observed to tilt and dump through the sludge layer as shown generally in the region 32. The sludge layer is simply incapable of supporting a useful surcharge of sand. Thus, in the prior art, sand surcharging has been theoretically interesting, but totally impractical as a process for dewatering and compacting sludge, and this has been the case whether the sludge was allowed to settle naturally or the settling process was accelerated by the use of flocculants.

2~11 However, it has been determined that the use of the specific hydrolyzed starch flocculants described in the above-referenced Canadian patent applications produces a sludge :Layer with remarkably enhanced shear strength and permeability characteristics, and an appreciation of this fact resulted in reconsideration of the heretofore substantially impractical and discarded sand surcharge concept. Throughout the remainder of this specification the term "hydrolyzed starch flocculant"
means one of the specific starch flocculants disclosed in the above-referenced Canadian applications or a chemical or fully-functional equivalent comprising, for example, hydrolyzed starch with polyelectrolytes and a low dielectric constant fluid rendered in aqueous form.
As shown in Figure 4, a sludge layer 33 which has been treated with a hydrolyzed starch flocculant is capable of supporting a substantial sand surcharge which operates as a porous piston to compact and dewater the sludge layer. In addition, the observed improved permeability of the sludge layer 33 resulting from treatment with a hydrolyzed starch flocculant affords an enhancement to the degree of compaction of dewatering which can be achieved. Furthermore, as shown in Figure 5, sludge layer 33, treated with a hydrolyzed starch flocculant, is sufficiently strong that a second layer of sludge 35 may be layed over the sand layer 34 and then second sludge layer, itself, may be subjected to a surcharge brought about by another sand layer 36. For relatively deep tailings ponds, a number of such alternate layers of treated sludge and sand may be employed to obtain a very high degree of compaction and dewatering.
It has also been proposed in the prior art to mix sludge, which has been flocculant-treated with sand to obtain a material which, ineffect, is "internally surcharged." one may refer, by way of example to U.S. Patent 3,680,693 issued August 1, 1972, ll~V'~81 .. ..

and entitled "Process for the Treatment of Slime and Waste Solids." While this technique has been promising, the amount ; of sand which can be added to the sludge has been limited by the strength of the sludge and, as previously noted, no pre-viously known floccuIant affords the strength and permeability enhancement to the sludge layer observed to resuIt from use of the hydrolyzed starch floccuIants previously identified.
It has now been found that sand mixed with sludge treated with one of these hydrolyzed starch flocculants results in a material which, indeed, exhibits important internal surcharge character-istics resuIting in a compacted sand/sludge layer 37 as illus-treated in Figure 6. Furthermore, as shown in Figure 7, a combination of internal and external sand surcharging techniques may be employed in which the mixed sand/treated-sludge layer 37 is itself overlayed with a sand layer 38. In addition, of course, the multilayering technique illustrated in Figure 5 is equally applicable.
It has been observed at the Suncor-Oil Sands Division plant that on the order of 35% of the fines (and a larger portion of the clay component) i5 discharged into the tailings pond; the remainder is stored in the interstices between adjacent sand grains or is discarded as lumps which are part of the oversize. It has been proposed in the past to increase the quantity of silt, and particularly the quantity of clay, stored in the interstices be-tween adjacent sand grains in the material employed to build a pond-impounding dike. By way of example, one may refer to pre-viously referenced U.S. Patent 4,008,146, issued February 15, 1977, and entitled "Method of Sludge Disposal Related to the Hot Water Extraction of Tar Sands" and also to the corresponding Canadian patent 1,063,956, issued October 9, 1979. As disclosed in that reference, sand and sludge are admixed in a pre-' -20-scribed fashion, and the resultant material is discharged at the dike site to effect dike building. This is an important concept, but its use in practice has been somewhat limited be-cause the stability o~ the resulting dike structure is insuf-ficient to permit building the dike to a height which represents storage of meaningful additional quantities of fines.
It has now been determined that, if sand is admixed with sludge which has been treated with a hydrolyzed starch flocculant, an important increase in the strength of the resulting material, when employed for dike building, is observed such that the resul-ting structure is much more stable. Thus, substantially higher dikes can be built, and significantly large quantities of silt and, particularly, clay can be stored in the interstices between adjacent sand grains in the material.
An exemplary procedure for storing silt and clay particles in the interstices between adjacent grains of sand in a sand dike is illustrated in Figure 8. A tailings pond 41 is enclosed by dike walls 42 and contains a clarified water layer 43 and a sludge layer 44. Sludge is withdrawn from the pond 41 via sludge with-drawal means 51 and is transferred to a line 47 by a pump 46 which is supported by flotation means 45 on the surface of the pond 41. The sludge material is transferred from the line 47 into a line 50 where it is combined with, by way of example, tailings material from the hot water extraction process for recovering bitumen from tar sands. This waste water stream from the extrac-tion process is primarily water and sand, but inclues minor amounts of silt, clay, and bitumen. Thus, the combined streams which are transferred from line 50 into a settling zone 52 contain a sub-stantial amount of sand.

