BRPI0707970B1 - MULTIPLE WINCHES - Google Patents

MULTIPLE WINCHES Download PDF

Info

Publication number
BRPI0707970B1
BRPI0707970B1 BRPI0707970-2A BRPI0707970A BRPI0707970B1 BR PI0707970 B1 BRPI0707970 B1 BR PI0707970B1 BR PI0707970 A BRPI0707970 A BR PI0707970A BR PI0707970 B1 BRPI0707970 B1 BR PI0707970B1
Authority
BR
Brazil
Prior art keywords
load
winch
gantry crane
speed
winches
Prior art date
Application number
BRPI0707970-2A
Other languages
Portuguese (pt)
Inventor
Brian Chang
Original Assignee
Yantai Raffles Shipyard Limited
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yantai Raffles Shipyard Limited filed Critical Yantai Raffles Shipyard Limited
Publication of BRPI0707970A2 publication Critical patent/BRPI0707970A2/en
Publication of BRPI0707970B1 publication Critical patent/BRPI0707970B1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C17/00Overhead travelling cranes comprising one or more substantially horizontal girders the ends of which are directly supported by wheels or rollers running on tracks carried by spaced supports
    • B66C17/04Overhead travelling cranes comprising one or more substantially horizontal girders the ends of which are directly supported by wheels or rollers running on tracks carried by spaced supports with lifting beams, e.g. slewable beams, carrying load-engaging elements, e.g. magnets, hooks

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Control And Safety Of Cranes (AREA)

Abstract

guindaste de pórtico com múltiplos guinchos, sendo que a presente invenção proporciona um guindaste de pórtico com múltiplos guinchos para rebocagem de uma carga estrutural l. a carga estrutural l possui duas vigas de carga paralelas 40a, 40b. o sistema de guincho lo inclui um cinto fixo 12, um cinto paralelo 16 móvel em uma direção do pórtico, uma pluralidade de unidades de guincho 20 em cada cinto 12, 16 e uma pluralidade de conectores de carga 34 engatável em uma viga de carga e uma outra pluralidade de conectores de carga 34 engatável na outra viga de carga. uma distribuição de carga é determinada e a pluralidade de conectores de carga 34 á agrupada, de modo que cada grupo tenha uma carga meta e o centro de gravidade caia dentro do grupo selecionado de unidades de guincho 20 e conectores de carga associados 34. durante a operação para cima/para baixo de guincho, verificações de segurança sobre os componentes de guincho, tensão/posição de cada cabo 28 e desequilíbrio da carga l são monitoradas.multi-winch gantry crane, the present invention providing a multi-winch gantry crane for towing a structural load 1. structural load 1 has two parallel load beams 40a, 40b. the winch system lo includes a fixed belt 12, a parallel belt 16 movable in one direction of the gantry, a plurality of winch units 20 on each belt 12, 16 and a plurality of load connectors 34 engageable on a load beam and another plurality of load connectors 34 engageable on the other load beam. A load distribution is determined and the plurality of load connectors 34 are grouped so that each group has a target load and the center of gravity falls within the selected group of winch units 20 and associated load connectors 34. winch up / down operation, safety checks on winch components, tension / position of each cable 28 and load unbalance l are monitored.

Description

Relatório Descritivo da Patente de Invenção para “Guindaste de Pórtico com Múltiplos Guinchos”Invention Patent Descriptive Report for “Gantry Crane with Multiple Winches”

Campo Técnico da InvençãoTechnical Field of the Invention

A presente invenção refere-se a um guindaste de pórtico com múltiplos guinchos para levantar e abaixar um membro estrutural. Em particular, a invenção refere-se a um sistema e a um processo para sincronizar uma pluralidade de guinchos independentes de um guindaste de pórtico a fim de elevar e abaixar uma carga suspensa seguramente.The present invention relates to a gantry crane with multiple winches for raising and lowering a structural member. In particular, the invention relates to a system and a process for synchronizing a plurality of winches independent of a gantry crane in order to safely raise and lower a suspended load.

Estado da TécnicaState of the art

Estruturas marinhas ou de alto-mar são geralmente enormes e pesadas. Frequentemente, um guindaste com um guincho simples não é suficiente para guinchar tal estrutura marinha ou de altomar. Como resultado, as embarcações tem repousado para construir módulos de tais estruturas marinhas e então para montar os módulos em um dique flutuante. Por exemplo, uma plataforma semi-submersível tem um casco e um convés. Os cascos são compostos de dois pontões e um número de colunas verticais de cada pontão. Os pontões e as colunas verticais são tipicamente construídos com placas de aço e anteparos para formar um número de compartimentos internos ou tanques de lastro. A r plataforma é também construída com placas e anteparos. Agua é bombeada em ou fora dos tanques de lastro para ajustar a flutuabilidade do casco e/ou plataforma durante a fabricação ou da plataforma semi-submersível toda durante a operação.Marine or offshore structures are usually huge and heavy. Often, a crane with a simple winch is not enough to winch such a marine or offshore structure. As a result, vessels have rested to build modules from such marine structures and then to assemble the modules on a floating dyke. For example, a semi-submersible platform has a hull and a deck. The hulls are composed of two pontoons and a number of vertical columns of each pontoon. Pontoons and vertical columns are typically constructed with steel plates and bulkheads to form a number of internal compartments or ballast tanks. The r platform is also built with plates and screens. Water is pumped into or out of the ballast tanks to adjust the buoyancy of the hull and / or platform during manufacture or the entire semi-submersible platform during operation.

Os tamanhos e os pesos de tais módulos de uma estrutura marinha ou estrutura fabricada são usualmente limitados pela capacidade do peso de trabalho de uma instalação de guindaste. O pontão, a coluna ou a plataforma parcialmente completados com tanques de lastro ou compartimentos utilizáveis são frequentemente flutuados no mar ao invés de serem manipulados por guindaste com base em terra. Por exemplo, uma plataforma parcialmente completada pode ser flutuada acima de um casco submerso; o casco submerso é então flutuado para elevar a plataforma parcialmente completada acima do nível de água, de modo que o trabalho ulterior na plataforma é completado no mar. Tal fabricação de estruturas no início é dependente de condições climáticas e barcaças de guindaste disponíveis. Isto toma a fabricação de tais estruturas caras e de risco.The sizes and weights of such modules in a marine structure or fabricated structure are usually limited by the capacity of the working weight of a crane installation. The pontoon, column or platform partially completed with ballast tanks or usable compartments is often floated in the sea instead of being handled by a land-based crane. For example, a partially completed platform can be floated above a submerged hull; the submerged hull is then floated to raise the partially completed platform above the water level, so that further work on the platform is completed at sea. Such fabrication of structures in the beginning is dependent on weather conditions and available crane barges. This makes the manufacture of such expensive and risky structures.

