BRPI1006862A2 - método e sistema para otimização de tomada de decisão para um poço de hidrocarbonetos, e, sistema associado com a produção de hidrocarbonetos - Google Patents

método e sistema para otimização de tomada de decisão para um poço de hidrocarbonetos, e, sistema associado com a produção de hidrocarbonetos

Info

Publication number
BRPI1006862A2
BRPI1006862A2 BRPI1006862A BRPI1006862A BRPI1006862A2 BR PI1006862 A2 BRPI1006862 A2 BR PI1006862A2 BR PI1006862 A BRPI1006862 A BR PI1006862A BR PI1006862 A BRPI1006862 A BR PI1006862A BR PI1006862 A2 BRPI1006862 A2 BR PI1006862A2
Authority
BR
Brazil
Prior art keywords
hydrocarbon
decision making
optimizing decision
system associated
well
Prior art date
Application number
BRPI1006862A
Other languages
English (en)
Inventor
A Dale Bruce
Chang Dar-Lon
Postl Dieter
Hommema Jennifer
K Ellisson Timothy
Original Assignee
Exxonmobil Upstream Res Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=42340056&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=BRPI1006862(A2) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Exxonmobil Upstream Res Co filed Critical Exxonmobil Upstream Res Co
Publication of BRPI1006862A2 publication Critical patent/BRPI1006862A2/pt
Publication of BRPI1006862B1 publication Critical patent/BRPI1006862B1/pt

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Feedback Control In General (AREA)
BRPI1006862-7A 2009-01-13 2010-01-05 Método e sistema para otimização de tomada de decisão para um poço de hidrocarbonetos, e, sistema associado com a produção de hidrocarbonetos BRPI1006862B1 (pt)

Applications Claiming Priority (5)

Application Number Priority Date Filing Date Title
US14430709P 2009-01-13 2009-01-13
US61/144307 2009-01-13
US28701909P 2009-12-16 2009-12-16
US61/287019 2009-12-16
PCT/US2010/020119 WO2010083072A1 (en) 2009-01-13 2010-01-05 Optimizing well operating plans

Publications (2)

Publication Number Publication Date
BRPI1006862A2 true BRPI1006862A2 (pt) 2017-06-06
BRPI1006862B1 BRPI1006862B1 (pt) 2020-03-17

Family

ID=42340056

Family Applications (1)

Application Number Title Priority Date Filing Date
BRPI1006862-7A BRPI1006862B1 (pt) 2009-01-13 2010-01-05 Método e sistema para otimização de tomada de decisão para um poço de hidrocarbonetos, e, sistema associado com a produção de hidrocarbonetos

Country Status (5)

Country Link
US (1) US8914268B2 (pt)
CN (1) CN102282562B (pt)
BR (1) BRPI1006862B1 (pt)
EA (1) EA201170931A1 (pt)
WO (1) WO2010083072A1 (pt)