~ `\
~l~V'~8~

In the settling zone 52, an upper layer 53 and a-lower layer 54 are formed. The upper layer is withdrawn through line 55 and is transferred into a line 56, where it is combined with beach run-off water transfarred from zone 61 via line 57, and added to the retention pond 41.
The lower layer 54 in settling zone 52 is withdrawn through a line 58 and is transferred to an inclined sand pile 59 situated adjacent a dike 60. The lower layer 54 of the settling zone 52 typically comprises on the order of 2% bitumen, 39% sand, 9% silt 9 4% clay, and 46% water. This mixture is dispersed over the sand pile to form additional sand layers whereby a part of the clay, silt, and water in the stream is retained in the interstices of the sand layers. The remainder of the aqueous stream percolates down the inclined sand pile zone and settles into the retention zone 61. A pump 62 in the retention zone 61 withdraws the aqueous portion of that pond and transfers it into the line 57 where, as previously noted, it is combined with the stream from the upper layer of zone 52 in the line 56.
Thus, a part of the sludge from the tailings pond 41 is removed and dispersed with the sand of the wastewater stream over the pond dike wall to carry out dike building. Substantially in-creased quantities of the sludge withdrawn from the pond are stored in the interstices of the sand pile zone 59 thereby providing a means for reducing the solids content and, more importantly, clay content of the tailings pond 41. It may be noted that tailings pond 41 and retention zone 61 can be unitary wherein the sand pile 59 is located on the dike walls 42 of the tailings pond 41.
In that manner, only one pond is necessary to conduct the whole process, and there is no need to transfer clarified water from the zone 61 to the zone 41.