Estas estruturas marinhas são tipicamente feitas de aço e requer manutenção periódica. Frequentemente, após uma vida útil de cerca de 10- 20 anos, é mais econômico repolir novamente uma estrutura marinha ao invés de construir novamente. A fim de guinchar tal estrutura marinha por guindaste tipo ponte rolante, os anteparos devem ser conectados e projetados para elevação aérea. Diferentes partes da estruturas podem ter diferentes pesos. Um guindaste com múltiplos guinchos independentes é, portanto, desejado; um processo de controle de guindaste com uma pluralidade de guinchos para operação segura é portanto requerido.These marine structures are typically made of steel and require periodic maintenance. Often, after a service life of around 10-20 years, it is more economical to refurbish a marine structure instead of building it again. In order to tow such a marine structure by an overhead crane, the bulkheads must be connected and designed for aerial elevation. Different parts of the structure can have different weights. A crane with multiple independent winches is therefore desired; a crane control process with a plurality of winches for safe operation is therefore required.

Sumáriosummary

A seguir é apresentado um sumário simplificado para proporcionar um entendimento básico da presente invenção. Este sumário não é uma vista panorâmica extensiva da invenção e não se pretende identificar aspectos chaves da invenção. Ainda, é apresentado algum dos conceitos da invenção em uma forma generalizada como introdução à descrição detalhada que se segue.The following is a simplified summary to provide a basic understanding of the present invention. This summary is not an extensive overview of the invention and is not intended to identify key aspects of the invention. In addition, some of the concepts of the invention are presented in a generalized form as an introduction to the detailed description that follows.

Em uma concretização, a presente invenção proporciona um sistema de guincho tendo uma pluralidade de unidades de tambor de guincho independentes dispostas em cada um dos dois cintos espaçados. O sistema de guincho compreende: um conector de carga operável para conectar a um cabo associado com cada um do respectivo tambor de guincho; e uma carga tendo duas vigas de carga alongadas, que são espaçadas substancialmente para mesma dimensão que os cintos espaçados; em que o conector de carga é operável para conectar as vigas de carga alongadas e a carga em si sincroniza a operação de guincho para cima e para baixo dos tambores de guincho independentes.In one embodiment, the present invention provides a winch system having a plurality of independent winch drum units arranged in each of the two spaced belts. The winch system comprises: a load connector operable to connect to a cable associated with each of the respective winch drum; and a load having two elongated load beams, which are spaced substantially to the same dimension as the spaced belts; wherein the load connector is operable to connect the elongated load beams and the load itself synchronizes the winch operation up and down the independent winch drums.

Em uma outra concretização, a presente invenção provê um processo de controle para o sistema de guincho acima. O processo de controle compreende: determinar a distribuição de cargas com respeito a dois cintos; agrupar unidades de guincho e conectores de carga associados em um ou mais grupos de modo que o centro de gravidade caia dentro de um grupo, entre dois grupos ou dentro dos grupos; estabelecer uma carga meta para cada um de um ou mais agrupamento de unidades de guincho e conectores de carga associados; e incrementar a carga de uma predeterminada etapa tal como 10%, até a carga meta durante a operação enquanto verificando o sistema de guincho quanto a segurança; tensão; deslocamento e velocidade de cada cabo; e desequilíbrio na carga.In another embodiment, the present invention provides a control process for the above winch system. The control process comprises: determining the load distribution with respect to two belts; group winch units and associated cargo connectors into one or more groups so that the center of gravity falls within a group, between two groups or within groups; establish a target load for each of one or more grouping of winch units and associated load connectors; and increasing the load of a predetermined stage such as 10%, up to the target load during the operation while checking the winch system for safety; tension; displacement and speed of each cable; and load imbalance.

Breve Descrição dos DesenhosBrief Description of Drawings

Esta invenção será descrita por meios de concretizações não limitativas da presente invenção, com referência aos desenhos anexos, em que:This invention will be described by means of non-limiting embodiments of the present invention, with reference to the accompanying drawings, in which:

Figura IA ilustra um guindaste de pórtico de cinto duplo de acordo com uma concretização da presente invenção;Figure IA illustrates a double belt gantry crane according to an embodiment of the present invention;

Figura IB ilustra o uso de conectores de carga e vigas de mancai de carga para guinchar para cima e para baixo uma carga com o guindaste mostrada na Figuras 1 A;Figure IB illustrates the use of load connectors and load bearing beams to winch a load up and down with the crane shown in Figures 1A;

Figura 1C ilustra um conector de carga mostrado nas Figuras IA elB;Figure 1C illustrates a load connector shown in Figures IA and lB;

Figura ID ilustra uma unidade de guincho mostrada nas Figuras IA e IB; eFigure ID illustrates a winch unit shown in Figures IA and IB; and

Figura 1E ilustra uma disposição das roldanas de cabo mostradas nas Figuras IA e IB.Figure 1E illustrates an arrangement of the cable pulleys shown in Figures IA and IB.

Figura 2 ilustra um fluxograma para operação segura do guindaste mostrado na Figura IA de acordo com uma outra concretização da presente invenção; eFigure 2 illustrates a flow chart for safe operation of the crane shown in Figure IA according to another embodiment of the present invention; and

Figuras 3A -3E ilustram agrupamentos de guinchos para sincronizar unidades de guincho separadas e controle de nivelamento de uma carga de acordo com ainda uma outra concretização da presente invenção.Figures 3A-3E illustrate groupings of winches for synchronizing separate winch units and level control of a load in accordance with yet another embodiment of the present invention.

Descrição Detalhada da InvençãoDetailed Description of the Invention

Uma ou mais concretizações específicas e alternativas da presente invenção serão, a seguir, descritas com referência aos desenhos anexos. Será evidente para aqueles versados na técnica, todavia, que esta invenção pode ser praticada sem tais detalhes específicas. Alguns dos detalhes não podem ser descritos em extensão de modo a não obscurecer a invenção. Para efeito de referência, os números de referência comum ou séries de números serão usados através das figuras, quando referir-se aos mesmos ou similares aspectos comuns às figuras.One or more specific and alternative embodiments of the present invention will now be described with reference to the accompanying drawings. It will be apparent to those skilled in the art, however, that this invention can be practiced without such specific details. Some of the details cannot be described in length so as not to obscure the invention. For reference purposes, the common reference numbers or series of numbers will be used through the figures, when referring to the same or similar aspects common to the figures.

