BR112015016668B1 - DRILLING PLATFORM - Google Patents

DRILLING PLATFORM Download PDF

Info

Publication number
BR112015016668B1
BR112015016668B1 BR112015016668-7A BR112015016668A BR112015016668B1 BR 112015016668 B1 BR112015016668 B1 BR 112015016668B1 BR 112015016668 A BR112015016668 A BR 112015016668A BR 112015016668 B1 BR112015016668 B1 BR 112015016668B1
Authority
BR
Brazil
Prior art keywords
well
center
drilling
equipment
floor
Prior art date
Application number
BR112015016668-7A
Other languages
Portuguese (pt)
Other versions
BR112015016668B8 (en
BR112015016668A2 (en
Inventor
Michael Kannegaard
Allan McCOLL
Original Assignee
Maersk Drilling A/S
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from US13/772,709 external-priority patent/US9458680B2/en
Application filed by Maersk Drilling A/S filed Critical Maersk Drilling A/S
Priority claimed from PCT/EP2014/050509 external-priority patent/WO2014108541A2/en
Publication of BR112015016668A2 publication Critical patent/BR112015016668A2/en
Publication of BR112015016668B1 publication Critical patent/BR112015016668B1/en
Publication of BR112015016668B8 publication Critical patent/BR112015016668B8/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B15/00Supports for the drilling machine, e.g. derricks or masts
    • E21B15/02Supports for the drilling machine, e.g. derricks or masts specially adapted for underwater drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/14Racks, ramps, troughs or bins, for holding the lengths of rod singly or connected; Handling between storage place and borehole
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/14Racks, ramps, troughs or bins, for holding the lengths of rod singly or connected; Handling between storage place and borehole
    • E21B19/143Racks, ramps, troughs or bins, for holding the lengths of rod singly or connected; Handling between storage place and borehole specially adapted for underwater drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/14Racks, ramps, troughs or bins, for holding the lengths of rod singly or connected; Handling between storage place and borehole
    • E21B19/15Racking of rods in horizontal position; Handling between horizontal and vertical position
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/14Racks, ramps, troughs or bins, for holding the lengths of rod singly or connected; Handling between storage place and borehole
    • E21B19/15Racking of rods in horizontal position; Handling between horizontal and vertical position
    • E21B19/155Handling between horizontal and vertical position

Abstract

PLATAFORMA DE PERFURAÇÃO. São divulgadas aqui modalidades de uma plataforma de perfuração offshore compreendendo - uma coberta do piso de perfuração (107) tendo um orifício que define um primeiro centro do poço (123a); - um primeiro mastro (104) que se estende para cima em relação à coberta do piso de perfuração; - um primeiro sistema elevador (105a) suportado pelo primeiro mastro e configurado para elevar e abaixar o equipamento tubular através do primeiro centro do poço; sendo que a estrutura de suporte de carga do primeiro sistema elevador é deslocada a partir de e localizada em um primeiro lado do primeiro centro do poço; - primeiro equipamento de manuseio de dutos (136, 132a,b; 2592) para mover o equipamento tubular para o primeiro sistema elevador de modo a permitir que o primeiro sistema elevador eleve ou abaixe o equipamento tubular através do primeiro centro do poço; sendo que o primeiro equipamento de manuseio de dutos é operável para mover o equipamento tubular pelo menos parcialmente debaixo da estrutura de suporte de carga e/ou através de uma abertura formada na dita estrutura de suporte de carga.DRILLING PLATFORM. Disclosed herein are embodiments of an offshore drilling rig comprising - a drilling floor deck (107) having a hole defining a first well center (123a); - a first mast (104) extending upwards with respect to the cover of the drilling floor; - a first lift system (105a) supported by the first mast and configured to raise and lower the tubular equipment through the first center of the well; the load-bearing structure of the first elevator system being displaced from and located on a first side of the first center of the shaft; - first pipeline handling equipment (136, 132a,b; 2592) for moving the tubular equipment to the first elevator system so as to allow the first elevator system to raise or lower the tubular equipment through the first center of the well; the first pipeline handling equipment being operable to move the tubular equipment at least partially under the load-bearing structure and/or through an opening formed in said load-bearing structure.

Description

Campo TécnicoTechnical Field

[001] A presente invenção refere-se, de modo geral, a plataformas de perfuração offshore, como plataformas de perfuração semissubmersíveis, navios de perfuração ou outras plataformas de perfuração offshore.[001] The present invention generally relates to offshore drilling platforms, such as semi-submersible drilling platforms, drilling ships or other offshore drilling platforms.

Antecedentesbackground

[002] Plataformas de perfuração offshore são amplamente usadas na exploração e aproveitamento de reservatórios de hidrocarboneto sob o fundo do mar.[002] Offshore drilling rigs are widely used in the exploration and exploitation of hydrocarbon reservoirs under the seabed.

[003] Um tipo de estrutura de perfuração é a plataforma de perfuração semissubmersível que tipicamente obtém sua flutuabilidade de pontões lastrados, à prova d'água localizados abaixo da superfície do oceano e ação da onda. A coberta de operação pode ser localizada alta acima no nível do mar devido à alta estabilidade do design, e, portanto, a coberta de operação é mantida bem longe das ondas. Colunas estruturais conectam os pontões e coberta de operação. Outros exemplos de plataformas de perfuração offshore incluem navios de perfuração.[003] One type of drilling structure is the semi-submersible drilling rig that typically obtains its buoyancy from ballasted, waterproof pontoons located below the ocean surface and wave action. The operating deck can be located high above sea level due to the high stability of the design, and therefore the operating deck is kept well out of the waves. Structural columns connect the pontoons and operating deck. Other examples of offshore drilling rigs include drill ships.

[004] A US 6.766.860 revela uma plataforma de perfuração offshore do tipo semissubmersível compreendendo duas trajetórias dentro da mesma torres de perfuração. O piso da torre de perfuração é elevado acima do resto da coberta de perfuração. Mesas giratórias são posicionadas na coberta de perfuração abaixo das trajetórias de içamento primárias e secundárias. Na coberta de perfuração, duto de perfuração e a broca é composta e funciona através da coluna d'água para o fundo do mar onde ele é girado por qualquer mesa giratória e/ou um mecanismo de rotação (impulsor superior) suspenso na torre. Depois, tubulações de revestimento são montadas em uma das trajetórias de elevação e colocadas dentro do orifício. Rampas alimentam os dutos para as trajetórias de elevação primárias e secundárias.[004] US 6,766,860 discloses a semi-submersible type offshore drilling rig comprising two trajectories within the same drilling rig. The floor of the rig is elevated above the rest of the drilling deck. Turntables are positioned on the drill deck below the primary and secondary lift paths. On the drilling deck, the drill duct and drill is made up and works through the water column to the seabed where it is rotated by any turntable and/or a rotation mechanism (upper impeller) suspended in the turret. Then casing pipes are mounted on one of the lift paths and placed into the hole. Ramps feed the ducts for the primary and secondary lift paths.

[005] Deseja-se, de modo geral, fornecer uma plataforma de perfuração offshore que permite uma operação mais eficiente e flexível. Deseja-se ainda, de modo geral, fornecer uma plataforma de perfuração offshore que facilita a operação com um alto grau de segurança.[005] It is generally desired to provide an offshore drilling platform that allows for a more efficient and flexible operation. It is also generally desired to provide an offshore drilling rig that facilitates the operation with a high degree of safety.

Sumáriosummary

[006] De acordo com um primeiro aspecto, são divulgadas aqui modalidades de uma plataforma de perfuração offshore compreendendo a coberta do piso de perfuração tendo um orifício que define um primeiro centro do poço. As modalidades da plataforma de perfuração compreendem adicionalmente um primeiro mastro que se estende para cima em relação à coberta do piso de perfuração, e um primeiro sistema elevador suportado pelo primeiro mastro e configurado para içar e baixar o equipamento tubular através do primeiro centro do poço, sendo que a estrutura de suporte de carga do primeiro sistema elevador é deslocado a partir de e localizada em um primeiro lado do primeiro centro do poço. As modalidades da plataforma de perfuração compreendem adicionalmente o primeiro equipamento de manuseio de dutos para mover o equipamento tubular para o primeiro sistema elevador de modo a permitir que o primeiro sistema elevador eleve ou abaixe o equipamento tubular através do primeiro centro do poço sendo que o primeiro equipamento de manuseio de dutos é operável para mover o equipamento tubular pelo menos parcialmente debaixo da estrutura de suporte de carga e/ou através de uma abertura formada na dita estrutura de suporte de carga.[006] According to a first aspect, modalities of an offshore drilling rig comprising the drilling floor cover having a hole defining a first well center are disclosed herein. The drilling rig embodiments further comprise a first mast extending upwards with respect to the cover of the drilling floor, and a first lift system supported by the first mast and configured to raise and lower the tubular equipment through the first center of the well, the load-bearing structure of the first elevator system being displaced from and located on a first side of the first center of the shaft. Drilling rig arrangements further comprise the first pipeline handling equipment to move the tubular equipment to the first elevator system so as to allow the first elevator system to raise or lower the tubular equipment through the first center of the well with the first pipeline handling equipment is operable to move tubular equipment at least partially under the load-bearing structure and/or through an opening formed in said load-bearing structure.

[007] Em algumas modalidades, o primeiro equipamento de manuseio de dutos também é disposto para apresentar o equipamento tubular para o sistema elevador, isto é, de modo que a extremidade superior do equipamento tubular está dentro do alcance de um impulsor superior, gancho ou dispositivo de conexão similar do sistema elevador, permitindo que o sistema elevador suspensa subsequentemente o equipamento tubular sobre o centro do poço (neste caso o primeiro sistema elevador e primeiro centro do poço, respectivamente). Em algumas modalidades, o equipamento tubular é apresentado enquanto ainda pelo menos parcialmente abaixo da estrutura de suporte de carga e/ou na abertura formada na estrutura de suporte de carga. Na presente revelação as expressões apresentando o equipamento tubular para um centro do poço, o respectivo sistema elevador daquele centro do poço e alimentando o equipamento tubular para um centro do poço são usadas indistintamente.[007] In some embodiments, the first pipeline handling equipment is also arranged to present the tubular equipment to the elevator system, i.e., so that the upper end of the tubular equipment is within reach of an upper impeller, hook or connection device similar to the elevator system, allowing the elevator system to subsequently suspend the tubular equipment over the well center (in this case the first elevator system and first well center, respectively). In some embodiments, the tubular equipment is presented while still at least partially below the load-bearing structure and/or in the opening formed in the load-bearing structure. In the present disclosure the expressions presenting the tubular equipment to a well center, the respective lifting system from that well center and feeding the tubular equipment to a well center are used interchangeably.

[008] Devido ao comprimento considerável do equipamento tubular, o equipamento de manuseio de duto (que de alguma forma governa a trajetória dos tubos sendo apresentada), o mastro e a estrutura de suporte de carga do sistema elevador deve ser disposto para permitir que o equipamento tubular seja elevado para vertical sem colidir com a plataforma de perfuração. Por exemplo, o equipamento tubular pode ser apresentado através do equipamento de manuseio de duto na forma de um conduto inclinado parcialmente ou completamente abaixo da coberta do piso de perfuração. Na medida em que o tubo é elevado para a vertical acima do centro do poço ele pode colidir com o mastro ou a estrutura de suporte de carga a menos que uma abertura suficiente seja fornecida aqui e/ou o equipamento de manuseio de duto e a plataforma de perfuração são dispostos para permitir que a extremidade inferior do tubo balance em direção ao centro do poço na medida em que é elevado. Tipicamente, uma abertura será preferível na medida em que a estrutura de suporte da plataforma de perfuração e/ou o equipamento suspenso sobre a área da janela do casco abaixo do centro do poço (por exemplo, cadeia de tubo de perfuração, tensores do tubo de perfuração) podem não permitir que a extremidade inferior do tubo se desloque suficientemente.[008] Due to the considerable length of the tubular equipment, the pipeline handling equipment (which somehow governs the trajectory of the tubes being presented), the mast and load-bearing structure of the elevator system must be arranged to allow the tubular rig is raised to vertical without colliding with the drilling rig. For example, tubular equipment may be presented through the pipeline handling equipment in the form of a pipeline sloped partially or completely below the cover of the drilling floor. As the pipe is raised vertically above the center of the well it may impinge on the mast or load-bearing structure unless a sufficient opening is provided here and/or the pipeline handling equipment and platform drill holes are arranged to allow the lower end of the pipe to swing towards the center of the well as it is raised. Typically, an opening will be preferable as the drilling rig support structure and/or equipment is suspended over the hull window area below the center of the well (eg drill pipe chain, drill pipe tensioners). perforation) may not allow the lower end of the tube to move sufficiently.

[009] Consequentemente, na medida que a estrutura de suporte de carga do primeiro sistema elevador é deslocada a partir de e localizada sobre o primeiro lado do primeiro centro do poço, o acesso ao centro do poço é facilitado não somente para operadores humanos mas também para equipamento, incluindo algum equipamento tubular e outro equipamento grande que não tem de ser manobrado através das aberturas da estrutura do mastro para ter acesso ao centro do poço. Em particular, o acesso ao centro do poço é facilitado a partir de pelo menos três lados que não o primeiro lado. Em algumas modalidades, o primeiro mastro também pode ser deslocado a partir de e localizado no primeiro lado do primeiro centro do poço. Isso está em contraste com as estruturas de torre de perfuração convencionais que cercam o centro do poço, isto é, onde o centro do poço encontra-se dentro da base da torre de perfuração, normalmente em ou em estreita proximidade ao centro geométrico da base. Em tais sistemas, todo o acesso lateral tem de passar através das aberturas laterais das estruturas da torre de perfuração, que muitas vezes são formadas como um V invertido nos lados da estrutura e que são referidas como portas V. No entanto, apesar da presença de tais aberturas, o acesso é restrito pela estrutura do mastro, em particular pela largura e altura de qualquer dessas aberturas. O primeiro mastro pode compreender uma abertura alinhada com o espaço na estrutura de suporte de carga e moldada e dimensionada de modo a permitir que os dutos sejam alimentados através da abertura no mastro e através do espaço para o centro do poço.[009] Consequently, as the load-bearing structure of the first elevator system is moved from and located on the first side of the first well center, access to the well center is facilitated not only for human operators but also for equipment, including some tubular equipment and other large equipment that does not have to be maneuvered through the openings in the mast frame to gain access to the center of the well. In particular, access to the center of the well is facilitated from at least three sides other than the first side. In some embodiments, the first mast may also be offset from and located on the first side of the first shaft center. This is in contrast to conventional rig structures that surround the center of the well, that is, where the center of the well lies within the base of the rig, usually at or in close proximity to the geometric center of the base. In such systems, all side access must pass through the side openings of the rig structures, which are often formed as an inverted V on the sides of the structure and which are referred to as V doors. such openings, access is restricted by the structure of the mast, in particular the width and height of any of these openings. The first mast may comprise an opening aligned with space in the load-bearing structure and shaped and sized to allow ducts to be fed through the opening in the mast and through the space to the center of the well.

[0010] O primeiro equipamento de manuseio de dutos é operável para mover o equipamento tubular pelo menos parcialmente debaixo da estrutura de suporte de carga e/ou através de uma abertura formada na dita estrutura de suporte de carga. A direção longitudinal pode ser definida dentro de um plano da coberta do piso de perfuração pelo primeiro centro do poço e o primeiro sistema elevador. Em algumas modalidades, o primeiro sistema elevador e, opcionalmente, o primeiro mastro são configurados para permitir que o equipamento tubular seja movido em direção ao primeiro centro do poço ao longo da direção longitudinal a partir do primeiro lado, isto é, o mesmo lado no qual o sistema elevador está situado. Consequentemente, o equipamento de manuseio de duto não precisa tomar espaço no segundo lado do centro do poço, fornecendo assim um piso de perfuração mais aberto. Os primeiro e segundo lados podem ser distinguidos por um eixo através do primeiro centro do poço dividindo o primeiro e o segundo lado um do outro onde a estrutura de suporte de carga do sistema elevador cruza o plano definido pela coberta do piso de perfuração somente no primeiro lado.[0010] The first pipeline handling equipment is operable to move the tubular equipment at least partially under the load-bearing structure and/or through an opening formed in said load-bearing structure. The longitudinal direction can be defined within a plan of the drill floor cover by the first well center and the first elevator system. In some embodiments, the first elevator system and, optionally, the first mast are configured to allow the tubular equipment to be moved towards the first center of the well along the longitudinal direction from the first side, i.e., the same side on the which elevator system is located. Consequently, the pipeline handling equipment does not need to take up space on the second side of the well center, thus providing a more open drilling floor. The first and second sides can be distinguished by an axis through the first center of the well dividing the first and second sides from each other where the load-bearing structure of the elevator system crosses the plane defined by the cover of the drilling floor only on the first side.

[0011] Em algumas modalidades, o equipamento tubular pode ser movido para o centro do poço a partir de ambos lados do centro do poço (na direção longitudinal), permitindo assim que o equipamento tubular de várias áreas de armazenamento, e usando equipamento de manuseio de duto diferente, seja movido enquanto mantém uma grande área de coberta do piso de perfuração aberta livre.[0011] In some embodiments, the tubular equipment can be moved to the center of the well from either side of the well center (in the longitudinal direction), thus allowing the tubular equipment to multiple storage areas, and using handling equipment of different duct, be moved while keeping a large open drill floor covering area free.

[0012] Para este fim, o primeiro sistema elevador e, opcionalmente, o primeiro mastro podem definir uma abertura através da qual o equipamento tubular é móvel em direção ao primeiro centro do poço a partir do primeiro lado. Alternativamente ou adicionalmente o equipamento tubular pode ser pelo menos parcialmente movido abaixo da estrutura de suporte de carga, por exemplo, mesmo abaixo da coberta do piso de perfuração. Em algumas modalidades, o primeiro sistema elevador compreende uma pluralidade de cilindros ou outros membros de suporte que se estendem para cima em relação à coberta do piso de perfuração, sendo que os membros de suporte são dispostos como dois ou mais grupos de membros de suporte que são lateralmente espaçados um do outro de modo a permitir que o equipamento tubular seja movido em direção ao centro do poço a partir do primeiro lado ao longo da direção longitudinal através de uma abertura entre os dois grupos de membros de suporte. Alternativamente ou adicionalmente, os cilindros podem ser posicionados elevados em relação ao piso de perfuração sobre uma fundação, que é parte da estrutura de suporte de carga, e os dutos podem ser movidos através de uma abertura na fundação. Alternativamente ou adicionalmente, um ou mais dos membros de suporte podem ser deslocados um do outro na direção longitudinal. Será apreciado que uma abertura na estrutura de suporte de carga, por exemplo, entre os membros de suporte, habilita uma solução de manuseio de duto compacta que por sua vez permite um piso de perfuração aberto. A abertura é moldada e dimensionada de modo a permitir que o equipamento tubular seja alimentado através da abertura. Em algumas modalidades, a abertura é de pelo menos 0,5 m, como pelo menos 1 m de largura, como pelo menos 2 m de largura, como pelo menos 3 m de largura. Consequentemente, uma trajetória central e direta de alimentação de duto para os dutos para o centro do poço é fornecida. Os dutos podem ser alimentados pelo menos parcialmente, como completamente, através da abertura e mesmo ser apresentados para um impulsor superior em uma trajetória de movimento para frente e/ou para cima única. Cada grupo de membros de suporte pode compreender um ou mais cilindros ou outros membros de suporte, por exemplo, 2, 3, ou mesmo mais cilindros, tipicamente dependendo da capacidade de içamento desejada. O centro do poço pode ser longitudinalmente deslocado a partir de uma área entre os dois grupos de membros de suporte de modo a permitir o acesso ao centro do poço também a partir da direção transversal. Em particular, o centro do poço pode ser deslocado a partir de cada eixo que conecta dois dos membros de suporte. Para este fim, os membros de suporte podem suportar uma ou mais polias cujo eixo se estende na direção conectando os grupos de membros de suporte. A plataforma de perfuração pode compreender adicionalmente a estrutura de armazenamento para armazenar o equipamento tubular posicionada longitudinalmente deslocada a partir do primeiro centro do poço no primeiro lado do primeiro centro do poço, e o primeiro equipamento de manuseio de dutos pode ser operável para mover o equipamento tubular a partir da estrutura de armazenamento para o primeiro centro do poço.[0012] To this end, the first elevator system and, optionally, the first mast may define an opening through which the tubular equipment is movable towards the first center of the well from the first side. Alternatively or additionally the tubular equipment can be at least partially moved below the load-bearing structure, for example just below the cover of the drilling floor. In some embodiments, the first elevator system comprises a plurality of cylinders or other support members that extend upwardly relative to the cover of the drilling floor, the support members being arranged as two or more groups of support members that are laterally spaced from one another so as to allow the tubular equipment to be moved towards the center of the well from the first side along the longitudinal direction through an opening between the two groups of support members. Alternatively or additionally, the cylinders can be positioned elevated relative to the drill floor on a foundation, which is part of the load-bearing structure, and the ducts can be moved through an opening in the foundation. Alternatively or additionally, one or more of the support members can be displaced from one another in the longitudinal direction. It will be appreciated that an opening in the load-bearing structure, for example between the support members, enables a compact duct handling solution which in turn allows for an open drilling floor. The opening is shaped and sized to allow tubular equipment to be fed through the opening. In some arrangements, the opening is at least 0.5 m, such as at least 1 m wide, such as at least 2 m wide, such as at least 3 m wide. Consequently, a central and direct pipeline feed path for the pipelines to the center of the well is provided. The ducts can be fed at least partially, as well as completely, through the opening and even be presented to an upper impeller in a single forward and/or upward motion path. Each group of support members may comprise one or more cylinders or other support members, for example 2, 3, or even more cylinders, typically depending on the desired lifting capacity. The center of the well can be longitudinally offset from an area between the two groups of support members so as to allow access to the center of the well also from the transverse direction. In particular, the center of the well can be offset from each axis connecting two of the support members. To this end, the support members may support one or more pulleys whose axis extends in the direction connecting the support member groups. The drilling rig may further comprise storage structure for storing the tubular equipment positioned longitudinally offset from the first well center on the first side of the first well center, and the first pipeline handling equipment may be operable to move the equipment tube from the storage structure to the first center of the well.

[0013] Por exemplo, em algumas modalidades tubos de elevação e/ou outro tipo de dutos (como aqueles mencionados acima) podem ser armazenados no primeiro lado do centro do poço (por exemplo, no lado oposto do mastro do que no centro do poço), enquanto outros tipos de dutos, como dutos de perfuração e/ou revestimentos, podem ser armazenados e/ou montados para suportes no segundo lado, oposto ao primeiro lado. Alternativamente ou adicionalmente, o armazenamento e/ou construção de suporte dos dutos de perfuração e/ou revestimentos pode ser realizado em uma posição transversalmente deslocada a partir do centro do poço. Em algumas modalidades, a estrutura de armazenamento de duto no primeiro lado é para suportar o equipamento tubular mais pesado como as seções do tubo de perfuração e/ou revestimento. Em algumas modalidades o duto de perfuração e/ou revestimento, e/ou cadeias de duto de perfuração ou revestimentos pode ser armazenado na estrutura de armazenamento no primeiro lado do centro do poço (por exemplo, no lado oposto do mastro do que o centro do poço), enquanto os tubos de elevação podem ser armazenados no segundo lado, oposto ao primeiro lado, ou transversalmente deslocado a partir do primeiro centro do poço. A construção de suporte dos dutos de perfuração e/ou revestimentos pode então ser realizada em uma posição no primeiro lado, por exemplo, atrás do sistema elevador quando visto a partir do primeiro centro do poço.[0013] For example, in some arrangements lifting tubes and/or other type of ducts (such as those mentioned above) can be stored on the first side of the well center (for example, on the opposite side of the mast than in the well center ), while other types of ducts, such as drill ducts and/or casings, can be stored and/or mounted to supports on the second side, opposite the first side. Alternatively or additionally, the storage and/or support construction of the drilling ducts and/or casings can be carried out in a position transversely offset from the center of the well. In some embodiments, the duct storage structure on the first side is for supporting heavier tubular equipment such as drill pipe and/or casing sections. In some embodiments the drilling pipeline and/or casing, and/or drilling pipeline chains or casings may be stored in the storage structure on the first side of the center of the well (for example, on the opposite side of the mast than the center of the well), while the riser tubes can be stored on the second side, opposite the first side, or transversely offset from the first center of the well. The support construction of the drilling and/or casing ducts can then be carried out in a position on the first side, for example, behind the elevator system when viewed from the first center of the well.

[0014] Em algumas modalidades, a estrutura de armazenamento de duto no primeiro lado é disposta para armazenar dutos na posição vertical. A estrutura de armazenamento de duto pode ser localizada no mesmo nível que a coberta do piso de perfuração ou pelo menos parcialmente em um nível diferente, por exemplo, um nível inferior de modo a permitir que dutos sejam avançados ao longo de uma direção de inclinação através da abertura/espaço no sistema elevador.[0014] In some embodiments, the duct storage structure on the first side is arranged to store ducts in a vertical position. The pipeline storage structure may be located on the same level as the drilling floor cover or at least partially on a different level, for example a lower level to allow pipelines to be advanced along a slope direction through of the opening/space in the elevator system.

[0015] Para os fins da presente descrição, o termo "mastro" refere- se a uma estrutura de suporte que se estende para cima em relação à coberta do piso de perfuração e suporta um sistema elevador para içar ou baixar dutos (como colunas de perfuração, revestimentos e/ou tubos de elevação) em direção ao leito do oceano por exemplo, de modo que a perfuração no leito do oceano pode ser realizada. O mastro pode se estender a partir da coberta do piso de perfuração ou a partir de uma coberta diferente da coberta do piso de perfuração. Em qualquer evento, o mastro incluindo a estrutura de suporte de carga do sistema elevador define uma base sobre a coberta do piso de perfuração ou pelo menos dentro de um plano definido pela coberta do piso de perfuração. A base pode ser definida como o espaço no plano definido pela coberta do piso de perfuração que é ocupada ou coberta pela estrutura do mastro e a estrutura de suporte de carga do sistema elevador, isto é, como uma seção transversal do mastro e a estrutura de suporte de carga do sistema elevador no plano da coberta do piso de perfuração. A posição do mastro pode ser definida por um centro geométrico da base.[0015] For the purposes of this description, the term "mast" refers to a support structure that extends upwards relative to the drilling floor cover and supports an elevator system for raising or lowering ducts (such as columns of drilling, casing and/or riser pipes) towards the ocean floor for example, so that drilling in the ocean floor can be carried out. The mast can extend from the drill floor cover or from a different cover than the drill floor cover. In any event, the mast including the load-bearing structure of the lift system defines a base on the drilling floor cover or at least within a plane defined by the drilling floor cover. The base can be defined as the space in the plane defined by the cover of the drilling floor that is occupied or covered by the mast structure and the load-bearing structure of the elevator system, that is, as a cross section of the mast and the structure. load support of the elevator system in the plane of the cover of the drilling floor. The position of the mast can be defined by a geometric center of the base.