If, as previously discussed, the sludge layer 44 in the retention pond 41 has been treated with the hydrolyzed starch flocculant, the strength of the resultant sand/sludge mixture discharged onto the sand pile 59 to increase the height of the dike will be very much stronger, thereby permitting the dike to be built to a substantially greater height without compromising its integrity.
An exemplary system for adding hydrolyzed starch floccu-lant to the tailings from the separation zone 20 discharged through the line 6 and alternative line 23 (Figure 1) is illus-trated in Figure 9. Tailings from the separation cell are trans-ferred, via line 23, to a sand separàtion zone 71 in which the sand component rapidly settles to the bottom for discharge as wet sand through a line 72 to a tailings sump 73. Tailings water is withdrawn frorn the sand separation zone 71 at a higher point via line 74 into which the hydrolyzed starch flocculant is intro duced through a line 75. The flocculated tailings water is then discharged into a thickening pond 76 which functions as a holding zone during the several days residence period required for the flocculant to settle the fines (principally clay) well below the surface. Optionally, the hydrolyzed starch flocculant may be broadcast on the surface of the thickening pond as indicated in the region 77, or a combination of flocculant dosing techniques may be applied to the tailings water. Virtually clear water may be withdrawn from the upper layer of the thickening pond 76 via line 78 for recycle into the hot water process.
Thickened tailings water is drawn from the lower regions of the thickening pond 76 and is transferred, via line 79, to the tailings sump 73. The content of the tailings sump 73, which will be a sand and flocculated thickened tailings water mixture, is withdrawn via line 81 and transferred to a sand pond 82. In 1~4~'~81 the sand pond 82, further settling takes place and, because of the use of the hydrolyzed starch flocculant, an effect takes place corresponding to that illustrated in Figure 6; i.e., a higher degree of dewatering and compaction results than would be obtained if another type of flocculant were used. As a re-sult, a clarified water layer 160 is also present on the surfaee of the sand pond 82, and this clarified water layer may be with~
drawn by pump ~3 for transfer via line 34 to a primary tailin~s pond 85.
Tailings from downstream incremental bitumen recovery pro-cesses, which essentially comprise fines-laden water, may also be conducted via line 24 for discharge into the primary tailings pond 85. Hydrolyzed starch flocculant may also be added to this tail-ings stream as indicated at 87 in order to maintain the flocGu-lant dosage in the primary tailings pond 85 at an optimum level.
Clarified water is withdrawn by pump ~8 from the upper level of the primary tailings pond 85 for recycle via line 89 to the hot water process.
Figure 10 illustrates an examplary system for accomplish-ing addition of hydrolyzed starchflocculant to sludge accompanied by sand inclusion to obtain the effect illustrated in Figure 6 and discussed above. Tailings from the separation cell are con-veyed via line 23 to a sand separation zone 90 wherein the sand component rapidly settles to the bottom for discharge through line 91 to a tailings sump 92. Fines-containing tailings water is withdrawn from an upper region of the sand separation zone 90 through line 93 for discharge into a primary tailings pond 94.
The primary tailings pond 94 also receives, via line 24, the tail-ings from the downstream processes for extracting incremental amounts of bitumen. As indicated at 95, hydrolyzed starch floceu-lant may be added to this stream to maintain the flocculant dosage 1~4~

in the primary tailings pond at a desired level. Clarified water is withdrawn, by pump 96, for recycle via line 97 back into the hot water process.
Sludge is withdrawn from the sludge layer of primary tailings pond 94 by a pump 98 and is transferred via line 99 ; to an auxiliary pond 100 which functions essentially as a sludge holding area. Sludge is withdrawn from the auxiliary pond 100 by a pump iO1 and is transferred via line 102 to the tailings sump 92. It will be understood that, if the sludge withdrawal rates from the primary tailings pond 94 is commensurate with the ;- capacity of the tailings sump 92, the transfer of sludge to the auxiliary pond 100 need not necessarily be carried out. As a practical matter, such nice adjustments cannot always be achieved~
and it is therefore often desirable to provide the auxiliary pond 100 .
Hydrolyzed starch flocculant is added to the wet sand/sludge mixture by injecting it into the sludge stream from the auxiliary pond 100 ~as indicated at 103), by adding the flocculant to the tailings sump 92 (as indicated at 104), and/or by adding the flocculant to the mixture discharged from the tailings sump 92 through line 105 for discharge into a third pond 106. In the third pond 106, a high degree of dewatering and compaction of the sand/hydrolyzed starch flocculated sludge mixture, generally as depicted in Figure 6, takes place. As a result, clarified water from a layer 161 may be withdrawn, by pump 107 from the upper layer of the pond 106 and transferred via line 108 to the primary tailings pond 94 from which it is available as recycle water to the hot water process.
It may be noted that the system sludge has a bitumen con-tent which may be sufficient for economic recovery as the priceof crude oil continues to increase. For that reason, provision ~14V~

