BRPI0919436A2 - sistema e método para modelar perfis de fluxo em um furo de poço - Google Patents

sistema e método para modelar perfis de fluxo em um furo de poço

Info

Publication number
BRPI0919436A2
BRPI0919436A2 BRPI0919436A BRPI0919436A BRPI0919436A2 BR PI0919436 A2 BRPI0919436 A2 BR PI0919436A2 BR PI0919436 A BRPI0919436 A BR PI0919436A BR PI0919436 A BRPI0919436 A BR PI0919436A BR PI0919436 A2 BRPI0919436 A2 BR PI0919436A2
Authority
BR
Brazil
Prior art keywords
wellbore
flow profiles
modeling flow
modeling
profiles
Prior art date
Application number
BRPI0919436A
Other languages
English (en)
Inventor
Xiaowei Wang
Original Assignee
Baker Hughes Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baker Hughes Inc filed Critical Baker Hughes Inc
Publication of BRPI0919436A2 publication Critical patent/BRPI0919436A2/pt

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/10Locating fluid leaks, intrusions or movements
    • E21B47/103Locating fluid leaks, intrusions or movements using thermal measurements
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/06Measuring temperature or pressure
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/12Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling
BRPI0919436A 2008-09-26 2009-09-21 sistema e método para modelar perfis de fluxo em um furo de poço BRPI0919436A2 (pt)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US10031008P 2008-09-26 2008-09-26
US12/512,115 US20100082258A1 (en) 2008-09-26 2009-07-30 System and method for modeling fluid flow profiles in a wellbore
PCT/US2009/057644 WO2010036599A2 (en) 2008-09-26 2009-09-21 System and method for modeling fluid flow profiles in a wellbore

Publications (1)

Publication Number Publication Date
BRPI0919436A2 true BRPI0919436A2 (pt) 2015-12-15

Family

ID=42058334

Family Applications (1)

Application Number Title Priority Date Filing Date
BRPI0919436A BRPI0919436A2 (pt) 2008-09-26 2009-09-21 sistema e método para modelar perfis de fluxo em um furo de poço

Country Status (8)

Country Link
US (1) US20100082258A1 (pt)
BR (1) BRPI0919436A2 (pt)
CA (1) CA2737691C (pt)
GB (1) GB2475820B (pt)
MY (1) MY158887A (pt)
NO (1) NO20110478A1 (pt)
SA (1) SA109300572B1 (pt)
WO (1) WO2010036599A2 (pt)

