BR112016019527A2 - - Google Patents
Info
- Publication number
- BR112016019527A2 BR112016019527A2 BR112016019527A BR112016019527A BR112016019527A2 BR 112016019527 A2 BR112016019527 A2 BR 112016019527A2 BR 112016019527 A BR112016019527 A BR 112016019527A BR 112016019527 A BR112016019527 A BR 112016019527A BR 112016019527 A2 BR112016019527 A2 BR 112016019527A2
- Authority
- BR
- Brazil
Links
Classifications
-
- D—TEXTILES; PAPER
- D21—PAPER-MAKING; PRODUCTION OF CELLULOSE
- D21G—CALENDERS; ACCESSORIES FOR PAPER-MAKING MACHINES
- D21G9/00—Other accessories for paper-making machines
- D21G9/0009—Paper-making control systems
- D21G9/0018—Paper-making control systems controlling the stock preparation
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B13/00—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
- G05B13/02—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
- G05B13/04—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators
- G05B13/041—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators in which a variable is automatically adjusted to optimise the performance
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B13/00—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
- G05B13/02—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
- G05B13/04—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators
- G05B13/048—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators using a predictor
Landscapes
- Engineering & Computer Science (AREA)
- Health & Medical Sciences (AREA)
- Artificial Intelligence (AREA)
- Computer Vision & Pattern Recognition (AREA)
- Evolutionary Computation (AREA)
- Medical Informatics (AREA)
- Software Systems (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Automation & Control Theory (AREA)
- Paper (AREA)
- Feedback Control In General (AREA)
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| IN977/CHE/2014 | 2014-02-26 | ||
| IN977CH2014 IN2014CH00977A (enExample) | 2014-02-26 | 2015-02-25 | |
| PCT/IB2015/051393 WO2015128808A1 (en) | 2014-02-26 | 2015-02-25 | A system and a method for advanced optimization of continuous digester operation |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| BR112016019527A2 true BR112016019527A2 (enExample) | 2017-08-22 |
| BR112016019527B1 BR112016019527B1 (pt) | 2022-08-16 |
Family
ID=52630446
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| BR112016019527-2A BR112016019527B1 (pt) | 2014-02-26 | 2015-02-25 | Sistema para a otimização de uma operação de digestor contínuo de um digestor contínuo e método para otimizar uma operação de digestor contínuo de um digestor contínuo usando um ou mais processadores |
Country Status (7)
| Country | Link |
|---|---|
| US (1) | US10344429B2 (enExample) |
| EP (1) | EP3111281B1 (enExample) |
| CN (1) | CN106462121B (enExample) |
| BR (1) | BR112016019527B1 (enExample) |
| CA (1) | CA2940996C (enExample) |
| IN (1) | IN2014CH00977A (enExample) |
| WO (1) | WO2015128808A1 (enExample) |
Families Citing this family (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP3051367B1 (en) * | 2015-01-28 | 2020-11-25 | Honeywell spol s.r.o. | An approach and system for handling constraints for measured disturbances with uncertain preview |
| EP3056706A1 (en) | 2015-02-16 | 2016-08-17 | Honeywell International Inc. | An approach for aftertreatment system modeling and model identification |
| EP3125052B1 (en) | 2015-07-31 | 2020-09-02 | Garrett Transportation I Inc. | Quadratic program solver for mpc using variable ordering |
| US10272779B2 (en) | 2015-08-05 | 2019-04-30 | Garrett Transportation I Inc. | System and approach for dynamic vehicle speed optimization |