may be made to bypass section 102a of line 102 by a circuit which includes line 109, optional tertiary bitumen recovery process 100, and line 111.
Figure 11 illustrates a system which combines the tech-niques illustrated in Figures 9 and 10 in order to obtain a higher rate of recovery of recycle water and, particularly, to minimize the containment volume required to hold the sludge.
Such a higher water recovery rate may be dictated by the fresh water requirements of the entire hot water process system or, in a given installation, may only be necessary during periods when relatively poor (i.e., high in clay content) tar sands feed is being worked. The containment volume problem is critical at sites of limited area and is, for example, more important at the Suncor-Oil Sands Division lease site than the fresh water aspect.
Tailings from the separation cell are transferred, via line 23, to a sand separation zone 140 in which the sand compon-ent rapidly settles to the bottom for discharge as wet sand through a line 141 to a tailings sump 142. Tailings water is withdrawn from the sand separation zone at a higher point via line ~43 into which hydrolyzed starch flocculant is introduced through a line 151. The flocculated tailings water is then discharged into a thickening pond 152 which functions as a holding zone dur-ing the residence period (on the order of up to one day) required for the flocculant to settle the fines (principally clay) well below the surface. Optionally, the hydrolyzed starch flocculant may be broadcast on the surface of the thickening pond as indica-ted in the region 157, or a combination of flocculant dosing techniques may be administered to the tailings water. Virtually clear recycle water may be withdrawn from the upper level of the thickening pond 152 via line 157 for recycle into the hot water ll~V~l prscess. Thickened tailings water is withdrawn from the lower region of the thickening pond 152 and is transferred, via line 153, to the tailings sump 1420 Because clay particles undergo an aging process varying in length from a few days to many weeks before they begin to settle, an individual practical installation may require the addition of a holding pond 170 which receives the tailings water via a line 171. Aged tailings water is withdrawn through line 172 and transferred to the thickening pond 152.
A first tailings pond 144 receives, via line 24, the tail-ings from downstream processes for extracting incremental amounts of bitumen. As indicated at 145, hydrolyzed starch flocculant may be added to this stream to maintain the flocculant dosage in the first tailings pond at a desired level. Clarified water is withdrawn, by pump 146, for recycle, via line 147, back into the hot water process along with the recycle water obtained from the thickening pond 152.
Sludge is withdrawn from the sludge layer of the first tailings pond 144 by pump 148 and is transferred via line 149 to a second tailings pond 150 which functions essentially as a sludge holding area. Sludge is withdrawn from the lower region of the second tailings pond 150 by a pump 131 and is transferred via line 132 to the tailings sump 142. It will be understood that if the sludge withdrawal rate from the first tailings pond 144 is commensurate with the capacity of the tailings sump 142, the transfer of sludge to the second tailings pond 150 need not neces-sarily be carried out.
Hydrolyzed starch flocculant is added to the wet sand/sludge mixture by injecting it into the sludge stream from the second tailings pond 150 as indicated at 133, by adding the flocculant -~ li4VZ8~