[0016] Em algumas modalidades, o primeiro sistema elevador compreende uma ou mais polias, um ou mais cabos de elevação que se estendem sobre as polias e operáveis para carregar o equipamento tubular quando içado ou baixado através do primeiro centro do poço; e pelo menos dois membros de suporte que se estendem para cima em relação à coberta do piso de perfuração e configurados para carregar as polias e peso do equipamento tubular transferido pelos cabos de elevação e as polias; e sendo que os dois membros de suporte são posicionados afastados uns dos outros de modo a formar uma abertura entre os dois membros de suporte através dos quais o equipamento tubular da abertura é móvel em direção ao primeiro centro do poço a partir do primeiro lado. O sistema elevador pode ser um sistema elevador hidráulico compreendendo cilindros que se estendem para cima ou outros atuadores para carregar a carga a ser içada ou baixada tipicamente através de grandes polias montadas na parte de cima dos cilindros. A estrutura de suporte de carga de uma plataforma do cilindro compreende assim os cilindros e as uma ou mais polias que podem estar na forma de um conjunto de roldana. A base de tais cilindros no plano da coberta do piso de perfuração também é parte da base do mastro. Os cilindros podem se estender a partir da coberta do piso de perfuração ou a partir de uma fundação abaixo ou elevada acima da coberta do piso de perfuração. As cargas exercidas sobre o sistema elevador durante a descida ou içamento do equipamento em ou fora do centro do poço podem ser ditas por serem pelo menos parcialmente transferidas para a plataforma de perfuração através dos cilindros. Por isso, em tais modalidades, o mastro predominantemente suporta os sistemas elevadores na direção horizontal enquanto a carga é carregada pelos cilindros. Em algumas modalidades, o sistema elevador pode ser um sistema de mecanismo de extração. Para tais sistemas as polias são carregadas por outros membros de suporte adequados, como colunas que se estendem para cima e/ou outras partes de suporte de carga da estrutura do mastro. Em ambos casos, as cargas são transferidas para a plataforma de perfuração através da estrutura de suporte de carga que pode ser integrada em ou separada do mastro. A estrutura de suporte de carga compreende as polias e os membros de suporte que carregam as polias e qualquer carga suspensa das polias. Em outras palavras, de modo geral, a estrutura de suporte de carga transfere substancialmente todo o peso do sistema elevador e da carga suspensa a partir dele para partes da plataforma de perfuração em ou abaixo do nível da coberta do piso de perfuração.[0016] In some embodiments, the first elevator system comprises one or more pulleys, one or more lifting cables that extend over the pulleys and operable to carry tubular equipment when raised or lowered through the first center of the well; and at least two support members extending upwardly relative to the cover of the drilling floor and configured to carry the pulleys and weight of the tubular equipment transferred by the lifting cables and pulleys; and the two support members being positioned spaced apart from each other so as to form an opening between the two support members through which the tubular apparatus of the opening is movable towards the first center of the well from the first side. The lift system may be a hydraulic lift system comprising upwardly extending cylinders or other actuators to carry the load to be lifted or lowered typically via large pulleys mounted on top of the cylinders. The load-bearing structure of a cylinder platform thus comprises the cylinders and the one or more pulleys which may be in the form of a pulley assembly. The base of such cylinders in the plane of the drill floor deck is also part of the base of the mast. Cylinders can extend from the drill floor cover or from a foundation below or elevated above the drill floor cover. The loads exerted on the lift system during the lowering or lifting of the equipment in or out of the well center can be said to be at least partially transferred to the drilling rig via the cylinders. Therefore, in such arrangements, the mast predominantly supports the elevator systems in the horizontal direction while the load is carried by the cylinders. In some embodiments, the elevator system may be an extraction mechanism system. For such systems the pulleys are carried by other suitable support members such as upwardly extending columns and/or other load bearing parts of the mast frame. In both cases, loads are transferred to the drilling rig via the load-bearing structure that can be integrated into or detached from the mast. The load-bearing structure comprises the pulleys and support members that carry the pulleys and any load suspended from the pulleys. In other words, generally speaking, the load-bearing structure transfers substantially all of the weight of the elevator system and the load suspended therefrom to parts of the drilling rig at or below the level of the drilling floor deck.

[0017] Em algumas modalidades, uma extremidade do cabo de elevação é ancorada em um lado da estrutura de suporte de carga, oposto ao lado no qual o primeiro centro do poço está situado, por exemplo, de modo que as forças transferidas através das polias e os membros de suporte que carregam as polias sejam substancialmente verticais. O tambor e/ou motor do mecanismo de extração pode ser completamente ou parcialmente encapsulado pela estrutura do mastro. Em algumas modalidades, os cabos de elevação podem ser ancorados à plataforma de perfuração através de um número de membros de ancoragem como compensadores, por exemplo, um número de cilindros. Estes membros de ancoragem podem ser dispostos em dois grupos de membros de ancoragem de modo a formar uma abertura entre os dois grupos de membros de ancoragem onde a abertura é alinhada com uma abertura entre os membros de suporte de modo a permitir que os dutos sejam alimentados através da abertura entre os grupos de membros de ancoragem. Em algumas modalidades, o cabo de elevação ou linhas podem ser fixados aos membros de ancoragem através de uma ligação que se estende através da abertura entre os membros de ancoragem em uma altura acima da coberta do piso de perfuração suficiente para permitir que os dutos sejam alimentados através da abertura entre os membros de ancoragem e abaixo da ligação.[0017] In some embodiments, one end of the lifting cable is anchored to one side of the load-bearing structure, opposite the side on which the first center of the well is situated, for example, so that forces transferred through the pulleys and the support members carrying the pulleys are substantially vertical. The drum and/or motor of the pull-out mechanism can be completely or partially encapsulated by the mast frame. In some embodiments, the riser ropes can be anchored to the drilling rig via a number of anchoring members such as compensators, for example a number of cylinders. These anchoring members can be arranged in two groups of anchoring members so as to form an opening between the two groups of anchoring members where the opening is aligned with an opening between the support members so as to allow the ducts to be fed. through the opening between the groups of anchoring members. In some embodiments, the lifting cable or lines can be attached to the anchoring members through a link that extends through the opening between the anchoring members at a height above the drill floor cover sufficient to allow the ducts to be fed. through the opening between the anchoring members and below the link.

[0018] De modo geral, através da presente revelação, referência a um sistema elevador suportado pelo mastro não se refere somente às modalidades onde o mastro carrega uma parte do peso do sistema elevador (e/ou qualquer carga carregada pelo sistema elevador), mas também às modalidades onde o mastro suporta o sistema elevador somente, ou pelo menos predominantemente, contra forças laterais/horizontais.[0018] In general, throughout the present disclosure, reference to an elevator system supported by the mast does not refer only to modalities where the mast carries a part of the weight of the elevator system (and/or any load carried by the elevator system), but also to modes where the mast supports the elevator system only, or at least predominantly, against lateral/horizontal forces.

[0019] Em algumas modalidades, uma direção longitudinal pode ser definida no plano da coberta do piso de perfuração como uma direção que se estende através do primeiro centro do poço e através da posição do primeiro sistema elevador. Em algumas modalidades, a posição do primeiro sistema elevador dentro do plano da coberta do piso de perfuração pode ser definida como a posição de um centro de massa no topo da roldana(s) do primeiro sistema elevador sobre o qual os cabos de elevação do primeiro sistema elevador são executados. Em algumas modalidades de um sistema elevador de cilindro, a roldana superior é uma roldana viajante ou grupo de polias suportado e empurrado para cima pelos cilindros. No sistema de mecanismo de extração a parte de cima é tipicamente fixada aos membros de suporte em uma posição vertical fixa em relação ao mastro. Em muitas modalidades, a plataforma é equipada com um impulsor superior disposto para girar as colunas de perfuração e baixa-las através do primeiro centro do poço; o impulsor superior é disposto para ser elevado pelo primeiro sistema elevador. Para manter o impulsor superior girando, um carrinho guia é tipicamente disposto para deslizar ao longo de guias que se estendem verticalmente, por exemplo, trilho ou trilhos, enquanto é conectado ao impulsor superior. Os trilhos podem ser parte de ou fixados ao primeiro mastro. Em algumas modalidades a direção longitudinal pode então ser definida no plano da coberta do piso de perfuração como uma direção que se estende através do primeiro centro do poço e através da posição deste trilho ou, no caso de vários trilhos, um ponto central dos ditos trilhos. Em algumas modalidades o ponto central é calculado pela pesagem da posição de cada um dos trilhos com uma fração da força de rotação a partir do impulsor superior que os trilhos absorvem. Da mesma forma, uma direção transversal pode ser definida dentro do plano da coberta do piso de perfuração à medida que se estende normal à direção longitudinal.[0019] In some embodiments, a longitudinal direction may be defined in the plane of the drilling floor deck as a direction that extends through the first center of the well and through the position of the first elevator system. In some embodiments, the position of the first elevator system within the plane of the drilling floor deck may be defined as the position of a center of mass at the top of the sheave(s) of the first elevator system on which the lifting cables of the first elevator system elevator system are run. In some embodiments of a cylinder lift system, the top sheave is a traveling sheave or group of pulleys supported and pushed up by the cylinders. In the extraction mechanism system the top is typically attached to the support members in a fixed vertical position relative to the mast. In many embodiments, the rig is equipped with an upper impeller arranged to rotate the drill strings and lower them through the first center of the well; the upper impeller is arranged to be lifted by the first lift system. To keep the upper impeller rotating, a carriage is typically arranged to slide along vertically extending guides, eg rail or rails, while being connected to the upper impeller. The rails can be part of or attached to the first mast. In some embodiments the longitudinal direction can then be defined in the plane of the drilling floor cover as a direction extending through the first center of the well and through the position of this rail or, in the case of several rails, a central point of said rails . In some embodiments the center point is calculated by weighing the position of each of the rails with a fraction of the rotational force from the upper impeller that the rails absorb. Likewise, a transverse direction can be defined within the plane of the drill floor deck as it extends normal to the longitudinal direction.

[0020] Em algumas modalidades, o primeiro mastro define uma base sobre a coberta do piso de perfuração, onde a coberta do piso de perfuração se estende fora da base. A área de coberta do piso de perfuração que se estende fora da base do primeiro mastro pode ser dimensionada e moldada de modo a permitir que a instalação de vigas deslizáveis para deslizamento do equipamento e/ou para uma empilhadeira ou outros veículos para funcionar na área da coberta do piso de perfuração fora da base do mastro. Em algumas modalidades, as vigas deslizáveis são instaladas sobre a coberta do piso de perfuração. Por exemplo, a área da coberta do piso de perfuração fora da base do mastro pode ser pelo menos 200 m2, como pelo menos 500 m2, como pelo menos 1000 m2, como pelo menos 2000 m2, por exemplo, pelo menos 5000 m2. Em particular, o primeiro centro do poço pode ser localizado fora da base definida pelo primeiro mastro, e o primeiro centro do poço pode ser deslocado a partir da base ao longo da direção longitudinal. Em algumas modalidades, a coberta do piso de perfuração compreende uma ou mais áreas de coberta do piso de perfuração abertas não, de outro modo, obstruídas pelas instalações fixas como o primeiro mastro, mastros adicionais, equipamento de manuseio de duto, e/ou similares, como será descrito em mais detalhe abaixo.[0020] In some embodiments, the first mast defines a base on the drill floor cover, where the drill floor cover extends outside the base. The drilling floor coverage area that extends outside the base of the first mast can be dimensioned and shaped to allow the installation of sliding beams for sliding the equipment and/or for a forklift or other vehicles to operate in the area of drill floor cover outside the base of the mast. In some embodiments, the sliding beams are installed on top of the drill floor cover. For example, the area of the drilling floor deck outside the base of the mast can be at least 200 m2 such as at least 500 m2 such as at least 1000 m2 such as at least 2000 m2 for example at least 5000 m2. In particular, the first center of the well can be located outside the base defined by the first mast, and the first center of the well can be displaced from the base along the longitudinal direction. In some embodiments, the drilling floor deck comprises one or more open drilling floor deck areas not otherwise obstructed by fixed installations such as the first mast, additional masts, pipeline handling equipment, and/or the like , as will be described in more detail below.

[0021] Em algumas modalidades, a coberta do piso de perfuração e, em particular, a parte em proximidade direta ao centro do poço é estacionária sem a necessidade de elevar ou baixar partes da coberta do piso de perfuração para permitir o funcionamento (isto é, descida) do sistema de segurança contra estouro (BOP) e/ou outro equipamento submarino pesado (por exemplo, a árvore de Natal). Em algumas modalidades, o BOP e/ou outro equipamento submarino pesado é armazenado em uma coberta abaixo da coberta do piso de perfuração. Consequentemente, tal equipamento submarino não toma espaço sobre a coberta do piso de perfuração.[0021] In some embodiments, the drilling floor cover and, in particular, the part in direct proximity to the center of the well is stationary without the need to raise or lower parts of the drilling floor cover to allow operation (i.e. , descent) of the overflow safety system (BOP) and/or other heavy subsea equipment (eg the Christmas tree). In some arrangements, the BOP and/or other heavy subsea equipment is stored on a deck below the drilling floor deck. Consequently, such subsea equipment does not take up space on the drilling floor deck.

[0022] O termo centro do poço refere-se a um orifício na coberta do piso de perfuração através do qual a plataforma de perfuração é configurada para baixar os dutos em direção ao leito do oceano e, em particular, através do qual os dutos podem ser baixados por todo o caminho até o leito do oceano. Um centro do poço é, às vezes, também referido como um centro de perfuração. Será apreciado que a coberta do piso de perfuração pode compreender furos adicionais como tocas de raposa e tocas de rato que podem, por exemplo, ser usados para construir cadeias de dutos, mas através dos quais a plataforma de perfuração não pode baixar os dutos para o leito do oceano e/ou através dos quais a plataforma de perfuração não pode realizar a perfuração no leito do oceano, por exemplo, por falta de um sistema disposto para girar como uma coluna de perfuração com força suficiente como um impulsor superior ou uma mesa giratória. Em algumas modalidades, tal furo adicional é um orifício na coberta do piso de perfuração através do qual a plataforma de perfuração não pode progredir a coluna de perfuração através de um sistema de tubo de perfuração. Em algumas modalidades, um centro do poço é diferenciado de um furo adicional por ter um desviador e/ou um invólucro de desviador disposto abaixo de modo que a coluna de perfuração passe através do centro do poço que se estende através do dito desviador ou invólucro de desviador.[0022] The term well center refers to a hole in the cover of the drilling floor through which the drilling rig is configured to lower the pipelines towards the ocean floor and, in particular, through which the pipelines can be downloaded all the way to the ocean floor. A well center is sometimes also referred to as a drill center. It will be appreciated that the drilling floor cover may comprise additional holes such as fox holes and mouse holes which can, for example, be used to build pipeline chains, but through which the drilling rig cannot lower the pipelines into the ocean floor and/or through which the drilling rig cannot drill on the ocean floor, for example, for lack of a system arranged to rotate like a drill string with sufficient force such as an upper impeller or a turntable . In some embodiments, such additional hole is a hole in the drill floor deck through which the drill rig cannot progress the drill string through a drill pipe system. In some embodiments, a well center is distinguished from an additional hole by having a diverter and/or a diverter housing disposed below such that the drill string passes through the well center that extends through said diverter or diverter housing. derailleur.

[0023] A plataforma de perfuração offshore pode ser uma plataforma de perfuração semissubmersível, isto é, pode compreender um ou mais pontões de flutuabilidade localizados abaixo da superfície do oceano e ação da onda, e uma plataforma de operação elevada acima da superfície do oceano e suportada por uma ou mais estruturas de coluna que se estendem a partir do pontão de flutuabilidade para a plataforma de operação. Alternativamente, a plataforma offshore pode ser de um tipo diferente, como uma plataforma de perfuração autoelevadora ou um navio de perfuração.[0023] The offshore drilling platform may be a semi-submersible drilling rig, that is, it may comprise one or more buoyancy pontoons located below the ocean surface and wave action, and an operating platform elevated above the ocean surface and supported by one or more column structures that extend from the buoyancy pontoon to the operating platform. Alternatively, the offshore platform can be of a different type, such as a self-elevating drilling rig or a drill ship.

[0024] Em algumas modalidades, o primeiro equipamento de manuseio de dutos define uma primeira via de alimentação de duto ao longo da qual o equipamento tubular é movido em direção ao primeiro centro do poço. Em particular, a primeira via de alimentação de duto pode cruzar o primeiro centro do poço.[0024] In some embodiments, the first pipeline handling equipment defines a first pipeline feed path along which the tubular equipment is moved towards the first center of the well. In particular, the first pipeline feed path may cross the first well center.

[0025] Em algumas modalidades, a plataforma de perfuração compreende o segundo equipamento de manuseio de dutos para mover o equipamento tubular para o primeiro sistema elevador de modo a permitir que o primeiro sistema elevador eleve ou abaixe o equipamento tubular através do primeiro centro do poço. O segundo equipamento de manuseio de dutos pode definir uma segunda via de alimentação do duto ao longo da qual o equipamento tubular é movido em direção ao primeiro centro do poço. Em particular, a segunda via de alimentação do duto pode cruzar o primeiro centro do poço; o segundo equipamento de manuseio de dutos pode ser configurado para mover o equipamento tubular em direção ao primeiro centro do poço a partir de um segundo lado do centro do poço, oposto ao primeiro lado no qual o mastro está situado. A segunda via de alimentação do duto pode ser uma trajetória reta ou pode ter um formato diferente, por exemplo, compreende várias seções de trajetória, um, algumas ou todas as quais podem ser retas. Quando a segunda via de alimentação do duto se estende substancialmente ao longo da direção longitudinal (pelo menos proximal ao centro do poço como, por exemplo, dentro de 1 m ou mais, como dentro de 2 m ou mais, como dentro de 3 m ou mais, como dentro de 4 m ou mais, como dentro de 5 m ou mais, como dentro de 10 m ou mais) áreas laterais de coberta do piso de perfuração que se estende transversalmente adjacente ao centro do poço pode ser mantido livre do equipamento de manuseio de duto, como estaleiradores de tubo, roughnecks ferro, etc. e, em particular, livres do equipamento de manuseio de dutos horizontal como máquinas de alimentação de tubo, por exemplo, passarelas elevadas. Também, para modalidades onde a plataforma de perfuração compreende ainda centro(s) de do poço disposto ao longo da direção transversal que dispõe o equipamento de manuseio de duto no segundo lado pode permitir que o equipamento de manuseio de duto atenda mais de um centro do poço e/ou equipamento de manuseio de duto que atende o primeiro centro do poço pode cooperar com o equipamento de encaixe de dutos servindo um segundo centro do poço. Da mesma forma, quando a segunda via de alimentação do duto se estende substancialmente ao longo da direção transversal, áreas de coberta do piso de perfuração que se estendem longitudinalmente adjacentes ao centro do poço podem ser mantidas livres do equipamento de manuseio de duto. No último caso os dutos são tipicamente movidos a partir de uma área de armazenamento localizada no primeiro lado e/ou transversalmente localizada em relação ao centro do poço. Aqui, o termo substancialmente ao longo da direção longitudinal ou direção transversal destina-se a se referir a uma direção paralela à dita direção e direções levemente desviando da dita direção como dentro de +/- 30°, por exemplo, +/- 20°, +/- 10°, como +/- 5°.[0025] In some embodiments, the drilling rig comprises the second pipeline handling equipment to move the tubular equipment to the first elevator system to allow the first elevator system to raise or lower the tubular equipment through the first well center . The second pipeline handling equipment may define a second pipeline feed path along which the tubular equipment is moved towards the first center of the well. In particular, the second pipeline feed path may cross the first well center; the second pipeline handling equipment can be configured to move the tubular equipment towards the first center of the well from a second side of the center of the well, opposite the first side on which the mast is situated. The second duct feed path may be a straight path or it may have a different shape, for example it comprises several path sections, one, some or all of which may be straight. When the second pipeline feed path extends substantially along the longitudinal direction (at least proximal to the center of the well such as within 1 m or more, such as within 2 m or more, such as within 3 m or more, such as within 4 m or more, such as within 5 m or more, such as within 10 m or more) side areas of drilling floor cover extending transversely adjacent to the center of the well can be kept free of the drilling equipment duct handling such as pipe yards, iron roughnecks, etc. and, in particular, free from horizontal pipeline handling equipment such as tube feeding machines, eg elevated walkways. Also, for modalities where the drilling rig further comprises well center(s) arranged along the transverse direction that has the pipeline handling equipment on the second side, it may allow the pipeline handling equipment to serve more than one center of the well and/or pipeline handling equipment serving the first well center may cooperate with the pipeline fitting equipment serving a second well center. Likewise, when the second pipeline feed path extends substantially along the transverse direction, longitudinally extending drilling floor deck areas adjacent to the center of the well can be kept free of pipeline handling equipment. In the latter case the ducts are typically moved from a storage area located on the first side and/or located transversely to the center of the well. Here, the term substantially along the longitudinal direction or transverse direction is intended to refer to a direction parallel to said direction and directions slightly deviating from said direction as within +/- 30°, eg +/- 20° , +/- 10°, such as +/- 5°.

[0026] O termo equipamento tubular destina-se a se referir ao equipamento tubular que é avançado através do centro do poço em direção ao fundo do mar durante um ou mais estágios da operação de perfuração. Em particular, o termo equipamento tubular refere-se aos elementos tubulares retos que podem ser unidos para formar uma cadeia de equipamento tubular. O equipamento tubular pode ser selecionado a partir de dutos de perfuração e/ou outros elementos tubulares da coluna de perfuração, tubos de elevação, colunas de assentamento, forros e revestimentos. Exemplos de elementos tubulares da coluna de perfuração incluem dutos de perfuração, tubos mestres, etc. Para os fins da presente descrição, o equipamento tubular também será de modo geral referido aos dutos. Os dutos podem ter comprimentos e diâmetros variáveis. O duto de perfuração tipicamente tem um comprimento entre 33' a 45' e diâmetros de até 19'' ou mesmo 20''. Antes do avanço através do centro do poço, os dutos de perfuração são normalmente montados para cadeias de duas, três ou mesmo mais cadeias de duto de perfuração, chamadas de duplas, triplas etc. A construção de suportes é realizada por equipamento de construção de suporte dedicado e/ou por um sistema elevador. Uma vez montados, os suportes são normalmente armazenados em uma área de recuo, tipicamente na posição vertical suportada por, por exemplo, estaleiros da torre. A junta de dutos de elevação tipicamente tem comprimentos entre 50' e 90' e diâmetros de até 70''.[0026] The term tubular equipment is intended to refer to tubular equipment that is advanced through the center of the well towards the seabed during one or more stages of the drilling operation. In particular, the term tubular equipment refers to straight tubular elements that can be joined to form a chain of tubular equipment. Tubular equipment can be selected from drill ducts and/or other drill string tubular elements, riser tubes, stand columns, linings and casings. Examples of drill string tubular elements include drill ducts, master tubes, etc. For the purposes of this description, tubular equipment will also generally be referred to as pipelines. The ducts can be of variable lengths and diameters. The drill duct typically has a length between 33' to 45' and diameters up to 19'' or even 20''. Prior to advancing through the center of the well, drill ducts are normally assembled for strings of two, three or even more strings of drill duct, called doubles, triples, etc. Support construction is performed by dedicated support construction equipment and/or an elevator system. Once assembled, brackets are normally stored in a setback area, typically in an upright position supported by, for example, tower shipyards. Lift duct joints typically have lengths between 50' and 90' and diameters up to 70''.

[0027] Em algumas modalidades, o primeiro e/ou segundo equipamento de manuseio de dutos compreende equipamentos de manuseio de duto horizontais para manusear o equipamento tubular orientado horizontalmente, e/ou equipamentos de manuseio de duto verticais para manusear pelo menos o equipamento tubular orientado verticalmente. Consequentemente, o primeiro e/ou segundo equipamento de manuseio de dutos podem permitir que dutos de tipos diferentes de armazenamento/área de docas para armazenar dutos em diferentes orientações sejam movidos para o centro do poço e/ou entre uma ou mais áreas de armazenamento usando uma via de alimentação de duto comum, permitindo assim que outras áreas de coberta do piso de perfuração sejam mantidas livres do equipamento de manuseio de duto. Alternativamente ou adicionalmente, o equipamento de manuseio de duto pode compreender dispositivos para alterar a orientação dos dutos e/ou equipamento para avançar dutos em uma direção inclinada, por exemplo, para cima a partir de um local de armazenamento rebaixado. Tal equipamento pode compreender uma corrediça, um contentor de tubo projetado especialmente com um braço superior móvel para içar tubos ou calha.[0027] In some embodiments, the first and/or second pipeline handling equipment comprises horizontal pipeline handling equipment to handle horizontally oriented tubular equipment, and/or vertical pipeline handling equipment to handle at least the oriented tubular equipment vertically. Consequently, the first and/or second pipeline handling equipment may allow pipelines of different types of storage/dock area to store pipelines in different orientations to be moved to the center of the well and/or between one or more storage areas using a common pipeline feed path, thus allowing other cover areas of the drill floor to be kept free of pipeline handling equipment. Alternatively or additionally, the pipeline handling equipment may comprise devices for changing the orientation of the pipelines and/or equipment for advancing pipelines in an inclined direction, for example upwards from a recessed storage location. Such equipment may comprise a slide, a specially designed tube container with a movable upper arm for lifting tubes or chute.

[0028] A área de doca é uma área de armazenamento tubular, tipicamente em comunicação direta com um ou mais centros do poço (através do equipamento de manuseio de duto), onde os dutos podem ser armazenados prontos e rapidamente recuperados para serem baixados em direção ao leito do oceano, e os dutos podem ser recuados. Em muitos casos, os dutos serão transportados para outra área de armazenamento ou fora da plataforma de perfuração durante trânsito devido ao peso substancial e/ou centro de gravidade mais alto da área de doca em relação aos movimentos da plataforma de perfuração no mar. Dutos são tipicamente armazenados verticalmente já que isto é conveniente porque os dutos não precisam de uma rotação completa antes de serem executados; no entanto, os dutos podem, em princípio, ser armazenados na posição horizontal ou ambas. Estes dutos também podem ser armazenados na área de doca ao levando os dutos para fora do centro do poço. Tipicamente, uma doca é adequada para armazenar e receber suportes (isto é, 2 ou mais dutos únicos unidos, como tripletos) do duto de perfuração e/ou revestimento em diâmetros variáveis. O armazenamento dos dutos em suportes economiza tempo em uma operação de perfuração porque menos conexões têm de ser feitas quando entrando no furo (o centro do poço) e quebradas quando saindo do furo. Em tais casos, o armazenamento vertical é preferível porque armazenar suportes (que são tipicamente muito longos) horizontalmente requer uma base grande. A doca compreenderá equipamento para prender os tubos, como sistemas de estaleiro de torre para armazenar dutos verticais, os quais serão projetados para acomodar um ou mais diâmetros de dutos. É, portanto, típico que a doca terá áreas designadas para prender, por exemplo, tubo de perfuração e revestimentos dependendo do diâmetro. Consequentemente, em algumas modalidades uma área de recuo é um armazenamento de duto disposto para armazenar cadeias de tubo de perfuração, invólucro (opcionalmente de diâmetros variáveis) ou ambos. Tais suportes podem ser cadeias de 2 ou mais, como de 3 ou mais, como 4 ou mais. Em algumas modalidades a doca compreende adicionalmente equipamento de manuseio de duto (como um contentor de tubo) disposto para liberar os suportes para e a partir do equipamento de retenção da área de doca e apresentar o suporte para o sistema elevador (tipicamente o gancho ou impulsor superior) ou entregar o suporte para outra máquina no equipamento de manuseio de duto (como uma calha ou uma máquina de contentor de tubo adicional) que realiza a apresentação. Uma doca também é tipicamente combinada com o equipamento de construção de suporte que é disposto para receber unidades e conectá-las em um suporte após o qual o suporte é recuado na área de doca pronto para ser inserido no furo.[0028] The dock area is a tubular storage area, typically in direct communication with one or more well centers (via pipeline handling equipment), where pipelines can be stored ready and quickly retrieved to be lowered towards to the ocean floor, and the ducts can be retracted. In many cases, the pipelines will be transported to another storage area or off the drilling rig during transit due to the substantial weight and/or higher center of gravity of the dock area relative to the drilling rig's movements at sea. Ducts are typically stored vertically as this is convenient because the ducts do not need a full rotation before being run; however, the ducts can, in principle, be stored horizontally or both. These ducts can also be stored in the dock area by taking the ducts out of the center of the well. Typically, a dock is suitable for storing and receiving supports (ie 2 or more single ducts joined together, such as triplets) of drill and/or casing duct in varying diameters. Storing pipelines on supports saves time in a drilling operation because fewer connections have to be made when entering the hole (the center of the well) and broken when exiting the hole. In such cases, vertical storage is preferable because storing supports (which are typically very long) horizontally requires a large base. The dock will comprise pipe clamping equipment, such as tower yard systems for storing vertical ducts, which will be designed to accommodate one or more duct diameters. It is therefore typical that the dock will have designated areas for clamping eg drill pipe and liners depending on diameter. Consequently, in some embodiments a setback area is a duct storage arranged to store strings of drill pipe, casing (optionally of varying diameters) or both. Such supports can be chains of 2 or more, such as 3 or more, such as 4 or more. In some embodiments the dock additionally comprises duct handling equipment (such as a tube container) arranged to release the supports to and from the dock area holding equipment and present the support for the elevator system (typically the hook or impeller top) or deliver the support to another machine in the duct handling equipment (such as a chute or an additional tube container machine) that performs the presentation. A dock is also typically combined with support construction equipment that is arranged to receive units and attach them to a support after which the support is recessed into the dock area ready to be inserted into the hole.