Families Citing this family (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2819640C (en) * 2010-12-02 2016-10-04 Gilles Mathieu Mining systems and methods
UA116760C2 (uk) 2011-04-07 2018-05-10 Біі Векторінг Течнолоґи Інк. Пристрій для обробки рослин
US8448720B2 (en) 2011-06-02 2013-05-28 Halliburton Energy Services, Inc. Optimized pressure drilling with continuous tubing drill string
US9617833B2 (en) 2012-06-22 2017-04-11 Halliburton Energy Services, Inc. Evaluating fluid flow in a wellbore
MX365398B (es) * 2013-01-28 2019-05-31 Halliburton Energy Services Inc Sistemas y métodos para monitorear fluidos de pozo usando microanálisis de datos de bombeo en tiempo real.
US9534489B2 (en) * 2013-03-06 2017-01-03 Baker Hughes Incorporated Modeling acid distribution for acid stimulation of a formation
US9367653B2 (en) * 2013-08-27 2016-06-14 Halliburton Energy Services, Inc. Proppant transport model for well system fluid flow simulations
US10359540B2 (en) 2013-08-30 2019-07-23 Landmark Graphics Corporation Cart-based proxy flow simulation procedure for ranking geostatistical realizations of rock properties
US20150114628A1 (en) * 2013-10-24 2015-04-30 Baker Hughes Incorporated Downhole Pressure/Thermal Perturbation Scanning Using High Resolution Distributed Temperature Sensing
US10119396B2 (en) 2014-02-18 2018-11-06 Saudi Arabian Oil Company Measuring behind casing hydraulic conductivity between reservoir layers
US9683435B2 (en) 2014-03-04 2017-06-20 General Electric Company Sensor deployment system for a wellbore and methods of assembling the same
GB201410050D0 (en) 2014-06-06 2014-07-16 Maersk Olie & Gas Method of estimating well productivity along a section of a wellbore
MX2017006256A (es) 2014-12-12 2017-07-31 Halliburton Energy Services Inc Diagnostico y tratamiento de dispositivos informaticos opticos.
US10392922B2 (en) 2015-01-13 2019-08-27 Saudi Arabian Oil Company Measuring inter-reservoir cross flow rate between adjacent reservoir layers from transient pressure tests
US10180057B2 (en) 2015-01-21 2019-01-15 Saudi Arabian Oil Company Measuring inter-reservoir cross flow rate through unintended leaks in zonal isolation cement sheaths in offset wells
US10094202B2 (en) * 2015-02-04 2018-10-09 Saudi Arabian Oil Company Estimating measures of formation flow capacity and phase mobility from pressure transient data under segregated oil and water flow conditions
US10648293B2 (en) 2015-08-05 2020-05-12 Halliburton Energy Services, Inc. Quantification of crossflow effects on fluid distribution during matrix injection treatments
US10984156B2 (en) * 2015-08-07 2021-04-20 Halliburton Energy Services, Inc. Modelling of fluid elasticity effects on proppant dynamics
CN105041300A (zh) * 2015-08-28 2015-11-11 中国海洋石油总公司 一种分布式光纤井下采集设备、井下流量计及井下监测方法
WO2017052523A1 (en) * 2015-09-23 2017-03-30 Schlumberger Canada Limited Temperature measurement correction in producing wells
US11105948B2 (en) 2015-09-30 2021-08-31 Schlumberger Technology Corporation Downhole tool analysis using anomaly detection of measurement data
NO342159B1 (en) * 2016-02-16 2018-04-09 Wellstarter As A method and system for real-time fluid flow monitoring in a wellbore
CA2983541C (en) 2017-10-24 2019-01-22 Exxonmobil Upstream Research Company Systems and methods for dynamic liquid level monitoring and control
WO2020142064A1 (en) * 2018-12-31 2020-07-09 Halliburton Energy Services, Inc. Predicting downhole fluid mixing and channeling in wellbores
US11193370B1 (en) 2020-06-05 2021-12-07 Saudi Arabian Oil Company Systems and methods for transient testing of hydrocarbon wells
US20220403734A1 (en) * 2021-06-17 2022-12-22 Halliburton Energy Services, Inc. Data driven in-situ injection and production flow monitoring
US11867034B2 (en) * 2021-06-17 2024-01-09 Halliburton Energy Services, Inc. Systems and methods for automated gas lift monitoring

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2792727B1 (fr) * 1999-04-23 2001-05-18 Inst Francais Du Petrole Methode et dispositif pour la determination du coefficient de joule-thomson d'un fluide
GB9916022D0 (en) * 1999-07-09 1999-09-08 Sensor Highway Ltd Method and apparatus for determining flow rates
US6789937B2 (en) * 2001-11-30 2004-09-14 Schlumberger Technology Corporation Method of predicting formation temperature
US7668694B2 (en) * 2002-11-26 2010-02-23 Unico, Inc. Determination and control of wellbore fluid level, output flow, and desired pump operating speed, using a control system for a centrifugal pump disposed within the wellbore
US7725301B2 (en) * 2002-11-04 2010-05-25 Welldynamics, B.V. System and method for estimating multi-phase fluid rates in a subterranean well
US6962365B2 (en) * 2003-03-04 2005-11-08 Autoliv Asp, Inc. Inflation gas generation devices and methods utilizing joule-thomson heating
US20070213963A1 (en) * 2003-10-10 2007-09-13 Younes Jalali System And Method For Determining Flow Rates In A Well
US20050149264A1 (en) * 2003-12-30 2005-07-07 Schlumberger Technology Corporation System and Method to Interpret Distributed Temperature Sensor Data and to Determine a Flow Rate in a Well
AU2005224600B2 (en) * 2004-03-04 2011-08-11 Halliburton Energy Services, Inc. Multiple distributed force measurements
US7730967B2 (en) * 2004-06-22 2010-06-08 Baker Hughes Incorporated Drilling wellbores with optimal physical drill string conditions
GB2416871A (en) * 2004-07-29 2006-02-08 Schlumberger Holdings Well characterisation using distributed temperature sensor data
US20070032994A1 (en) * 2005-08-02 2007-02-08 Kimminau Stephen J System and method of flow assurance in a well
US20070234789A1 (en) * 2006-04-05 2007-10-11 Gerard Glasbergen Fluid distribution determination and optimization with real time temperature measurement
WO2009128977A2 (en) * 2008-02-12 2009-10-22 Baker Hughes Incorporated Fiber optic sensor system using white light interferometery