to the tailings sump 142 as indicated at 134, and/or by adding the flocculant to the sand/sludge mixture discharged from the tailings sump 142 through line 135 into a third tailings pond 136, as generally indicated at 139. In the-third tailings pond 136 a high degree of dewatering and compaction of the sand/hydro-lyzed starch floccuIated sludge mixture, in the manner depicted in Figure 6, is obtained. As a result, clarified water may he withdrawn, by pump 137, from the upper layer 162 of the third tailings pond 136 for transfer via line 138 to the first tailings pond 144 from which it is available as recycle water to the hot water process.
- As previously noted, the sludge has a significant bitumen content. Hence, optional tertiary bitumen recovery may be sought in the bypass loop comprising line 154, process 155, and line 156, disposed around the line section 132a between the pump 131 and the tailings sump 142.
It may be noted, with respect to the discussions relevant to Figures 8, 9, 10, and 11, that, in many instances, the plur-ality of ponds illustrated for clarity in explaining the processes may often be, in practice, a single pond. In that instance, cer-tain of the process steps, such as pumping clarified water and/or sludge between the ponds, takes place naturally so that no special provisions need be made for carrying out these steps.
It will be appreciated by those skilled in the art, of course, that the systems illustrated in Figures 9, 10, and 11 are merely exemplary of approaches toward practical installation which will vary with the process material, type of process, cli-mate, and according to many other factors. The approaches in-volved are basically to employ the thickening pond, sludge recycled from the field, or a combination of both. The ways in which these approaches can be applied toyether or separately are quite li~V'~81 numerous. Merely by way o~ example, (13 either one or both sludges may be added to the tailings before sand separation; (2) either one or both sludges may be added to the tailings after sand separation (such as ir.to a tailings sump~; (3) extra stages involving repeated sand separation and remixing with fresh sludge may be added with recycle of surplus sludge back to the thicken-ing pond or out to the field; or (~) a settling vessel or cyclone may be used for sand separation or the displacement technique disclosed within previously referenced U.S. Patent 4,088,146, may be used.
Figures 12a, 12b, 12c, and 12d illustrate sequential steps in a process by which an external sand surcharge achieving the result illustrated in Figures 4, 5, and 7 can be obtained in re-gions (such as northwest Alberta) having harsh winters. Consider, as shown in Figure 12a, a first summer perlod in which a first auxiliary pond 110 contains sludge received, by way of example, from a primary tailings pond, not.shown in Figures 12a, 12b, 12c, or 12d. The sludge is withdrawn by pump 111, for transfer, via line 112 to a second auxiliary pond 113. Hydrolyzed starch flocculant may be added, as indicated at 114, if the sludge has not previously been treated with the starch flocculant or if the - d,osage needs to be renewed or increased. The sludge transfer . ~, .
from pond llO to pond 113 is carried out throughout the summer.
Subsequently, as illustrated in Figure 12b, during the first winter, sludge from the primary tailings pond is transferred into the first auxiliary pond 110 via line 115. Because of the harshly cold environment at the site of the Athabasca tar sands, a thick ice layer 116 forms on top the sludge 117. After the ice has be come sufficiently thick to bear the weight of heavy machinery, a layer 118 of sand is spread on top of the ice layer 116.

;

Upon spring thaw, the ice layer 116 melts to permit the sand layer 118 to settle on top the hydrolyzed starch flocculant - treated sludge layer 117 to be supported thereby and to functio~
as a porous piston to effect further dewatering and compactio~
of the sludge layer 117. During the second summer, Figure 12c, sludge is again withdrawn from the first auxiliary pond 110 b~
the pump 111 and is transferred via line 112 to the second au~-iliary pond 113 for deposit as another sludge layer 119 over-~he-sand layer 118. Hydrolyzed starch flocculant is added as in dicated at 114 if the transferred sludge has not been previousLy treated to the desired dosage~
During a second winter, Figure 12d, sludge from a primary tailings pond is again received into the first auxiliary pond 110 via line 115. In the second auxiliary pond, a new ice layer 120 forms on top the second sludge layer 119, and when the ice~
layer 120 reaches sufficient thickness, a second layer of san~
121 is spread over it such that, upon spring thaw, the sand layer 121 settles atop the sludge layer 119 to obtain additional e~-ternal surcharging of the entire system below it.
20 . The foregoing yearly cycle may be repeated until the cap-acity of the second auxiliary pond is reached whereupon another auxiliary pond can begin to receive sludge from the first aux-iliary pond 110.
It will be readily apparent that many diverse techniques may be employed to emplace a sand surcharge over a sludge layer in a tail.ings pond. For example, the sand may simply be broad-cast over the pond surface as illustrated in previously referenced U.S. Patent 4,036,?52, or any other workable technique may be used to obtain the effect illustrated in Figure 4, etc., so long as -. 30 the sludge layer is first treated with hydrolyzed starch floccu-lant to improve its shear strength and permeability characteristics.

: -30-114~;~81 While the principles of the invention have now been made clear in an illustrative embodiment, there will be immediately obvious to those skilled in the art, many modifications of struc-ture, arrangement, proportions, the elements, materials, and components used in the practice of the invention which are par-ticularly adapted for specific environments and operation re-quirements without departing from those principles.

