BRPI0715142B8 - método e sistema para realizar operações em campos de petróleo com base em predição de pressão de poro - Google Patents
método e sistema para realizar operações em campos de petróleo com base em predição de pressão de poro Download PDFInfo
- Publication number
- BRPI0715142B8 BRPI0715142B8 BRPI0715142A BRPI0715142A BRPI0715142B8 BR PI0715142 B8 BRPI0715142 B8 BR PI0715142B8 BR PI0715142 A BRPI0715142 A BR PI0715142A BR PI0715142 A BRPI0715142 A BR PI0715142A BR PI0715142 B8 BRPI0715142 B8 BR PI0715142B8
- Authority
- BR
- Brazil
- Prior art keywords
- model
- formation
- generation
- pore pressure
- temperature
- Prior art date
Links
- 238000000034 method Methods 0.000 title abstract 5
- 239000011148 porous material Substances 0.000 title abstract 4
- 230000015572 biosynthetic process Effects 0.000 abstract 8
- 238000005553 drilling Methods 0.000 abstract 6
- 238000009434 installation Methods 0.000 abstract 3
- 238000004590 computer program Methods 0.000 abstract 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/06—Measuring temperature or pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/06—Measuring temperature or pressure
- E21B47/07—Temperature
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
Landscapes
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Geochemistry & Mineralogy (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geophysics (AREA)
- Earth Drilling (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Geophysics And Detection Of Objects (AREA)
- Testing Or Calibration Of Command Recording Devices (AREA)
Abstract
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US83609906P | 2006-08-07 | 2006-08-07 | |
US60/836.099 | 2006-08-07 | ||
US11/834,554 US7996199B2 (en) | 2006-08-07 | 2007-08-06 | Method and system for pore pressure prediction |
PCT/US2007/075387 WO2008019374A1 (en) | 2006-08-07 | 2007-08-07 | Method and system for pore pressure prediction |
Publications (3)
Publication Number | Publication Date |
---|---|
BRPI0715142A2 BRPI0715142A2 (pt) | 2013-06-04 |
BRPI0715142B1 BRPI0715142B1 (pt) | 2018-05-15 |
BRPI0715142B8 true BRPI0715142B8 (pt) | 2020-02-11 |
Family
ID=39030333
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
BRPI0715142A BRPI0715142B8 (pt) | 2006-08-07 | 2007-08-07 | método e sistema para realizar operações em campos de petróleo com base em predição de pressão de poro |
Country Status (5)
Country | Link |
---|---|
US (2) | US7996199B2 (pt) |
CN (1) | CN101512100B (pt) |
BR (1) | BRPI0715142B8 (pt) |
MX (1) | MX346613B (pt) |
WO (1) | WO2008019374A1 (pt) |
Families Citing this family (25)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8374836B2 (en) * | 2008-11-12 | 2013-02-12 | Geoscape Analytics, Inc. | Methods and systems for constructing and using a subterranean geomechanics model spanning local to zonal scale in complex geological environments |
CA2750374A1 (en) | 2009-01-13 | 2010-07-22 | Schlumberger Canada Limited | In-situ stress measurements in hydrocarbon bearing shales |
CN102220865B (zh) * | 2011-05-13 | 2014-04-02 | 中国石油天然气股份有限公司 | 一种检测灰岩地层孔隙压力的方法 |
US9228430B2 (en) | 2011-08-26 | 2016-01-05 | Schlumberger Technology Corporation | Methods for evaluating cuttings density while drilling |
US20130049983A1 (en) | 2011-08-26 | 2013-02-28 | John Rasmus | Method for calibrating a hydraulic model |
GB2494960A (en) * | 2011-08-26 | 2013-03-27 | John C Rasmus | Calibrating a wellbore hydraulic model |
US20130048380A1 (en) * | 2011-08-26 | 2013-02-28 | John Rasmus | Wellbore interval densities |
US9394783B2 (en) | 2011-08-26 | 2016-07-19 | Schlumberger Technology Corporation | Methods for evaluating inflow and outflow in a subterranean wellbore |
