BRPI1013587A2 - método para melhorar isolamento zonal entre formações ao longo de um furo de sondagem - Google Patents
método para melhorar isolamento zonal entre formações ao longo de um furo de sondagemInfo
- Publication number
- BRPI1013587A2 BRPI1013587A2 BRPI1013587A BRPI1013587A BRPI1013587A2 BR PI1013587 A2 BRPI1013587 A2 BR PI1013587A2 BR PI1013587 A BRPI1013587 A BR PI1013587A BR PI1013587 A BRPI1013587 A BR PI1013587A BR PI1013587 A2 BRPI1013587 A2 BR PI1013587A2
- Authority
- BR
- Brazil
- Prior art keywords
- drillhole
- zonal isolation
- formations along
- improving
- improving zonal
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/10—Setting of casings, screens, liners or the like in wells
- E21B43/103—Setting of casings, screens, liners or the like in wells of expandable casings, screens, liners, or the like
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/13—Methods or devices for cementing, for plugging holes, crevices, or the like
- E21B33/14—Methods or devices for cementing, for plugging holes, crevices, or the like for cementing casings into boreholes
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US16512809P | 2009-03-31 | 2009-03-31 | |
PCT/US2010/029407 WO2010120523A2 (en) | 2009-03-31 | 2010-03-31 | Expansion against cement for zonal isolation |
Publications (1)
Publication Number | Publication Date |
---|---|
BRPI1013587A2 true BRPI1013587A2 (pt) | 2016-04-19 |
Family
ID=42936829
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
BRPI1013587A BRPI1013587A2 (pt) | 2009-03-31 | 2010-03-31 | método para melhorar isolamento zonal entre formações ao longo de um furo de sondagem |
BRPI1013589A BRPI1013589A2 (pt) | 2009-03-31 | 2010-03-31 | método para expandir um tubular expansível em um furo de sondagem |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
BRPI1013589A BRPI1013589A2 (pt) | 2009-03-31 | 2010-03-31 | método para expandir um tubular expansível em um furo de sondagem |
Country Status (7)
Country | Link |
---|---|
US (2) | US20120073814A1 (pt) |
CN (2) | CN102365419A (pt) |
AU (2) | AU2010234746A1 (pt) |
BR (2) | BRPI1013587A2 (pt) |
CA (2) | CA2756983A1 (pt) |
GB (2) | GB2480963B (pt) |
WO (2) | WO2010117851A2 (pt) |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20140144634A1 (en) * | 2012-11-28 | 2014-05-29 | Halliburton Energy Services, Inc. | Methods of Enhancing the Fracture Conductivity of Multiple Interval Fractures in Subterranean Formations Propped with Cement Packs |
EP2806007B1 (en) | 2013-05-24 | 2017-04-05 | Services Pétroliers Schlumberger | Methods for maintaining zonal isolation in a subterranean well |
US20170174977A1 (en) * | 2014-03-31 | 2017-06-22 | Schlumberger Technology Corporation | Methods for maintaining zonal isolation in a subterranean well |
BR112017002659B1 (pt) | 2014-08-13 | 2022-04-05 | Shell Internationale Research Maatschappij B.V. | Conjunto e método para abaixar e expandir um elemento tubular em um furo de sondagem. |
US10563475B2 (en) * | 2015-06-11 | 2020-02-18 | Saudi Arabian Oil Company | Sealing a portion of a wellbore |
MX2018004120A (es) * | 2015-11-02 | 2018-05-17 | Halliburton Energy Services Inc | Composiciones fraguables con diversos tiempos de fraguado. |