[0029] O equipamento de manuseio de dutos horizontal pode ser configurado para mover o equipamento tubular ao longo de uma via de alimentação de duto em direção ao primeiro centro do poço, por exemplo, ao longo de uma via de alimentação reta do duto. Por exemplo, os dutos podem ser movidos a partir de uma área de armazenamento horizontal por meio do equipamento de manuseio de dutos horizontal e elevados em uma orientação vertical por meio do equipamento de manuseio de dutos vertical, o sistema elevador hidráulico, o equipamento de manuseio de dutos horizontal, e/ou por dois ou mais desses dispositivos que cooperam uns com os outros. Da mesma forma, os dutos a partir de uma posição de armazenamento vertical podem ser movidos para o centro do poço pelo equipamento de manuseio de dutos vertical.[0029] Horizontal pipeline handling equipment can be configured to move tubular equipment along a pipeline feed path towards the first center of the well, for example, along a straight pipeline feed path. For example, ducts can be moved from a horizontal storage area by means of the horizontal duct handling equipment and raised in a vertical orientation by means of the vertical duct handling equipment, the hydraulic lift system, the handling equipment of horizontal ducts, and/or by two or more such devices cooperating with each other. Likewise, ducts from a vertical storage position can be moved to the center of the well by vertical duct handling equipment.

[0030] O equipamento de manuseio de dutos horizontal pode ser qualquer aparelho ou dispositivo adequado para mover os dutos em uma orientação horizontal e/ou para elevar - sozinho ou em cooperação com outro equipamento de manuseio de duto - o equipamento tubular de uma orientação horizontal para uma vertical. Exemplos de equipamentos de manuseio de duto horizontais incluem passarelas elevadas, como lançadeiras de passarela. O equipamento de manuseio de dutos vertical pode ser qualquer aparelho ou dispositivo adequado para mover os dutos em uma orientação vertical e/ou para alterar - sozinho ou em cooperação com outro equipamento de manuseio de duto - a orientação do equipamento tubular, por exemplo, entre uma orientação horizontal e uma vertical. Exemplos de equipamento de manuseio de dutos verticais incluem contentores de coluna, hidracontentores, e outros tipos de contentores, braços hidráulicos, etc. ou combinações dos mesmos.[0030] Horizontal duct handling equipment may be any apparatus or device suitable for moving ducts in a horizontal orientation and/or for lifting - alone or in cooperation with other duct handling equipment - tubular equipment in a horizontal orientation to a vertical. Examples of horizontal pipeline handling equipment include elevated walkways such as walkway shuttles. Vertical duct handling equipment can be any apparatus or device suitable for moving ducts in a vertical orientation and/or for changing - alone or in cooperation with other duct handling equipment - the orientation of the tubular equipment, for example, between one horizontal and one vertical orientation. Examples of vertical pipeline handling equipment include column containers, hydraulic containers, and other types of containers, hydraulic arms, etc. or combinations thereof.

[0031] Em algumas modalidades, o segundo equipamento de manuseio de dutos compreende um equipamento de manuseio de dutos horizontal que se estende ao longo da segunda via de alimentação do duto; e equipamento de manuseio de dutos vertical para manusear pelo menos o equipamento tubular orientado verticalmente. O equipamento de manuseio de dutos vertical pode ser móvel entre pelo menos uma primeira posição na segunda via de alimentação do duto entre o equipamento de manuseio de dutos horizontal e o primeiro centro do poço e uma segunda posição lateralmente deslocada em relação à segunda via de alimentação do duto. De modo geral, o equipamento de manuseio de dutos vertical e horizontal pode cooperar um com o outro e/ou com o sistema elevador do primeiro mastro para realizar uma variedade de operações de manuseio de tubo. Em particular, as operações de manuseio de tubo não ocupam área de coberta do piso de perfuração desnecessária e não afetam as operações que são simultaneamente realizadas em outras áreas de coberta do piso de perfuração, deixando assim uma ou mais áreas de coberta do piso de perfuração livres de operações de tubo como uma área de coberta do piso de perfuração aberta como discutido abaixo. Em particular, no exemplo acima, quando o equipamento de manuseio de dutos vertical está na primeira posição ele pode ser configurado para receber o equipamento tubular a partir do primeiro equipamento de manuseio de dutos horizontal. Mover o equipamento de manuseio de dutos vertical para a segunda posição, por outro lado, permite que o equipamento tubular seja movido pelo equipamento de manuseio de dutos horizontal diretamente para o primeiro centro do poço. Para este fim, o equipamento de manuseio de dutos horizontal pode ser móvel, por exemplo, sobre trilhos ou vigas deslizáveis ou outro guia adequado, ao longo da segunda via de alimentação do duto para e na direção contrária do primeiro centro do poço.[0031] In some embodiments, the second pipeline handling equipment comprises a horizontal pipeline handling equipment that extends along the second pipeline feed path; and vertical duct handling equipment for handling at least vertically oriented tubular equipment. The vertical pipeline handling equipment may be movable between at least a first position in the second pipeline feed path between the horizontal pipeline handling equipment and the first well center and a second position laterally displaced with respect to the second feed path of the duct. Generally speaking, the vertical and horizontal pipeline handling equipment can cooperate with each other and/or the first mast lift system to perform a variety of pipe handling operations. In particular, pipe handling operations do not occupy unnecessary drilling floor coverage area and do not affect operations that are simultaneously carried out on other drilling floor coverage areas, thus leaving one or more drilling floor coverage areas free from pipe operations such as an open drill floor deck area as discussed below. In particular, in the above example, when the vertical pipeline handling equipment is in the first position it can be configured to receive the tubular equipment from the first horizontal pipeline handling equipment. Moving the vertical pipeline handling equipment to the second position, on the other hand, allows the tubular equipment to be moved by the horizontal pipeline handling equipment directly to the first center of the well. To this end, the horizontal pipeline handling equipment may be mobile, for example, on sliding rails or beams or other suitable guide, along the second pipeline feed path to and away from the first well center.

[0032] O equipamento de manuseio de dutos horizontal pode ser localizado na coberta do piso de perfuração, isto é, no mesmo nível que a coberta do piso de perfuração. Além disso, o equipamento de manuseio de dutos horizontal pode ser cercado pelas áreas de coberta do piso de perfuração moldadas e dimensionadas para permitir que operadores humanos e/ou equipamento móvel como empilhadeiras e/ou equipamento derrapável se mova ao lado (isto é, paralelo ao lado longo do tubo quando manejado pelo equipamento de manuseio de dutos horizontal) e/ou ao redor do equipamento de manuseio de dutos horizontal e/ou entre o equipamento de manuseio de dutos horizontal e outras partes da coberta do piso de perfuração incluindo um centro do poço. Devido a ausência de diferenças de peso tal movimento é ainda possível de um modo seguro e eficiente.[0032] Horizontal pipeline handling equipment can be located on the drilling floor deck, that is, on the same level as the drilling floor deck. In addition, the horizontal pipeline handling equipment can be surrounded by the shaped and sized drilling floor deck areas to allow human operators and/or mobile equipment such as forklifts and/or skidable equipment to move to the side (i.e., parallel along the side of the pipe when handled by horizontal pipeline handling equipment) and/or around horizontal pipeline handling equipment and/or between horizontal pipeline handling equipment and other parts of the drilling floor cover including a center of the well. Due to the absence of weight differences such movement is still possible in a safe and efficient way.

[0033] Para os fins desta descrição, o termo coberta do piso de perfuração destina-se a se referir à coberta de uma plataforma de operação de uma plataforma de perfuração offshore imediatamente acima cujas juntas dos dutos são montadas para formar a coluna de perfuração que é avançada através do centro do poço em direção ao leito do oceano. A parte da coberta do piso de perfuração em proximidade imediata ao centro do poço é normalmente referida como o piso de perfuração, que é o local de trabalho primário para uma tripulação da plataforma e/ou máquinas que realizam funções similares, como roughnecks ferro. O piso de perfuração normalmente compreende uma mesa giratória para girar a coluna de perfuração. Para os fins da presente descrição, o termo coberta do piso de perfuração inclui o piso de perfuração localizado diretamente sob/próximo ao mastro e cercando o centro do poço assim como áreas de coberta no mesmo nível que e conectadas com o piso de perfuração pela área de piso ininterrupta no mesmo nível, isto é, a área de coberta onde operadores humanos e equipamento móvel como empilhadeiras, equipamento movido em vigas de deslizamento, etc. pode mover ao redor e para/a partir do centro do poço; em algumas modalidades sem ter de subir/descer escadas ou outras elevações. A coberta do piso de perfuração é tipicamente o piso de uma plataforma, por exemplo, a plataforma mais baixa, acima do sistema desviador. Sistemas desviadores para plataformas de perfuração offshore são tipicamente fornecidas abaixo da mesa giratória da plataforma de perfuração. Tal sistema desviador fornece uma via de ventilação e garante que o fluxo pode ser direcionada para a direção contrária da plataforma de perfuração. Por isso, em algumas modalidades, a plataforma de perfuração offshore compreende um sistema desviador sob o primeiro centro do poço.[0033] For the purposes of this description, the term drilling floor cover is intended to refer to the cover of an operating platform of an offshore drilling platform immediately above whose pipeline joints are assembled to form the drilling string that it is advanced through the center of the well towards the ocean floor. The portion of the cover of the drill floor in close proximity to the center of the well is commonly referred to as the drill floor, which is the primary job site for a rig crew and/or machines that perform similar functions, such as iron roughnecks. The drill floor usually comprises a turntable to rotate the drill string. For the purposes of this description, the term drilling floor cover includes the drilling floor located directly under/near the mast and surrounding the center of the well as well as areas of cover on the same level that are connected to the drilling floor by the area. uninterrupted floor level at the same level, ie the deck area where human operators and mobile equipment such as forklifts, equipment moved on slide beams, etc. can move around and to/from the center of the well; in some sports without having to go up/down stairs or other elevations. The drilling floor cover is typically the floor of a rig, eg the lowest rig above the diverter system. Diverter systems for offshore drilling rigs are typically provided below the rig's turntable. Such a diverter system provides a ventilation path and ensures that the flow can be directed away from the drilling rig. Therefore, in some modalities, the offshore drilling rig comprises a diverter system under the first well center.

[0034] Pelo menos partes da coberta do piso de perfuração podem ser formadas pelo teto de um invólucro ou gabinete que acomoda o equipamento de mistura de lama e/ou outro equipamento operacional da plataforma de perfuração, permitindo assim uma disposição compacta e que economiza espaço do equipamento na plataforma de perfuração. Por exemplo, a coberta do piso de perfuração pode compreender uma área de armazenamento para armazenar o equipamento tubular como dutos de perfuração, revestimentos, tubos de elevação, etc., por exemplo, uma área de armazenamento para armazenar equipamento tubular na orientação horizontal. A área de armazenamento pode ser localizada próximo ao dispositivo de manuseio de tubo horizontal ou, se este é móvel, próximo à via de alimentação de duto ao longo da qual o dispositivo de manuseio de tubo horizontal pode se mover. Em algumas modalidades, a área de armazenamento de tubo e/ou equipamento de manuseio de dutos horizontal pode ser parcialmente ou completamente cercada pelas áreas de coberta do piso de perfuração aberta, por exemplo, área de coberta do piso de perfuração moldada e dimensionada para permitir que veículos ou itens deslizantes sejam movidos ao redor de uma área de armazenamento de tubo.[0034] At least parts of the drilling floor cover can be formed by the roof of a casing or cabinet that accommodates the mud mixing equipment and/or other operational equipment of the drilling rig, thus allowing for a compact and space-saving arrangement of the rig on the drilling rig. For example, the drilling floor cover may comprise a storage area for storing tubular equipment such as drill ducts, casings, riser pipes, etc., for example a storage area for storing tubular equipment in horizontal orientation. The storage area can be located next to the horizontal pipe handling device or, if the latter is mobile, next to the duct feed path along which the horizontal pipe handling device can move. In some embodiments, the pipe storage area and/or horizontal pipeline handling equipment may be partially or completely surrounded by the open drilling floor covering areas, for example, drilling floor covering area molded and sized to allow vehicles or sliding items to be moved around a pipe storage area.

[0035] Em algumas modalidades, a coberta do piso de perfuração compreende pelo menos uma primeira área de coberta aberta e desobstruída do piso de perfuração localizada adjacente ao primeiro mastro, por exemplo, na direção longitudinal ou transversal do primeiro mastro, que não seja qualquer área de coberta do piso de perfuração usada para o movimento do equipamento tubular para o primeiro centro do poço, e libre de qualquer mastro ou estrutura de armazenamento de dutos ou outras instalações fixas. Por isso, a área de coberta do piso de perfuração aberta se estende fora da estrutura do mastro. Consequentemente, a plataforma de perfuração fornece uma área de coberta aberta e livre do piso de perfuração para colocação e/ou movimento do equipamento auxiliar e/ou para manusear e/ou operar tal equipamento auxiliar enquanto ao mesmo tempo proporciona o acesso eficiente e seguro ao centro do poço. Exemplos de tal equipamento auxiliar incluem equipamento de registro de dados durante a perfuração, equipamento de medição de dados durante a perfuração, equipamento de tubulação em espiral, etc. e equipamento similar que não os dutos que forma a coluna de perfuração, revestimento/forro de poço ou tubos de elevação e outro que não o equipamento submarino pesado como BOPs e árvores de Natal. De modo geral, o equipamento auxiliar pode compreender equipamento auxiliar sobre a coberta e equipamento auxiliar suspendível como equipamento de fundo de poço que pode ser elevado através do centro do poço a partir de um pórtico ou estrutura de montagem. Por exemplo, o equipamento auxiliar pode compreender um componente suspendível e um componente sobre a coberta, por exemplo, uma bobina na qual a tubulação em espiral ou fio é enrolada para uso para suspender o componente suspendível através do centro do poço. Outros exemplos de componentes auxiliares sobre a coberta compreendem componentes de fornecimento e/ou de suporte similar para fornecer ao componente suspendível energia ou outros suprimentos que de outro modo suportam o equipamento suspendível.[0035] In some embodiments, the cover of the drilling floor comprises at least an open and unobstructed first area of cover of the drilling floor located adjacent to the first mast, for example, in the longitudinal or transverse direction of the first mast, other than any drill floor deck area used for movement of tubular equipment to the first well center, and clear of any mast or storage structure for pipelines or other fixed installations. Therefore, the open drill floor deck area extends outside the mast frame. Consequently, the drilling rig provides an open area of cover and clear of the drilling floor for placement and/or movement of auxiliary equipment and/or for handling and/or operating such auxiliary equipment while at the same time providing efficient and safe access to the center of the well. Examples of such auxiliary equipment include data recording equipment while drilling, data measuring equipment while drilling, spiral piping equipment, etc. and similar equipment other than the ducts forming the drill string, well casing/liner or riser pipes and other than heavy subsea equipment such as BOPs and Christmas trees. Generally speaking, the auxiliary equipment may comprise overhead auxiliary equipment and suspendable auxiliary equipment such as downhole equipment that can be lifted through the center of the well from a gantry or mounting structure. For example, the auxiliary equipment may comprise a suspendable component and an over-the-cover component, for example a coil on which spiral piping or wire is wound for use to suspend the suspendable component through the center of the well. Other examples of ancillary components on deck comprise similar supply and/or support components to supply the suspendable component with energy or other supplies that would otherwise support the suspendable equipment.

[0036] Em algumas modalidades, a plataforma de perfuração é configurada para realizar o movimento do equipamento tubular, em particular tubos de elevação, revestimento, forro, elementos da coluna de perfuração, para o primeiro centro do poço ao longo de uma via de alimentação de duto que somente cruza áreas de coberta do piso de perfuração fora da primeira área de coberta do piso de perfuração aberta. Consequentemente, o manejo e/ou operação do equipamento auxiliar pode ser realizado com interferência limitada ou mesmo sem interferência com a inserção do equipamento tubular através do centro do poço, isto é, na direção contrária da trajetória crítica da operação de perfuração. O manuseio do equipamento auxiliar pode, por exemplo, incluir a preparação do equipamento auxiliar suspendível como sensores, robôs, drones que devem ser baixados dentro do poço perfurado em um momento posterior. A plataforma de perfuração offshore pode então ser configurada, durante todo o movimento do equipamento tubular para o primeiro centro do poço, para manter a primeira área de coberta do piso de perfuração aberta livre do dito equipamento tubular sendo movido para o primeiro centro do poço. Em particular, em algumas modalidades, a primeira área de coberta do piso de perfuração aberta não é ocupada e/ou não pode ser ocupada nem por um equipamento de manuseio de dutos horizontal nem pelo equipamento de manuseio de dutos vertical. Em particular, as áreas de coberta do piso de perfuração abertas são livres de qualquer trilhos, guias ou vigas deslizáveis da passarela elevada ou outras máquinas de alimentação de tubo. O manuseio do equipamento auxiliar pode ainda ser realizado de uma maneira segura suficientemente remota a partir da operação de perfuração normal. Uma área de coberta do piso de perfuração aberta pode ainda ser dimensionada e moldada para permitir que o equipamento auxiliar sobre a coberta seja fixamente instalado, isto é, durante toda a operação de perfuração ou pelo menos estágios da mesma.[0036] In some embodiments, the drilling rig is configured to carry out the movement of tubular equipment, in particular riser tubes, casing, liner, drill string elements, to the first center of the well along a feed path of duct that only crosses drill floor cover areas outside the first open drill floor cover area. Consequently, the handling and/or operation of the auxiliary equipment can be carried out with limited interference or even without interference with the insertion of the tubular equipment through the center of the well, that is, in the opposite direction of the critical trajectory of the drilling operation. Handling of auxiliary equipment may, for example, include the preparation of suspendable auxiliary equipment such as sensors, robots, drones that must be lowered into the drilled well at a later time. The offshore drilling rig can then be configured, throughout the movement of the tubular rig to the first well center, to keep the first open drilling floor deck area free of said tubular rig being moved to the first well center. In particular, in some arrangements, the first deck area of the open drilling floor is not occupied and/or cannot be occupied by either horizontal pipeline handling equipment or vertical pipeline handling equipment. In particular, the open drill floor deck areas are free from any slides, guides or sliding beams from the elevated walkway or other pipe feeding machines. The handling of auxiliary equipment can still be carried out in a safe manner sufficiently remote from normal drilling operation. An open drilling floor deck area may be further sized and molded to allow auxiliary equipment on the deck to be fixedly installed, i.e., during the entire drilling operation or at least stages thereof.

[0037] Para este fim, a primeira área de coberta do piso de perfuração aberta pode ser maior do que 1 m em ambas direções (por exemplo, 1 m por 1 m ou 1 m por 5 m), como maior do que 2 m em ambas direções, como maior do que 3 m em ambas direções, como maior do que 4 m em ambas direções, como mais de 5 m em ambas direções. Em algumas modalidades, a primeira área de coberta do piso de perfuração pode ter pelo menos 4m2, ex., pelo menos 10m2, por exemplo, pelo menos 15m2, por exemplo, pelo menos 25m2, por exemplo, pelo menos 35m2, por exemplo, pelo menos 50m2, por exemplo, pelo menos 65m2, por exemplo, pelo menos 80m2, 100m2 de tamanho, por exemplo, pelo menos 200m2, como pelo menos 500m2, como pelo menos 1000 m2, como pelo menos 2000 m2, por exemplo, pelo menos 5000 m2. A área de coberta do piso de perfuração aberta pode cobrir pelo menos um setor de um círculo ao redor do centro do poço que tem um raio de pelo menos 2 m, como 3 m, como 4 m, como 5 m, como 6 m, como 8 m, como 9 m, como 10 m, como 15 m, como 20 m, como 30 m, o setor tendo um ângulo central de pelo menos 50°, como pelo menos 60°, como pelo menos 90°, por exemplo, pelo menos 120°, exemplo, pelo menos 130°.[0037] For this purpose, the first cover area of the open drilling floor can be greater than 1 m in both directions (for example, 1 m by 1 m or 1 m by 5 m), such as greater than 2 m in both directions, as greater than 3 m in both directions, as greater than 4 m in both directions, as greater than 5 m in both directions. In some arrangements, the first covered area of the drilling floor may be at least 4m2, eg at least 10m2, eg at least 15m2, eg at least 25m2, eg at least 35m2, eg at least 50m2, eg at least 65m2, eg at least 80m2, 100m2 in size, eg at least 200m2, like at least 500m2, like at least 1000m2, like at least 2000m2, eg at least minus 5000 m2. The open drill floor covering area can cover at least one sector of a circle around the center of the well that has a radius of at least 2 m, such as 3 m, such as 4 m, such as 5 m, such as 6 m, like 8 m, like 9 m, like 10 m, like 15 m, like 20 m, like 30 m, the sector having a center angle of at least 50°, like at least 60°, like at least 90°, for example , at least 120°, eg at least 130°.

[0038] Em algumas modalidades, uma ou mais das áreas de coberta do piso de perfuração abertas são acessíveis com uma grua, como uma grua de guindaste da coberta, de modo que o equipamento relativamente grande pode ser elevado sobre ou fora da área de coberta do piso de perfuração aberta. Em algumas modalidades, a plataforma de perfuração compreende tal grua. Tal equipamento pode ser equipamento auxiliar como discutido abaixo.[0038] In some embodiments, one or more of the open drilling floor deck areas are accessible with a crane, such as a deck crane crane, so that relatively large equipment can be lifted over or outside the deck area of open drill floor. In some embodiments, the drilling rig comprises such a crane. Such equipment may be auxiliary equipment as discussed below.

[0039] Em algumas modalidades, a área de coberta do piso de perfuração aberta tem uma altura livre de pelo menos 3 m, como pelo menos 5 m, como pelo menos 10 m, como pelo menos 20 m, por exemplo, pelo menos 30 m.[0039] In some arrangements, the open drilling floor deck area has a clear height of at least 3 m, such as at least 5 m, such as at least 10 m, such as at least 20 m, for example, at least 30 m.

[0040] O termo área de coberta do piso de perfuração aberta destina-se a se referir a uma parte da coberta do piso de perfuração que está livre do equipamento de manuseio de duto, pelo menos equipamento de manuseio de duto fixamente instalado, durante a operação de perfuração normal como perfuração, confecção e quebra de suportes, inserção e movimento dos dutos. O equipamento de manuseio de duto refere-se ao equipamento para perfuração, confecção e quebra de suportes, inserção e movimento dos dutos. O termo operação de perfuração normal é ainda destinado a se referir às operações que não as operações excepcionais como reparo, trabalho de manutenção, ou similares. O termo equipamento fixamente instalado destina-se a se referir ao equipamento que não é móvel durante a operação normal da plataforma de perfuração, por exemplo, não derrapável ou de outro modo deslocável. Em algumas modalidades, a área de coberta do piso de perfuração aberta está ainda livre do equipamento de tubulação em espiral, pelo menos equipamento de tubulação em espiral fixamente instalado, durante a operação de perfuração normal. Em algumas modalidades, a área de coberta do piso de perfuração aberta está ainda livre do equipamento submarino pesado durante a operação de perfuração normal. Aqui o termo equipamento submarino refere-se ao equipamento como sistemas de segurança contra estouros ou Árvores de Natal ou conjunto similar de válvulas, bobinas, e encaixes que são instalados sob a plataforma de perfuração durante a operação de perfuração. Em algumas modalidades, a área de coberta do piso de perfuração aberta não é usada durante a operação de perfuração normal para mover o equipamento tubular, tubulação em espiral e/ou equipamento submarino pesado para/a partir do centro do poço.[0040] The term open drilling floor covering area is intended to refer to a portion of the drilling floor covering that is free of pipeline handling equipment, at least fixedly installed pipeline handling equipment, during the normal drilling operation such as drilling, making and breaking of supports, insertion and movement of ducts. Duct handling equipment refers to equipment for drilling, making and breaking supports, inserting and moving the ducts. The term normal drilling operation is further intended to refer to operations other than exceptional operations such as repair, maintenance work, or the like. The term fixedly installed equipment is intended to refer to equipment that is not mobile during the normal operation of the drilling rig, for example, non-skidable or otherwise displaceable. In some embodiments, the open drilling floor deck area is still free of spiral piping equipment, at least fixedly installed spiral piping equipment, during normal drilling operation. In some embodiments, the open drilling floor deck area is still clear of heavy subsea equipment during normal drilling operation. Here the term subsea equipment refers to equipment such as overflow safety systems or Christmas Trees or similar sets of valves, coils, and fittings that are installed under the drilling rig during the drilling operation. In some embodiments, the open drilling floor deck area is not used during normal drilling operation to move tubular equipment, spiral piping and/or heavy subsea equipment to/from the center of the well.