Figura IA mostra um sistema de guincho 10 de acordo com uma concretização da presente invenção. Como mostrado na Figura IA, o sistema de guincho 10 inclui um cinto aéreo fixo 12 e um cinto aéreo de pórtico 16 para reter uma carga L. O cinto aéreo fixo 12 estende-se através do topo de duas colunas 13 enquanto o cinto de pórtico 16 estende-se através do topo de duas colunas inferiores 17. Embora o cinto fixo 12 e o cinto de pórtico 16 estejam nas diferentes alturas, eles são substancialmente paralelos entre si. Em cada um dos cintos 12 e 16 existem seis unidades de guincho 20a, 20b...20f. Como mostrado nas Figuras IA, ID e 1E, cada unidade de guincho 20a, 20b...20f inclui um tambor 22, um conjunto de motor-engrenagem de guincho 24, um conjunto de freios de guincho 26a, 26b...etc, um codificador 27, um cabo 28 e roldanas de cabo 30 e uma célula de carga 29. As roldanas de cabo 30 incluem um conjunto de roldanas fixas 31 e um conjunto de conectores de carga 34 conectados a um conjunto de roldanas de deslocamento 32 para cooperação com o conjunto de roldanas fixas 31 e uma polia de ângulo de desvio 36.Figure 1A shows a winch system 10 according to an embodiment of the present invention. As shown in Figure IA, the winch system 10 includes a fixed aerial belt 12 and a gantry aerial belt 16 to hold a load L. The fixed aerial belt 12 extends across the top of two columns 13 while the gantry belt 16 extends across the top of two lower columns 17. Although the fixed belt 12 and the gantry belt 16 are at different heights, they are substantially parallel to each other. On each of the belts 12 and 16 there are six winch units 20a, 20b ... 20f. As shown in Figures IA, ID and 1E, each winch unit 20a, 20b ... 20f includes a drum 22, a winch motor-gear assembly 24, a winch brake set 26a, 26b ... etc, an encoder 27, a cable 28 and cable pulleys 30 and a load cell 29. The cable pulleys 30 include a set of fixed pulleys 31 and a set of load connectors 34 connected to a set of displacement pulleys 32 for cooperation with the set of fixed pulleys 31 and a deflection angle pulley 36.

Como mostrado na Figura IA, as roldanas fixas 31a, 31b...etc. são conectadas à uma borda inferior de cada cinto 12, 16 em uma maneira alternada ao longo do eixo longitudinal do respectivo cinto e são uniformemente espaçadas. As roldanas deslocantes 32a, 32b...etc. e os conectores de carga 34 são igual e uniformemente espaçados pelas barras de ligação pivotadas 38a, 38b, 38c. Em uso, os conectores de carga 34 são conectados à uma viga de mancal de carga alongada 40 e uma carga L. Como mostrado nas Figuras IA e 1B, existem duas vigas de mancal de carga espaçadas 40a, 40b. O cinto aéreo de pórtico 16 é movido distante do cinto aéreo 12 para substancialmente a mesma dimensão entre as vigas de mancal de carga espaçadas 40a, 40b.As shown in Figure IA, the fixed pulleys 31a, 31b ... etc. they are connected to a lower edge of each belt 12, 16 in an alternating manner along the longitudinal axis of the respective belt and are evenly spaced. The shifting pulleys 32a, 32b ... etc. and the load connectors 34 are evenly and evenly spaced by the pivoted connection bars 38a, 38b, 38c. In use, the load connectors 34 are connected to an elongated load bearing beam 40 and a load L. As shown in Figures IA and 1B, there are two spaced load bearing beams 40a, 40b. The gantry aerial belt 16 is moved away from the aerial belt 12 to substantially the same dimension between the spaced load bearing beams 40a, 40b.

O sistema de guincho 50 também inclui um painel de controle 50 porém não está mostrado na Figura IA. O painel de controle 50 inclui pelo menos um controlador lógico programável (PLC)52, acionador/inversor 54 para cada motor de guincho, um alarme/buzina 56, um botão de parada de emergência 58 e um console de controle central 60. O PLC 52 é programado para permitir o controle manual e automático de unidade de guincho individual 20 ou grupos de unidades de guincho. O console de controle central 60 inclui pelo menos um painel de tela de display/toque 62, bastão de controle 64a, 64b..etc. para cada unidade de guincho, luzes indicadoras 66, alarme/buzina 56 e parada de emergência 58.The winch system 50 also includes a control panel 50 but is not shown in Figure IA. The control panel 50 includes at least one programmable logic controller (PLC) 52, actuator / inverter 54 for each winch motor, an alarm / horn 56, an emergency stop button 58 and a central control console 60. The PLC 52 is programmed to allow manual and automatic control of individual winch unit 20 or groups of winch units. Central control console 60 includes at least one display / touch screen panel 62, control stick 64a, 64b..etc. for each winch unit, indicator lights 66, alarm / horn 56 and emergency stop 58.

Com a presente invenção, a tensão transmitida de cada unidade de guincho 20a, 20b...etc. é uniformemente distribuída pelos respectivos conjuntos de roldanas fixas 30 e roldanas de deslocamento 32 para os respectivos conectores de carga 34 e vigas de mancal de carga 40a,40b. A carga transmitida para diferentes unidades de guincho ou grupos de guinchos pode ser dependente do centro de gravidade da carga L.With the present invention, the voltage transmitted from each winch unit 20a, 20b ... etc. it is uniformly distributed over the respective sets of fixed pulleys 30 and displacement pulleys 32 to the respective load connectors 34 and load bearing beams 40a, 40b. The load transmitted to different winch units or groups of winches can be dependent on the load center of gravity L.

Operação do sistema de guincho 10 inclui a execução das seguintes funções:Operation of the winch system 10 includes performing the following functions:

.verificações de segurança;security checks;

2. pretensão e calibração;2. pretension and calibration;

3. controle de nível; e3. level control; and

4.operação do grupo de guincho sincronizada;4. synchronized winch group operation;

A Figura 2 mostra um fluxograma 200 para operação segura do sistema de guincho 10, de acordo com uma outra concretização da presente invenção. Como mostrado na Figura 2, a operação do sistema de guincho 200 inicia-se da etapa 205. Na etapa 205, a força é fornecida ao painel de controle 50, console de controle central 60 e faróis/holofotes 70.Figure 2 shows a flow chart 200 for safe operation of the winch system 10, according to another embodiment of the present invention. As shown in Figure 2, operation of the winch system 200 starts from step 205. In step 205, power is supplied to the control panel 50, central control console 60 and headlights / searchlights 70.

Uma decisão é então feita na etapa 210 se o agrupamento de guincho for corretamente selecionado considerando o peso da carga L e seu centro de gravidade. Se o agrupamento de guincho não for corretamente feito e a decisão na etapa 210 for negativa, a operação do sistema 200 é abortada. Se a decisão na etapa 210 for positiva, a operação do sistema 200 avança para a etapa 15.A decision is then made in step 210 if the winch assembly is correctly selected considering the weight of the load L and its center of gravity. If the winch assembly is not done correctly and the decision in step 210 is negative, the operation of system 200 is aborted. If the decision in step 210 is positive, the operation of system 200 proceeds to step 15.