Families Citing this family (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10839321B2 (en) 1997-01-06 2020-11-17 Jeffrey Eder Automated data storage system
FR2961614B1 (fr) * 2010-06-22 2012-06-15 Inst Francais Du Petrole Procede d'exploitation d'un gisement petrolier a partir d'un modele de reservoir deforme graduellement au moyen de cosimulations
WO2012027020A1 (en) * 2010-08-24 2012-03-01 Exxonmobil Upstream Research Company System and method for planning a well path
US20120278053A1 (en) * 2011-04-28 2012-11-01 Baker Hughes Incorporated Method of Providing Flow Control Devices for a Production Wellbore
EP2543811A1 (en) * 2011-07-06 2013-01-09 Vetco Gray Controls Limited Subsea electronics module
WO2014200669A2 (en) * 2013-06-10 2014-12-18 Exxonmobil Upstream Research Company Determining well parameters for optimization of well performance
CN103412483B (zh) * 2013-07-31 2016-08-10 中国石油大学(华东) 一种海上平台注采的无模型梯度优化控制方法及模拟装置
WO2015016932A1 (en) 2013-08-01 2015-02-05 Landmark Graphics Corporation Algorithm for optimal icd configuration using a coupled wellbore-reservoir model
AU2013404930B2 (en) * 2013-11-11 2017-06-08 Halliburton Energy Services, Inc . Designing wellbore completion intervals
CN103643931A (zh) * 2013-12-18 2014-03-19 中国海洋石油总公司 海上裸眼水平井完井压裂一体化管柱及其施工方法
GB2528384A (en) * 2014-06-24 2016-01-20 Logined Bv Completion design based on logging while drilling (LWD) data
EP3175087A1 (en) * 2014-07-28 2017-06-07 Services Pétroliers Schlumberger Methods and systems for determining well drilling paths in a hydrocarbon field
RU2613903C2 (ru) * 2015-06-11 2017-03-21 Шлюмберже Текнолоджи Б.В. Способ количественного анализа распределения твердых частиц загрязнителя, проникших в пористую среду при фильтрации
US20170002630A1 (en) * 2015-07-02 2017-01-05 Schlumberger Technology Corporation Method of performing additional oilfield operations on existing wells
WO2017106513A1 (en) * 2015-12-18 2017-06-22 Baker Hughes Incorporated Integrated modeling and simulation of formation and well performance
US10443359B2 (en) 2016-07-28 2019-10-15 Exxonmobil Upstream Research Company Multilateral well optimization and system
US20180189702A1 (en) * 2016-12-29 2018-07-05 Halliburton Energy Services, Inc. Power distribution system optimization for well stimulation and servicing environments
WO2019222031A1 (en) * 2018-05-12 2019-11-21 Schlumberger Technology Corporation Seismic data interpretation system
CN110175358B (zh) * 2019-04-24 2020-08-04 山东科技大学 一种采掘生产计划编制时空约束模型构建方法
US11326423B2 (en) * 2019-05-16 2022-05-10 Saudi Arabian Oil Company Automated production optimization technique for smart well completions using real-time nodal analysis including recommending changes to downhole settings
US11499423B2 (en) 2019-05-16 2022-11-15 Saudi Arabian Oil Company Automated production optimization technique for smart well completions using real-time nodal analysis including comingled production calibration
US11441395B2 (en) 2019-05-16 2022-09-13 Saudi Arabian Oil Company Automated production optimization technique for smart well completions using real-time nodal analysis including real-time modeling
US11821289B2 (en) 2019-11-18 2023-11-21 Saudi Arabian Oil Company Automated production optimization technique for smart well completions using real-time nodal analysis
US11231520B2 (en) 2020-05-06 2022-01-25 Saudi Arabian Oil Company Dynamic hydrocarbon well skin modeling and operation
US11692415B2 (en) 2020-06-22 2023-07-04 Saudi Arabian Oil Company Hydrocarbon well stimulation based on skin profiles
CN112036741B (zh) * 2020-08-28 2022-10-11 四川长宁天然气开发有限责任公司 一种页岩气钻井工程智能调度方法及系统
CN111810144B (zh) * 2020-08-28 2023-04-21 四川长宁天然气开发有限责任公司 一种页岩气井工程智能调度方法及系统
CN112819198B (zh) * 2020-12-31 2023-11-14 中国石油大学(北京) 一种基于成本分析模型的工厂化钻井优化配置方法和系统
WO2024038305A1 (en) * 2022-08-18 2024-02-22 Abu Dhabi Company for Onshore Petroleum Operations Limited Congestion analysis tool