[0041] Quando a primeira área de coberta do piso de perfuração aberta compreende uma via de acesso para o primeiro centro do poço, cuja via de acesso se estende fora da base do primeiro mastro, o equipamento auxiliar pode facilmente ser movido para/a partir do primeiro centro do poço. A via de acesso pode permitir o livre acesso a partir de toda a primeira área de coberta do piso de perfuração aberta para o primeiro centro do poço sem entrar na base do mastro. A via de acesso pode fornecer uma altura livre de pelo menos 3 m, como pelo menos 5 m, como pelo menos 7 m como pelo menos 10 m, como pelo menos 15 m, como pelo menos 20 m permitindo assim que mesmo itens altos sejam movidos. Por exemplo, enquanto a área de coberta do piso de perfuração aberta é de modo geral livre do equipamento de manuseio de duto durante as operações de perfuração normais, em certas situações excepcionais pode ser desejável mover o equipamento tubular como tubos de elevação para a área de coberta do piso de perfuração aberta, por exemplo, para trabalho de reparo ou manutenção. Tais operações podem então ser realizadas convenientemente e com segurança sem interferir com a operação normal de perfuração. Quando a via de acesso é uma trajetória reta, por exemplo, que se estende na direção longitudinal ou transversal, acesso particularmente conveniente é fornecido. Da mesma forma, quando a via de acesso é curta, por exemplo, menos de 20 m como menos de 10 m, acesso eficiente é fornecido. Quando a via de acesso é larga o suficiente para permitir que veículos como empilhadeiras e/ou itens deslizantes se movam ao longo das vigas deslizáveis para se moverem entre a área de coberta do piso de perfuração aberta e o centro do poço, a eficiência da plataforma de perfuração é aumentada. Por exemplo, a via de acesso pode ter pelo menos 2 m de largura, como pelo menos 3 m, por exemplo, pelo menos 5 m de largura.[0041] When the first area covered by the open drilling floor comprises an access path to the first well center, which access path extends outside the base of the first mast, the auxiliary equipment can easily be moved to/from from the first center of the well. The access road can allow free access from the entire first covered area of the open drill floor to the first center of the well without entering the base of the mast. The access road can provide a clearance height of at least 3 m, such as at least 5 m, such as at least 7 m, such as at least 10 m, such as at least 15 m, such as at least 20 m thus allowing even tall items to be moved. For example, while the open drilling floor deck area is generally free of pipeline handling equipment during normal drilling operations, in certain exceptional situations it may be desirable to move tubular equipment such as riser pipes to the area of open drilling floor covering, eg for repair or maintenance work. Such operations can then be carried out conveniently and safely without interfering with normal drilling operation. When the access road is a straight path, for example extending in a longitudinal or transverse direction, particularly convenient access is provided. Likewise, when the access road is short, eg less than 20 m or less than 10 m, efficient access is provided. When the access road is wide enough to allow vehicles such as forklifts and/or sliding items to move along the sliding beams to move between the cover area of the open drill floor and the center of the well, the efficiency of the rig perforation is increased. For example, the access road can be at least 2 m wide, such as at least 3 m, for example at least 5 m wide.

[0042] Em algumas modalidades, a plataforma de perfuração compreende vias de acesso para o centro do poço a partir de dois três ou mesmo a partir de todos os quatro lados, isto é, a partir de ambas direções longitudinais e de ambas direções transversais.[0042] In some modalities, the drilling rig comprises access ways to the center of the well from two-three or even from all four sides, that is, from both longitudinal directions and both transverse directions.

[0043] Em algumas modalidades, a plataforma de perfuração compreende uma estrutura protetora configurada para impedir que o equipamento tubular operado acima do primeiro centro do poço caia sobre a área de coberta do piso de perfuração em uma direção contrária ao primeiro mastro. A estrutura protetora pode ser configurada para proteger pelo menos parte de (como toda) a primeira área de coberta do piso de perfuração aberta de tal queda do equipamento tubular. A estrutura protetora pode ser uma estrutura protetora lateral que se estende, por exemplo, ao longo da direção longitudinal, entre as estruturas de suporte localizadas nos respectivos lados do primeiro centro do poço; uma das estruturas de suporte pode ser o primeiro mastro. Consequentemente, mesmo durante as operações de perfuração em andamento, o equipamento auxiliar pode ser manejado e/ou colocado com segurança dentro da primeira área de coberta do piso de perfuração aberta. A estrutura protetora pode ser formada completamente ou parcialmente de uma ou mais vigas, correntes, ou estruturas similares; pode ser localizada em uma elevação adequada acima da coberta do piso de perfuração, baixa o suficiente para permitir que o equipamento tubular seja pego e em algumas modalidades alta o suficiente para permitir que o equipamento auxiliar seja movido por baixo. Em algumas modalidades, a estrutura protetora pode compreender proteções dispostas nas respectivas alturas e/ou proteções que são móveis entre as respectivas alturas, por exemplo, para permitir pegar o equipamento tubular de várias alturas como tubos e suportes. Por exemplo, a estrutura protetora pode ser elevada acima da coberta do piso de perfuração pelo menos 2 m, como pelo menos 3 m, como pelo menos 5 m, como pelo menos 7 m, como pelo menos 10 m, como pelo menos 15 m, como pelo menos 20 m, como pelo menos 30 m, como pelo menos 40 m; a estrutura protetora pode ser elevada menos de 30 m, como menos de 25 m, como menos de 20 m, como menos de 15 m, como menos de 10 m, como menos de 7 m, como menos de 5 m, como menos de 3 m. Nas modalidades, onde a plataforma de perfuração compreende uma estrutura de armazenamento de duto sobre um segundo lado do primeiro centro do poço oposto ao primeiro lado onde o mastro está situado, a estrutura protetora pode se estender entre e ser conectada ao primeiro mastro e a estrutura de armazenamento de duto.[0043] In some embodiments, the drilling rig comprises a protective structure configured to prevent tubular equipment operated above the first center of the well from falling onto the covered area of the drilling floor in a direction opposite to the first mast. The protective structure may be configured to protect at least part of (as well as all) the first open perforation floor deck area from such a fall of the tubular equipment. The protective structure may be a lateral protective structure which extends, for example, along the longitudinal direction, between the support structures located on the respective sides of the first center of the well; one of the support structures could be the first mast. Consequently, even during ongoing drilling operations, auxiliary equipment can be safely handled and/or placed within the first covered area of the open drilling floor. The protective structure can be formed completely or partially from one or more beams, chains, or similar structures; it can be located at a suitable elevation above the drilling floor cover, low enough to allow tubular equipment to be picked up and in some arrangements high enough to allow auxiliary equipment to be moved underneath. In some embodiments, the protective structure may comprise shields arranged at the respective heights and/or shields that are movable between the respective heights, for example, to allow for picking up tubular equipment of various heights such as tubes and supports. For example, the protective structure can be raised above the drilling floor cover at least 2 m, as at least 3 m, as at least 5 m, as at least 7 m, as at least 10 m, as at least 15 m , as at least 20 m, as at least 30 m, as at least 40 m; the protective structure can be raised less than 30 m, as less than 25 m, as less than 20 m, as less than 15 m, as less than 10 m, as less than 7 m, as less than 5 m, as less than 3 m. In embodiments, where the drilling rig comprises a pipeline storage structure on a second side of the first center of the well opposite the first side where the mast is situated, the protective structure may extend between and be connected to the first mast and the structure of duct storage.

[0044] Em algumas modalidades, a estrutura protetora pode ser móvel entre uma posição fechada onde impede que o equipamento tubular operado acima do primeiro centro do poço caia sobre a primeira área de coberta do piso de perfuração aberta e uma posição aberta onde permite o acesso lateral aumentado, por exemplo, sem restrição de altura, para o primeiro centro do poço a partir da área que é configurada para proteger. Por exemplo, a estrutura protetora pode ser articulada ou horizontalmente ou verticalmente deslizável. Como observado acima, a estrutura protetora pode compreender partes em várias alturas, algumas ou todas das quais podem ser abertas. Também, pode ser desejável mover a estrutura protetora durante o uso de uma estrutura de suporte como descrito no presente documento. Alternativamente ou adicionalmente, a estrutura protetora pode ser operável para ser movida para diferentes elevações.[0044] In some embodiments, the protective structure may be movable between a closed position where it prevents tubular equipment operated above the first center of the well from falling onto the first covered area of the open drilling floor and an open position where it allows access raised side, for example, without height restriction, to the first center of the well from the area it is configured to protect. For example, the protective structure can be hinged either horizontally or vertically slidable. As noted above, the protective structure can comprise parts at various heights, some or all of which can be opened. Also, it may be desirable to move the protective structure while using a support structure as described herein. Alternatively or additionally, the protective structure can be operable to be moved to different elevations.

[0045] Em algumas modalidades, uma plataforma de perfuração offshore compreende uma estrutura de pórtico ou outra estrutura de montagem adequada para suspender o equipamento auxiliar suspendível a partir de uma posição elevada acima da coberta do piso de perfuração, permitindo que o equipamento auxiliar seja abaixado ou elevado através do primeiro centro do poço; sendo que a estrutura de montagem é móvel entre uma posição inferior para monta o equipamento auxiliar para a estrutura de montagem, e uma posição elevada que permite abaixar ou elevar o equipamento auxiliar suspenso a partir da estrutura de montagem através do primeiro centro do poço.[0045] In some embodiments, an offshore drilling rig comprises a gantry structure or other suitable mounting structure to suspend the suspendable auxiliary equipment from an elevated position above the drilling floor cover, allowing the auxiliary equipment to be lowered or elevated through the first center of the well; the mounting frame being movable between a lower position for mounting auxiliary equipment to the mounting frame, and an elevated position which allows for lowering or raising auxiliary equipment suspended from the mounting frame through the first center of the well.

[0046] Em algumas modalidades, a estrutura de montagem pode se estender ao longo da direção longitudinal a partir de um primeiro mastro que é longitudinalmente deslocado a partir do centro do poço como descrito no presente documento. A estrutura de montagem pode compreender dispositivos, como um ou mais ganchos, polias, roldanas, membros guia como arcos de guia, e/ou um ou mais outros mecanismos de conexão e/ou dispositivos para suportar cabos ou fios ou tubulação em espiral para o equipamento auxiliar de conexão sobre a coberta posicionado na coberta do piso de perfuração, por exemplo, sobre as áreas de coberta do piso de perfuração abertas com equipamento auxiliar suspendível como ferramentas de fundo do poço seja avançado em direção ao fundo do mar. A estrutura de montagem é diferente do sistema elevador e de preferência operável independentemente do sistema elevador.[0046] In some embodiments, the mounting frame may extend along the longitudinal direction from a first mast that is longitudinally offset from the center of the well as described in this document. The mounting structure may comprise devices such as one or more hooks, pulleys, pulleys, guide members such as guide arches, and/or one or more other connecting mechanisms and/or devices to support cables or wires or spiral piping for the over-deck attachment auxiliary equipment positioned on the drilling floor deck, for example, over open drilling floor deck areas with suspended auxiliary equipment such as downhole tools is advanced towards the sea floor. The mounting structure is different from the elevator system and preferably operable independently of the elevator system.

[0047] Será apreciado que uma estrutura de montagem como descrita no presente documento pode ser usada em combinação com várias modalidades de uma plataforma de perfuração compreendendo uma coberta do piso de perfuração tendo um orifício que define um primeiro centro do poço; um primeiro mastro que se estende para cima em relação à coberta do piso de perfuração, e um primeiro sistema elevador suportado pelo primeiro mastro e configurado para içar e baixar equipamento tubular através do primeiro centro do poço.[0047] It will be appreciated that a mounting structure as described herein can be used in combination with various embodiments of a drilling rig comprising a drilling floor cover having a hole defining a first well center; a first mast extending upward relative to the drill floor cover, and a first lift system supported by the first mast and configured to lift and lower tubular equipment through the first center of the well.

[0048] Consequentemente, o equipamento auxiliar suspendível a ser baixado através do centro do poço pode de modo conveniente, eficiente e seguro ser preparado, montado e trazido para uma posição operacional sem a necessidade para operadores humanos escalarem altura não seguras. Em particular, quando a estrutura de montagem está em sua posição inferior, um mecanismo de conexão da estrutura de montagem para conectar o equipamento auxiliar à estrutura de montagem é feita convenientemente acessível aos operadores humanos a partir da coberta do piso de perfuração; por exemplo, a posição inferior pode estar a não mais que 3 m, como não mais que 2,5 m acima da coberta do piso de perfuração, como não mais que 2 m, como não mais que 1,5 m. A posição elevada pode estar pelo menos, 3 m, 5 m, ou 10 m acima da coberta do piso de perfuração, como pelo menos 15 m acima da coberta do piso de perfuração, por exemplo, pelo menos 20 m acima da coberta do piso de perfuração, por exemplo, pelo menos 30 m acima da coberta do piso de perfuração, por exemplo, pelo menos 40 m acima da coberta do piso de perfuração.[0048] Consequently, the suspended auxiliary equipment to be lowered through the center of the pit can conveniently, efficiently and safely be prepared, assembled and brought into an operational position without the need for human operators to climb unsafe heights. In particular, when the mounting frame is in its lower position, a mounting frame connecting mechanism for connecting auxiliary equipment to the mounting frame is made conveniently accessible to human operators from the cover of the drilling floor; for example, the bottom position can be no more than 3 m, such as no more than 2.5 m above the drill floor cover, such as no more than 2 m, such as no more than 1.5 m. The elevated position can be at least 3 m, 5 m, or 10 m above the drilling floor cover, such as at least 15 m above the drilling floor cover, for example at least 20 m above the floor cover of drilling, for example, at least 30 m above the cover of the drilling floor, for example at least 40 m above the cover of the drilling floor.

[0049] Quando a estrutura de montagem é disposta horizontalmente deslocada a partir do centro do poço (na direção longitudinal e/ou transversal), por exemplo, conectada a um ou mais dos cantos ou lados do mastro de frente para a área de coberta do piso de perfuração aberta, a preparação do equipamento auxiliar e sua conexão à estrutura de montagem pode convenientemente ser realizada a partir da primeira área de coberta do piso de perfuração aberta sem ou pelo menos com mínima interferência com qualquer operação de perfuração em andamento. Em algumas modalidades, o deslocamento horizontal é mais de 0,5 m, como mais de 1 m, como mais de 2 m, como mais de 3 m, como mais de 4 m, como mais de 5 m, como mais de 6 m, como mais de 7 m, como mais de 10 m, como 15 m, como mais de 20 m; ao mesmo tempo menos de 100 m, como menos de 75 m, como menos de 50 m, como menos de 25 m, como menos de 15 m, como menos de 10 m, como menos de 7 m, como menos de 5 m, como menos de 3 m, como menos de 2 m, como menos de 7 m. Em algumas modalidades, a altura da estrutura de suporte e o deslocamento horizontal a partir do centro do poço são dispostos para permitir um ângulo e/ou raio de dobra adequado para o fio suspenso conectando um equipamento auxiliar suspendível através do centro do poço. Para este fim, em algumas modalidades, a primeira área de coberta do piso de perfuração aberta permite um espaçamento de qualquer equipamento auxiliar na coberta, como bobinas de fio enrolado ou tubulação em espiral ou outros componentes na coberta que suportam o equipamento auxiliar suspendível, a partir da estrutura de suporte (medida na coberta do piso de perfuração) de mais de 1 m, como mais de 2 m, como mais de 3 m, como mais de 4 m, como mais de 5 m, como mais de 6 m, como mais de 7 m, como mais de 10 m, como mais de 15 m, como mais de 20 m.[0049] When the mounting structure is arranged horizontally displaced from the center of the well (in the longitudinal and/or transverse direction), for example, connected to one or more of the corners or sides of the mast facing the roof area of the open drilling floor, the preparation of the auxiliary equipment and its connection to the mounting structure can conveniently be carried out from the first covered area of the open drilling floor without or at least with minimal interference with any drilling operation in progress. In some embodiments, the horizontal offset is more than 0.5 m, such as over 1 m, such as over 2 m, such as over 3 m, such as over 4 m, such as over 5 m, such as over 6 m , as more than 7 m, as more than 10 m, as 15 m, as more than 20 m; at the same time less than 100 m, as less than 75 m, as less than 50 m, as less than 25 m, as less than 15 m, as less than 10 m, as less than 7 m, as less than 5 m, like less than 3 m, like less than 2 m, like less than 7 m. In some embodiments, the height of the support structure and the horizontal offset from the center of the well are arranged to allow a suitable bend angle and/or radius for the suspended wire connecting a suspendable auxiliary equipment through the center of the well. To this end, in some modalities, the first deck area of the open perforation floor allows for a spacing of any auxiliary equipment on the deck, such as coiled wire coils or spiral piping or other deck components that support the suspended auxiliary equipment, the from the support structure (measured on the drilling floor deck) of more than 1 m, such as over 2 m, such as over 3 m, such as over 4 m, such as over 5 m, such as over 6 m, like more than 7 m, like more than 10 m, like more than 15 m, like more than 20 m.

[0050] A estrutura de montagem pode por exemplo, compreender uma viga ou estrutura alongada similar que pode ser deslizavelmente disposta sobre os trilhos ou faixas no mastro e sobre uma estrutura correspondente, por exemplo, uma estrutura de armazenamento de duto, sobre um segundo lado do centro do poço oposto ao primeiro lado onde o mastro está situado. A estrutura de montagem pode ser parte de ou separada de uma estrutura protetora como descrito no presente documento.[0050] The mounting structure may, for example, comprise a beam or similar elongated structure that can be slidably arranged on the rails or tracks in the mast and on a corresponding structure, for example, a pipeline storage structure, on a second side from the center of the shaft opposite the first side where the mast is situated. The mounting frame can be part of or separate from a protective frame as described in this document.

[0051] A plataforma de perfuração pode compreender adicionalmente uma estrutura de armazenamento de duto, por exemplo, fornecendo uma área de doca para armazenar as cadeias de tubos montadas, posicionadas sobre um segundo lado do primeiro centro do poço oposto ao primeiro lado. Novamente, esta estrutura de armazenamento de duto pode ser localizada no mesmo nível que a coberta do piso de perfuração ou pelo menos parcialmente em um nível diferente, por exemplo, um nível inferior de modo a permitir que dutos sejam avançados ao longo de uma direção de inclinação.[0051] The drilling rig may further comprise a pipeline storage structure, for example providing a dock area to store the assembled pipe strings, positioned on a second side of the first well center opposite the first side. Again, this pipeline storage structure can be located on the same level as the drill floor cover or at least partially on a different level, for example a lower level in order to allow pipelines to be advanced along a direction of inclination.

[0052] Quando a primeira área de coberta do piso de perfuração aberta se estende ao redor da área de doca para um lado da área de doca distal a partir do primeiro centro do poço, o equipamento móvel pode ser movido ao redor da primeira área de coberta do piso de perfuração aberta e ao redor da área de doca a partir de um lado lateral do centro do poço para o outro lado sem interferir com a operação de perfuração.[0052] When the first area of cover of the open drill floor extends around the dock area to one side of the dock area distal from the first well center, mobile equipment can be moved around the first area of open drill floor cover and around the dock area from one side of the center well to the other side without interfering with the drilling operation.

[0053] Em algumas modalidades, a plataforma de perfuração é uma plataforma de atividade dupla (ou mesmo múltipla) onde mais de uma operação de perfuração principal ou auxiliar pode ser realizada através de dois ou mesmo mais centro de trabalho separados, um, alguns ou todos dos quais podem ser centros do poço. Em algumas modalidades, além de um centro do poço para realizar as operações de perfuração primárias, um centro de trabalho adicional pode ser um orifício no piso de perfuração através do qual os dutos podem ser baixados, mas através dos quais os dutos podem não necessariamente ser baixados por todo o caminho até o leito do oceano. Tal centro de trabalho pode ainda compreender um fundo que evita que os dutos caiam inadvertidamente para o leito do oceano. Alternativamente ou adicionalmente, um ou mais centros de trabalho adicionais podem ser centros do poço como descrito acima. Para este fim, em algumas modalidades, a plataforma de perfuração offshore compreende adicionalmente um segundo centro de trabalho como um segundo centro do poço deslocado a partir do primeiro centro do poço, opcionalmente um segundo mastro que se estende para cima em relação à coberta do piso de perfuração, e um segundo sistema elevador suportado pelo segundo mastro e configurado para içar e baixar o equipamento tubular através do segundo centro de trabalho.[0053] In some embodiments, the drilling rig is a dual (or even multiple) activity platform where more than one main or auxiliary drilling operation can be performed through two or even more separate work centers, one, some or all of which may be well centers. In some embodiments, in addition to a well center to carry out primary drilling operations, an additional work center may be a hole in the drilling floor through which pipelines can be lowered, but through which pipelines may not necessarily be downloaded all the way to the ocean floor. Such a work center may also comprise a bottom that prevents the pipelines from inadvertently falling to the ocean floor. Alternatively or additionally, one or more additional work centers may be well centers as described above. To this end, in some embodiments, the offshore drilling rig further comprises a second work center as a second well center offset from the first well center, optionally a second mast extending upwards relative to the floor deck rigs, and a second lift system supported by the second mast and configured to raise and lower the tubular equipment through the second work center.

[0054] Em algumas modalidades, as posições do primeiro centro do poço e o segundo centro de trabalho juntas definem uma direção transversal dentro do plano da coberta do piso de perfuração; os primeiro e segundo mastros podem ser dispostos lado a lado na direção transversal ou em outra configuração adequada. Os dois mastros podem ser integrados em um mastro.[0054] In some embodiments, the positions of the first well center and the second work center together define a transverse direction within the plane of the cover of the drilling floor; the first and second masts can be arranged side by side in the transverse direction or in another suitable configuration. The two masts can be integrated into one mast.

[0055] Em algumas modalidades, a posição do segundo centro de trabalho é colocada substancialmente ao longo da direção longitudinal; os primeiro e segundo mastros podem ser dispostos opostos um ao outro, por exemplo, em uma configuração face-a-face ou costas-com- costas.[0055] In some embodiments, the position of the second working center is placed substantially along the longitudinal direction; the first and second masts can be arranged opposite each other, for example, in a face-to-face or back-to-back configuration.

[0056] Por isso, atividades de perfuração duplas (ou mesmo múltiplas) eficientes podem ser realizadas, e a equipe de perfuração e equipamento podem convenientemente ser movidos entre os centros do poço. Além disso, as operações em ambos o primeiro centro do poço e o segundo centro de trabalho podem convenientemente ser monitoradas e/ou controladas, por exemplo, a partir de uma cabine do perfurador única tendo uma linha de visão direta para ambos o primeiro centro do poço e o segundo centro de trabalho. Além disso, o primeiro centro do poço e o segundo centro de trabalho podem ser usados como back-up/substituição um para o outro de um modo conveniente, porque as áreas de armazenamento, equipamento de manuseio de duto etc. que servem ambos o primeiro centro do poço e o segundo centro de trabalho podem ser dispostas para servir/cooperar de modo eficiente com ambos o primeiro centro do poço e o segundo centro de trabalho. Este é particularmente o caso quando o segundo centro de trabalho é operável como um centro do poço. Será apreciado que, durante operação das modalidades de uma plataforma de perfuração com dois (ou mais) centros do poço, nem todos os centros do poço podem necessariamente ser capazes de simultaneamente acessar o mesmo poço de perfuração.[0056] By this, efficient double (or even multiple) drilling activities can be carried out, and the drilling crew and equipment can be conveniently moved between the well centers. Furthermore, operations at both the first well center and the second work center can conveniently be monitored and/or controlled, for example from a single driller cabin having a direct line of sight to both the first well center. well and the second work center. In addition, the first well center and the second work center can be used as backup/replacement for each other in a convenient way, because storage areas, pipeline handling equipment etc. Serving both the first well center and the second work center can be arranged to efficiently serve/cooperate with both the first well center and the second work center. This is particularly the case when the second work center is operable as a well center. It will be appreciated that, when operating a drilling rig modalities with two (or more) well centers, not all well centers may necessarily be able to simultaneously access the same drilling well.

[0057] Em algumas modalidades, a plataforma de perfuração compreende uma estrutura protetora que se estende entre o primeiro centro do poço e o segundo centro de trabalho, por exemplo, um segundo centro do poço, e configurada para impedir que o equipamento tubular operado acima do primeiro centro do poço caia sobre um segundo centro de trabalho. A estrutura protetora pode ser uma estrutura protetora lateral que se estende em uma direção transversal à direção que conecta um primeiro centro do poço e o segundo centro de trabalho entre as estruturas de suporte localizadas nos respectivos lados do primeiro centro do poço e o segundo centro de trabalho; uma das estruturas de suporte pode ser o mastro. Em algumas modalidades, a estrutura protetora pode ser configurada para ser trazida para uma configuração retraída que permite que os dutos sejam transferidos entre o primeiro centro do poço e o segundo centro de trabalho. Por exemplo, a estrutura protetora pode ter a forma de uma estrutura de barreira divisória como uma parede, cerca ou cortina que pode ser rolada para cima ao redor de um eixo horizontal ou vertical ou de outro modo trazida para uma configuração compacta, inativa. A estrutura protetora pode ter uma altura correspondente ao comprimento dos maiores dutos manuseados pela plataforma de perfuração, por exemplo, pelo menos 50% como pelo menos 75% como pelo menos 100% de uma altura dos maiores dutos. Será apreciado que tal estrutura protetora pode ser implementada em qualquer plataforma de perfuração tendo dois ou mais sistemas elevadores e centros de trabalho.[0057] In some embodiments, the drilling rig comprises a protective structure that extends between the first well center and the second work center, for example, a second well center, and configured to prevent tubular equipment operated above from the first center of the well lands on a second work center. The protective structure may be a lateral protective structure that extends in a direction transverse to the direction connecting a first well center and the second working center between the support structures located on the respective sides of the first well center and the second well center. Work; one of the support structures can be the mast. In some embodiments, the protective structure can be configured to be brought into a stowed configuration that allows the pipelines to be transferred between the first well center and the second work center. For example, the protective structure can take the form of a dividing barrier structure such as a wall, fence or curtain that can be rolled up around a horizontal or vertical axis or otherwise brought into a compact, inactive configuration. The protective structure may have a height corresponding to the length of the largest pipelines handled by the drilling rig, for example, at least 50% as at least 75% as at least 100% of a height of the largest pipelines. It will be appreciated that such a protective structure can be implemented on any drilling rig having two or more lift systems and work centers.

[0058] A capacidade do equipamento relacionada ao primeiro centro do poço e o segundo centro de trabalho, por exemplo, os respectivos mastros, partes de um mastro comum, sistemas elevadores, etc., pode ser diferente, por exemplo, elas podem ter diferentes capacidades de elevação, ou elas podem ter capacidade de elevação igual e/ou ser de outro modo idênticas ou pelo menos indistintamente usadas para operações de perfuração. O equipamento relacionado ao segundo centro de trabalho pode compreender e/ou cooperar com os mesmos ou recursos, elementos, componentes ou dispositivos correspondentes já discutidos em relação ao primeiro mastro e/ou o primeiro centro do poço. Por exemplo, o segundo mastro pode compreender ou cooperar com uma estrutura protetora e/ou uma estrutura de montagem como descrito no presente documento. Os primeiro e segundo mastros podem ser estruturas separadas ou combinadas como uma estrutura do mastro única. Por exemplo, os primeiro e segundo mastros podem ser incorporados como um primeiro e segundo sistemas elevadores de suporte de mastro combinados.[0058] The capacity of the equipment related to the first well center and the second work center, for example, the respective masts, parts of a common mast, elevator systems, etc., may be different, for example, they may have different lifting capacities, or they may have equal lifting capacity and/or be otherwise identical or at least interchangeably used for drilling operations. Equipment related to the second work center may comprise and/or cooperate with the same or corresponding resources, elements, components or devices already discussed in relation to the first mast and/or the first well center. For example, the second mast may comprise or cooperate with a protective structure and/or a mounting structure as described herein. The first and second masts can be separate structures or combined as a single mast frame. For example, the first and second masts can be incorporated as a combined first and second mast support lift systems.