Na etapa 215, a força elétrica é fornecida ao conjunto de motorengrenagem de guincho 24 e a todos outros componentes do sistema de guincho 10.In step 215, electrical power is supplied to the winch motor assembly 24 and all other components of the winch system 10.

Uma decisão é então feita na etapa 220 se qualquer travamento de segurança for ativado. Um travamento de segurança inclui um botão de ativação e parada de emergência 58 e /ou comutação da operação do sistema para modalidade de reparo/manutenção, modalidade de programação ou modalidade de calibração. Se qualquer travamento de segurança for ativado, a operação do sistema é reposicionada na etapa 222. Se nenhum travamento de segurança for ativado, a operação de sistema avança para a etapa 225.A decision is then made at step 220 if any safety interlock is activated. A safety interlock includes an on / off button 58 and / or switching system operation to repair / maintenance mode, programming mode or calibration mode. If any safety interlock is activated, system operation is repositioned at step 222. If no safety interlock is activated, system operation proceeds to step 225.

Na etapa 225, cada inversor de motor de guincho/acionador 54 é verificado se é normal. Se a verificação na etapa 225 for negativa, isto é, um inversor/acionador de motor de guincho pode ser falho, a operação do sistema é abortado; um sinal é então enviado ao console de controle central 60 e a luz indicadora relevante 66 é iluminada para indicar a falha. Se a verificação na etapa 225 for positiva, a operação do sistema avança para a etapa 230.In step 225, each winch / drive motor inverter 54 is checked for normality. If the check in step 225 is negative, that is, a winch motor inverter / driver may be faulty, the system operation is aborted; a signal is then sent to the central control console 60 and the relevant indicator light 66 is illuminated to indicate the fault. If the check in step 225 is positive, system operation proceeds to step 230.

Na etapa 230, uma decisão é feita se qualquer um do motor de guincho 24 é superaquecido. Se a decisão na etapa 230 for positiva, a luz indicadora relevante 66 no console de controle central 60 é iluminada, tal como uma indicação de reparo na etapa 238. O superaquecimento do motor de guincho pode ser devido ao malfuncionamento da vento inha 232, malfuncionamento do termistor 234,vencimento do periodo de manutenção 236, sobrecarga,etc. Uma vez a falha do motor de guincho seja retificada, a indicação do reparo é reposicionada na etapa 238. A operação do sistema então verifica, na etapa 240, se o reparo/reposicionamento tem sido realizado. Se reparo/reposicionamento for realizado, por exemplo, após um predeterminado intervalo de tempo, a operação do sistema é abortada na etapa 277. Se o reparo/ reposiciomanento for realizado, íteras de operação do sistema voltam para a etapa 230 e a condição de superaquecimento do motor de guincho é verificada novamente. Quando todos os motores de guincho 24 estão na condição de operação normal, a operação do sistema processa-se para a etapa 245.In step 230, a decision is made whether either of the winch motor 24 is overheated. If the decision in step 230 is positive, the relevant indicator light 66 in the central control console 60 is illuminated, as well as a repair indication in step 238. The overheating of the winch motor may be due to malfunctioning of the wind 232, malfunctioning thermistor 234, maintenance period 236 expiry, overload, etc. Once the winch motor failure is rectified, the repair indication is repositioned in step 238. The operation of the system then checks, in step 240, whether the repair / repositioning has been carried out. If repair / repositioning is performed, for example, after a predetermined time interval, the system operation is aborted in step 277. If the repair / repositioning is performed, system operation ips will return to step 230 and the overheat condition the winch motor is rechecked. When all winch motors 24 are in normal operating condition, system operation proceeds to step 245.

Na etapa 245, uma decisão é feita se cada codificador de guincho 27 está em condição de trabalho normal. Em condição de trabalho normal, a posição de cada condificador 27 indica a parte de socairo do cabo do respectivo tambor de guincho 22, que calcula para indicar a posição vertical da carga L. Ao mesmo tempo, a rotação por tempo unitário é calculada para indicar a velocidade do tambor de guincho 22. Se a decisão na etapa 245 for negativa, isto é, um codificador de guincho 27 está malfuncionando, a operação do sistema pára e executa, na etapa 295, um programa de monitoramento de falha para identificar/reportar a condição de falha, por exemplo, pela iluminação da luz indicadora relevante 66. Se a decisão na etapa 245 for positiva, a operação do sistema avança para a etapa 250.In step 245, a decision is made whether each winch encoder 27 is in normal working condition. In normal working condition, the position of each capacitor 27 indicates the cable break part of the respective winch drum 22, which calculates to indicate the vertical position of the load L. At the same time, the rotation per unit time is calculated to indicate the speed of the winch drum 22. If the decision in step 245 is negative, that is, a winch encoder 27 is malfunctioning, system operation stops and runs, in step 295, a failure monitoring program to identify / report the fault condition, for example, by illuminating the relevant indicator light 66. If the decision in step 245 is positive, the system operation proceeds to step 250.

Na etapa 245, uma decisão é feita se cada codificador de guincho 27 é condição de trabalho normal. Na condição de trabalho normal, a posição de cada codificador 27 indica a parte de socairo do cabo a partir do respectivo tambor de guincho 22, que é calculada para indicar a posição vertical da carga L. Ao mesmo tempo, a rotação por tempo unitário é calculada para indicar a velocidade do tambor de guincho 22. Se a decisão na etapa 245 for negativa, isto é, o codificador de guincho 27 estiver malfuncionando, a operação do sistema pára e executa, na etapa 295, um programa de monitoração de falha para identificar/ reportar a condição da falha, por exemplo, pela iluminação da luz indicadora relevante 66. Se a decisão na etapa 245 for positiva, a operação do sistema avança para a etapa 250.In step 245, a decision is made whether each winch encoder 27 is a normal working condition. In the normal working condition, the position of each encoder 27 indicates the tamper part of the cable from the respective winch drum 22, which is calculated to indicate the vertical position of the load L. At the same time, the rotation per unit time is calculated to indicate the speed of the winch drum 22. If the decision in step 245 is negative, that is, the winch encoder 27 is malfunctioning, system operation stops and executes, in step 295, a fault monitoring program to identify / report the fault condition, for example, by illuminating the relevant indicator light 66. If the decision in step 245 is positive, the system operation proceeds to step 250.

Na etapa 250, cada freio de guincho 26a, 26b...etc. é verificado se está sob ordem de trabalho. Se um freio de guincho 26a, 26b...etc. não estiver sob ordem de trabalho, a operação do sistema pára e executa, na etapa 295, o programa de monitoração de falha para identificar a falha/reportar a condição da falha. Se todos os freios de guincho 26a, 26b...etc. estiverem em condição de trabalho, a operação do sistema avança para a etapa 255.In step 250, each winch brake 26a, 26b ... etc. it is checked if it is under work order. If a winch brake 26a, 26b ... etc. is not under work order, the system operation stops and executes, in step 295, the fault monitoring program to identify the fault / report the fault condition. If all winch brakes 26a, 26b ... etc. are in working condition, system operation proceeds to step 255.