| US10124750B2 (en) | 2016-04-26 | 2018-11-13 | Honeywell International Inc. | Vehicle security module system |
| US10728249B2 (en) | 2016-04-26 | 2020-07-28 | Garrett Transporation I Inc. | Approach for securing a vehicle access port |
| US10036338B2 (en) | 2016-04-26 | 2018-07-31 | Honeywell International Inc. | Condition-based powertrain control system |
| US11199120B2 (en) | 2016-11-29 | 2021-12-14 | Garrett Transportation I, Inc. | Inferential flow sensor |
| US11057213B2 (en) | 2017-10-13 | 2021-07-06 | Garrett Transportation I, Inc. | Authentication system for electronic control unit on a bus |
| US10908562B2 (en) * | 2017-10-23 | 2021-02-02 | Honeywell International Inc. | Apparatus and method for using advanced process control to define real-time or near real-time operating envelope |
| WO2020160078A1 (en) * | 2019-01-31 | 2020-08-06 | Dow Global Technologies Llc | Process control |
| FI130616B (en) * | 2021-10-08 | 2023-12-14 | Andritz Ab | Method for producing cellulose in a multi-step process |
Family Cites Families (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP0919889A1 (en) * | 1997-11-26 | 1999-06-02 | Siemens Aktiengesellschaft | Modelling, simulation and optimisation of continuous Kamyr digester systems |
| US6542852B2 (en) * | 1999-09-15 | 2003-04-01 | General Electric Company | System and method for paper web time-to-break prediction |
| SE522691C3 (sv) * | 2002-06-12 | 2004-04-07 | Abb Ab | Dynamisk on-line-optimering av produktionsprocesser |
| US7204914B2 (en) * | 2003-08-13 | 2007-04-17 | Metso Automation Usa Inc. | System and method for controlling a processor including a digester utilizing time-based assessments |
| CA2752470C (en) * | 2009-02-13 | 2017-05-30 | Abb Research Ltd. | A system and a method for optimization of continuous digestion process |
| US8216517B2 (en) * | 2009-03-30 | 2012-07-10 | General Electric Company | System and method for monitoring an integrated system |
| CN105088842A (zh) * | 2015-06-24 | 2015-11-25 | 潘秀娟 | 一种基于预测控制的制浆蒸煮控制方法 |
-
2015
- 2015-02-25 IN IN977CH2014 patent/IN2014CH00977A/en unknown
- 2015-02-25 WO PCT/IB2015/051393 patent/WO2015128808A1/en not_active Ceased
- 2015-02-25 EP EP15708606.7A patent/EP3111281B1/en active Active
- 2015-02-25 CN CN201580022458.XA patent/CN106462121B/zh active Active
- 2015-02-25 CA CA2940996A patent/CA2940996C/en active Active
- 2015-02-25 BR BR112016019527-2A patent/BR112016019527B1/pt active IP Right Grant
-
2016
- 2016-08-26 US US15/248,078 patent/US10344429B2/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| EP3111281A1 (en) | 2017-01-04 |
| CA2940996A1 (en) | 2015-09-03 |
| US10344429B2 (en) | 2019-07-09 |
| IN2014CH00977A (enExample) | 2015-08-28 |
| BR112016019527B1 (pt) | 2022-08-16 |
| US20160362838A1 (en) | 2016-12-15 |
| EP3111281B1 (en) | 2018-12-05 |
| WO2015128808A1 (en) | 2015-09-03 |
| CA2940996C (en) | 2018-07-03 |
| CN106462121A (zh) | 2017-02-22 |
| CN106462121B (zh) | 2019-10-25 |
Similar Documents
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| B06U | Preliminary requirement: requests with searches performed by other patent offices: procedure suspended [chapter 6.21 patent gazette] | ||
| B350 | Update of information on the portal [chapter 15.35 patent gazette] | ||
| B350 | Update of information on the portal [chapter 15.35 patent gazette] | ||
| B09A | Decision: intention to grant [chapter 9.1 patent gazette] | ||
| B16A | Patent or certificate of addition of invention granted [chapter 16.1 patent gazette] |
Free format text: PRAZO DE VALIDADE: 20 (VINTE) ANOS CONTADOS A PARTIR DE 25/02/2015, OBSERVADAS AS CONDICOES LEGAIS |