[0059] O termo operação de perfuração principal destina-se a se referir à operação de perfuração atual onde a coluna de perfuração é avançada através de um tubo de perfuração para e dentro o fundo do mar. Operações de perfuração auxiliares podem incluem a construção de cadeias de dutos, avanço do equipamento tubular em direção a ou para o fundo do mar, perfuração de um furo superior, e ou similares. Portanto, a plataforma de perfuração é configurada para avançar os tubos de elevação para o fundo do mar através de pelo menos o primeiro centro do poço, e a plataforma de perfuração compreende um desviador localizado sob a coberta do piso de perfuração no primeiro centro do poço. Em algumas modalidades, a plataforma de perfuração é configurada para permitir que as operações de perfuração sejam realizadas através de ambos centros do poço, isto é, ambos centros do poço, mastros, e sistemas elevadores pode ser configuradas para permitir que os tubos de elevação e a coluna de perfuração sejam avançados todo o caminho para o leito do oceano. Em algumas modalidades, o segundo mastro e/ou o segundo sistema elevador pode ser configurado para funcionar como um sistema auxiliar, por exemplo, para inserir tubos de elevação, construir suportes, e ou similares. Em algumas modalidades, o segundo sistema elevador pode ter uma capacidade diferente, por exemplo, menor, que o primeiro sistema elevador. Mesmo assim, mesmo em tais modalidades, o segundo mastro, sistema elevador e centro do poço podem ser adequados para assumirem a operação de perfuração primária, por exemplo, em situações quando o primeiro mastro, sistema elevador ou centro do poço não estão funcionando. Em outras palavras, qualquer dos recursos discutidos acima em relação ao primeiro centro do poço pode ainda estarem dispostos em relação ao segundo centro do poço, como um recurso combinado para ambos centros de poços ou um recurso em relação ao segundo centro do poço sozinho.[0059] The term main drilling operation is intended to refer to the current drilling operation where the drill string is advanced through a drill pipe to and into the seabed. Auxiliary drilling operations may include building pipeline chains, advancing tubular equipment to or to the sea floor, drilling an upper hole, and or the like. Therefore, the drilling rig is configured to advance the riser pipes to the seabed through at least the first center of the well, and the drilling rig comprises a diverter located under the cover of the drilling floor at the first center of the well. . In some embodiments, the drilling rig is configured to allow drilling operations to be carried out through both well centers, that is, both well centers, masts, and elevator systems can be configured to allow the risers and the drill string are advanced all the way to the ocean floor. In some embodiments, the second mast and/or the second elevator system can be configured to function as an auxiliary system, for example, to insert riser tubes, build supports, and the like. In some embodiments, the second elevator system may have a different capacity, for example less, than the first elevator system. Even so, even in such modalities, the second mast, elevator system and well center may be adequate to take over the primary drilling operation, for example, in situations when the first mast, elevator system or well center are not functioning. In other words, any of the features discussed above with respect to the first well center may still be arranged with respect to the second well center, as a combined feature for both well centers or a feature with respect to the second well center alone.

[0060] Em algumas modalidades, a plataforma de perfuração offshore compreende e então o equipamento de manuseio de duto para alimentar o equipamento tubular em direção ao primeiro centro do poço e equipamento de manuseio de duto para alimentar o equipamento tubular em direção ao segundo centro de trabalho, por exemplo, um segundo centro do poço; cada ou ambos dos equipamento de manuseio de duto define uma respectiva via de alimentação de duto, por exemplo, substancialmente ao longo da direção longitudinal, através da direção transversal, ao longo da qual a via de alimentação de duto equipamento tubular é movida em direção ao primeiro centro do poço e o segundo centro de trabalho, respectivamente. Em algumas modalidades, o equipamento tubular pode ser movido em paralelo para ambos o primeiro centro do poço e o segundo centro de trabalho. Em algumas modalidades, os dutos podem ser movidos a partir de uma estrutura de armazenamento comum como quando o equipamento tubular é movido para o poço/centros de trabalho a partir do mesmo lado. Isto permite uma operação mais eficiente de uma plataforma, e fornece um grau maior de flexibilidade e redundância dos componentes críticos. Algumas modalidades da plataforma de perfuração offshore compreendem uma estrutura de armazenamento de duto posicionada longitudinalmente deslocada a partir do primeiro centro do poço sobre um segundo lado do centro do poço, oposto ao primeiro lado e lateralmente posicionada entre as respectivas vias de alimentação de duto.[0060] In some embodiments, the offshore drilling rig comprises and then pipeline handling equipment for feeding tubular equipment towards the first well center and pipeline handling equipment for feeding tubular equipment towards the second well center. work, for example, a second well center; each or both of the duct handling equipment defines a respective duct feed path, for example, substantially along the longitudinal direction, through the transverse direction, along which the pipeline equipment duct feed path is moved towards the first well center and second work center respectively. In some embodiments, tubular equipment can be moved in parallel to both the first well center and the second work center. In some embodiments, ducts can be moved from a common storage structure such as when tubular equipment is moved to the well/work centers from the same side. This allows for more efficient operation of a platform, and provides a greater degree of flexibility and redundancy for critical components. Some embodiments of the offshore drilling rig comprise a longitudinally positioned pipeline storage structure offset from the first well center over a second well center side, opposite the first side and laterally positioned between respective pipeline feed paths.

[0061] Em algumas modalidades, a plataforma de perfuração pode compreender dois invólucros de desviador, um posicionado sob cada centro do poço.[0061] In some embodiments, the drilling rig may comprise two diverter casings, one positioned under each center of the well.

[0062] Como observado acima, qualquer recurso discutido em relação ao primeiro centro do poço pode estar presente em relação ao segundo centro de trabalho, incluindo uma coberta do piso de perfuração aberta são - referidos como uma segunda área de coberta do piso de perfuração aberta. Em algumas modalidades, a coberta do piso de perfuração compreende pelo menos uma primeira área de coberta do piso de perfuração aberta localizada adjacente ao primeiro mastro na direção transversal em um lado oposto ao segundo centro de trabalho, e uma segunda área de coberta do piso de perfuração aberta localizada adjacente ao segundo mastro na direção transversal em um lado oposto ao primeiro centro do poço. As primeira e segunda áreas de coberta do piso de perfuração são então áreas diferentes da área de coberta do piso de perfuração entre o primeiro centro do poço e o segundo centro de trabalho e que não seja qualquer área de coberta do piso de perfuração usada para o movimento do equipamento tubular para o primeiro centro do poço. Consequentemente, as áreas de coberta do piso de perfuração abertas são fornecidas em ambos os lados transversais do poço/centros de trabalho, desse modo aumentando ainda mais a flexibilidade e eficiência de uma plataforma, já que o equipamento auxiliar pode ser armazenado e/ou manuseado em ambos os lados do mastro e movidos para/a partir de ambos poço/centros de trabalho sem interferir com a operação de perfuração em outro poço/centro de trabalho. Em particular, em algumas modalidades, a plataforma de perfuração é configurada para realizar o movimento do equipamento tubular para o primeiro centro do poço e para o segundo centro de trabalho ao longo das respectivas primeira e segunda vias de alimentação do duto em direção aos respectivos primeiro e segundo centros do poço cujas primeira e segunda vias de alimentação do duto somente cruzam as áreas de coberta do piso de perfuração fora da primeira e segunda áreas de coberta do piso de perfuração abertas.[0062] As noted above, any features discussed in relation to the first well center may be present in relation to the second work center, including an open drilling floor covering are - referred to as a second open drilling floor covering area . In some embodiments, the drilling floor covering comprises at least a first open drilling floor covering area located adjacent to the first mast in the transverse direction on a side opposite the second work center, and a second drilling floor covering area. open borehole located adjacent to the second mast in the transverse direction on a side opposite the first well center. The first and second drilling floor coverage areas are then different areas of the drilling floor coverage area between the first well center and the second work center and other than any drilling floor coverage area used for the movement of the tubular equipment to the first center of the well. Consequently, open drill floor covering areas are provided on both cross sides of the well/work centers, thereby further increasing the flexibility and efficiency of a rig, as auxiliary equipment can be stored and/or handled. on both sides of the mast and moved to/from both well/work centers without interfering with the drilling operation in the other well/work center. In particular, in some embodiments, the drilling rig is configured to carry out movement of the tubular rig to the first well center and the second work center along respective first and second pipeline feed paths towards the respective first and second well centers whose first and second pipeline feed lanes only intersect the drill floor cover areas outside the first and second open drill floor cover areas.

[0063] Quando cada uma das primeira e segunda áreas de coberta do piso de perfuração abertas compreende uma via de acesso que se estende fora da base dos primeiro e segundo mastros e ao longo da direção transversal para o primeiro centro do poço e o segundo centro de trabalho, o equipamento auxiliar pode ser movido diretamente entre ambas as áreas de coberta do piso de perfuração abertas e o respectivo poço/centros de trabalho.[0063] When each of the first and second areas of open drilling floor coverage comprises an access road that extends outside the base of the first and second masts and along the transverse direction to the first center of the well and the second center The auxiliary equipment can be moved directly between both the open drilling floor deck areas and the respective well/work centers.

[0064] Quando as primeira e segunda áreas de coberta do piso de perfuração abertas são conectadas uma à outra por uma área de cobertura de conexão do piso de perfuração, o equipamento pode convenientemente ser movido entre as áreas de coberta do piso de perfuração abertas sem interferir com as operações de perfuração. A área de cobertura de conexão do piso de perfuração pode então ser moldada e dimensionada de modo a permitir que o equipamento seja movido entre as áreas de coberta do piso de perfuração abertas, por exemplo, por meio de uma empilhadeira e/ou sobre vigas deslizáveis, sem ter de subir ou descer sobre diferentes níveis da coberta. Por exemplo, a área de cobertura de conexão do piso de perfuração pode definir uma trajetória de conexão entre as primeira e segunda áreas de piso de perfuração abertas tendo uma largura de pelo menos 2 m, como pelo menos 3 m, como pelo menos 5 m. Em algumas modalidades, a área de cobertura de conexão do piso de perfuração se estende ao redor da estrutura de armazenamento de duto em um lado da estrutura de armazenamento de duto distal a partir do primeiro centro do poço e o segundo centros de trabalho.[0064] When the first and second open drilling floor covering areas are connected to each other by a drilling floor connection covering area, the equipment can be conveniently moved between the open drilling floor covering areas without interfere with drilling operations. The drilling floor connecting coverage area can then be molded and sized to allow the equipment to be moved between the open drilling floor coverage areas, for example, by means of a forklift and/or over sliding beams , without having to climb or descend on different levels of the deck. For example, the drilling floor connecting coverage area can define a connecting path between the first and second open drilling floor areas having a width of at least 2 m, such as at least 3 m, such as at least 5 m . In some embodiments, the drill floor connecting coverage area extends around the pipeline storage structure on one side of the pipeline storage structure distal from the first well center and the second work centers.

[0065] Em algumas modalidades a plataforma de perfuração compreende uma área de armazenamento para armazenar dutos localizada abaixo do nível definido pela coberta do piso de perfuração. A coberta do piso de perfuração pode então se estender acima e parcialmente ou completamente através de toda a área de armazenamento. Os dutos podem então ser armazenados de modo que ambas as extremidades de cada tubo são posicionadas abaixo do nível da coberta do piso de perfuração. Em particular, em algumas modalidades a área de armazenamento é configurada para receber dutos na orientação vertical de modo que uma extremidade superior dos dutos está localizada abaixo do nível da coberta do piso de perfuração. Os dutos podem ser juntas de duto de elevação, cadeias de duto de perfuração, cadeias de revestimento, ou outros membros tubulares. A plataforma de perfuração pode então compreender o equipamento de manuseio de duto para alimentar os dutos a partir da área de armazenamento através de uma abertura na coberta do piso de perfuração, diferente do poço e centros de trabalho, e para apresentar os dutos para o sistema elevador, por exemplo, de modo que uma extremidade superior de um membro tubular pode ser conectada a um impulsor superior, gancho ou dispositivo de conexão similar do sistema elevador e elevada através da abertura no piso de perfuração e para suspender o tubo acima do centro do poço. A abertura pode ser um furo ou corte no piso de perfuração. O equipamento de manuseio de duto pode compreender uma calha inclinada para avançar as juntas de duto de elevação e/ou outros tipos de dutos como suportes ou unidades do duto de perfuração ou revestimentos. Em algumas modalidades a calha pode ser configurada para ajustar sua posição e/ou inclinação enquanto a junta de duto de elevação ou outro tubo é avançada para cima através da abertura no piso de perfuração de modo a guiar a junta de duto de elevação ou outro tubo em direção a uma orientação cada vez mais vertical enquanto a junta de duto de elevação ou outro tubo é avançada para cima começando a partir de uma posição inclinada sobre uma calha. Consequentemente, um armazenamento particularmente de economia de espaço dos dutos é fornecido que fornece ainda um baixo centro de gravidade da estrutura. A área(s) de armazenamento pode ser localizada adjacente à janela do casco localizada abaixo dos centros do poço, como em dois lados opostos da janela do casco.[0065] In some embodiments, the drilling platform comprises a storage area to store pipelines located below the level defined by the cover of the drilling floor. The drill floor cover can then extend above and partially or completely through the entire storage area. The ducts can then be stored so that both ends of each pipe are positioned below the level of the drill floor cover. In particular, in some embodiments the storage area is configured to receive ducts in vertical orientation so that an upper end of the ducts is located below the level of the drill floor deck. The ducts can be riser duct joints, drill duct chains, casing chains, or other tubular members. The drilling rig can then comprise pipeline handling equipment to feed the pipelines from the storage area through an opening in the drilling floor deck, other than the well and work centers, and to present the pipelines to the system. elevator, for example, so that an upper end of a tubular member can be connected to an upper impeller, hook or similar connecting device of the elevator system and lifted through the opening in the drill floor and to suspend the pipe above the center of the pit. The opening can be a hole or cut in the drill floor. Duct handling equipment may comprise an inclined chute for advancing riser duct joints and/or other types of duct such as supports or drill duct units or casings. In some embodiments the chute can be configured to adjust its position and/or slope while the riser duct joint or other pipe is advanced upward through the opening in the drill floor to guide the riser duct joint or other pipe toward an increasingly vertical orientation as the riser duct joint or other pipe is advanced upward starting from an inclined position over a chute. Consequently, particularly space-saving storage of the ducts is provided that still provides a low center of gravity of the structure. Storage area(s) may be located adjacent to the hull window located below the pit centers, such as on two opposite sides of the hull window.

[0066] Em algumas modalidades, a plataforma de perfuração é disposta de modo que ambas as juntas de duto de elevação e cadeias de tubo de perfuração e/ou revestimentos podem ser armazenadas parcialmente ou completamente abaixo do piso de perfuração.[0066] In some embodiments, the drilling rig is arranged so that both riser duct joints and drill pipe strings and/or casings can be stored partially or completely below the drilling floor.

[0067] A área de armazenamento abaixo do nível da coberta do piso de perfuração pode ser configurada para armazenar dutos na orientação vertical e/ou horizontal.[0067] The storage area below the level of the drill floor deck can be configured to store ducts in vertical and/or horizontal orientation.

[0068] Por exemplo, quando a plataforma de perfuração é um navio de perfuração, a área de armazenamento abaixo da coberta do piso de perfuração pode ser configurada para o armazenamento horizontal de dutos, como tubos de elevação, para frente e/ou para trás da janela do casco. A plataforma pode então ser disposta para trazer as juntas de duto de elevação (ou outros dutos) sob o piso de perfuração e girar as juntas de duto de elevação para que elas sejam apresentadas através do orifício no piso de perfuração. Esta rotação pode ocorrer acima da maior área de janela do casco. A função de rotação do tubo de perfuração (ou outro tubo) pode ser realizada por uma das modalidades descritas no pedido de patente dinamarquesa copendente PA 2013 70602.[0068] For example, when the drilling rig is a drilling vessel, the storage area below the drilling floor cover can be configured for horizontal storage of pipelines, such as riser pipes, forward and/or backward from the hull window. The platform can then be arranged to bring the riser duct joints (or other ducts) under the drill floor and rotate the riser duct joints so that they are presented through the hole in the drill floor. This rotation can take place above the largest window area of the hull. The rotation function of the drill pipe (or other pipe) can be performed by one of the modalities described in copending Danish patent application PA 2013 70602.

[0069] O furo é de preferência encaixado com uma escotilha de modo que a escotilha pode ser usada como um piso quando a escotilha está fechada e o furo não está em uso.[0069] The hole is preferably fitted with a hatch so that the hatch can be used as a floor when the hatch is closed and the hole is not in use.

[0070] Em algumas modalidades, a plataforma de perfuração compreende uma construção de suporte e/ou área de doca (de preferência uma doca baixada) em um lado do mastro, oposto ao centro do poço.[0070] In some embodiments, the drilling rig comprises a supporting construction and/or dock area (preferably a lowered dock) on one side of the mast, opposite the center of the well.

[0071] De modo geral, de acordo com um aspecto, são divulgadas aqui modalidades de uma plataforma de perfuração offshore compreendendo: - uma coberta do piso de perfuração tendo um orifício que define um primeiro centro do poço; - um primeiro mastro que se estende para cima em relação à coberta do piso de perfuração; - um primeiro sistema elevador suportado pelo primeiro mastro e configurado para elevar e abaixar o equipamento tubular através do primeiro centro do poço; sendo que a estrutura de suporte de carga do primeiro sistema elevador é deslocada a partir de e localizada em um primeiro lado do primeiro centro do poço; - primeiro equipamento de manuseio de dutos para mover o equipamento tubular para o primeiro sistema elevador de modo a permitir que o primeiro sistema elevador eleve ou abaixe o equipamento tubular através do primeiro centro do poço; - uma estrutura de armazenamento como uma polia para armazenar dutos escolhidos a partir de dutos de perfuração, revestimentos, cadeias de dutos de perfuração e cadeias de revestimentos, localizados no primeiro lado do centro do poço; pelo menos parcialmente debaixo da coberta do piso de perfuração e/ou pelo menos parcialmente atrás da estrutura de suporte de carga quando visto a partir do primeiro centro do poço.[0071] Generally speaking, according to one aspect, embodiments of an offshore drilling rig comprising: - a drilling floor cover having a hole defining a first well center are disclosed herein; - a first mast extending upwards in relation to the cover of the drilling floor; - a first lift system supported by the first mast and configured to raise and lower the tubular equipment through the first center of the well; the load-bearing structure of the first elevator system being displaced from and located on a first side of the first center of the shaft; - first pipeline handling equipment to move the tubular equipment to the first elevator system so as to allow the first elevator system to raise or lower the tubular equipment through the first well center; - a storage structure such as a pulley to store pipelines chosen from drilling pipelines, casings, drilling pipeline chains and casing chains, located on the first side of the well center; at least partially under the cover of the drilling floor and/or at least partially behind the load-bearing structure when viewed from the first center of the well.

[0072] Por exemplo, isto pode ser vantajoso onde dois centros do poço são dispostos adjacentes a um mastro de atividade dupla em uma configuração lado a lado onde dutos pode ser movidos a partir da doca para ambos centros do poço. Em combinação com uma abertura formada no sistema elevador, por exemplo, entre grupos dos cilindros de içamento, que permite que os suportes sejam apresentados para o sistema elevador, um piso de perfuração aberto é atingível (consulte, por exemplo, Figura 15).[0072] For example, this may be advantageous where two well centers are arranged adjacent to a dual activity mast in a side-by-side configuration where ducts can be moved from the dock to both well centers. In combination with an opening formed in the lift system, for example between groups of lifting cylinders, which allows supports to be presented to the lift system, an open drilling floor is attainable (see for example Figure 15).

[0073] Em algumas modalidades a plataforma de perfuração compreende uma construção de suporte e/ou área de doca (de preferência uma doca baixada) adjacente ao mastro e atrás da cabine do perfurador, como no lado oposto da cabine dos perfuradores em relação ao centro(s) do poço. Exemplos disso são ilustrados nas figuras 14-21.[0073] In some embodiments the drilling rig comprises a support construction and/or dock area (preferably a lowered dock) adjacent to the mast and behind the drill booth, such as on the opposite side of the drill booth from the center (s) of the well. Examples of this are illustrated in figures 14-21.

[0074] Alternativamente, a plataforma de perfuração pode compreender uma construção de suporte e/ou área de doca em um dos lados transversais do centro do poço; por exemplo, isto pode ser vantajoso onde dois centros do poço são dispostos entre dois mastros ou porções do mastro dispostas em uma configuração face a face.[0074] Alternatively, the drilling rig may comprise a support construction and/or dock area on one of the transverse sides of the center of the well; for example, this may be advantageous where two well centers are arranged between two masts or portions of the mast arranged in a face-to-face configuration.

[0075] Equipamento de construção de suporte pode ser operável para montar cadeias de dutos de perfuração e/ou revestimentos, por exemplo, compreendendo dois, três ou mais dutos de perfuração. Tal equipamento de construção de suporte pode ser equipamento de construção de suporte dedicado que não operável para baixar os dutos para o leito do oceano. O equipamento de construção de suporte pode ser localizado pelo menos parcialmente abaixo da coberta do piso de perfuração.[0075] Support construction equipment may be operable to assemble strings of drilling ducts and/or casings, for example comprising two, three or more drilling ducts. Such support construction equipment may be dedicated support construction equipment which is not operable to lower the pipelines to the ocean floor. Supporting construction equipment may be located at least partially below the cover of the drilling floor.

[0076] Em algumas modalidades, a plataforma de perfuração compreende o equipamento de manuseio de dutos vertical para alimentar os dutos para a dita configuração de construção de suporte. O equipamento de manuseio de dutos vertical pode ser disposto para trazer os dutos armazenados para frente e/ou para trás do piso de perfuração para a configuração de construção de suporte sem cruzar o piso de perfuração. A área de doca pode ser baixada relativamente à coberta do piso de perfuração.[0076] In some embodiments, the drilling rig comprises vertical pipeline handling equipment to feed the pipelines to said support construction configuration. Vertical pipeline handling equipment can be arranged to bring stored pipelines to the front and/or rear of the drill floor into the supporting construction configuration without crossing the drill floor. The dock area can be lowered relative to the drill floor cover.

[0077] Em algumas modalidades, o primeiro sistema elevador compreende uma pluralidade de cilindros verticais que se estendem para cima a partir de uma posição adjacente ao primeiro centro do poço, e um impulsor superior operável para baixar os dutos através do primeiro centro do poço; e sendo que a plataforma de perfuração compreende adicionalmente equipamento de manuseio de duto operável para apresentar suportes e/ou unidades do revestimento ou duto de perfuração a partir de uma área de doca em um lado dos cilindros, oposto ao centro do poço, para o impulsor superior através de uma abertura formada entre dois grupos de cilindros, como através do corte na coberta de perfuração como discutido acima. Breve Descrição dos Desenhos[0077] In some embodiments, the first elevator system comprises a plurality of vertical cylinders extending upward from a position adjacent to the first center of the well, and an upper impeller operable to lower the ducts through the first center of the well; and the drilling rig further comprising pipeline handling equipment operable to present supports and/or casing units or drilling pipeline from a dock area on one side of the cylinders, opposite the center of the well, to the impeller top through an opening formed between two groups of cylinders, as through the cut in the perforation deck as discussed above. Brief Description of Drawings

[0078] Os objetivos, recursos e vantagens acima e/ou adicionais das modalidades e aspectos da presente invenção, serão ainda elucidados pelas seguinte descrição detalhada ilustrativa e não limitadora com referência aos desenhos anexos, sendo que:[0078] The above and/or additional objectives, features and advantages of the modalities and aspects of the present invention will be further elucidated by the following illustrative and non-limiting detailed description with reference to the attached drawings, as follows:

[0079] Figuras 1 a 8 ilustram vistas de uma modalidade de uma plataforma de perfuração offshore sendo que a Figura 1 mostra uma vista em 3D da plataforma de perfuração, as Figuras 2 a 6 mostram vistas em 3D de partes da plataforma de perfuração a partir de diferentes pontos de vista, a Figura 7 mostra uma vista em seção transversal de uma plataforma de perfuração em um plano longitudinal através do centro da plataforma de perfuração, olhando na direção transversal, e Figura 8 mostra um vista superior da plataforma de perfuração.[0079] Figures 1 to 8 illustrate views of a modality of an offshore drilling platform, Figure 1 shows a 3D view of the drilling platform, Figures 2 to 6 show 3D views of parts of the drilling platform from from different points of view, Figure 7 shows a cross-sectional view of a drilling rig in a longitudinal plane through the center of the drilling rig, looking in the transverse direction, and Figure 8 shows a top view of the drilling rig.

[0080] Figura 9 ilustra esquematicamente adicionalmente as modalidades da disposição da coberta da coberta do piso de perfuração de uma plataforma de perfuração.[0080] Figure 9 further schematically illustrates the arrangement modalities of the cover of the cover of the drilling floor of a drilling rig.

[0081] Figura 10 ilustra esquematicamente as áreas de coberta do piso de perfuração abertas em uma modalidade de uma plataforma de perfuração.[0081] Figure 10 schematically illustrates the open drilling floor cover areas in one embodiment of a drilling rig.

[0082] Figura 11 ilustra esquematicamente a base do mastro em uma modalidade de uma plataforma de perfuração.[0082] Figure 11 schematically illustrates the base of the mast in a modality of a drilling platform.

[0083] Figura 12 ilustra esquematicamente disposições da coberta do piso de perfuração de outra modalidade de uma plataforma de perfuração.[0083] Figure 12 schematically illustrates arrangements of the drilling floor cover of another modality of a drilling rig.

[0084] Figura 13 ilustra esquematicamente disposições da coberta do piso de perfuração de modalidades adicionais de uma plataforma de perfuração.[0084] Figure 13 schematically illustrates drill floor deck arrangements of additional modalities of a drilling rig.

[0085] Figura 14 ilustra outra modalidade de uma plataforma de perfuração offshore.[0085] Figure 14 illustrates another modality of an offshore drilling rig.

[0086] Figuras 15 a 21 ilustram outra modalidade de uma plataforma de perfuração offshore, sendo que as Figuras 15 a 16 mostram vistas em 3D de partes da plataforma de perfuração a partir de diferentes pontos de vista, as Figuras 17 a 18 mostram vistas em seção transversal horizontais da plataforma de perfuração, as Figuras 19 a 20 mostram vistas em seção lateral da plataforma de perfuração, e a Figura 21 mostra outra vista em 3D do piso de perfuração visto a partir do estibordo do navio de perfuração. Figuras 22A-22D mostram vistas em seção transversal horizontais das plataformas de perfuração ilustrando diferente disposições nos quais os dutos podem ser alimentados para um centro do poço.[0086] Figures 15 to 21 illustrate another modality of an offshore drilling platform, and Figures 15 to 16 show 3D views of parts of the drilling platform from different points of view, Figures 17 to 18 show views in horizontal cross section of the drilling rig, Figures 19 to 20 show side sectional views of the drilling rig, and Figure 21 shows another 3D view of the drilling floor seen from the starboard side of the drilling vessel. Figures 22A-22D show horizontal cross-sectional views of drilling rigs illustrating different arrangements in which pipelines can be fed to a well center.

[0087] Figuras 23 A)-D) ilustram diferentes configurações de aberturas para acomodar dutos que são entregues para um centro do poço.[0087] Figures 23 A)-D) illustrate different configurations of openings to accommodate ducts that are delivered to a well center.

[0088] Figura 24 mostra uma modalidade onde a estrutura do mastro é mostrada tendo uma abertura para permitir que os dutos sejam alimentado para um centro do poço.[0088] Figure 24 shows an embodiment where the mast structure is shown having an opening to allow the ducts to be fed to a center of the well.

Descrição DetalhadaDetailed Description

[0089] Na seguinte descrição, referência é feita às figuras anexas, que mostram por meio de ilustração como a invenção pode ser praticada.[0089] In the following description, reference is made to the attached figures, which show by way of illustration how the invention can be practiced.

[0090] Uma modalidade de uma plataforma de perfuração offshore será descrita com referência às Figuras 1 a 8.[0090] A modality of an offshore drilling rig will be described with reference to Figures 1 to 8.