Na etapa 255, cada “pad” de freio é verificado se está na condição normal. Se qualquer um do “pad” de freio estiver gasto e o atuador de freio associado estiver próximo do seu limite de deslocamento, a operação do sistema pára e executa, na etapa 295, o programa de monitorar/ reportar a falha. Se todos os “pads” de freio estiverem ainda em condição de trabalho, a operação do sistema avança para a etapa 257.In step 255, each brake pad is checked for normal condition. If any of the brake pad is worn and the associated brake actuator is close to its travel limit, system operation stops and executes, in step 295, the fault monitor / report program. If all brake pads are still in working condition, system operation proceeds to step 257.

Na etapa 257, a velocidade de cada tambor de guincho 22 no grupo de guincho selecionado feito na etapa 210 é incrementada em 10%, antes da operação do sistema de guincho avançar para a etapa 260.In step 257, the speed of each winch drum 22 in the selected winch group made in step 210 is increased by 10%, before the operation of the winch system proceeds to step 260.

Na etapa 260, a velocidade de cada tambor é verificada se é normal. Se uma velocidade de tambor for muito rápida, pode existir um afrouxamento ou ruptura no cabo associado 28. Em adição ou altemativamente, o freio de guincho associado 26 ou unidade de engrenagem 24 pode falhar. Se a velocidade do tambor de guincho for muito lenta, o mesmo pode estar sobrecarregado. Se a verificação na etapa 260 determinar que a velocidade de tambor de guincho é anormal, a operação do sistema pára e executa o programa de monitoração/reportagem de falha na etapa 295. Se as velocidades de guincho de todas as unidades de guincho 24 forem anormais, a operação do sistema avança para a etapa 270.In step 260, the speed of each drum is checked for normality. If a drum speed is too fast, there may be a loosening or break in the associated cable 28. In addition or alternatively, the associated winch brake 26 or gear unit 24 may fail. If the speed of the winch drum is too slow, it may be overloaded. If the check in step 260 determines that the winch drum speed is abnormal, the system operation stops and runs the fault monitoring / reporting program in step 295. If the winch speeds of all winch units 24 are abnormal , system operation proceeds to step 270.

Na etapa 270, cada célula de carga 29 associada com uma unidade de guincho 24 é verificada se está sobrecarregada. Se uma célula de carga 29 estiver sobrecarregada, a condição da célula de carga é verificada novamente na etapa 272 após um decorrer de um predeterminado período de tempo. Se a verificação na etapa 272 for novamente positiva, a operação do sistema pára e executa, na etapa 295, o programa de monitoração/reportagem da falha. Se nenhuma da unidade de guincho estiver sobrecarregada na etapa 270 ou condição de sobrecarga na etapa 272 tiver recuperada, o sistema avança para a etapa 275.In step 270, each load cell 29 associated with a winch unit 24 is checked for overload. If a load cell 29 is overloaded, the condition of the load cell is checked again at step 272 after a predetermined period of time has elapsed. If the check in step 272 is positive again, the system operation stops and executes, in step 295, the fault monitoring / reporting program. If none of the winch unit is overloaded at step 270 or overload condition at step 272 has recovered, the system proceeds to step 275.

Na etapa 275, o sistema 200 permite um operador a operar as unidades de guincho 24 para cima ou para baixo de acordo com o comando do operador. Ao mesmo tempo, a operação do sistema continua a verificar o sistema para quaisquer brechas de segurança.In step 275, system 200 allows an operator to operate the winch units 24 up or down according to the operator's command. At the same time, system operation continues to check the system for any security breaches.

Na etapa 280, a tensão dinâmica e o deslocamento de cada cabo associado com cada unidade de guincho são verificados se eles são normais. Se a tensão e o deslocamento forem anormais, por exemplo, devido a frouxidão ou ruptura em um cabo, a operação do sistema pára e executa o programa de monitoração de falha/reportagem na etapa 295. Se a tensão e o deslocamento de todos os cabos forem normais, a operação do sistema avança para a etapa 285.In step 280, the dynamic tension and displacement of each cable associated with each winch unit is checked for normality. If the tension and displacement are abnormal, for example, due to looseness or break in a cable, the system operation stops and runs the fault / reporting monitoring program in step 295. If the tension and displacement of all cables normal, system operation proceeds to step 285.

Na etapa 285, as unidades de guincho 24 são verificadas se elas são sincronizadas. Se a diferença na velocidade de qualquer uma das unidades de guincho 24 exceder uma predeterminada porcentagem da diferença na velocidade ente todas as unidades de guincho, a operação de sistema pára e executa o programa de monitoração de falha/reportagem na etapa 295. Se as diferenças na velocidade de guincho entre todas as unidades de guincho estiverem consistentes com a mudança no número de camadas de cabo no tambor de guincho 22, a operação de sistema continua para a etapa 290.In step 285, the winch units 24 are checked to see if they are synchronized. If the difference in speed of any of the winch units 24 exceeds a predetermined percentage of the difference in speed between all winch units, the system operation stops and runs the fault / reporting monitoring program in step 295. If the differences in the winch speed between all winch units are consistent with the change in the number of cable layers in the winch drum 22, the system operation continues to step 290.

Na etapa 290, qualquer desequilíbrio da carga L é novamente verificado. O desequilíbrio da carga L pode ser devido à seleção imprópria do agrupamento de guincho. Se tal desequilíbrio acontecer, e, a predeterminada diferença de percentagem nas tensões e deslocamentos do cabo na etapa 280 não for detectada, ou a sincronização das unidades de guincho nas etapa 285 não for detectada, a operação de sistema pára e executa o programa de monitoração de falha/reportagem na etapa 295. Se nenhum desequilíbrio da carga L for detectado, o sistema 200 avança para a etapa 292.In step 290, any unbalance of the load L is checked again. Load imbalance L may be due to improper selection of the winch assembly. If such an imbalance occurs, and the predetermined percentage difference in the cable stresses and displacements in step 280 is not detected, or the synchronization of the winch units in step 285 is not detected, the system operation stops and executes the monitoring program. failure / reporting in step 295. If no load imbalance L is detected, system 200 proceeds to step 292.