Family Cites Families (87)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4024040A (en) 1974-02-26 1977-05-17 Hercules Incorporated Polymerization of unsaturated monomers with radiation in the presence of salts
US4204574A (en) 1977-09-22 1980-05-27 Conoco, Inc. Low shear polymer injection method with ratio control between wells
US4687059A (en) 1986-03-21 1987-08-18 Atlantic Richfield Company Enhanced hydrocarbon recovery process utilizing thermoelastic fracturing
US5058012A (en) 1989-02-07 1991-10-15 Marathon Oil Company Method of extrapolating reservoir performance
US5038864A (en) 1990-05-10 1991-08-13 Marathon Oil Company Process for restoring the permeability of a subterranean formation
US5095989A (en) 1991-02-21 1992-03-17 Texaco Inc. Microemulsion method for improving the injectivity of a well
US5416697A (en) 1992-07-31 1995-05-16 Chevron Research And Technology Company Method for determining rock mechanical properties using electrical log data
NO179421C (no) 1993-03-26 1996-10-02 Statoil As Apparat for fordeling av en ström av injeksjonsfluid i adskilte soner i en grunnformasjon
US5632336A (en) 1994-07-28 1997-05-27 Texaco Inc. Method for improving injectivity of fluids in oil reservoirs
US5663499A (en) * 1995-10-20 1997-09-02 Semmelbeck; Mark E. Method for estimating permeability from multi-array induction logs
US6109368A (en) 1996-03-25 2000-08-29 Dresser Industries, Inc. Method and system for predicting performance of a drilling system for a given formation
US6101447A (en) 1998-02-12 2000-08-08 Schlumberger Technology Corporation Oil and gas reservoir production analysis apparatus and method
WO1999057418A1 (en) 1998-05-04 1999-11-11 Schlumberger Evaluation & Production (Uk) Services Near wellbore modeling method and apparatus
US6016868A (en) 1998-06-24 2000-01-25 World Energy Systems, Incorporated Production of synthetic crude oil from heavy hydrocarbons recovered by in situ hydrovisbreaking
US6227296B1 (en) 1998-11-03 2001-05-08 Exxonmobil Upstream Research Company Method to reduce water saturation in near-well region
US6088656A (en) 1998-11-10 2000-07-11 Schlumberger Technology Corporation Method for interpreting carbonate reservoirs
US6662146B1 (en) 1998-11-25 2003-12-09 Landmark Graphics Corporation Methods for performing reservoir simulation
US6460006B1 (en) 1998-12-23 2002-10-01 Caterpillar Inc System for predicting compaction performance
US6182756B1 (en) 1999-02-10 2001-02-06 Intevep, S.A. Method and apparatus for optimizing production from a gas lift well
EP1151326B1 (en) 1999-02-12 2005-11-02 Schlumberger Limited Uncertainty constrained subsurface modeling
US6810370B1 (en) 1999-03-31 2004-10-26 Exxonmobil Upstream Research Company Method for simulation characteristic of a physical system
US6230101B1 (en) 1999-06-03 2001-05-08 Schlumberger Technology Corporation Simulation method and apparatus
US6196318B1 (en) 1999-06-07 2001-03-06 Mobil Oil Corporation Method for optimizing acid injection rate in carbonate acidizing process
GB2351350B (en) 1999-06-23 2001-09-12 Sofitech Nv Cavity stability prediction method for wellbores
US6266619B1 (en) 1999-07-20 2001-07-24 Halliburton Energy Services, Inc. System and method for real time reservoir management
US6549879B1 (en) 1999-09-21 2003-04-15 Mobil Oil Corporation Determining optimal well locations from a 3D reservoir model
NO310797B1 (no) 1999-12-13 2001-08-27 Univ California Fremgangsmåte for å overvåkning av havbunnens innsynkning og gravitasjonsendring
US6826486B1 (en) 2000-02-11 2004-11-30 Schlumberger Technology Corporation Methods and apparatus for predicting pore and fracture pressures of a subsurface formation
US6980940B1 (en) 2000-02-22 2005-12-27 Schlumberger Technology Corp. Intergrated reservoir optimization
US6840317B2 (en) 2000-03-02 2005-01-11 Shell Oil Company Wireless downwhole measurement and control for optimizing gas lift well and field performance
US7464013B2 (en) 2000-03-13 2008-12-09 Smith International, Inc. Dynamically balanced cutting tool system