[0091] A plataforma de perfuração é uma plataforma de perfuração semissubmersível, compreendendo pontões 101 a partir dos quais as colunas de suporte 102 se estendem para cima, e uma plataforma lateral superior 103 suportada pelas colunas 102. Durante a operação, a plataforma de perfuração flutua na superfície do oceano com os pontões 101 tipicamente sob a água e as colunas de suporte que se estendem para fora da água de modo que uma plataforma lateral superior é elevada acima da água. Para este fim, os pontões podem ser enchidos com água de lastro de modo a fazer com que uma plataforma seja submersa até o nível desejado.[0091] The drilling rig is a semi-submersible drilling rig, comprising jetties 101 from which the support columns 102 extend upwards, and an upper side platform 103 supported by the columns 102. During operation, the drilling rig floats on the ocean surface with the pontoons 101 typically underwater and support columns extending out of the water so that an upper lateral platform is elevated above the water. To this end, pontoons can be filled with ballast water in order to submerge a platform to the desired level.

[0092] A plataforma lateral superior compreender uma coberta do piso de perfuração 107 disposta elevada a partir de uma coberta principal 120 e parcialmente formada pelo teto de um gabinete 121 que acomoda o equipamento de mistura de lama e/ou outro equipamento. A coberta do piso de perfuração 107 compreende dois furos que definem centros do poço 123a,b localizados próximo a um mastro de atividade dupla 104. O mastro de atividade dupla 104 se estende para cima a partir da coberta do piso de perfuração 107 e compreende duas porções do mastro 104a,b dispostas lado a lado na direção transversal. A plataforma de perfuração compreende os respectivos sistemas elevadores hidráulicos 105a,b, cada um para baixar uma coluna de perfuração através de um respectivo dos centros do poço 123a,b em direção ao leito do oceano. Cada sistema elevador hidráulico compreende cilindros 106a,b, respectivamente, que se estendem para cima a partir da coberta do piso de perfuração e suportam a carga a ser baixada ou içada. Cada porção do mastro é associada com um dos sistemas elevadores e estabiliza os sistemas elevadores contra forças laterais e/ou contra a dobra dos membros de suporte que carregam o peso das polias e a carga suspensa a partir do sistema elevador. Cada centro do poço está situado próximo a uma das porções do mastro e o sistema elevador correspondente; ambos centros do poço são localizados no mesmo lado em relação ao mastro. A posição de cada um dos centros do poço em relação ao sistema elevador correspondente define uma direção longitudinal, neste exemplo a direção longitudinal da plataforma de perfuração, isto é, entre o arco e a popa da plataforma de perfuração. Os centros do poço são dispostos ao longo de uma direção transversal, normal à direção longitudinal, neste exemplo a direção transversal (de bombordo a estibordo) da plataforma de perfuração. As direções longitudinal e transversal são indicadas pelas setas 140 e 141, respectivamente, na Figura 8.[0092] The upper side platform comprises a drilling floor deck 107 disposed elevated from a main deck 120 and partially formed by the roof of a cabinet 121 that accommodates the mud mixing equipment and/or other equipment. The drill floor cover 107 comprises two holes defining well centers 123a,b located near a dual activity mast 104. The dual activity mast 104 extends upward from the drill floor cover 107 and comprises two mast portions 104a,b arranged side by side in the transverse direction. The drilling rig comprises respective hydraulic lift systems 105a,b each for lowering a drill string through a respective one of the well centers 123a,b towards the ocean floor. Each hydraulic lift system comprises cylinders 106a,b, respectively, which extend upwards from the cover of the drilling floor and support the load to be lowered or lifted. Each portion of the mast is associated with one of the elevator systems and stabilizes the elevator systems against lateral forces and/or against bending of the support members that carry the weight of the pulleys and the suspended load from the elevator system. Each center of the well is situated close to one of the portions of the mast and the corresponding elevator system; both well centers are located on the same side with respect to the mast. The position of each of the well centers in relation to the corresponding elevator system defines a longitudinal direction, in this example the longitudinal direction of the drilling rig, that is, between the bow and stern of the drilling rig. The well centers are arranged along a transverse direction, normal to the longitudinal direction, in this example the transverse direction (port to starboard) of the drilling rig. The longitudinal and transverse directions are indicated by arrows 140 and 141, respectively, in Figure 8.

[0093] Os cilindros de cada sistema elevador são dispostos em dois grupos que são posicionados deslocados um do outro na direção transversal de modo a formar uma abertura 126a,b, respectivamente, entre os dois grupos. Cada abertura 126a,b é então alinhada com um respectivo dos centros do poço ao longo da direção longitudinal. Cada abertura se estende para cima ao longo de todo o comprimento dos cilindros, permitindo assim que os dutos sejam movidos através da abertura em direção ao respectivo centro do poço e mesmo elevado em uma posição vertical enquanto sendo localizados pelo menos parcialmente na abertura entre os cilindros. O centro do poço é longitudinalmente deslocado a partir da abertura. Alternativamente ou adicionalmente os cilindros ou outros membros de suporte podem ser posicionados sobre uma fundação elevada acima do piso de perfuração e uma abertura pode pelo menos parcialmente ser formada na fundação. Uma abertura também pode ser obtida de um modo alternativo ou em combinação com uma abertura entre os cilindros, como será ilustrado em combinação com as Figuras 22-24 abaixo. As hastes dos cilindros suportam polias 133a,b, respectivamente, de uma ligação móvel sobre a qual os fios de elevação são suspensos. Uma extremidade dos fios de elevação é ancorada à plataforma de perfuração, enquanto a outra extremidade é conectada ao impulsor superior 137a,b ou gancho do sistema elevador correspondente. As polias 133a,b são lateralmente suportadas e guiadas pelas respectivas porções do mastro. O eixo das polias se estende na direção transversal entre dois grupos de cilindros, isto é, entre membros de suporte para suportar o peso da polia(s).[0093] The cylinders of each elevator system are arranged in two groups that are positioned offset from each other in the transverse direction so as to form an opening 126a,b, respectively, between the two groups. Each opening 126a,b is then aligned with a respective one of the well centers along the longitudinal direction. Each opening extends upwards along the entire length of the cylinders, thus allowing the ducts to be moved through the opening towards the respective center of the well and even raised to a vertical position whilst being located at least partially in the opening between the cylinders. . The center of the well is longitudinally displaced from the opening. Alternatively or additionally the cylinders or other support members can be positioned on a foundation raised above the drilling floor and an opening can be at least partially formed in the foundation. An opening can also be obtained alternatively or in combination with an opening between the cylinders, as will be illustrated in combination with Figures 22-24 below. The rods of the cylinders support pulleys 133a,b, respectively, of a movable link on which the lifting wires are suspended. One end of the lift wires is anchored to the drilling rig, while the other end is connected to the upper pusher 137a,b or hook of the corresponding lift system. Pulleys 133a,b are laterally supported and guided by respective portions of the mast. The axis of the pulleys extends in the transverse direction between two groups of cylinders, that is, between support members to support the weight of the pulley(s).

[0094] A configuração lado a lado do mastro de atividade dupla e centros do poço permite operações duplas eficientes, fácil acesso a ambos centros do poço, e controle visual conveniente de ambos os centros do poço a partir de uma única cabine do perfurador 134 que pode, por exemplo, ser posicionada transversalmente entre os centros do poço, por exemplo, dentro da base do mastro.[0094] The side-by-side configuration of the dual activity mast and well centers allows for efficient dual operations, easy access to both well centers, and convenient visual control of both well centers from a single drill cabin 134 that it can, for example, be positioned transversely between the centers of the shaft, for example within the base of the mast.

[0095] A plataforma de perfuração compreende uma estrutura de recuo 112 ou estrutura de armazenamento de duto similar para armazenar cadeias de dutos localizadas no outro lado (visto na direção longitudinal) dos centros do poço, oposto ao mastro. A estrutura de recuo compreende uma estrutura de suporte que suporta estaleiros da torre tendo dedos que se estendem horizontalmente entre os quais os dutos podem ser armazenados. A estrutura de recuo é disposta transversalmente entre as posições transversais dos centros do poço de modo a permitir que os suportes sejam movidos para/a partir de ambos centros do poço a partir de/para a doca. Para este fim, dois contentores de coluna 113a,b ou equipamento de manuseio de dutos vertical similar são dispostos para mover os suportes para dentro e fora da estrutura de recuo 112. Os contentores de coluna são operáveis para mover ao longo da direção transversal ao longo de uma viga de suporte 130 abrangendo a distância transversal entre os centros do poço. A viga de suporte pode ser uma parte da estrutura de suporte da doca. A estrutura de recuo 112 pode se estender para baixo para uma coberta abaixo da coberta do piso de perfuração de modo a permitir que suportes montados a partir de múltiplos tubos a serem armazenados e movidos para um respectivo dos centros do poço. A estrutura de recuo pode compreender uma toca de raposa e equipamento de construção de suporte separado ou integrado, permitindo assim que as cadeias de tubos sejam montadas e armazenadas sem interferir com as operações nos centros do poço. Alternativamente ou adicionalmente, um dos sistemas elevadores e centros do poço, por exemplo, centro do poço 123a,b pode ser utilizado para construir suportes.[0095] The drilling rig comprises a setback structure 112 or similar pipeline storage structure for storing pipeline chains located on the other side (viewed in the longitudinal direction) of the well centers, opposite the mast. The setback structure comprises a support structure that supports tower yards having horizontally extending fingers between which the ducts can be stored. The setback structure is disposed transversely between the transverse positions of the well centers to allow the supports to be moved to/from both well centers to/from the dock. To this end, two column containers 113a,b or similar vertical duct handling equipment are arranged to move the supports in and out of the setback structure 112. The column containers are operable to move along the transverse direction along of a support beam 130 spanning the transverse distance between the well centers. The support beam can be a part of the dock's support structure. The setback structure 112 may extend downwards to a deck below the drill floor deck to allow brackets mounted from multiple pipes to be stored and moved to a respective one of the well centers. The setback structure may comprise a fox hole and separate or integrated support construction equipment, thus allowing the strings of pipes to be assembled and stored without interfering with operations at the well centers. Alternatively or additionally, one of the elevator systems and well centers, for example, well center 123a,b can be used to build supports.

[0096] Uma área de armazenamento de tubo 109 para armazenar tubos na orientação horizontal é localizada atrás da estrutura de recuo, vista a partir dos centros do poço. Em ambos os lados transversais de uma área de armazenamento de tubo respectivas passarelas elevadas 108a,b, ou equipamento de manuseio de dutos horizontal similar, são localizados se estendendo na direção longitudinal, cada um alinhado com um dos centros do poço, isto é, de modo que um equipamento de manuseio de dutos horizontal define um eixo longitudinal que cruza um dos centros do poço. Cada passarela elevada é operável para mover os tubos da área de armazenamento 109 para o centro do poço correspondente e sistema elevador. Para este fim, os tubos podem ser colocados sobre a passarela elevada por uma grua, por exemplo, um dos guindastes articulados 138, e a passarela elevada pode ser longitudinalmente movida para o centro do poço correspondente, por exemplo, nas vigas deslizáveis ou faixas 139a,b que definem uma via de alimentação reta de duto para o centro do poço correspondente. Por isso, as passarelas elevadas movem o equipamento tubular ao longo das vias de alimentação de duto correspondentes 139a,b em direção ao centro do poço correspondente. As passarelas elevadas e faixas 139a,b definem assim vias de alimentação de duto longitudinais, cada interseção com um do centros do poço. As vias de alimentação de duto 139a,b se estendem em direção aos centros do poço a partir de um lado dos centros do poço oposto ao lado no qual o mastro está situado. Os contentores de coluna 113a,b podem ser transversalmente movidos para uma posição na via de alimentação de duto, isto é, na extensão longitudinal de uma das passarelas elevadas. Nesta posição, o contentor da coluna pode então receber um tubo a partir da passarela elevada e, em cooperação com a passarela elevada, trazer o tubo para uma posição vertical.[0096] A tube storage area 109 for storing tubes in horizontal orientation is located behind the setback structure, seen from the centers of the well. On both transverse sides of a pipe storage area respective elevated walkways 108a,b, or similar horizontal pipeline handling equipment, are located extending in the longitudinal direction, each aligned with one of the well centers, i.e. so that horizontal pipeline handling equipment defines a longitudinal axis that crosses one of the well centers. Each elevated walkway is operable to move tubes from storage area 109 to the center of the corresponding shaft and elevator system. To this end, the tubes can be placed on the raised walkway by a crane, for example one of the articulated cranes 138, and the raised walkway can be moved longitudinally to the center of the corresponding well, for example on the sliding beams or tracks 139a ,b which define a straight pipeline feed path to the center of the corresponding well. Hence, the elevated walkways move the tubular equipment along the corresponding pipeline feed paths 139a,b towards the center of the corresponding well. Elevated walkways and lanes 139a,b thus define longitudinal duct feedways, each intersecting with one of the well centers. Duct feed paths 139a,b extend towards the shaft centers from a side of the shaft centers opposite the side on which the mast is situated. The column containers 113a,b can be transversely moved into a position in the duct feed path, i.e. in the longitudinal extension of one of the elevated walkways. In this position, the column container can then receive a tube from the elevated walkway and, in cooperation with the elevated walkway, bring the tube into a vertical position.

[0097] A plataforma de perfuração compreende outra área de armazenamento 115 no outro lado do mastro, isto é, no lado oposto aos centros do poço. Esta área de armazenamento está situada em uma coberta mais baixa do que a coberta do piso de perfuração, e é usada para armazenar juntas de duto de elevação marinhas (também simplesmente referidas como tubos de elevação) em uma orientação vertical. Os tubos de elevação podem então ser movidos, por exemplo, por meio de uma grua do pórtico 136 e respectivas calhas 132a,b ou outro equipamento de alimentação de tubo adequado para os respectivos centros do poço. Como os tubos de elevação podem ser movidos através das aberturas 126a,b entre os cilindros 106a,b dos sistemas elevadores, os tubos de elevação podem ser movidos diretamente a partir da área de armazenamento de duto de elevação 115 para o centro do poço de uma maneira eficiente em espaço.[0097] The drilling rig comprises another storage area 115 on the other side of the mast, that is, on the side opposite the well centers. This storage area is situated on a deck lower than the drill floor deck, and is used to store marine riser duct joints (also simply referred to as riser pipes) in a vertical orientation. The riser tubes can then be moved, for example, by means of a gantry crane 136 and respective chutes 132a,b or other suitable tube feeding equipment to the respective well centers. As the riser tubes can be moved through the openings 126a,b between the cylinders 106a,b of the elevator systems, the riser tubes can be moved directly from the riser duct storage area 115 to the center of the well of a space-efficient way.

[0098] Neste exemplo, como todos os dutos são movidos para os centros do poço a partir de lados opostos dos centros do poço ao longo da direção longitudinal, e já que a estrutura de recuo 112 e a área de armazenamento 115 são localizadas longitudinalmente deslocadas a partir dos centros do poço, a coberta do piso de perfuração 107 compreende grandes áreas de coberta do piso de perfuração abertas 110a,b em ambos os lados laterais do mastro e centros do poço. Estas áreas de coberta do piso de perfuração abertas não são ocupadas pelo equipamento de manuseio de duto, e todos os movimentos do tubo entre a área de armazenamento/docas 112, 115 e os centros do poço 123a,b são realizados ao longo da direção longitudinal. As vias de alimentação de duto ao longo das quais os tubos e outro dutos são movidos para/a partir dos centros do poço não cruzam as áreas laterais de coberta do piso de perfuração abertas 110a,b. Consequentemente, estas áreas podem ser usadas como área de trabalho, por exemplo, para montar o equipamento auxiliar suspendível como tubulação em espiral, e/ou para posicionar equipamento auxiliar sobre a coberta 111. No exemplo das Figuras 1-8, a área de coberta do piso de perfuração aberta 110a é usada para colocação e/ou movimento do equipamento auxiliar sobre a coberta e/ou para manusear e/ou operar tal equipamento auxiliar enquanto ao mesmo tempo proporciona o acesso eficiente e seguro ao centro do poço. A área de coberta do piso de perfuração aberta 110b é mantida livre de qualquer equipamento de manuseio de duto e qualquer outro equipamento permanentemente instalado; esta área pode então ser usada como uma área de trabalho e/ou área de armazenamento intermediária. Ambas as áreas de coberta do piso de perfuração abertas 110a,b são conectadas com os centros do poço por vias de acesso diretas, retas 114a,b, respectivamente, permitindo assim que o equipamento seja convenientemente movido entre as áreas de coberta do piso de perfuração abertas 110a,b e os centros do poço, por exemplo, sobre vigas deslizáveis 116. Qualquer trabalho dentro das áreas de coberta do piso de perfuração abertas 110a,b não interfere com movimentos do tubo para/a partir dos centros do poço ou com outras operações nos centros do poço.[0098] In this example, as all ducts are moved to the well centers from opposite sides of the well centers along the longitudinal direction, and since the setback structure 112 and storage area 115 are located longitudinally displaced from the well centers, the drill floor cover 107 comprises large open drill floor cover areas 110a,b on both sides of the mast and well centers. These open drill floor deck areas are not occupied by the pipeline handling equipment, and all pipe movements between storage area/docks 112, 115 and well centers 123a,b are carried out along the longitudinal direction. . Duct feed paths along which pipes and other ducts are moved to/from well centers do not intersect the open drill floor deck deck areas 110a,b. Consequently, these areas can be used as a working area, for example, to mount the suspendable auxiliary equipment such as spiral piping, and/or to position auxiliary equipment on the deck 111. In the example of Figures 1-8, the deck area of open drilling floor 110a is used for placing and/or moving auxiliary equipment over the deck and/or for handling and/or operating such auxiliary equipment while at the same time providing efficient and safe access to the well center. The open drilling floor deck area 110b is kept clear of any pipeline handling equipment and any other permanently installed equipment; this area can then be used as a working area and/or intermediate storage area. Both of the open drilling floor cover areas 110a,b are connected to the well centers by direct, straight access ways 114a,b respectively, thus allowing the rig to be conveniently moved between the drilling floor cover areas open 110a,b and the well centers, eg over sliding beams 116. Any work within the open drilling floor cover areas 110a,b does not interfere with pipe movements to/from the well centers or with other operations in the well centers.

[0099] Os centros do poço são colocados fora da base do mastro e longitudinalmente deslocados em relação aos cilindros 106a,b, e as vias de acesso não são bloqueadas por quaisquer outras estruturas instaladas fixamente sobre a coberta do piso de perfuração ou estruturas elevadas a uma baixa altura acima da coberta do piso de perfuração. Assim, o acesso conveniente entre as áreas de coberta do piso de perfuração abertas 110a,b e os centros do poço é fornecido.[0099] The well centers are placed outside the base of the mast and longitudinally displaced in relation to the cylinders 106a,b, and the access ways are not blocked by any other structures fixedly installed on the cover of the drilling floor or structures raised to a low height above the drill floor deck. Thus, convenient access between the open drill floor cover areas 110a,b and the well centers is provided.

[00100] As áreas de coberta do piso de perfuração abertas mesmo estendidas lateralmente ao longo das passarelas elevadas, permitem assim que o equipamento seja movido ao longo das passarelas elevadas e/ou armazenados nas áreas de coberta do piso de perfuração abertas 117a,b que se estendem ao longo de cada uma das passarelas elevadas. Em particular, como as passarelas elevadas são localizadas na coberta do piso de perfuração e como a coberta do piso de perfuração compreende uma grande área de piso que se estende ao longo das passarelas elevadas, membros da tripulação podem trabalhar com ou nas passarelas elevadas sem qualquer (ou pelo menos com reduzido) perigo de cair. As partes 117a,b da área de coberta do piso de perfuração aberta que se estende ao longo da passarelas elevadas são grandes o suficiente para permitir que as vigas deslizáveis sejam instaladas, permitindo assim que o equipamento seja movido na direção contrárias às áreas laterais de coberta do piso de perfuração abertas 110a,b.[00100] The open drilling floor cover areas even extended laterally along the raised walkways thus allow the equipment to be moved along the raised walkways and/or stored in the open drilling floor cover areas 117a,b that extend along each of the elevated walkways. In particular, as the elevated walkways are located on the drilling floor cover and as the drilling floor cover comprises a large floor area that extends along the raised walkways, crew members can work with or on the raised walkways without any (or at least with reduced) danger of falling. The portions 117a,b of the open drilling floor deck area that extends along the raised walkways are large enough to allow the sliding beams to be installed, thus allowing the equipment to be moved in the opposite direction to the side deck areas of drill floor open 110a,b.

[00101] As áreas laterais de coberta do piso de perfuração abertas 110a,b são ainda ligadas uma a outra por uma área de cobertura de conexão do piso de perfuração 118, neste exemplo uma trajetória reta da área de coberta do piso de perfuração aberta que se estende entre uma estrutura de recuo 112 e uma área de armazenamento de tubo 109. A área de cobertura de conexão do piso de perfuração 118 forma um caminho largo o suficiente para que as vigas deslizáveis sejam instaladas ou uma empilhadeira para mover ao longo, permitindo assim que o equipamento seja convenientemente movido a partir de uma das áreas laterais de coberta do piso de perfuração abertas 110a,b para a outra, sem ter que cruzar os centros do poço.[00101] The open drilling floor covering side areas 110a,b are further connected to each other by a drilling floor connecting cover area 118, in this example a straight path of the open drilling floor covering area which extends between a setback structure 112 and a pipe storage area 109. The drill floor connection coverage area 118 forms a path wide enough for slide-in beams to be installed or a forklift to move along, allowing so the rig is conveniently moved from one of the open drilling floor deck deck areas 110a,b to the other, without having to cross well centers.

[00102] Como é mais facilmente visto nas Figuras 2 e 4, a plataforma de perfuração compreende estruturas protetoras 119 que se estendem na direção longitudinal a partir dos respectivos lados laterais do mastro 104 para a estrutura de suporte da estrutura de recuo 112. Será apreciado, no entanto, que as estruturas protetoras 119 podem ser suportadas por uma estrutura de suporte separada. As estruturas protetoras perpassam através das vias de acesso 114a,b entre os centros do poço e o respectivas áreas de coberta do piso de perfuração abertas 110a,b a uma altura alta o suficiente para permitir que o equipamento seja movido sob as estruturas protetoras. Por exemplo, as vias de acesso 114a,b podem ter uma altura livre de pelo menos 10 m, como pelo menos 20 m, permitindo assim que os mesmos itens altos sejam movidos. As estruturas protetoras são adicionalmente situadas em uma altura acima da coberta do piso de perfuração que é adequada para impedir que os dutos que entram através de um dos centros do poço caiam sobre as áreas de coberta do piso de perfuração abertas 110a,b. Consequentemente, os equipamentos armazenados ou ainda membros da tripulação trabalhando em uma das áreas de coberta do piso de perfuração abertas 110a,b são protegidas contra a queda do equipamento tubular. Em algumas modalidades, a altura na qual as estruturas protetoras são dispostas podem ser ajustáveis. Por exemplo, as estruturas protetoras podem ser montadas para trilhos ou faixas que se estendem para cima ao longo das estruturas de suporte para as quais as estruturas protetoras são montadas. As estruturas protetoras podem então ser içadas por fios ou cabos, por um mecanismo hidráulico, ou por outro mecanismo de elevação adequado. Por isso, as estruturas protetoras podem ser posicionadas em diferentes alturas de acordo com o comprimento do equipamento tubular em operação. Alternativamente, a estrutura protetora pode ser formada como uma pluralidade de estruturas separadas que são dispostas em diferentes alturas e/ou cujas alturas podem ser individualmente ajustadas. Ainda em outra modalidade as estruturas protetoras podem ser operáveis para serem abertas de modo a permitir o acesso desobstruído ao centro do poço, mesmo para equipamento tendo uma grande altura. Por exemplo, dutos com defeito podem precisar ser colocado dentro de uma das áreas de coberta do piso de perfuração abertas 110a,b, de modo a permitir a manutenção ou reparo do equipamento defeituoso enquanto a operação de perfuração continua. As estruturas protetoras podem ser abertas em um número de modos diferentes. Por exemplo, elas podem ser articuladas em um lado ou ambos os lados, ou elas podem ser deslizáveis para uma grande altura. Os inventores perceberam que tal estrutura protetora também pode ser implementada em combinação com outros tipos de estruturas do mastro, como outras estruturas protetoras fornecendo uma coberta do piso de perfuração aberta.[00102] As is more easily seen in Figures 2 and 4, the drilling rig comprises protective structures 119 that extend in the longitudinal direction from the respective lateral sides of the mast 104 to the support structure of the recoil structure 112. It will be appreciated However, the protective structures 119 can be supported by a separate support structure. The protective structures run through access roads 114a,b between the well centers and the respective open drill floor cover areas 110a,b at a height sufficient to allow the equipment to be moved under the protective structures. For example, access roads 114a,b may have a clearance height of at least 10 m, such as at least 20 m, thus allowing the same tall items to be moved. The protective structures are additionally situated at a height above the drill floor deck that is adequate to prevent pipelines entering through one of the well centers from falling onto the open drill floor deck areas 110a,b. Consequently, stored equipment or crew members working in one of the open drilling floor deck areas 110a,b are protected against dropping the tubular equipment. In some embodiments, the height at which the protective structures are placed can be adjustable. For example, the protective structures can be mounted to rails or tracks that extend upward along the support structures to which the protective structures are mounted. The protective structures can then be lifted by wires or cables, a hydraulic mechanism, or another suitable lifting mechanism. Therefore, the protective structures can be positioned at different heights according to the length of the tubular equipment in operation. Alternatively, the protective structure can be formed as a plurality of separate structures which are arranged at different heights and/or whose heights can be individually adjusted. In yet another modality the protective structures can be operable to be opened in order to allow unobstructed access to the center of the well, even for equipment having a great height. For example, defective ducts may need to be placed within one of the open drilling floor deck areas 110a,b, in order to allow maintenance or repair of the defective equipment while the drilling operation continues. Protective structures can be opened in a number of different ways. For example, they can be hinged on one side or both sides, or they can be slidable to a great height. The inventors realized that such a protective structure can also be implemented in combination with other types of mast structures, such as other protective structures providing an open drill floor covering.