Na etapa 292, o sistema 200 verifica se a velocidade toda de cada tambor de guincho selecionado 22 tem atingido sua velocidade total. Se a decisão na etapa 272 for negativa, o sistema 200 itera de novo para etapa 257 e a velocidade de guincho é aumentada pelos aumentos de 10% da velocidade toda. Com cada aumento na velocidade de guincho, o sistema de 200 itera através da etapa 260 para a etapa 290 e uma decisão é feita novamente na etapa 292. Se a decisão na etapa 292 for positiva, significando que o tambor de guincho relevante 22 tem atingido sua velocidade total, o sistema 200 salta de volta para o nó 273 e continua a verificar cada unidade de guincho a partir da etapa 272 através da etapa 292 para uma operação segura.In step 292, system 200 verifies that the entire speed of each selected winch drum 22 has reached its full speed. If the decision in step 272 is negative, system 200 iterates back to step 257 and the winch speed is increased by 10% increases in the entire speed. With each increase in winch speed, the 200 system iterates through step 260 to step 290 and a decision is made again at step 292. If the decision at step 292 is positive, meaning that the relevant winch drum 22 has reached at full speed, system 200 jumps back to node 273 and continues to check each winch unit from step 272 through step 292 for safe operation.

A carga L considerada na presente invenção é tipicamente pesada e cara; como resultado, o centro de gravidade tipicamente não está no centro geométrico. Assim, a elevação da carga L deve ser planejada de tal modo que o centro de gravidade da carga esteja dentro do envelope definido pelos conectores de carga 34; Isto é para assegurar que a carga não seja tombada durante o içamento ou abaixamento. Este problema é complicado na presente invenção porque todos os conjuntos de guincho-engrenagem 24 não estão mecanicamente sincronizados. O problema encontrado na presente invenção é superado pelo benefício da rigidez da carga L atuando como um mecanismo de sincronização. Ao mesmo tempo, as tensões e as velocidades dos cabos 28 são monitoradas de modo que a carga L permaneça em nível durante o içamento ou abaixamento.The load L considered in the present invention is typically heavy and expensive; as a result, the center of gravity is typically not in the geometric center. Thus, the lifting of the load L must be planned in such a way that the load's center of gravity is within the envelope defined by the load connectors 34; This is to ensure that the load is not tipped over when lifting or lowering. This problem is complicated by the present invention because all winch-gear assemblies 24 are not mechanically synchronized. The problem found in the present invention is overcome by the benefit of load stiffness L acting as a synchronization mechanism. At the same time, the voltages and speeds of the cables 28 are monitored so that the load L remains level during lifting or lowering.

As Figuras 3A-3E ilustram vários agrupamentos das unidades de guincho 24 para operação segura do sistema de guincho 200 de acordo com a presente invenção. Como mostrado na Figura 3A, alguns dos guinchos em ambos os cintos 12, 16 são operados em um grupo de tal modo que o centro de gravidade caia dentro do envelope definido por um grupo de guinchos. Se a tensão do cabo em qualquer unidade de guincho no grupo dos guinchos selecionados exceder sua carga de trabalho, a operação de guincho é parada e o programa de monitoração aprontaria o operador a reagrupar as unidades de guincho para operação segura.Figures 3A-3E illustrate various groupings of the winch units 24 for safe operation of the winch system 200 according to the present invention. As shown in Figure 3A, some of the winches on both belts 12, 16 are operated in a group such that the center of gravity falls within the envelope defined by a group of winches. If the cable tension on any winch unit in the group of selected winches exceeds its working load, the winch operation is stopped and the monitoring program would prepare the operator to regroup the winch units for safe operation.

A Figura 3 A ilustra um agrupamento das unidades de guincho 24 em cada um dos dois cintos em adição a um terceiro agrupamento que ligas ambos os cintos. A Figura 3B ilustra um agrupamento das unidades de guincho 24 em um cinto e outros dois agrupamentos no segundo cinto. A Figura 3C ilustra um agrupamento em U dos guinchos que expande ambos os cintos. A Figura 3D ilustra um agrupamento das unidades de guincho 24 em cada um dos dois cintos 12, 16. A Figura 3E ilustra um agrupamento de unidades de guincho 24 em um cinto e um agrupamento em L que expande dois cintos. Nestas configurações de agrupamento de guinchos possíveis, o centro de gravidade cai dentro de um grande envelope definido pelo agrupamento de guinchos. Durante o guincho para cima e para baixo da carga L, a tensão e a velocidade do cabo associados em cada uma da unidade de guincho 24 são continuamente monitoradas, Isto é, as tensões do cabo são mantidas dentro da carga de trabalho de segurança para assegurar uma operação segura; ao mesmo tempo, o sistema 200 assegura diferenças nas velocidades de cabo que não excedam a predeterminada diferença de velocidade em porcentagem. De modo que todos os conjuntos de guincho-engrenagem 24 são substancialmente sincronizados e a carga L permanece substancialmente em nível.Figure 3A illustrates a grouping of winch units 24 in each of the two belts in addition to a third grouping that links both belts. Figure 3B illustrates a group of winch units 24 on one belt and two other groups on the second belt. Figure 3C illustrates a U-shape of the winches that expands both belts. Figure 3D illustrates a grouping of winch units 24 in each of the two belts 12, 16. Figure 3E illustrates a grouping of winch units 24 on a belt and an L-shape that expands two belts. In these possible winch bundle configurations, the center of gravity falls within a large envelope defined by the winch bundle. During the up and down winch of load L, the associated cable tension and speed in each of the winch unit 24 are continuously monitored. That is, the cable tensions are maintained within the safety workload to ensure safe operation; at the same time, system 200 ensures differences in cable speeds that do not exceed the predetermined percentage speed difference. So that all winch-gear assemblies 24 are substantially synchronized and the load L remains substantially level.