US20050273304A1 (en) 2000-03-13 2005-12-08 Smith International, Inc. Methods for evaluating and improving drilling operations
US7020597B2 (en) 2000-10-11 2006-03-28 Smith International, Inc. Methods for evaluating and improving drilling operations
US6785641B1 (en) 2000-10-11 2004-08-31 Smith International, Inc. Simulating the dynamic response of a drilling tool assembly and its application to drilling tool assembly design optimization and drilling performance optimization
US20020013687A1 (en) 2000-03-27 2002-01-31 Ortoleva Peter J. Methods and systems for simulation-enhanced fracture detections in sedimentary basins
US7188058B2 (en) 2000-04-04 2007-03-06 Conocophillips Company Method of load and failure prediction of downhole liners and wellbores
US6745159B1 (en) 2000-04-28 2004-06-01 Halliburton Energy Services, Inc. Process of designing screenless completions for oil or gas wells
US20020055868A1 (en) 2000-05-24 2002-05-09 Dusevic Angela G. System and method for providing a task-centric online environment
US7369973B2 (en) * 2000-06-29 2008-05-06 Object Reservoir, Inc. Method and system for representing reservoir systems
GB0017227D0 (en) 2000-07-14 2000-08-30 Schlumberger Ind Ltd Fully coupled geomechanics in a commerical reservoir simulator
US7177764B2 (en) 2000-07-14 2007-02-13 Schlumberger Technology Corp. Simulation method and apparatus for determining subsidence in a reservoir
CA2421863C (en) 2000-09-12 2009-05-12 Schlumberger Canada Limited Evaluation of multilayer reservoirs
US20020049575A1 (en) 2000-09-28 2002-04-25 Younes Jalali Well planning and design
AU2002213981A1 (en) 2000-10-04 2002-04-15 Sofitech N.V. Production optimization methodology for multilayer commingled reservoirs using commingled reservoir production performance data and production logging information
US6634426B2 (en) 2000-10-31 2003-10-21 James N. McCoy Determination of plunger location and well performance parameters in a borehole plunger lift system
WO2002047011A1 (en) 2000-12-08 2002-06-13 Ortoleva Peter J Methods for modeling multi-dimensional domains using information theory to resolve gaps in data and in theories
US6836731B1 (en) 2001-02-05 2004-12-28 Schlumberger Technology Corporation Method and system of determining well performance
US6668922B2 (en) 2001-02-16 2003-12-30 Schlumberger Technology Corporation Method of optimizing the design, stimulation and evaluation of matrix treatment in a reservoir
US7200539B2 (en) 2001-02-21 2007-04-03 Baker Hughes Incorporated Method of predicting the on-set of formation solid production in high-rate perforated and open hole gas wells
GB2372567B (en) 2001-02-22 2003-04-09 Schlumberger Holdings Estimating subsurface subsidence and compaction
US6901391B2 (en) 2001-03-21 2005-05-31 Halliburton Energy Services, Inc. Field/reservoir optimization utilizing neural networks
US6904366B2 (en) 2001-04-03 2005-06-07 The Regents Of The University Of California Waterflood control system for maximizing total oil recovery
US6980929B2 (en) 2001-04-18 2005-12-27 Baker Hughes Incorporated Well data collection system and method
FR2824652B1 (fr) 2001-05-09 2003-10-31 Inst Francais Du Petrole Methode pour determiner par simulation numerique les conditions de restauration par les fluides d'un gisement, d'un puits complexe endommage par les operations de forage
US20040205576A1 (en) 2002-02-25 2004-10-14 Chikirivao Bill S. System and method for managing Knowledge information
FR2837947B1 (fr) 2002-04-02 2004-05-28 Inst Francais Du Petrole Methode pour quantifier les incertitudes liees a des parametres continus et discrets descriptifs d'un milieu par construction de plans d'experiences et analyse statistique
US6892812B2 (en) 2002-05-21 2005-05-17 Noble Drilling Services Inc. Automated method and system for determining the state of well operations and performing process evaluation
US7512543B2 (en) 2002-05-29 2009-03-31 Schlumberger Technology Corporation Tools for decision-making in reservoir risk management
US7657415B2 (en) 2002-05-31 2010-02-02 Schlumberger Technology Corporation Subterranean formation treatment methods using a darcy scale and pore scale model