[00103] Como é mais facilmente visto nas Figuras 2 e 6 a plataforma de perfuração compreende adicionalmente uma viga de pórtico ou estrutura 125 ou uma estrutura de montagem similar para suspender o equipamento auxiliar suspendível a partir de uma posição elevada acima da coberta do piso de perfuração, permitindo que o equipamento auxiliar seja abaixado ou elevado através do primeiro centro do poço. A viga de pórtico 125 é conectada às respectivas estruturas de suporte em ambos lados longitudinais dos centros do poço e lateralmente deslocados a partir do centro do poço. Nesta modalidade particular, a viga de pórtico é fixa ao mastro 104 e à estrutura de recuo 112 e abrange a via de acesso 114a entre a área de coberta do piso de perfuração aberta 110a e os centros do poço. A viga de pórtico 125 é operável para ser içada ou baixada pelo menos entre uma posição operacional elevada acima da coberta do piso de perfuração, e uma posição inferior imediatamente acima da coberta do piso de perfuração permitindo a montagem do equipamento auxiliar para a estrutura de montagem. Por exemplo, a posição inferior pode estar não mais que 2 m acima da coberta do piso de perfuração ou outra altura suficientemente baixa para o pessoal fixar o equipamento à viga de pórtico diretamente a partir da coberta do piso de perfuração. A posição elevada pode estar pelo menos, 3 m, 5 m, ou 10 m acima da coberta do piso de perfuração, como pelo menos 15 m acima da coberta do piso de perfuração, por exemplo, pelo menos 20 m acima da coberta do piso de perfuração. Para este fim, a viga de pórtico pode ser montada sobre trilhos ou faixas que se estendem para cima ao longo das estruturas de suporte às quais a viga de pórtico está conectada. A viga de pórtico pode então ser içada por fios ou cabos, por um mecanismo hidráulico, ou por outro mecanismo de elevação adequado. Por exemplo, a viga de pórtico 125 e a estrutura protetora 119 podem ser montadas para o mesmo mecanismo de içamento. Em algumas modalidades, a viga de pórtico pode ainda ser uma parte da estrutura protetora. Será apreciado que uma viga de pórtico ou estrutura de montagem similar pode ser disposta proximal a, e operável com, cada um dos centros do poço ou proximal a, e operável com, somente um dos centros do poço as no exemplo das Figuras 1-8.[00103] As is more easily seen in Figures 2 and 6 the drilling rig further comprises a gantry beam or structure 125 or a similar mounting structure to suspend the suspendable auxiliary equipment from an elevated position above the floor covering of drilling, allowing auxiliary equipment to be lowered or raised through the first center of the well. The gantry beam 125 is connected to respective support structures on both sides longitudinally from the well centers and laterally offset from the well center. In this particular embodiment, the gantry beam is attached to the mast 104 and the setback structure 112 and spans the access road 114a between the cover area of the open drilling floor 110a and the well centers. The gantry girder 125 is operable to be raised or lowered at least between an operating position elevated above the drilling floor cover, and a lower position immediately above the drilling floor cover enabling the mounting of auxiliary equipment to the mounting structure. . For example, the lower position can be no more than 2 m above the drilling floor cover or other height low enough for personnel to attach the equipment to the gantry beam directly from the drilling floor cover. The elevated position can be at least 3 m, 5 m, or 10 m above the drilling floor cover, such as at least 15 m above the drilling floor cover, for example at least 20 m above the floor cover of perforation. To this end, the gantry beam can be mounted on rails or tracks that extend upwards along the support structures to which the gantry beam is connected. The gantry beam can then be lifted by wires or cables, a hydraulic mechanism, or other suitable lifting mechanism. For example, gantry beam 125 and protective frame 119 can be mounted to the same lifting mechanism. In some arrangements, the gantry beam can still be a part of the protective structure. It will be appreciated that a gantry beam or similar mounting structure may be disposed proximal to and operable with each of the well centers or proximal to and operable with only one of the well centers as in the example of Figures 1-8 .

[00104] Quando a viga de pórtico 125 é baixada para sua posição inferior, a tripulação da plataforma pode convenientemente montar a viga de pórtico com o equipamento suspendível que deve ser baixado através de um dos centros do poço. Exemplos de tal equipamento incluem equipamentos de registro de dados durante a perfuração, equipamentos de medição de dados durante a perfuração, equipamento de tubulação em espiral. Para este fim, o equipamento a ser baixado através do centro do poço pode ser conectado a um fio, cabo ou tubulação em espiral 135 que por sua vez pode ser levado através de ganchos, polias, arcos de guia e/ou membros guia similar 129 que são conectados à viga de pórtico 125 à bobinas, tambores, ou equipamento auxiliar similar sobre a coberta 111 posicionados em um lado das áreas de coberta do piso de perfuração abertas 110a,b. Em algumas modalidades, a montagem pode então ser realizada sem qualquer necessidade que membros da tripulação de perfuração subam a alturas não seguras. Além disso, a montagem é realizada na direção contrária centro do poço, não interferindo assim com qualquer atividade realizada ao mesmo tempo no centro do poço. Uma vez montada, a viga de pórtico 125 é içada para a altura desejada permitindo assim a descida do equipamento auxiliar suspendível através do centro do poço 123a em um ângulo adequado. As bobinas, tambores ou outro equipamento auxiliar sobre a coberta 111 usados para baixar o equipamento auxiliar suspendível através do centro do poço podem convenientemente ser posicionados, por exemplo, deslizados sobre vigas deslizáveis 116, para um local desejado dentro da área de coberta do piso de perfuração aberta 110a.[00104] When the gantry beam 125 is lowered to its lower position, the platform crew can conveniently mount the gantry beam with the suspendable equipment which must be lowered through one of the well centers. Examples of such equipment include data recording equipment while drilling, data measuring equipment while drilling, spiral piping equipment. To this end, the equipment to be lowered through the center of the well can be connected to a wire, cable or spiral tubing 135 which in turn can be carried through hooks, pulleys, guide arches and/or similar guide members 129 which are connected to gantry beam 125 to coils, drums, or similar auxiliary equipment on deck 111 positioned on one side of open drill floor deck areas 110a,b. In some embodiments, assembly can then be carried out without any need for drilling crew members to ascend to unsafe heights. Furthermore, the assembly is carried out in the opposite direction to the center of the well, thus not interfering with any activity carried out at the same time in the center of the well. Once assembled, the gantry girder 125 is lifted to the desired height thus allowing the suspended auxiliary equipment to be lowered through the center of the shaft 123a at a suitable angle. Coils, drums or other auxiliary equipment on the deck 111 used to lower the suspendable auxiliary equipment through the center of the well may conveniently be positioned, for example, slid over sliding beams 116, to a desired location within the deck's deck area. open perforation 110a.

[00105] A coberta principal 120 está situada abaixo da coberta do piso de perfuração e permite que o equipamento submarino pesado 124, por exemplo, BOPs e Árvores de Natal seja movido para a janela do casco 122 sob os centros do poço de modo a permitir que tal equipamento seja baixado em direção ao leito do oceano. Consequentemente, a coberta do piso de perfuração e, em particular, a parte dessa coberta do piso de perfuração que está situada em estreita proximidade ao centro do poço pode ser estacionária e não precisar ser içada ou baixada para o equipamento submarino seja baixado para o leito do oceano.[00105] The main deck 120 is situated below the cover of the drilling floor and allows heavy subsea equipment 124, eg BOPs and Christmas Trees to be moved to the hull window 122 under the well centers to allow for that such equipment is lowered towards the ocean floor. Consequently, the drilling floor cover and, in particular, the part of that drilling floor cover that is situated in close proximity to the center of the well may be stationary and need not be raised or lowered for the subsea equipment to be lowered to the bed. of the ocean.

[00106] Um ou mais roughnecks ferro 127 ou equipamento de manuseio de duto similar podem ser dispostos sobre a coberta do piso de perfuração em proximidade imediata aos centros do poço. Tal equipamento pode ser disposto de modo que ele pode servir somente um dos centros do poço ou ambos centros do poço.[00106] One or more 127 iron roughnecks or similar pipeline handling equipment may be disposed on the drill floor deck in close proximity to the well centers. Such equipment can be arranged so that it can serve only one of the well centers or both well centers.

[00107] Como pode ser mais facilmente visto nas Figuras 4 a 6, os tubos de elevação podem ser movidos diretamente a partir da área de armazenamento de duto de elevação 115 através de uma das aberturas 126a,b para um dos centros do poço 123a,b. Para este fim, um tubo de perfuração pode ser movido por uma grua do pórtico 136 a partir de sua posição na área de armazenamento 125 sobre uma calha 132a,b, respectivamente, ou outro equipamento de alimentação de tubo adequado, que define uma superfície inclinada que se estende para cima e em direção a uma das aberturas 126a,b. O tubo de perfuração pode então ser pego pelo impulsor superior 137a,b do sistema elevador correspondente 105a,b e puxado para a posição vertical acima do centro do poço correspondente 123a,b. Figura 4 mostra um tubo de perfuração 128 posicionado na calha 132b e que se estende através da abertura 126b em direção ao centro do poço 123b. Figura 5 mostra o tubo de perfuração conectado ao impulsor superior 137b do sistema elevador 105b e no processo de ser elevado para cima e através da abertura 126b em direção ao centro do poço 123b. Figura 6 mostra o tubo de perfuração após ser elevado para uma posição vertical acima do centro do poço 123b e pronto para ser baixado através do centro do poço 123b.[00107] As can be seen more easily in Figures 4 to 6, the riser pipes can be moved directly from the riser storage area 115 through one of the openings 126a,b to one of the well centers 123a, B. To this end, a drill pipe may be moved by a gantry crane 136 from its position in storage area 125 onto a chute 132a,b, respectively, or other suitable pipe feeding equipment, which defines an inclined surface. extending upwards and toward one of the openings 126a,b. The drill pipe can then be picked up by the upper impeller 137a,b of the mating elevator system 105a,b and pulled into the vertical position above the center of the mating well 123a,b. Figure 4 shows a drill pipe 128 positioned in chute 132b and extending through opening 126b towards the center of well 123b. Figure 5 shows the drill pipe connected to the upper impeller 137b of the elevator system 105b and in the process of being lifted up and through the opening 126b towards the center of the well 123b. Figure 6 shows the drill pipe after being raised to a vertical position above the center of well 123b and ready to be lowered through the center of well 123b.

[00108] Como é mais facilmente visto na Figura 8, a plataforma de perfuração compreende acesso ao centro do poço a partir de todos os quatro lados, isto é, a partir de ambas direções longitudinais e a partir de ambas direções transversais. Além disso, a disposição simétrica do mastro, os centros do poço e o armazenamento de tudo e manuseio de equipamento permite que dutos de todas as áreas de armazenamentos sejam eficientemente movidos para ambos os centros do poço. Em algumas modalidades, ambas as porções do mastro e sistemas elevadores podem ser projetados de uma maneira similar ou mesmo idêntica e fornecer capacidade de elevação similar ou mesmo igual. Consequentemente, redundância completa do sistema de perfuração duplo pode ser conseguida. Será compreendido, no entanto, que o sistema duplo pode alternativamente ser projetado com um centro do poço/sistema elevador primário e secundário, por exemplo, com diferentes capacidades de içamento. Em tais modalidades, um certo grau de redundância pode ainda ser conseguido.[00108] As is more easily seen in Figure 8, the drilling rig comprises access to the center of the well from all four sides, that is, from both longitudinal directions and from both transverse directions. In addition, the symmetrical arrangement of the mast, the well centers and all storage and equipment handling allows pipelines from all storage areas to be efficiently moved to both well centers. In some embodiments, both mast portions and lift systems can be designed in a similar or even identical manner and provide similar or even equal lifting capacity. Consequently, full redundancy of the dual piercing system can be achieved. It will be understood, however, that the dual system may alternatively be designed with a shaft center/primary and secondary lift system, for example with different lifting capacities. In such modalities, a certain degree of redundancy can still be achieved.

[00109] Embora a modalidade das Figuras 1-8 tenham sido descritas no contexto de um semissubmersível, será apreciado que os recursos descritos também podem ser implementados no contexto de um navio de perfuração ou outro tipo de plataforma de perfuração. Em particular, a estrutura protetora, a estrutura de montagem, as áreas de piso de perfuração abertas, desobstruídas através de vias de acesso aos centros do poço, e/ou uma abertura entre os cilindros de içamento pode ser implementada em outro tipo de plataforma de perfuração.[00109] Although the embodiment of Figures 1-8 has been described in the context of a semi-submersible, it will be appreciated that the features described can also be implemented in the context of a drillship or other type of drilling rig. In particular, the protective structure, the mounting structure, the open drilling floor areas, unobstructed through access ways to the well centers, and/or an opening between the lifting cylinders can be implemented in another type of drilling rig. drilling.

[00110] Figura 9 mostra vistas superiores de outro exemplo de uma coberta do piso de perfuração 107. A Figura 9a mostra a coberta do piso de perfuração e área de armazenamento adjacente 115 para tubos de elevação, enquanto a Figura 9b somente mostra a coberta do piso de perfuração. Além disso, enquanto a Figura 9a mostra as vigas deslizáveis 116 dispostas em toda a coberta do piso de perfuração, as vigas deslizáveis não são mostradas na Figura 9b para os fins de uma ilustração mais simples. Esta modalidade de uma coberta do piso de perfuração é similar a uma coberta do piso de perfuração que foi descrita com referência às Figuras 1-8 acima. Em particular, a modalidade da Figura 9 compreende uma grande coberta do piso de perfuração 107, um mastro de atividade dupla 104 e centros do poço correspondentes 123a,b dispostos lado a lado, uma área de armazenamento de tubo horizontal 109, uma estrutura de recuo 112 com equipamento de manuseio de dutos vertical 113a,b, todos como descrito acima.[00110] Figure 9 shows top views of another example of a drill floor cover 107. Figure 9a shows the drill floor cover and adjacent storage area 115 for riser pipes, while Figure 9b only shows the drill floor cover. drill floor. Furthermore, while Figure 9a shows the sliding beams 116 disposed across the cover of the drilling floor, the sliding beams are not shown in Figure 9b for the purposes of a simpler illustration. This embodiment of a drilling floor covering is similar to a drilling floor covering that has been described with reference to Figures 1-8 above. In particular, the embodiment of Figure 9 comprises a large drilling floor cover 107, a dual activity mast 104 and corresponding well centers 123a,b arranged side by side, a horizontal pipe storage area 109, a setback structure 112 with 113a,b vertical duct handling equipment, all as described above.

[00111] Como pode ser facilmente visto nas Figuras 9a-b, o equipamento de manuseio de dutos vertical 113a,b é móvel ao longo da direção transversal ao longo de uma viga de suporte 130. Eles podem ser posicionados em extensão longitudinal das respectivas das passarelas elevadas 108a,b entre a passarela elevada e o centro do poço correspondente 123a,b, isto é, sobre a via de alimentação de duto definida pela passarela elevada correspondente entre a passarela elevada e o centro do poço correspondente. As passarelas elevadas 108a,b são móveis sobre os respectivos trilhos ou vigas deslizáveis 139a,b ao longo da direção horizontal para um respectivo centro do poço. Por isso, as vigas deslizáveis definem vias de alimentação de duto longitudinais para os respectivos centros do poço.[00111] As can be easily seen in Figures 9a-b, the vertical duct handling equipment 113a,b is movable along the transverse direction along a support beam 130. They can be positioned in longitudinal extension of the respective two beams. Elevated walkways 108a,b between the raised walkway and the center of the corresponding well 123a,b, i.e. over the pipeline feed path defined by the corresponding raised walkway between the raised walkway and the center of the corresponding well. Elevated walkways 108a,b are movable on respective sliding rails or beams 139a,b along the horizontal direction to a respective center of the well. Therefore, the sliding beams define longitudinal duct feed paths to the respective well centers.

[00112] Também, um roughneck ferro 127 é mostrado posicionado entre os centros do poço 123a,b e dispostos sobre as vigas deslizáveis, permitindo assim que o roughneck ferro seja movido para fora do caminho, e alternadamente servido para ambos centros do poço.[00112] Also, an iron roughneck 127 is shown positioned between the centers of the well 123a,b and arranged over the glide rafters, thus allowing the iron roughneck to be moved out of the way, and alternately served to both well centers.

[00113] Também a Figura 9a claramente mostra os cilindros 106a,b que formam uma abertura 126a,b, respectivamente, de modo a permitir o acesso aos centros do poço 123a,b diretamente a partir da área de armazenamento de duto de elevação 115 por meio de uma grua do pórtico 136 e respectivas calhas 132a,b que levam ao respectivo centro do poço.[00113] Also Figure 9a clearly shows cylinders 106a,b that form an opening 126a,b, respectively, so as to allow access to the well centers 123a,b directly from the riser duct storage area 115 by means of a gantry crane 136 and respective chutes 132a,b leading to the respective center of the well.

[00114] Figuras 9a,b também mostram a cabine do perfurador 134 posicionada dentro da base do mastro 104, transversalmente entre os centros do poço. Por isso, a cabine do perfurador não interfere com as vias de acessos 114a,b a partir das áreas de coberta do piso de perfuração abertas 110a,b, enquanto permite o controle visual conveniente com ambos os centros do poço. As áreas de coberta do piso de perfuração abertas 110a,b compreendem partes 117a,b que se estendem ao longo das passarelas elevadas, e uma área de cobertura de conexão do piso de perfuração 118 conectando as áreas laterais de coberta do piso de perfuração abertas 110a,b uma com a outra, também todas como descrito acima. Figura 10 mostra a coberta do piso de perfuração 107 das Figuras 9a,b claramente ilustrando as áreas de coberta do piso de perfuração abertas 110a,b como áreas com escotilhas. A área de coberta do piso de perfuração que se estende fora da base do primeiro mastro é dimensionada e moldada de modo a permitir que instalação de vigas deslizáveis para deslizamento do equipamento e/ou para a empilhadeira ou outros veículos funcione na área de coberta do piso de perfuração fora da base do mastro. Por exemplo, a área da coberta do piso de perfuração fora da base do mastro pode ser pelo menos 200 m2, como pelo menos 500 m2, como pelo menos 1000 m2, como pelo menos 2000 m2, por exemplo, pelo menos 5000 m2. As áreas de coberta do piso de perfuração abertas são não, de outro modo, obstruídas pelas instalações fixas como o primeiro mastro, mastros adicionais, equipamento de manuseio de duto, e/ou similares. A área de coberta do piso de perfuração aberta tem uma altura livre de pelo menos 10 m, como pelo menos 20 m, por exemplo, pelo menos 30 m. Figura 10 também ilustra o acesso lateral a partir das áreas de coberta do piso de perfuração abertas para os centros do poço por setas 1014a,b. As vias de acessos 1014a,b são retas e elas se estendem inteiramente fora da base do mastro. O caminho adicional conectando as áreas de coberta do piso de perfuração abertas uma com a outra é ilustrado pela seta 1018. Todas as trajetórias de acesso e conexão 1014a,b e 1018 são largas o suficiente para serem equipadas com vigas deslizáveis e/ou permitem que empilhadeiras ou veículos operem através de toda a coberta do piso de perfuração. Por exemplo, as trajetórias de acesso e conexão podem cada ser pelo menos 2 m de largura, como pelo menos 3 m por exemplo, pelo menos 5 m de largura. Figura 10 adicionalmente ilustra o grande setor da coberta do piso de perfuração aberta 1010b ao redor o centro do poço 123b. O setor 1010b pode ter um raio de pelo menos 5 m como 20m, como 30m, o setor tendo um ângulo central Φ de pelo menos 60°, como pelo menos 90°, por exemplo, pelo menos 120°.[00114] Figures 9a,b also show the drill cabin 134 positioned inside the base of the mast 104, transversely between the centers of the well. Therefore, the drill cabin does not interfere with access ways 114a,b from open drill floor deck areas 110a,b, while allowing convenient visual control with both well centers. The open drilling floor covering areas 110a,b comprise portions 117a,b extending along the raised walkways, and a drilling floor connecting cover area 118 connecting the open drilling floor covering side areas 110a ,b with each other, also all as described above. Figure 10 shows the drilling floor covering 107 of Figures 9a,b clearly illustrating the open drilling floor covering areas 110a,b as hatch areas. The drilling floor deck area that extends outside the base of the first mast is dimensioned and molded to allow the installation of sliding beams for sliding equipment and/or for forklift trucks or other vehicles to operate in the floor deck area drill hole outside the base of the mast. For example, the area of the drilling floor deck outside the base of the mast can be at least 200 m2 such as at least 500 m2 such as at least 1000 m2 such as at least 2000 m2 for example at least 5000 m2. Open drill floor deck areas are not otherwise obstructed by fixed installations such as the first mast, additional masts, pipeline handling equipment, and/or the like. The open drilling floor deck area has a clearance height of at least 10 m, such as at least 20 m, for example at least 30 m. Figure 10 also illustrates the lateral access from the open drill floor cover areas to the well centers by arrows 1014a,b. Access ways 1014a,b are straight and they extend entirely outside the base of the mast. The additional path connecting the open drill floor deck areas to each other is illustrated by arrow 1018. All access and connecting paths 1014a, b and 1018 are wide enough to be equipped with slide-in beams and/or allow forklifts or vehicles operate through the entire cover of the drill floor. For example, the access and connection paths can each be at least 2 m wide, such as at least 3 m for example, at least 5 m wide. Figure 10 additionally illustrates the large sector of open drill floor deck 1010b around the center of well 123b. Sector 1010b can have a radius of at least 5m such as 20m, such as 30m, the sector having a center angle Φ of at least 60°, such as at least 90°, for example, at least 120°.

[00116] De modo geral, como ilustrado pelo setor 1010b, cada centro de poço define coordenadas polares (θ,p) na coberta do piso de perfuração onde a posição do mastro reside em θ=0 e a base do mastro abrange de θmast,min (negativo) a θmast,max Cruzando o Pmast,min e Pmast,max destes ângulos, respectivamente. Em algumas modalidades, a coberta do piso de perfuração aberta abrange mais de 1 m, como mais de 2 m, como mais de 5 m, como mais de 10 m, por exemplo, mais de 20 m dentro de um intervalo de ângulo Δθ abrangendo de θmast,max ou abaixo de θmast,min. Em algumas modalidades, Δθ é maior que 10°, como maior que 30°, como maior que 60°, como maior que 90°, ex. maior que 30°.[00116] In general, as illustrated by sector 1010b, each well center defines polar coordinates (θ,p) on the cover of the drilling floor where the position of the mast resides at θ=0 and the base of the mast spans from θmast, min (negative) to θmast,max Crossing the Pmast,min and Pmast,max of these angles, respectively. In some arrangements, the open drilling floor covering spans more than 1 m, such as over 2 m, such as over 5 m, such as over 10 m, for example over 20 m within an angle range Δθ spanning of θmast,max or below θmast,min. In some modalities, Δθ is greater than 10°, such as greater than 30°, such as greater than 60°, such as greater than 90°, eg. greater than 30°.

[00117] Figura 11 mostra a coberta do piso de perfuração 107 das Figuras mostra a coberta do piso de perfuração 107 das Figuras 9a,b claramente ilustrando a base do mastro 104 por uma linha pontilhada 1104. Os centros do poço 123a,b são cada um situados fora da base, e eles são deslocados a partir da base e dos cilindros 106a,b ao longo da direção longitudinal 1140. A direção longitudinal 1140 pode ser definida pela posição dos centros do poço 123a,b e as posições 1175a,b dos sistemas elevadores correspondentes. A posição do sistema elevador pode ser definida pelo centro de massa de um correspondente das polias 133a,b mostrada, por exemplo, na Figura 1. A Figura 11 também ilustra as vias de alimentação de duto ao longo da qual os dutos são avançados para o respectivo centros do poço, a saber as vias de alimentação de duto 1239a,b definidas pelas vigas deslizáveis das passarelas elevadas 1108a,b, e as vias de alimentação de duto 1132a,b definidas pelas respectivas calhas para avançar dutos a partir de um lado traseiro dos sistemas elevadores. Nesta modalidade, todas as vias de alimentação de duto se estendem ao longo da direção longitudinal 1140, e elas não cruzam ou de outro modo interfere com as áreas de coberta do piso de perfuração abertas 110a,b.[00117] Figure 11 shows the drill floor cover 107 of the Figures shows the drill floor cover 107 of Figures 9a,b clearly illustrating the base of the mast 104 by a dotted line 1104. The centers of the well 123a,b are each one situated outside the base, and they are displaced from the base and cylinders 106a,b along the longitudinal direction 1140. The longitudinal direction 1140 can be defined by the position of the well centers 123a,b and the positions 1175a,b of the systems matching elevators. The position of the elevator system can be defined by the center of mass of a corresponding one of the pulleys 133a,b shown, for example, in Figure 1. Figure 11 also illustrates the duct feed paths along which the ducts are advanced to the respective well centers, viz. the pipeline feed paths 1239a,b defined by the sliding beams of the elevated walkways 1108a,b, and the pipeline feed paths 1132a,b defined by the respective chutes for advancing pipelines from a rear side of the elevator systems. In this embodiment, all of the pipeline feed paths extend along the longitudinal direction 1140, and they do not cross or otherwise interfere with the open drill floor covering areas 110a,b.

[00118] Figura 12 ilustra uma disposição da coberta do piso de perfuração com um único centro do poço 1223, mas usando os mesmos princípios como descrito em conexão com a plataforma de perfuração mostrada nas Figuras 1-8. A coberta de perfuração da Figura 12 compreende um mastro 1204, um centro do poço 1223, uma área de armazenamento de tubo 1209, uma estrutura de recuo 1212, equipamento de manuseio de dutos horizontal 1208 e equipamento de manuseio de dutos vertical 1213, todos como descrito acima. Também nesta modalidade, a plataforma de perfuração compreende vias de acessos para o centro do poço a partir de todos os quatro lado, isto é, a partir de ambas direções longitudinais e a partir de ambas direções transversais.[00118] Figure 12 illustrates a drill floor cover arrangement with a single well center 1223, but using the same principles as described in connection with the drilling rig shown in Figures 1-8. The drilling deck of Figure 12 comprises a mast 1204, a well center 1223, a tube storage area 1209, a setback structure 1212, horizontal pipeline handling equipment 1208, and vertical pipeline handling equipment 1213, all with described above. Also in this modality, the drilling rig comprises access ways to the center of the well from all four sides, that is, from both longitudinal directions and from both transverse directions.

[00119] Na Figura 12/a, o equipamento de manuseio de dutos vertical 1213 é posicionado distante da e, em particular, transversalmente deslocado em relação a via de alimentação de duto definida pelos trilhos ou vigas deslizáveis 1239 entre o equipamento de manuseio de dutos horizontal 1208 e o centro do poço 1223. Por isso, nesta posição o equipamento de manuseio de dutos horizontal 1208 pode se mover ao longo das vigas deslizáveis 1239 por todo o caminho para o centro do poço 1223.[00119] In Figure 12/a, the vertical pipeline handling equipment 1213 is positioned away from and, in particular, transversely displaced in relation to the pipeline feed path defined by the sliding rails or beams 1239 between the pipeline handling equipment horizontal 1208 and the center of well 1223. Therefore, in this position the horizontal pipeline handling equipment 1208 can move along the sliding beams 1239 all the way to the center of well 1223.

[00120] Figura 12b mostra o equipamento de manuseio de dutos vertical 1213 em uma posição na via de alimentação de duto 1239 conectando um equipamento de manuseio de dutos horizontal 1208 e o centro do poço 1223. Por isso, nesta configuração, o equipamento de manuseio de dutos horizontal 1208 pode cooperar com o equipamento de manuseio de dutos vertical 1213.[00120] Figure 12b shows the vertical pipeline handling equipment 1213 in a position on the pipeline feed path 1239 connecting a horizontal pipeline handling equipment 1208 and the center of well 1223. Hence, in this configuration, the handling equipment 1208 horizontal duct handling equipment can cooperate with 1213 vertical duct handling equipment.

[00121] Como nas modalidades anteriores, o mastro compreende um sistema elevador hidráulico onde os cilindros 1206 são dispostos de modo a formar uma abertura central 1226, através da qual os tubos de elevação a partir de uma área de armazenamento atrás do mastro pode ser movida para o centro do poço 1223 por exemplo, usando uma calha 1232 ou outro equipamento de manuseio de duto.[00121] As in the previous embodiments, the mast comprises a hydraulic lift system where the cylinders 1206 are arranged to form a central opening 1226, through which the lifting tubes from a storage area behind the mast can be moved to the center of well 1223 for example using a 1232 chute or other pipeline handling equipment.