US9863241B2 (en) * | 2011-10-03 | 2018-01-09 | Landmark Graphics Corporation | Enhanced 1-D method for prediction of mud weight window for subsalt well section |
US8725479B2 (en) * | 2011-11-30 | 2014-05-13 | Baker Hughes Incorporated | Use of monte carlo simulations for establishing correlations and their uncertainties |
CN102682195B (zh) * | 2012-03-09 | 2015-12-16 | 中国石油大学(华东) | 半潜式平台瞬态钻井井筒温度计算方法 |
CN102720487B (zh) * | 2012-06-29 | 2015-10-14 | 中国石油天然气股份有限公司 | 一种获取气藏地层压力系统及其方法 |
US20140076632A1 (en) * | 2012-09-20 | 2014-03-20 | Baker Hughes Incoroporated | Method to predict overpressure uncertainty from normal compaction trendline uncertainty |
US20140083687A1 (en) * | 2012-09-27 | 2014-03-27 | Schlumberger Technology Corporation | Production in fractured systems |
US9273545B2 (en) | 2012-12-23 | 2016-03-01 | Baker Hughes Incorporated | Use of Lamb and SH attenuations to estimate cement Vp and Vs in cased borehole |
CN105089639B (zh) * | 2014-04-23 | 2018-03-13 | 中国石油化工股份有限公司 | 一种煤层气井井筒流动动态预测方法 |
EP2966258B1 (en) * | 2014-07-10 | 2018-11-21 | Services Petroliers Schlumberger | Depth positioning using gamma-ray correlation and downhole parameter differential |
CN104453879B (zh) * | 2014-11-14 | 2017-04-05 | 中国海洋石油总公司 | 钻前压力的预测方法 |
GB2552609A (en) * | 2015-04-17 | 2018-01-31 | Landmark Graphics Corp | Draw-down pressure apparatus, systems, and methods |
CN104895560B (zh) * | 2015-06-16 | 2017-06-23 | 中国海洋石油总公司 | 一种深水测试井筒压力、温度场模拟及水合物预测方法 |
EP3181810B1 (en) | 2015-12-18 | 2022-03-23 | Services Pétroliers Schlumberger | Distribution of radioactive tags around or along well for detection thereof |
EP3465282A4 (en) * | 2016-06-03 | 2020-01-08 | Services Petroliers Schlumberger | PORTRAIT PREDICTION |
CN108875109B (zh) * | 2017-05-16 | 2021-12-17 | 中国石油化工股份有限公司 | 一种异常地层压力的预测方法及系统 |
CN109854230B (zh) * | 2017-11-30 | 2022-05-10 | 中国石油天然气股份有限公司 | 井的测试方法及装置 |
CN110069751B (zh) * | 2019-05-07 | 2022-05-03 | 中国海洋石油集团有限公司 | 一种非欠压实地层孔隙压力预测方法 |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5128866A (en) | 1989-09-20 | 1992-07-07 | Chevron Corporation | Pore pressure prediction method |
US5282384A (en) | 1992-10-05 | 1994-02-01 | Baroid Technology, Inc. | Method for calculating sedimentary rock pore pressure |
US6986282B2 (en) | 2003-02-18 | 2006-01-17 | Schlumberger Technology Corporation | Method and apparatus for determining downhole pressures during a drilling operation |
-
2007
- 2007-08-06 US US11/834,554 patent/US7996199B2/en not_active Expired - Fee Related
- 2007-08-07 WO PCT/US2007/075387 patent/WO2008019374A1/en active Application Filing
- 2007-08-07 BR BRPI0715142A patent/BRPI0715142B8/pt not_active IP Right Cessation
- 2007-08-07 CN CN200780032423XA patent/CN101512100B/zh not_active Expired - Fee Related
- 2007-08-07 MX MX2009001262A patent/MX346613B/es active IP Right Grant
-
2011
- 2011-07-05 US US13/176,063 patent/US8447579B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
WO2008019374A1 (en) | 2008-02-14 |
MX2009001262A (es) | 2009-02-11 |
CN101512100B (zh) | 2013-07-03 |
US20110264431A1 (en) | 2011-10-27 |
US7996199B2 (en) | 2011-08-09 |
BRPI0715142B1 (pt) | 2018-05-15 |
BRPI0715142A2 (pt) | 2013-06-04 |
US8447579B2 (en) | 2013-05-21 |
MX346613B (es) | 2017-03-27 |
CN101512100A (zh) | 2009-08-19 |
US20080033704A1 (en) | 2008-02-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
BRPI0715142B8 (pt) | método e sistema para realizar operações em campos de petróleo com base em predição de pressão de poro | |
Trudel et al. | Plug and abandonment practices and trends: A British Columbia perspective | |
EA200870303A1 (ru) | Система и способ для планирования скважины | |
EA200601625A1 (ru) | Способ и устройство для формирования подземной скважины | |