Also Published As

Publication number Publication date
WO2010036599A3 (en) 2010-06-03
MY158887A (en) 2016-11-30
NO20110478A1 (no) 2011-06-14
US20100082258A1 (en) 2010-04-01
CA2737691A1 (en) 2010-04-01
WO2010036599A2 (en) 2010-04-01
GB2475820A (en) 2011-06-01
GB2475820B (en) 2012-06-13
SA109300572B1 (ar) 2014-04-01
CA2737691C (en) 2016-06-14
GB201104594D0 (en) 2011-05-04

Similar Documents

Publication Publication Date Title
BRPI0919436A2 (pt) sistema e método para modelar perfis de fluxo em um furo de poço
BRPI1008084A2 (pt) método, e , sistema para monitorar fluxo de fluido em um furo de poço
BRPI0810422A2 (pt) Sistema e método para detecção de irrupção de água e intervenção em um poço de produção
BRPI0816879A2 (pt) sistema para ancoragem em um furo de poço, método para ancoragem em um furo de poço, dispositivo, e método de ancoragem de uma ferramenta em um furo de poço.
BR112013030929A2 (pt) sistema e método para execução de serviços em um furo de poço
BRPI0810434A2 (pt) Sistema e método para detecção de fluxo transversal, e intervenção, em poços de produção
BR112013010464A2 (pt) sistema de referência redundante para construção de sáida multilateral em um furo de poço e método de referência redundante para construção de sáida multilateral em um furo de poço
BRPI1009578A2 (pt) método e sistema para otimizar características de fratura em um modelo de poço
BRPI0905918A2 (pt) Válvula de parada de fluxo e método para controlar fluxo em uma tubulação furo abaixo
BRPI0916759A2 (pt) sistema e método para comados de roteamento em um sistema de software modularizado
BRPI0820160A2 (pt) Método e sistema de perfuração para perfurar um furo de poço em uma formação terrestre.
GB201110905D0 (en) System and method for controlling flow in a wellbore
DK2370744T3 (da) Udsugningsstrømningsstyresystem og -fremgangsmåde
BRPI1012645A2 (pt) aparelho, sistema, e método para comunicação em torno de um local de poço, e, método para comunicação com uma coluna de perfuração em um furo de poço
BRPI0909002A2 (pt) aparelho para uso em um poço, sistema, e método para uso em um poço
BR112012003275A2 (pt) aparelho e método para o controle de fluido passivo em um furo do poço
BRPI0817188A2 (pt) Método para controlar hidratos em um sistema de produção submarino
BRPI0915845A2 (pt) sistema para medição de tensão de cizalhamento em tubulares fundo de poço
BRPI0909168A2 (pt) sistemas, conjuntos e processos para controlar ferramentas em um furo de poço
BRPI0908326A2 (pt) dispositivo fotovoltaico e método para instalar um sistema fotovoltaico em uma estrutura de construção
BRPI0921976A2 (pt) sistema para coletar fluido em um furo de poço, e método.
BRPI0915864A2 (pt) método e sistema para controle de giroscópio e gnss combinados
BRPI0914904A2 (pt) sistema empacotador único para uso em um furo de poço
BRPI0921307A2 (pt) aparelho e método de manutenção de furo de poço
EP2391831A4 (en) System and method for predicting fluid flow in subterranean reservoirs

Legal Events

Date Code Title Description
B08F Application dismissed because of non-payment of annual fees [chapter 8.6 patent gazette]
B08K Patent lapsed as no evidence of payment of the annual fee has been furnished to inpi [chapter 8.11 patent gazette]