US10794158B2 (en) * | 2016-11-01 | 2020-10-06 | Shell Oil Company | Method for sealing cavities in or adjacent to a cured cement sheath surrounding a well casing |
US11377927B2 (en) | 2018-07-20 | 2022-07-05 | Shell Usa, Inc. | Method of remediating leaks in a cement sheath surrounding a wellbore tubular |
CN112610177B (zh) * | 2021-01-14 | 2021-09-28 | 长江大学 | 一种用于弃井套管回收作业的挤压装置及挤压作业方法 |
Family Cites Families (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ZA96241B (en) * | 1995-01-16 | 1996-08-14 | Shell Int Research | Method of creating a casing in a borehole |
GB2384502B (en) * | 1998-11-16 | 2004-10-13 | Shell Oil Co | Coupling an expandable tubular member to a preexisting structure |
EG22306A (en) * | 1999-11-15 | 2002-12-31 | Shell Int Research | Expanding a tubular element in a wellbore |
GB0023032D0 (en) * | 2000-09-20 | 2000-11-01 | Weatherford Lamb | Downhole apparatus |
GC0000398A (en) * | 2001-07-18 | 2007-03-31 | Shell Int Research | Method of activating a downhole system |
WO2003093623A2 (en) * | 2002-05-06 | 2003-11-13 | Enventure Global Technology | Mono diameter wellbore casing |
US7066284B2 (en) * | 2001-11-14 | 2006-06-27 | Halliburton Energy Services, Inc. | Method and apparatus for a monodiameter wellbore, monodiameter casing, monobore, and/or monowell |
US7040404B2 (en) * | 2001-12-04 | 2006-05-09 | Halliburton Energy Services, Inc. | Methods and compositions for sealing an expandable tubular in a wellbore |
US6722433B2 (en) * | 2002-06-21 | 2004-04-20 | Halliburton Energy Services, Inc. | Methods of sealing expandable pipe in well bores and sealing compositions |
AU2003298303A1 (en) * | 2002-11-26 | 2004-06-18 | Shell Internationale Research Maatschappij B.V. | Method of installing a tubular assembly in a wellbore |
US7036586B2 (en) * | 2004-01-30 | 2006-05-02 | Halliburton Energy Services, Inc. | Methods of cementing in subterranean formations using crack resistant cement compositions |
US7284608B2 (en) * | 2004-10-26 | 2007-10-23 | Halliburton Energy Services, Inc. | Casing strings and methods of using such strings in subterranean cementing operations |
GB2419902B (en) * | 2004-11-09 | 2008-02-13 | Schlumberger Holdings | Method of cementing expandable tubulars |
WO2006063986A1 (en) * | 2004-12-15 | 2006-06-22 | Shell Internationale Research Maatschappij B.V. | Method of sealing an annular space in a wellbore |
US7267174B2 (en) * | 2005-01-24 | 2007-09-11 | Halliburton Energy Services, Inc. | Methods of plugging a permeable zone downhole using a sealant composition comprising a crosslinkable material and a reduced amount of cement |
CN101161983B (zh) * | 2007-11-28 | 2011-04-06 | 辽河石油勘探局 | 一种提高注水泥封堵效果的方法 |
-
2010
- 2010-03-31 CN CN201080014728XA patent/CN102365419A/zh active Pending
- 2010-03-31 CA CA2756983A patent/CA2756983A1/en not_active Abandoned
- 2010-03-31 WO PCT/US2010/029357 patent/WO2010117851A2/en active Application Filing
- 2010-03-31 AU AU2010234746A patent/AU2010234746A1/en not_active Abandoned
- 2010-03-31 GB GB1116395.3A patent/GB2480963B/en not_active Expired - Fee Related
- 2010-03-31 CA CA2757242A patent/CA2757242C/en active Active
- 2010-03-31 US US13/260,958 patent/US20120073814A1/en not_active Abandoned
- 2010-03-31 BR BRPI1013587A patent/BRPI1013587A2/pt not_active Application Discontinuation
- 2010-03-31 AU AU2010236839A patent/AU2010236839A1/en not_active Abandoned