Claims (3)

THE EMBODIMENTS OF THE INVENTION IN WHICH AN EXCLUSIVE PROPERTY
OR PRIVILEGE IS CLAIMED ARE DEFINED AS FOLLOWS:
1. In a tailings pond system for receiving fines-con-taining aqueous effluent from an industrial process, the method of obtaining a more thoroughly dewatered sludge layer in the tailings pond comprising the steps of:
A) adding hydrolyzed starch additive to the effluent, which additive is obtained by the aqueous hydrolysis of the starch in the presence of one or more metal salts;
B) allowing fines to settle into a sludge layer;
and C) surcharging the sludge layer with a layer of sand;
whereby the sand layer functions as a water permeable piston such that water within the sludge layer migrates upwardly through the sand layer.
2. In a tailings pond system for receiving fines-con-taining aqueous effluent from an industrial process, the method of obtaining a more thoroughly dewatered sludge layer in the tailings pond comprising the steps of:
A) adding hydrolyzed starch additive to the sludge to improve its shear strength and permea-bility characteristics; which additive is obtained by the aqueous hydrolysis of the starch in the presence of one or more metal salts;
B) surcharging the sludge layer with a layer of sand;
whereby the sand layer functions as a water permeable piston such that water within the sludge layer migrates upwardly through the sand layer.
3. A treatment for an industrial process tailings pond, applied to dewater a sludge layer within the pond, comprising employing a hydrolyzed starch additive which is obtained by the aqueous hydrolysis of the starch in the presence of one or more metal salts to obtain a sludge layer having improved compressa-bility, shear strength and permeability characteristics and sub-sequently surcharging the sludge layer with a layer of sand whereby the sand layer functions as a water permeable piston such that water within the sludge layer migrates upwardly through the sand layer.
CA000338892A 1979-10-31 1979-10-31 Method for dewatering the sludge layer of an industrial process tailings pond Expired CA1140281A (en)

Priority Applications (7)

Application Number Priority Date Filing Date Title
CA000338892A CA1140281A (en) 1979-10-31 1979-10-31 Method for dewatering the sludge layer of an industrial process tailings pond
AU63481/80A AU6348180A (en) 1979-10-31 1980-10-17 Method for dewatering the sludge layer of an industrial process tailings pond
ZA00806453A ZA806453B (en) 1979-10-31 1980-10-21 Method for dewatering the sludge layer of an industrial prcess tailings pond
GB8034382A GB2061907B (en) 1979-10-31 1980-10-24 Method of dewatering the sludge layer of an industrial process tailings pond
IN1229/CAL/80A IN153273B (en) 1979-10-31 1980-10-29
JP15242380A JPS5681182A (en) 1979-10-31 1980-10-31 Method of dehydrating sludge layer of tilling pond from industrial process
DE19803041087 DE3041087A1 (en) 1979-10-31 1980-10-31 METHOD FOR DRAINING THE SLUDGE LAYER OF AN INDUSTRIAL PROCESS MOUNTAIN POND

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CA000338892A CA1140281A (en) 1979-10-31 1979-10-31 Method for dewatering the sludge layer of an industrial process tailings pond

Publications (1)

Publication Number Publication Date
CA1140281A true CA1140281A (en) 1983-01-25

Family

ID=4115496

Family Applications (1)

Application Number Title Priority Date Filing Date
CA000338892A Expired CA1140281A (en) 1979-10-31 1979-10-31 Method for dewatering the sludge layer of an industrial process tailings pond

Country Status (7)

Country Link
JP (1) JPS5681182A (en)
AU (1) AU6348180A (en)
CA (1) CA1140281A (en)
DE (1) DE3041087A1 (en)
GB (1) GB2061907B (en)
IN (1) IN153273B (en)
ZA (1) ZA806453B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9068776B2 (en) 2009-10-30 2015-06-30 Suncor Energy Inc. Depositing and farming methods for drying oil sand mature fine tailings
US9404686B2 (en) 2009-09-15 2016-08-02 Suncor Energy Inc. Process for dying oil sand mature fine tailings
US9909070B2 (en) 2009-09-15 2018-03-06 Suncor Energy Inc. Process for flocculating and dewatering oil sand mature fine tailings