Uma vez que todas as verificações de segurança nas etapas 210255 estejam completas e as tensões e deslocamentos de cabo (cordel)/cabo, juntamente com as diferenças de porcentagem, estejam dentro dos limites do desenho, operação para cima/para baixo do guincho na etapa 275 continua. Durante a iniciação, por exemplo, durante a instalação do sistema inicial ou após a manutenção, a etapa de operação de guincho 275 inclui uma etapa de exigência e calibração 277 e uma etapa de nivelação de carga 278. Em uma concretização, a exigência é feita por guinchar cada conjunto dos blocos de roldana de deslocamento 32 e conectores de carga 34 em uma velocidade lenta de tal modo que a frouxidão do cabo é considerada. Quando não há mais cabo frouxo, a leitura de cada célula de carga 29 no console de controle central 60 associado com cada unidade de guincho 20 é zerada e a posição do bastão de controle 64 lido é re-posicionada. Na etapa de nivelação de carga 278, uma carga de teste é conectada a dois ou mais grupos de unidades de guincho 20 e a carga de teste é içada até uma predeterminada velocidade constante. Durante cada teste de nivelação de carga, a posição e a velocidade de cada unidade de guincho 20 são registradas por um registro de dados conectados a PLC 52. A posição vertical da carga de teste e a velocidade das unidades de guincho são analisadas; por exemplo, da mudança na altura e da velocidade correspondente, o guincho com a velocidade baixíssima é escolhido como guincho de referência, cuja posição e velocidade são usadas como dados de referência para as posições e velocidades de todas as outras unidades de guincho 20. Em outras palavras, a calibração automática das posições e velocidades de guincho é executada; compensação manual e automática é então tomada possível. Em adição, as células de carga 29 são calibradas. O sistema 200 também provê-se para operação manual e automática do guindaste todo.Once all safety checks in steps 210255 are complete and the cable (rope) / cable tensions and displacements, along with percent differences, are within the limits of the drawing, up / down operation of the winch in step 275 continues. During initiation, for example, during initial system installation or after maintenance, the winch operating step 275 includes a requirement and calibration step 277 and a load leveling step 278. In one embodiment, the requirement is made by screeching each set of displacement sheave blocks 32 and load connectors 34 at a slow speed such that the cable looseness is considered. When there is no more loose cable, the reading of each load cell 29 on the central control console 60 associated with each winch unit 20 is zeroed and the position of the read control rod 64 is repositioned. In load leveling step 278, a test load is connected to two or more groups of winch units 20 and the test load is lifted to a predetermined constant speed. During each load leveling test, the position and speed of each winch unit 20 are recorded by a data log connected to PLC 52. The vertical position of the test load and the speed of the winch units are analyzed; for example, the change in height and the corresponding speed, the winch with the very low speed is chosen as the reference winch, whose position and speed are used as reference data for the positions and speeds of all other winch units 20. In in other words, automatic calibration of winch positions and speeds is performed; Manual and automatic compensation is then made possible. In addition, load cells 29 are calibrated. System 200 is also provided for manual and automatic operation of the whole crane.

Uma vez realizada a exigência, calibração e nivelação automática do sistema de guincho, o sistema de guincho 10 está pronto para uso. Como mostrado na Figura 2, o sistema de guincho 10 continua a moniotorar a tensão e o deslocamento em todos os cabos 28 na etapa 280. Em adição, o sistema de guincho 10 também continua a monitorar o controle do nível das carga L pela verificação da sincronização de todas as unidades de guincho 20 na etapa a 285 e verificação quanto a qualquer desequilíbrio na etapa 290.Once the requirement, calibration and automatic leveling of the winch system is fulfilled, winch system 10 is ready for use. As shown in Figure 2, the winch system 10 continues to monitor the tension and displacement on all cables 28 in step 280. In addition, the winch system 10 also continues to monitor the load level control L by checking the synchronization of all winch units 20 in step 285 and checking for any imbalance in step 290.

Na implementação do guincho em grupo de acordo com a presente invenção, a massa e o centro de gravidade de diferentes módulos compondo a carga L são determinados. Uma distribuição de carga é determinada e uma seleção de 5 agrupamento de guincho é então feita com cada grupo tendo uma carga meta. Durante uma operação para cima para baixo do guincho, a carga meta é aumentada pelo aumento de 10% sobre um predeterminado período de tempo. Durante cada incremento de carga, todas as verificações de segurança da etapa 220 através 10 da etapa 272, tensão/deslocamento na etapa 280 e desequilíbrio na carga na etapa 285 e 290 são feitas. Se qualquer desequilíbrio na carga ocorrer, o agrupamento(s) de guincho é/são re-defínidos e a operação do sistema 200 é realizada de novo.In the implementation of the group winch according to the present invention, the mass and center of gravity of different modules composing the load L are determined. A load distribution is determined and a selection of 5 winch groups is then made with each group having a target load. During an up-down operation of the winch, the target load is increased by a 10% increase over a predetermined period of time. During each load increment, all safety checks in step 220 through 10 in step 272, tension / displacement in step 280 and load imbalance in step 285 and 290 are performed. If any imbalance in the load occurs, the winch group (s) is / are re-defined and the operation of system 200 is performed again.

Embora concretizações específicas tenham sido descritas e 15 ilustradas, entende-se que muitas mudanças, modificações, variações e suas combinações podem ser feitas na presente invenção sem se distanciar do escopo da invenção. Por exemplo, um guindaste de pórtico com múltiplos guinchos em mais do que dois cintos podem ser usados.Although specific embodiments have been described and illustrated, it is understood that many changes, modifications, variations and combinations thereof can be made in the present invention without departing from the scope of the invention. For example, a gantry crane with multiple winches on more than two belts can be used.

Claims (7)

REIVINDICAÇÕES 1. “Guindaste de Pórtico com Múltiplos Guinchos” caracterizado por ser um sistema de guincho tendo uma pluralidade de unidades de tambor de guincho independente dispostas em cada um dos 5 dois cintos espaçados, o sistema compreendendo:1. "Gantry Crane with Multiple Winches" characterized by being a winch system having a plurality of independent winch drum units arranged in each of the two spaced belts, the system comprising: um conector de carga operável para conectar a um cabo associado com cada um do respectivo tambor de guincho; e uma carga tendo duas vigas de carga alongadas, que são espaçadas para substancialmente mesma dimensão que os cintos 10 espaçados;an operable load connector for connecting to a cable associated with each of the respective winch drum; and a load having two elongated load beams, which are spaced to substantially the same dimension as the spaced belts 10; em que o conector de carga é operável para conectar com as vigas de carga alongada e a carga em si sincroniza a operação para cima/para baixo de guinchar dos tambores de guincho independentes.wherein the load connector is operable to connect with the elongated load beams and the load itself synchronizes the up / down squeaking operation of the independent winch drums. 1515 2. “Guindaste de Pórtico com Múltiplos Guinchos”, de acordo com a Reivindicação 1, caracterizado em que o conector de carga é conectado a um bloco de roldana deslocante enquanto um bloco de roldana fixo é disposto no cinto relevante.2. "Multi Winch Gantry Crane" according to Claim 1, characterized in that the load connector is connected to a shifting pulley block while a fixed pulley block is arranged on the relevant belt. 3. “Guindaste de Pórtico com Múltiplos Guinchos”, de acordo 20 com a Reivindicação 1 ou 2, caracterizado onde o processo compreende:3. "Gantry Crane with Multiple Winches" according to Claim 1 or 2, characterized where the process comprises: determinar a distribuição de carga com respeito a dois cintos; agrupar as unidades de guincho e conectores de carga associados em um ou mais grupos, de modo que o centro de gravidade caia 25 dentro de um grupo, entre dois grupos ou dentro dos grupos;determine the load distribution with respect to two belts; group the winch units and associated cargo connectors into one or more groups, so that the center of gravity falls within a group, between two groups or within groups; estabelecer uma carga meta para cada qual de um ou mais agrupamentos de unidades de guincho e conectores de carga associados; e incrementar a carga por uma predeterminada etapa até atingir a 30 carga meta durante a operação enquanto verificando o sistema de guincho quanto a segurança; tensão, deslocamento e velocidade de cada cabo; e desequilíbrio na carga.establish a target load for each of one or more groupings of winch units and associated load connectors; and increasing the load by a predetermined step until reaching the target load during operation while checking the winch system for safety; tension, displacement and speed of each cable; and load imbalance. 4. “Guindaste de Pórtico com Múltiplos Guinchos”, de acordo com a Reivindicação 3, caracterizado em que a predeterminada4. "Gantry Crane with Multiple Winches" according to Claim 3, characterized in that the predetermined 35 etapa é 10% da carga meta.35 stage is 10% of the target load. 5. “Guindaste de Pórtico com Múltiplos Guinchos”, de acordo com a Reivindicação 3 ou 4, caracterizado em que o desequilíbrio na carga ocorre quando a mudança de porcentagem na tensão, deslocamento ou velocidade de uma unidade de5. "Gantry Crane with Multiple Winches", according to Claim 3 or 4, characterized in that the imbalance in the load occurs when the percentage change in the tension, displacement or speed of a unit of 5 guincho excede uma predeterminada mudança de porcentagem.5 winch exceeds a predetermined percentage change. 6. “Guindaste de Pórtico com Múltiplos Guinchos”, de acordo com quaisquer uma das Reivindicações 3-5, caracterizado ainda por compreender:6. "Gantry Crane with Multiple Winches" according to any one of Claims 3-5, further comprising: exigência de cada cabo e calibração a célula de carga associada 10 com a mesma; e nivelação da carga.requirement of each cable and calibration of the load cell associated with it 10; and load leveling. 7. “Guindaste de Pórtico com Múltiplos Guinchos”, de acordo com a Reivindicação 6, caracterizado em que após realizar a nivelação de carga, o guincho com a velocidade mais baixa é usado como um guincho de referência para outros guinchos7. "Gantry Crane with Multiple Winches" according to Claim 6, characterized in that after carrying out load leveling, the lowest speed winch is used as a reference winch for other winches 15 quanto ao deslocamento ou a velocidade.15 regarding displacement or speed.
BRPI0707970-2A 2007-08-03 2007-08-03 MULTIPLE WINCHES BRPI0707970B1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/SG2007/000234 WO2009020429A1 (en) 2007-08-03 2007-08-03 Gantry crane with multiple hoists