- 2010-03-31 BR BRPI1013589A patent/BRPI1013589A2/pt not_active IP Right Cessation
- 2010-03-31 WO PCT/US2010/029407 patent/WO2010120523A2/en active Application Filing
- 2010-03-31 GB GB1116246A patent/GB2480788A/en not_active Withdrawn
- 2010-03-31 CN CN2010800149088A patent/CN102365420A/zh active Pending
- 2010-03-31 US US13/260,974 patent/US20120061078A1/en not_active Abandoned
Also Published As
Publication number | Publication date |
---|---|
CA2756983A1 (en) | 2010-10-14 |
WO2010117851A2 (en) | 2010-10-14 |
AU2010234746A1 (en) | 2011-09-29 |
BRPI1013589A2 (pt) | 2016-04-19 |
WO2010120523A3 (en) | 2011-01-20 |
GB2480963B (en) | 2013-01-30 |
WO2010117851A3 (en) | 2011-02-10 |
WO2010120523A2 (en) | 2010-10-21 |
GB201116246D0 (en) | 2011-11-02 |
GB2480963A (en) | 2011-12-07 |
CN102365419A (zh) | 2012-02-29 |
GB2480788A (en) | 2011-11-30 |
AU2010236839A1 (en) | 2011-09-22 |
GB201116395D0 (en) | 2011-11-02 |
CA2757242A1 (en) | 2010-10-21 |
US20120073814A1 (en) | 2012-03-29 |
US20120061078A1 (en) | 2012-03-15 |
CA2757242C (en) | 2016-11-01 |
CN102365420A (zh) | 2012-02-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
BRPI1013587A2 (pt) | método para melhorar isolamento zonal entre formações ao longo de um furo de sondagem | |
GB2488469B (en) | Isolation valve for subterranean use | |
HUE040110T2 (hu) | Gyártási eljárás üreges fúróhoz | |
BRPI1008672A2 (pt) | método para tratar um furo de poço. | |
BRPI1007558A2 (pt) | método de manutenção de um furo de poço. | |
GB2474959B (en) | Method for building a depositional space corresponding to a geological domain | |
GB201406199D0 (en) | Ion exchange method of swellable packer deployment | |
GB2473362B (en) | Method for changing the wettability of rock formations | |
BRPI0912765A2 (pt) | método de manutenção de um furo de poço | |
PL2501888T3 (pl) | Sposób wytwarzania oszklenia termoizolacyjnego | |
BR112012007911A2 (pt) | método de manutenção de um furo de poço | |
EP2324131A4 (en) | PROCESS FOR ISOLATING SMALL RNA | |
BRPI0821335A2 (pt) | Método de fraturamento hidráulico de poços horizontais para elevar a produtividade de hidrocaborneto | |
GB201208712D0 (en) | Method for preparing a beta-sialon phosphor | |
EP2516338A4 (en) | PROCESS FOR PRODUCING HOLLOW MICROSPHERES | |
GB201107918D0 (en) | Method for monitoring cement plugs | |
EP2389657A4 (en) | FLIGHT SELECTION PROCESS | |
EP2215042A4 (en) | PROCESS FOR FORMATION OF ALCOXYLATED FLUOROALCOHOLS | |
GB201520533D0 (en) | Methods for maintaining zonal isolation in a subterranean well | |
PL2655541T3 (pl) | Nowy sposób wiercenia wnęk podziemnych | |
PL397850A1 (pl) | Układ szczelinowania w odwiercie | |
IL226131A0 (en) | A method for creating an insulated structure | |
BRPI0821470A2 (pt) | Método para perfurar um furo de poço. | |
EP2134661A4 (en) | METHOD FOR DOPING GLASS | |
GB2474550B (en) | Methods for preparing bromfenec sodium polymorph |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
B06F | Objections, documents and/or translations needed after an examination request according [chapter 6.6 patent gazette] | ||
B06T | Formal requirements before examination [chapter 6.20 patent gazette] | ||
B11E | Dismissal acc. art. 34 of ipl - requirements for examination incomplete | ||
B11T | Dismissal: dismissal of application maintained |