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19751339C2 (en) * 1997-11-19 2003-07-03 Rag Ag Process for the treatment and processing of flotation tailings resulting from hard coal processing as an aqueous residue stream
DE10059076B4 (en) * 2000-11-28 2005-10-06 Rag Ag Sludge beds for dewatering flotation mine discharges
DE102009039283B4 (en) * 2009-08-28 2014-10-16 Technische Universität Bergakademie Freiberg Process for the recovery of valuable substances from technogenic sediment deposits
DE102009039286B4 (en) * 2009-08-28 2014-10-23 Technische Universität Bergakademie Freiberg Plant for the technogenic sedimentation of low-value sludge
DE102009039282B4 (en) * 2009-08-28 2014-11-13 Technische Universität Bergakademie Freiberg Process for the technogenic sedimentation of low-grade sludges

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4036752A (en) * 1975-01-24 1977-07-19 American Cyanamid Company Dewatering clay slurries

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9404686B2 (en) 2009-09-15 2016-08-02 Suncor Energy Inc. Process for dying oil sand mature fine tailings
US9909070B2 (en) 2009-09-15 2018-03-06 Suncor Energy Inc. Process for flocculating and dewatering oil sand mature fine tailings
US10590347B2 (en) 2009-09-15 2020-03-17 Suncor Energy Inc. Process for flocculating and dewatering oil sand mature fine tailings
US9068776B2 (en) 2009-10-30 2015-06-30 Suncor Energy Inc. Depositing and farming methods for drying oil sand mature fine tailings

Also Published As

Publication number Publication date
AU6348180A (en) 1981-05-07
GB2061907A (en) 1981-05-20
DE3041087A1 (en) 1981-05-21
IN153273B (en) 1984-06-23
ZA806453B (en) 1981-10-28
DE3041087C2 (en) 1991-02-07
GB2061907B (en) 1983-12-07
JPS625680B2 (en) 1987-02-05
JPS5681182A (en) 1981-07-02

Similar Documents

Publication Publication Date Title
US4399039A (en) Treatment of tailings pond sludge
US4437998A (en) Method for treating oil sands extraction plant tailings
US5645714A (en) Oil sand extraction process
CA2606312C (en) System and method for treating tailings
US5723042A (en) Oil sand extraction process
US3856668A (en) Method for treatment of coal washery waters
CA1140281A (en) Method for dewatering the sludge layer of an industrial process tailings pond
US3931006A (en) Method of reducing sludge accumulation from tar sands hot water process
CA2983393A1 (en) Separation of suspensions of solids employing water soluble polymer and a chemical agent
Lockhart Electro-osmotic dewatering of fine tailings from mineral processing
US4399038A (en) Method for dewatering the sludge layer of an industrial process tailings pond
CA1123977A (en) Dike building material comprising sand and treated sludge
US3751358A (en) Freeze-thaw separation of solids from tar sands extraction effluents
US3869384A (en) Tailings disposal system for tar sands plant
CA2768522C (en) Processes for treating tailings streams from oil sands ore
CA1124895A (en) Treatment of tailings pond sludge
US3953318A (en) Method of reducing sludge accumulation from tar sands hot water process
Sparks et al. A study of some factors affecting solvent losses in the solvent extraction—spherical agglomeration of oil sands
WO2003004831A1 (en) Oil sands separation process
US4008146A (en) Method of sludge disposal related to the hot water extraction of tar sands
CA1134310A (en) Method for surcharging with sand the sludge layer of a tar sands tailings pond
CA2757955A1 (en) Dewatering slurries
CA1085762A (en) Grinding as a means of reducing flocculant requirements for destabilizing sludge (tailings)
CA1121555A (en) Destabilization of sludge with hydrolyzed starch flocculants
Rao Flocculation and dewatering of Alberta oil sands tailings

Legal Events