CA2486857C (en) 2002-05-31 2011-11-22 Schlumberger Canada Limited Method and apparatus for effective well and reservoir evaluation without the need for well pressure history
CA2501722C (en) 2002-11-15 2011-05-24 Schlumberger Canada Limited Optimizing well system models
US6654692B1 (en) 2002-11-21 2003-11-25 Conocophillips Company Method of predicting rock properties from seismic data
US7181380B2 (en) 2002-12-20 2007-02-20 Geomechanics International, Inc. System and process for optimal selection of hydrocarbon well completion type and design
US6810332B2 (en) 2003-01-31 2004-10-26 Chevron U.S.A. Inc. Method for computing complexity, confidence and technical maturity indices for reservoir evaluations
US6823297B2 (en) 2003-03-06 2004-11-23 Chevron U.S.A. Inc. Multi-scale finite-volume method for use in subsurface flow simulation
US6804609B1 (en) 2003-04-14 2004-10-12 Conocophillips Company Property prediction using residual stepwise regression
US7835893B2 (en) 2003-04-30 2010-11-16 Landmark Graphics Corporation Method and system for scenario and case decision management
FR2855631A1 (fr) 2003-06-02 2004-12-03 Inst Francais Du Petrole Methode pour optimiser la production d'un gisement petrolier en presence d'incertitudes
US7069148B2 (en) * 2003-11-25 2006-06-27 Thambynayagam Raj Kumar Michae Gas reservoir evaluation and assessment tool method and apparatus and program storage device
US7725302B2 (en) * 2003-12-02 2010-05-25 Schlumberger Technology Corporation Method and system and program storage device for generating an SWPM-MDT workflow in response to a user objective and executing the workflow to produce a reservoir response model
US7343970B2 (en) 2003-12-04 2008-03-18 Schlumberger Technology Corporation Real time optimization of well production without creating undue risk of formation instability
US7191062B2 (en) 2003-12-22 2007-03-13 Caterpillar Inc Method and system of forecasting compaction performance
US20050199391A1 (en) 2004-02-03 2005-09-15 Cudmore Julian R. System and method for optimizing production in an artificially lifted well
GB2413403B (en) 2004-04-19 2008-01-09 Halliburton Energy Serv Inc Field synthesis system and method for optimizing drilling operations
US20060015310A1 (en) 2004-07-19 2006-01-19 Schlumberger Technology Corporation Method for simulation modeling of well fracturing
GB2416871A (en) * 2004-07-29 2006-02-08 Schlumberger Holdings Well characterisation using distributed temperature sensor data
FR2874706B1 (fr) 2004-08-30 2006-12-01 Inst Francais Du Petrole Methode de modelisation de la production d'un gisement petrolier
US7809537B2 (en) 2004-10-15 2010-10-05 Saudi Arabian Oil Company Generalized well management in parallel reservoir simulation
US7859943B2 (en) 2005-01-07 2010-12-28 Westerngeco L.L.C. Processing a seismic monitor survey
US7561998B2 (en) 2005-02-07 2009-07-14 Schlumberger Technology Corporation Modeling, simulation and comparison of models for wormhole formation during matrix stimulation of carbonates
US7277796B2 (en) * 2005-04-26 2007-10-02 Schlumberger Technology Corporation System and methods of characterizing a hydrocarbon reservoir
EP1922669A2 (en) 2005-07-27 2008-05-21 ExxonMobil Upstream Research Company Well modeling associated with extraction of hydrocarbons from subsurface formations
EP1922663A4 (en) 2005-07-27 2015-11-04 Exxonmobil Upstream Res Co WELL MODELING ASSOCIATED WITH EXTRACTION OF HYDROCARBONS IN UNDERGROUND FORMATIONS
MX2007016574A (es) 2005-07-27 2008-03-04 Exxonmobil Upstream Res Co Modelaje de pozo asociado con extraccion de hidrocarburos a partir de yacimientos subterraneos.
US7953587B2 (en) 2006-06-15 2011-05-31 Schlumberger Technology Corp Method for designing and optimizing drilling and completion operations in hydrocarbon reservoirs
US7925482B2 (en) 2006-10-13 2011-04-12 Object Reservoir, Inc. Method and system for modeling and predicting hydraulic fracture performance in hydrocarbon reservoirs
US8190458B2 (en) 2007-01-17 2012-05-29 Schlumberger Technology Corporation Method of performing integrated oilfield operations