Publications (2)

Publication Number Publication Date
BRPI0707970A2 BRPI0707970A2 (en) 2011-05-17
BRPI0707970B1 true BRPI0707970B1 (en) 2019-05-07

Family

ID=40341536

Family Applications (1)

Application Number Title Priority Date Filing Date
BRPI0707970-2A BRPI0707970B1 (en) 2007-08-03 2007-08-03 MULTIPLE WINCHES

Country Status (2)

Country Link
BR (1) BRPI0707970B1 (en)
WO (1) WO2009020429A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2502800B (en) * 2012-06-07 2015-05-20 Jaguar Land Rover Ltd Crane and related method of operation

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE7408521L (en) * 1974-05-30 1975-12-01 Nippon Kokan Kk LOADING DEVICE WITH LIFTING BLOCK
SU1242595A1 (en) * 1984-10-12 1986-07-07 Izmozherov Gennadij V Platform for repairing boilers of power units
US5210473A (en) * 1991-11-19 1993-05-11 Harnischfeger Corporation System with delay timer for motor load equalization
DE4142779C2 (en) * 1991-12-23 1996-11-07 Man Takraf Foerdertechnik Gmbh Hoist on the trolley of a container crane
JP2865254B1 (en) * 1998-04-14 1999-03-08 鹿島建設株式会社 Mounting device for plate-like exterior materials
JP2000086150A (en) * 1998-09-09 2000-03-28 Sumitomo Heavy Ind Ltd Swing type cable basket
US6598859B1 (en) * 2001-05-31 2003-07-29 Magnetek, Inc. Multiple hoist synchronization apparatus and method

Also Published As

Publication number Publication date
BRPI0707970A2 (en) 2011-05-17
WO2009020429A1 (en) 2009-02-12

Similar Documents

Publication Publication Date Title
ES2702536T3 (en) Control and evaluation of braking torque status
FI124542B (en) Method and arrangement of the condition of the lift rope
US8931350B2 (en) Rope test stand
BR112015032058B1 (en) SYSTEM FOR LIFTING A LOAD ON AN OFFSHORE PLATFORM AND OFFSHORE DRILLING PLATFORM
USRE36971E (en) Method of determining and analyzing a ship's weight
BRPI0707970B1 (en) MULTIPLE WINCHES
JP5490662B2 (en) Ship elevator operating method
JPH11348874A (en) Lighted buoy, remote inspection controller therefor, remote control transceiver therefor, and remote inspection control system therefor
CA3033936A1 (en) System for inspecting a tank in a ship
RU2441834C2 (en) Portal crane with a set of elevators
JP2022016827A (en) Installing method of mooring system and installing method of mooring floating body
KR102449484B1 (en) System for monitoring launch and recovery apparatus
CN110356980B (en) Novel integral platform hoisting launching method
CN109610351B (en) Method for treating axial lead of steel box girder suspension bridge
MARTI et al. HEAVYLIFTING OPERATIONS FOR THE ASSEMBLY OF A 150 M LONG SIMPLY SUPPORTED BRIDGE DECK
SU1020342A1 (en) Arrangement for testing a lift winch
CN103616174A (en) Reversing mechanism of anchor chain and mooring chain
KR20220060280A (en) Apparatus and method for testing hydraulic winches
CN114877191A (en) A structure health monitoring device for civil engineering
CN103837344A (en) Inclined run test device
SE410301B (en) DERRICKKRAN

Legal Events

Date Code Title Description
B09A Decision: intention to grant [chapter 9.1 patent gazette]
B16A Patent or certificate of addition of invention granted [chapter 16.1 patent gazette]

Free format text: PRAZO DE VALIDADE: 10 (DEZ) ANOS CONTADOS A PARTIR DE 07/05/2019, OBSERVADAS AS CONDICOES LEGAIS. (CO) 10 (DEZ) ANOS CONTADOS A PARTIR DE 07/05/2019, OBSERVADAS AS CONDICOES LEGAIS

B21F Lapse acc. art. 78, item iv - on non-payment of the annual fees in time

Free format text: REFERENTE A 15A ANUIDADE.

B24J Lapse because of non-payment of annual fees (definitively: art 78 iv lpi, resolution 113/2013 art. 12)

Free format text: EM VIRTUDE DA EXTINCAO PUBLICADA NA RPI 2681 DE 24-05-2022 E CONSIDERANDO AUSENCIA DE MANIFESTACAO DENTRO DOS PRAZOS LEGAIS, INFORMO QUE CABE SER MANTIDA A EXTINCAO DA PATENTE E SEUS CERTIFICADOS, CONFORME O DISPOSTO NO ARTIGO 12, DA RESOLUCAO 113/2013.