BRPI0703715A8 (pt) | método para recuperação de um fluido de formação de uma formação geológica subterrânea adjacente à parede de um furo perfurado, e método para recuperação de um fluido de formação a partir de uma formação adjacente a uma parede de um furo perfurado | |
WO2010104724A3 (en) | Method for integrating reservoir charge modeling and downhole fluid analysis | |
NO20073658L (no) | System og fremgangsmate for produksjon av fluider fra undergrunnsformasjoner | |
EA200870245A1 (ru) | Способы и устройства для прогнозирования добычи углеводородов с места заложения скважины | |
GB2463146A (en) | Modeling the transient behavior or BHA/drill string while drilling | |
FR2920816B1 (fr) | Methode pour mettre a jour un modele geologique a l'aide de donnees dynamiques et d'essais de puits | |
ATE386240T1 (de) | Verfahren zur herstellung einer erdwärmesonde | |
EA200800434A1 (ru) | Моделирование скважины, связанное с добычей углеводородов из подземных формаций | |
MX2009013365A (es) | Metodo para recuperar petroleo crudo de una formacion subterranea. | |
WO2010033716A3 (en) | Method for optimizing well production in reservoirs having flow barriers | |
GB2472919B (en) | Adjustment of mud circulation when evaluating a formation | |
EA201070362A1 (ru) | Способ использования характеристик давления для прогнозирования аномалий нагнетательных скважин | |
DE602004023058D1 (de) | Verfahren und vorrichtung zum bohren eines bohrlochs mit einem bohrloch-liner | |
TNSN06141A1 (en) | Method of installing horizontal drains for collecting seawater | |
EA200801333A1 (ru) | Система стволов скважин | |
Bai et al. | Sources of variability in flowback and produced water volumes from shale oil and gas wells | |
EA200801161A1 (ru) | Устройство и способ бурения с большим отходом от вертикали | |
WO2007124368A3 (en) | Dispersive riserless drilling fluid | |
RU2006125659A (ru) | Способ проведения локального направления гидроразрыва пласта | |
Xu et al. | Methods of setting depth range with credibility of conductor for deepwater drilling based on probability statistics | |
RU2006123072A (ru) | Способ определения скважин для забуривания новых стволов на зрелых обводненных месторождениях |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
B08F | Application dismissed because of non-payment of annual fees [chapter 8.6 patent gazette] |
Free format text: REFERENTE A 5A ANUIDADE. PAGAR RESTAURACAO. |
|
B08K | Patent lapsed as no evidence of payment of the annual fee has been furnished to inpi [chapter 8.11 patent gazette] |
Free format text: REFERENTE AO DESPACHO 8.6 PUBLICADO NA RPI 2261 DE 06/05/2014. |
|
B08H | Application fees: decision cancelled [chapter 8.8 patent gazette] |
Free format text: REFERENTE AOS DESPACHOS PUBLICADOS NA RPI 2261 DE 06/05/2014 E RPI 2278 DE 02/09/2014 |
|
B07A | Application suspended after technical examination (opinion) [chapter 7.1 patent gazette] | ||
B06A | Patent application procedure suspended [chapter 6.1 patent gazette] | ||
B09A | Decision: intention to grant [chapter 9.1 patent gazette] | ||
B16A | Patent or certificate of addition of invention granted [chapter 16.1 patent gazette] | ||
B16C | Correction of notification of the grant [chapter 16.3 patent gazette] |
Free format text: REF. RPI 2471 DE 15/05/2018 QUANTO A PRIORIDADE UNIONISTA. |
|
B21F | Lapse acc. art. 78, item iv - on non-payment of the annual fees in time |
Free format text: REFERENTE A 14A ANUIDADE. |
|
B24J | Lapse because of non-payment of annual fees (definitively: art 78 iv lpi, resolution 113/2013 art. 12) |
Free format text: EM VIRTUDE DA EXTINCAO PUBLICADA NA RPI 2631 DE 08-06-2021 E CONSIDERANDO AUSENCIA DE MANIFESTACAO DENTRO DOS PRAZOS LEGAIS, INFORMO QUE CABE SER MANTIDA A EXTINCAO DA PATENTE E SEUS CERTIFICADOS, CONFORME O DISPOSTO NO ARTIGO 12, DA RESOLUCAO 113/2013. |