Also Published As

Publication number Publication date
CN102282562B (zh) 2015-09-23
US8914268B2 (en) 2014-12-16
CN102282562A (zh) 2011-12-14
US20110246163A1 (en) 2011-10-06
WO2010083072A1 (en) 2010-07-22
EA201170931A1 (ru) 2012-01-30
BRPI1006862B1 (pt) 2020-03-17

Similar Documents

Publication Publication Date Title
BRPI1006862A2 (pt) método e sistema para otimização de tomada de decisão para um poço de hidrocarbonetos, e, sistema associado com a produção de hidrocarbonetos
BRPI1008672A2 (pt) método para tratar um furo de poço.
BRPI0912221A2 (pt) método para produzir nanofibras inorgânicas.
BR112012010299A2 (pt) método implementado por computador, e, sistema para a realização de um método de caracterização
BR112012010294A2 (pt) sistema integrado, e, método para a recuperação de hidrocarboneto de baixa emissão com produção de energia
BR112012002746A2 (pt) método para produção de copolímero
BRPI0916328A2 (pt) sistema e método para redução de fratura, bem como método para formação de um sistema para redução de fratura
BR112012005424A2 (pt) método para produzir n-propanol, e, microorganismo
EP2930155A4 (en) METHOD FOR PRODUCING A REINFORCED GLASS PLATE WITH CURVED PARTS AND REINFORCED GLASS PLATE WITH CROPPED PARTS
BR112012003386A2 (pt) método para comunicação com um nó correspondente, e, nó hospedeiro.
BRPI0817836A2 (pt) Método para a produção de cerveja
BRPI1008004A2 (pt) método para produção de metal, e, aparelho.
BRPI1011512A2 (pt) método para produzir um catalisador de fischer-tropsch, e, catalisador.
BRPI0820122A2 (pt) Método de otimização de produção de poços, sistema, e método.
BR112013030900A2 (pt) método para instalar um conjunto de junção de furo de poço, e, sistema de poço.
BRPI0922490A2 (pt) Método para produção de beta-santaleno
BRPI1012025A2 (pt) componente estrutural e método para produção de um componente estrutural.
BRPI1007504A2 (pt) método para pré-carregar um sistema de catamarã, e, sistema de catamarã.
BRPI0923299A2 (pt) metodo para a produção de minerios sintetizado.r988
BR112013018884A2 (pt) método para o tratamento de biomassa com um sistema de torrefação, e, sistema de torrefação para o tratamento de biomassa.
BRPI1009239A2 (pt) método para produção de lama e energia não putrscíveis e estação correspondente.
BRPI0810636A2 (pt) Vidro fornecido por moldagem e método para a produção de vidro fornecido por moldagem.
BR112014013188A2 (pt) documento de segurança, e método para fabricar um documento de segurança
BRPI1012272A2 (pt) processo e dispositivo para produzir peças pré-moldadas com geometrias especiais.
BRPI1007044A2 (pt) sistema de produção submarina, e, método para produzir hidrocarbonetos.

Legal Events

Date Code Title Description
B06F Objections, documents and/or translations needed after an examination request according art. 34 industrial property law
B06U Preliminary requirement: requests with searches performed by other patent offices: suspension of the patent application procedure
B09A Decision: intention to grant
B15K Others concerning applications: alteration of classification

Free format text: A CLASSIFICACAO ANTERIOR ERA: G06F 19/00

Ipc: E21B 43/00 (2006.01)

B16A Patent or certificate of addition of invention granted

Free format text: PRAZO DE VALIDADE: 10 (DEZ) ANOS CONTADOS A PARTIR DE 17/03/2020, OBSERVADAS AS CONDICOES LEGAIS.