[00122] Figura 13 mostra modalidades da coberta do piso de perfuração similar a uma da Figura 12, compreendendo um mastro 1204, um centro do poço 1223, uma área de armazenamento de tubo 1209, uma estrutura de recuo 1212, equipamento de manuseio de dutos horizontal 1208 móvel sobre trilhos 1239, equipamento de manuseio de dutos vertical 1213, um sistema elevador compreendendo cilindros 1206 dispostos em grupos formando uma abertura entre om, e equipamento de manuseio de duto 1232 para mover os tubos de elevação ou outro dutos através do abertura 1226, todos como descrito acima.[00122] Figure 13 shows modalities of the drilling floor cover similar to the one in Figure 12, comprising a mast 1204, a well center 1223, a tube storage area 1209, a setback structure 1212, pipeline handling equipment horizontal 1208 movable on rails 1239, vertical duct handling equipment 1213, an elevator system comprising cylinders 1206 arranged in groups forming an opening between the m, and duct handling equipment 1232 for moving lifting tubes or other ducts through the opening 1226 , all as described above.

[00123] Em particular, no exemplo da Figura 13a, a área de armazenamento de tubo 1209, a estrutura de recuo 1212, o equipamento de manuseio de dutos horizontal 1208 e o equipamento de manuseio de dutos vertical 1213 são situadas longitudinalmente alinhados com o mastro 1204. No exemplo da Figura 13b, a área de armazenamento de tubo 1209, a estrutura de recuo 1212, o equipamento de manuseio de dutos horizontal 1208 e o equipamento de manuseio de dutos vertical 1213 são situados transversalmente deslocados a partir do mastro. Por isso, na Figura 13a a via de alimentação de duto 1239 usada pelo equipamento de manuseio de duto 1208 se estende na direção longitudinal como nos exemplos anteriores, enquanto no exemplo da Figura 13b, a via de alimentação de duto 1239 se estende em uma direção transversal. Mesmo assim, em ambos exemplos, a coberta do piso de perfuração compreende uma área de coberta do piso de perfuração aberta 1210 mostrada esquematicamente como uma área com escotilhas. Na Figura 13a, a área de coberta do piso de perfuração aberta é localizada adjacente ao mastro na direção transversal, enquanto a área de coberta do piso de perfuração aberta da Figura 13b é localizada adjacente ao primeiro mastro na direção longitudinal.[00123] In particular, in the example of Figure 13a, the tube storage area 1209, the setback structure 1212, the horizontal pipeline handling equipment 1208 and the vertical pipeline handling equipment 1213 are situated longitudinally aligned with the mast 1204. In the example of Figure 13b, pipe storage area 1209, setback structure 1212, horizontal pipeline handling equipment 1208, and vertical pipeline handling equipment 1213 are located transversely offset from the mast. Therefore, in Figure 13a the duct feed path 1239 used by the duct handling equipment 1208 extends in the longitudinal direction as in the previous examples, while in the example of Figure 13b, the duct feed path 1239 extends in one direction. cross section. Even so, in both examples, the drill floor cover comprises an open drill floor cover area 1210 shown schematically as an area with hatches. In Figure 13a, the open drilling floor deck area is located adjacent to the mast in the transverse direction, while the open drilling floor deck area of Figure 13b is located adjacent to the first mast in the longitudinal direction.

[00124] Figura 14 ilustra outra modalidade de uma plataforma de perfuração offshore. A plataforma de perfuração da Figura 14 é um navio de perfuração tendo um casco 1401. A plataforma de perfuração compreende uma coberta do piso de perfuração 1407 formada na parte superior de uma substrutura 1497. A substrutura compreende uma plataforma suportada por pernas. A plataforma define a coberta do piso de perfuração e abrange através da janela do casco formada no casco do navio de perfuração. A coberta do piso de perfuração 1407 compreende dois furos que definem centros do poço 1423 localizados próximo a um mastro de atividade dupla 1404. A direção cruzando com ambos os centros do poço define uma direção transversal que, neste caso, é paralela a um eixo longitudinal do navio de perfuração. O mastro de atividade dupla 1404 é suportado pela substrutura 1497 e se estende para cima a partir da coberta do piso de perfuração 1407. O mastro compreende duas porções do mastro dispostos lado a lado na direção transversal de modo que elas são ambas situadas no mesmo lado em relação aos centros do poço. Cada porção do mastro acomoda um sistema elevador, cada um para baixar a coluna de perfuração através de um respectivo do centro do poço 1423 em direção ao leito do oceano. No exemplo da Figura 14, o sistema elevador é um sistema de mecanismo de extração onde o cabo de elevação é alimentado sobre polias estacionárias 1433 carregadas pelos membros de suporte. O motor/tambor dos mecanismos de extração (não mostrados) podem ser posicionados em um local adequado sobre a plataforma de perfuração. Alternativamente, outros sistemas elevadores como um sistema elevador hidráulico podem ser usados, como será ilustrado abaixo. Cada centro do poço está situado próximo a uma das porções do mastro e o sistema elevador correspondente. A posição de cada do centros do poço em relação ao sistema elevador correspondente define uma direção longitudinal, neste exemplo a direção transversal do navio de perfuração.[00124] Figure 14 illustrates another modality of an offshore drilling rig. The drilling rig of Figure 14 is a drilling vessel having a hull 1401. The drilling rig comprises a drill floor deck 1407 formed on top of a sub-frame 1497. The sub-frame comprises a platform supported by legs. The rig defines the drilling floor cover and spans through the hull window formed in the hull of the drillship. The cover of drill floor 1407 comprises two holes defining well centers 1423 located near a dual activity mast 1404. The direction crossing both well centers defines a transverse direction which, in this case, is parallel to a longitudinal axis of the drill ship. Dual activity mast 1404 is supported by subframe 1497 and extends upwards from the cover of drill floor 1407. The mast comprises two portions of the mast arranged side by side in the transverse direction so that they are both situated on the same side in relation to the well centers. Each portion of the mast accommodates an elevator system, each to lower the drill string through a respective one from the center of well 1423 towards the ocean floor. In the example of Figure 14, the elevator system is a pull-out mechanism system where the hoist rope is fed onto stationary pulleys 1433 carried by the support members. The motor/drum of the extraction mechanisms (not shown) can be positioned in a suitable location on the drilling rig. Alternatively, other elevator systems such as a hydraulic elevator system can be used, as illustrated below. Each center of the shaft is situated close to one of the portions of the mast and the corresponding elevator system. The position of each of the well centers relative to the corresponding elevator system defines a longitudinal direction, in this example the transverse direction of the drillship.

[00125] A configuração lado a lado do mastro de atividade dupla e centros do poço proporciona operações duplas eficientes, fácil acesso a ambos centros do poço, e controle visual conveniente de ambos centros do poço a partir de uma única cabine do perfurador 1434 que pode, por exemplo, ser posicionada simetricamente em relação aos centros do poço mas deslocadas a partir do eixo conectando os centros do poço, por exemplo, dentro da base do mastro. A cabine do perfurador pode ser dividida em duas ou mais cabines.[00125] The side-by-side configuration of dual activity mast and well centers provides efficient dual operations, easy access to both well centers, and convenient visual control of both well centers from a single 1434 drill cabin that can , for example, be positioned symmetrically with respect to the well centers but offset from the axis connecting the well centers, for example, within the base of the mast. The drill booth can be divided into two or more booths.

[00126] A plataforma de perfuração compreende uma estrutura de recuo 1412 ou estrutura de armazenamento de duto similar para armazenar cadeias de dutos de modo que os dutos armazenados são situados parcialmente ou completamente abaixo do nível definido pela coberta do piso de perfuração, isto é, abaixo da plataforma mais elevada da substrutura 1497 e parcialmente cobertos pela coberta do piso de perfuração 1407. A estrutura de recuo compreende uma estrutura de suporte que suporta estaleiros da torre tendo dedos que se estendem horizontalmente entre os quais os dutos podem ser armazenados. A estrutura de recuo é posicionada e disposta de modo a permitir que suportes sejam movidos para/a partir de ambos centros do poço a partir de/para a doca. Para este fim, em ou mais contentores de coluna ou equipamento de manuseio de dutos vertical similar pode ser disposto para mover os suportes para dentro e fora da estrutura de recuo 1412. O manuseio dos dutos para e a partir da área de doca 1412 será ilustrado em mais detalhe em relação às modalidades descritas abaixo. Em algumas modalidades, por exemplo, no caso das cadeias de duto de perfuração ou revestimentos, os dutos podem ser mais altos do que o piso de perfuração. Por isso, quando eles são armazenados na estrutura de recuo na orientação vertical suas extremidades mais superiores podem se estender acima do nível do piso de perfuração. Quando a alimentação deles a um dos centros do poço eles podem ser colocados em uma calha como será descrito abaixo. Alternativamente, a estrutura de recuo pode se estender a partir da coberta do piso de perfuração para cima. O manuseio dos dutos dentro da área de doca pode ser realizado pelos estaleiradores de tubo verticais ou similares. A estrutura de recuo 1412 compreende adicionalmente equipamento de construção de suporte 1477 configurado para construir suportes a partir de pedaços individuais do tubo. Um exemplo de tal equipamento de construção de suporte é descrito no WO 02/057593. Alternativamente ou adicionalmente, suportes podem ser construídos no piso de perfuração.[00126] The drilling rig comprises a 1412 setback structure or similar pipeline storage structure for storing pipeline chains so that the stored pipelines are situated partially or completely below the level defined by the drilling floor cover, i.e., below the highest platform of the sub-frame 1497 and partially covered by the cover of the drill floor 1407. The set-back structure comprises a support structure that supports tower yards having horizontally extending fingers between which the ducts can be stored. The setback structure is positioned and arranged to allow supports to be moved to/from both well centers to/from the dock. To this end, one or more column containers or similar vertical duct handling equipment may be arranged to move the supports into and out of setback structure 1412. The handling of ducts to and from dock area 1412 will be illustrated in more detail regarding the modalities described below. In some embodiments, for example in the case of drill duct chains or casings, the ducts may be taller than the drill floor. Therefore, when they are stored in the setback structure in vertical orientation, their uppermost ends can extend above the level of the drill floor. When feeding them to one of the well centers they can be placed in a trough as will be described below. Alternatively, the setback structure can extend from the drill floor cover upwards. The handling of the ducts within the dock area can be carried out by vertical pipe shipyards or similar. Setback structure 1412 further comprises support construction equipment 1477 configured to construct supports from individual pieces of tube. An example of such support construction equipment is described in WO 02/057593. Alternatively or additionally, supports can be built into the drill floor.

[00127] Em algumas modalidades, cada porção do mastro e sistema elevador formam uma respectiva abertura entre os dois membros de suporte que carregam as polias 1433, através das quais o equipamento tubular da abertura é móvel entre a estrutura de recuo 1412 em direção ao respectivo centros do poço.[00127] In some embodiments, each portion of the mast and elevator system form a respective opening between the two support members carrying the pulleys 1433, through which the tubular opening equipment is movable between the recoil structure 1412 towards the respective well centers.

[00128] Opcionalmente, a plataforma de perfuração compreende adicionalmente uma área de armazenamento de tubo 1409 para armazenar tubos na orientação horizontal situados em direção ao arco do navio de perfuração, isto é, transversalmente deslocado a partir dos centros do poço. Uma ou mais passarelas elevadas 1408 ou equipamentos de manuseio de dutos horizontais similares são dispostos para alimentar os dutos a partir da área de armazenamento 1409 ou a partir de outra área de armazenamentos para os centros do poço. Para este fim, as passarelas elevadas são alinhadas com o eixo definido pelos dois centros do poço. Estas passarelas elevadas 1408 e um ou mais armazéns para (por exemplo, 1409) ou popa (não mostrados) pode ser usados em combinação ou como uma alternativa para ter o tubo de perfuração 1415 armazenado abaixo da coberta de perfuração. Na modalidade da Figura 14 as passarelas elevadas 1408 podem ser usadas para fornecer juntas de duto de elevação adicionais, carregar o tubo de perfuração armazenamento abaixo da coberta de perfuração e/ou fornecer o piso de perfuração com outros dutos. Uma ou cada uma das passarelas elevadas podem ser operáveis para servir ambos centros do poço. Além disso a plataforma de perfuração compreende uma ou mais passarelas elevadas adicionais se movendo nas faixas 1476 e configuradas para alimentar dutos a partir da área de armazenamento de tubo 1409 ou a partir de outra área de armazenamentos no lado oposto do mastro (em direção à popa do navio) para o equipamento de construção de suporte 1477. A passarela(s) elevada que se move nas faixas 1476 é/são configuradas para se mover ao longo de uma direção paralela com as passarelas elevadas 1408, mas no outro lado do mastro. Na presente modalidade, uma ou mais passarelas elevadas podem ser operáveis para se mover ao longo de uma porção substancial do comprimento do navio de perfuração. Será apreciado que, em algumas modalidades, cada passarela elevada pode ser configurada para somente se mover para/a partir do equipamento de construção de suporte 1477 sem ser configurado para passar o equipamento de construção de suporte. Consequentemente, a plataforma de perfuração pode compreender duas passarelas elevadas que se movem nas faixas 1476 sobre os respectivos lados do equipamento de construção de suporte de modo a ser capaz de alimentar dutos para o equipamento de construção de suporte a partir de ambos os lados. O equipamento de construção de suporte 1477 pode então receber tubos a partir da passarela elevada nas faixas 1476, trazendo-os na orientação vertical, e conectando-os a outros tubos para formar suportes. Os suportes podem então ser colocados na estrutura de recuo para uso futuro.[00128] Optionally, the drilling rig further comprises a tube storage area 1409 for storing tubes in horizontal orientation situated towards the arc of the drilling vessel, i.e. transversely offset from the centers of the well. One or more elevated walkways 1408 or similar horizontal pipeline handling equipment are arranged to feed pipelines from storage area 1409 or from another storage area to well centers. To this end, the raised walkways are aligned with the axis defined by the two centers of the well. These elevated walkways 1408 and one or more storages for (eg, 1409) or aft (not shown) can be used in combination or as an alternative to having drill pipe 1415 stored below the drill deck. In the embodiment of Figure 14 the elevated walkways 1408 can be used to provide additional riser duct joints, load the drill pipe into storage below the drill deck, and/or provide the drill floor with other ducts. One or each of the raised walkways may be operable to serve both well centers. In addition the drilling rig comprises one or more additional elevated walkways moving in lanes 1476 and configured to feed pipelines from tube storage area 1409 or from another storage area on the opposite side of the mast (towards the stern of the ship) to the support construction equipment 1477. The raised walkway(s) moving in the lanes 1476 is/are configured to move along a direction parallel with the raised walkways 1408, but on the other side of the mast. In the present embodiment, one or more elevated walkways may be operable to move along a substantial portion of the length of the drillship. It will be appreciated that, in some embodiments, each elevated walkway can be configured to only move to/from the support construction equipment 1477 without being configured to pass the support construction equipment. Accordingly, the drilling rig may comprise two elevated walkways which move in tracks 1476 on respective sides of the supporting construction equipment so as to be able to feed ducts to the supporting construction equipment from both sides. Support construction equipment 1477 can then receive tubes from the raised walkway in tracks 1476, bringing them in vertical orientation, and connecting them to other tubes to form supports. Brackets can then be placed on the setback structure for future use.

[00129] A plataforma de perfuração compreende outra área de armazenamento 1415 abaixo da coberta do piso de perfuração 1407 e configurada para armazenar tubos de elevação em uma orientação vertical. Os tubos de elevação podem então ser movidos, por exemplo, por meio de uma grua do pórtico e respectivas calhas ou outro equipamento de alimentação de tubo adequado através de furos no piso de perfuração, como será descrito em mais detalhe em relação a descrição das modalidades adicionais abaixo.[00129] The drilling rig comprises another storage area 1415 below the cover of the drilling floor 1407 and configured to store riser pipes in a vertical orientation. The riser tubes can then be moved, for example, by means of a gantry crane and associated chutes or other suitable tube feeding equipment through holes in the drill floor, as will be described in more detail in relation to the description of the modalities below.

[00130] Como a estrutura do mastro 1404 está situada em um lado dos centros do poço, e já que a área de doca está situada no lado do mastro oposto aos centros do poço e/ou atrás da cabine do perfurador 1434, a coberta do piso de perfuração fornece uma grande área desobstruída de coberta no lado dos centros do poço opostos ao mastro. Esta área fornece acesso desobstruído a ambos os centros do poço e é livre do equipamento de manuseio de duto. Consequentemente, estas áreas podem ser usadas como área de trabalho, por exemplo, para montar equipamento auxiliar suspendível, e/ou para posicionar o equipamento auxiliar sobre a coberta como descrito em conexão com o exemplo das Figuras 1-8 acima. De modo geral, as juntas de duto de elevação e/ou outro dutos podem ser inclinadas entre uma orientação vertical e uma horizontal por um aparelho de inclinação como descrito no pedido de patente Dinamarquesa co-pendente no. PA 2013 00302, o conteúdo total do qual é incorporado inteiramente aqui a título de referência.[00130] As the structure of mast 1404 is situated on one side of the well centers, and since the dock area is situated on the side of the mast opposite the well centers and/or behind the 1434 driller cabin, the cover of the drill floor provides a large unobstructed area of cover on the side of the well centers opposite the mast. This area provides unobstructed access to both well centers and is free of pipeline handling equipment. Consequently, these areas can be used as a working area, for example, to mount suspendable auxiliary equipment, and/or to position auxiliary equipment on the deck as described in connection with the example of Figures 1-8 above. Generally speaking, riser duct and/or other duct joints may be inclined between a vertical and a horizontal orientation by a tilting apparatus as described in co-pending Danish patent application no. PA 2013 00302, the entire contents of which are incorporated entirely herein by way of reference.

[00131] Figuras 15-21 mostra outra modalidade de uma plataforma de perfuração, neste exemplo do navio de perfuração tendo um casco 2501, similar à plataforma de perfuração da Figura 14 mas com uma estrutura do mastro e sistema elevador diferentes. Em particular, as Figuras 15 e 16 mostram vistas em 3D do piso de perfuração visto a partir de bombordo e boreste do navio de perfuração, respectivamente (uma parte do casco do navio é cortada na Figura 16); Figuras 17 e 18 mostram seções transversais horizontais em um plano acima do piso de perfuração e um plano abaixo do piso de perfuração, respectivamente; Figuras 19 e 20 mostram vistas em seção lateral do navio de perfuração. Finalmente, a Figura 21 mostra outra vista em 3D do piso de perfuração visto a partir do estibordo do navio de perfuração.[00131] Figures 15-21 shows another embodiment of a drilling rig, in this example of the drilling vessel having a hull 2501, similar to the drilling rig in Figure 14 but with a different mast structure and lift system. In particular, Figures 15 and 16 show 3D views of the drilling floor seen from the port and starboard side of the drilling ship, respectively (a part of the ship's hull is cut away in Figure 16); Figures 17 and 18 show horizontal cross-sections in a plane above the drilling floor and a plane below the drilling floor, respectively; Figures 19 and 20 show side sectional views of the drilling vessel. Finally, Figure 21 shows another 3D view of the drilling floor seen from the starboard side of the drilling vessel.

[00132] Como no exemplo das Figura 14, a plataforma de perfuração da presente modalidade compreende uma coberta do piso de perfuração 2407 formada na parte superior de uma substrutura 2897. A substrutura compreende uma plataforma suportada por pernas. A plataforma define a coberta do piso de perfuração e varia através da janela do casco 2722 formada no casco do navio de perfuração. A coberta do piso de perfuração 2407 compreende dois furos que definem centros do poço 2423, um ou ambos sendo equipados com um invólucro de desviador. O mastro inclui duas porções do mastro, cada associada com, e adjacente a, um dos centros do poço. No presente exemplo, os centros do poço são situados fora da base do mastro 2404 como descrito em detalhe em relação às Figuras 1-8 e 14. Como nas modalidades anteriores, a direção entre cada centro do poço e o sistema elevador associado define uma direção longitudinal. Neste exemplo, a direção cruzando com ambos os centros do poço define uma direção transversal que, neste caso, é paralela a um eixo longitudinal do navio de perfuração. O mastro de atividade dupla 2404 é suportado pela substrutura 2897 e se estende para cima a partir da coberta do piso de perfuração 2407.[00132] As in the example of Figure 14, the drilling rig of the present embodiment comprises a drilling floor cover 2407 formed on top of a sub-frame 2897. The sub-frame comprises a platform supported by legs. The platform defines the drilling floor cover and varies through the hull window 2722 formed in the hull of the drillship. Drill floor cover 2407 comprises two holes defining well centers 2423, one or both being equipped with a diverter housing. The mast includes two portions of the mast, each associated with, and adjacent to, one of the shaft centers. In the present example, the well centers are located outside the base of mast 2404 as described in detail in relation to Figures 1-8 and 14. As in the previous embodiments, the direction between each well center and the associated elevator system defines a direction. longitudinal. In this example, the direction crossing both well centers defines a transverse direction which, in this case, is parallel to a longitudinal axis of the drillship. The 2404 dual activity mast is supported by the 2897 subframe and extends upward from the 2407 drill floor cover.

[00133] Como descrito em conexão com a modalidade das Figuras 1-8, cada porção do mastro acomoda um respectivo sistema elevador hidráulico cada para baixar uma coluna de perfuração através de um respectivo dos centros do poço 2423 em direção ao leito do oceano. Cada sistema elevador hidráulico compreende cilindros 2406, respectivamente, que se estendem para cima a partir da coberta do piso de perfuração e suportam a carga a ser baixada ou içada. Cada centro do poço está situado próximo a uma das porções do mastro e o sistema elevador correspondente; ambos centros do poço são localizados no mesmo lado em relação ao mastro, isto é, in a configuração lado a lado.[00133] As described in connection with the embodiment of Figures 1-8, each portion of the mast accommodates a respective hydraulic lift system each for lowering a drill string through a respective one of the well centers 2423 towards the ocean floor. Each hydraulic lift system comprises cylinders 2406, respectively, which extend upwards from the cover of the drill floor and support the load to be lowered or lifted. Each center of the well is situated close to one of the portions of the mast and the corresponding elevator system; both well centers are located on the same side with respect to the mast, that is, in the side-by-side configuration.

[00134] Os cilindros 2406 de cada sistema elevador são dispostos em dois grupos que são posicionados deslocados um do outro na direção transversal de modo a formar uma abertura entre os dois grupos. Cada abertura é então alinhada com um respectivo dos centros do poço ao longo da direção longitudinal e é moldada e dimensionada de modo a permitir que os dutos sejam movidos através da abertura em direção ao respectivo centro do poço e mesmo elevados em uma posição vertical enquanto sendo localizados pelo menos parcialmente na abertura entre o cilindros. O formato, tamanho e direção exatos de uma abertura podem depender do tipo de duto que é alimentado através da abertura, por exemplo, se uma abertura deve ser usada para alimentar os dutos de perfuração, revestimentos e/ou tubo de perfuração através da abertura. O centro do poço é longitudinalmente deslocado a partir da abertura. As hastes dos cilindros suportam as respectivas polias 2533, por exemplo, na forma de um conjunto de roldana, sobre o qual os fios de elevação 2484 são suspensos. As polias do cabo 2533 definem um eixo que é paralelo à direção conectando os dois grupos de cilindros de um dos sistemas elevadores. Uma extremidade dos fios de elevação 2484 é ancorada à plataforma de perfuração, enquanto a outra extremidade é conectada ao impulsor superior 2437 ou gancho do sistema elevador correspondente, através de uma ligação móvel 2187. As polias 2533 são lateralmente suportadas e guiadas pelas respectivas porções do mastro. Cada impulsor superior 2437 é conectado através de um carrinho 2569 a uma pista vertical disposto no mastro 2404. As extremidades fixas dos fios de elevação são ancoradas através de uma ligação 2482 e respectivos conjuntos de compensadores de cabo morto 2483. Os compensadores 2483 são também dispostos em dois grupos de modo a formar uma abertura sobre a qual a ligação 2482 se estende. Por isso, os dutos podem passar através da abertura entre os compensadores 2483 e abaixo da ligação 2482.[00134] The cylinders 2406 of each elevator system are arranged in two groups which are positioned offset from each other in the transverse direction so as to form an opening between the two groups. Each opening is then aligned with a respective one of the well centers along the longitudinal direction and is shaped and sized so as to allow the ducts to be moved through the opening towards the respective well center and even raised in a vertical position while being located at least partially in the gap between the cylinders. The exact shape, size and direction of an opening may depend on the type of duct that is fed through the opening, for example, whether an opening is to be used to feed drill ducts, casings and/or drill pipe through the opening. The center of the well is longitudinally displaced from the opening. The rods of the cylinders support the respective pulleys 2533, for example, in the form of a pulley assembly, on which the lifting wires 2484 are suspended. The 2533 cable pulleys define an axis that is parallel to the direction connecting the two groups of cylinders of one of the elevator systems. One end of the lift wires 2484 is anchored to the drilling rig, while the other end is connected to the upper impeller 2437 or corresponding lift system hook, via a movable link 2187. The pulleys 2533 are laterally supported and guided by the respective portions of the lift. mast. Each upper impeller 2437 is connected via a trolley 2569 to a vertical track disposed on the mast 2404. The fixed ends of the lift wires are anchored through a link 2482 and respective assemblies of dead cable trims 2483. The trims 2483 are also disposed. in two groups to form an opening over which link 2482 extends. Therefore, the ducts can pass through the opening between the compensators 2483 and below the connection 2482.

[00135] A configuração lado a lado do mastro de atividade dupla e centros do poço permite operações duplas eficientes, fácil acesso a ambos centros do poço, e controle visual conveniente de ambos os centros do poço a partir de uma única cabine do perfurador 2433 que pode, por exemplo, ser posicionada transversalmente entre os centros do poço, por exemplo, dentro da base do mastro.[00135] The side-by-side configuration of the dual activity mast and well centers allows for efficient dual operations, easy access to both well centers, and convenient visual control of both well centers from a single 2433 drill cabin that it can, for example, be positioned transversely between the centers of the shaft, for example, within the base of the mast.

[00136] A plataforma de perfuração compreende adicionalmente uma área de armazenamento de tubo 2509 para armazenar tubos na orientação horizontal e passarelas elevadas 2508 ou outro equipamento de manuseio de dutos horizontal para transportar tubos entre a área de armazenamento 2509 e os centros do poço 2423, também como descrito em conexão com Figura 14.[00136] The drilling rig further comprises a 2509 tube storage area to store tubes in horizontal orientation and 2508 elevated walkways or other horizontal pipeline handling equipment to transport tubes between the 2509 storage area and the 2423 well centers, also as described in connection with Figure 14.

[00137] A plataforma de perfuração compreende uma estrutura de recuo 2512 ou estrutura de armazenamento de duto similar para armazenar cadeias de dutos abaixo da substrutura 2897 e parcialmente cobertas pela coberta do piso de perfuração 2407. A estrutura de recuo compreende uma estrutura de suporte 2590 suportando estaleiros da torre tendo dedos que se estendem horizontalmente entre os quais dutos podem ser armazenados. Um ou mais contentores de coluna 2491 ou equipamento de manuseio de dutos vertical similar podem ser dispostos para mover suportes para dentro e fora da estrutura de recuo 2512. A estrutura de recuo 2512 compreende adicionalmente equipamento de construção de suporte 2677 configurado para construir suportes a partir de pedaços individuais do tubo através de uma toca de raposa 2592. A estrutura de recuo 2512 é localizada adjacente à janela do casco 2722 lateralmente deslocada a partir do eixo definido pelos centros do poço.[00137] The drilling rig comprises a 2512 setback structure or similar pipeline storage structure for storing pipeline chains below the subframe 2897 and partially covered by the drilling floor cover 2407. The setback structure comprises a support structure 2590 supporting tower shipyards having horizontally extending fingers between which ducts can be stored. One or more column containers 2491 or similar vertical duct handling equipment may be arranged to move supports into and out of setback structure 2512. Setback structure 2512 further comprises support construction equipment 2677 configured to build supports from of individual pieces of tube through a foxhole 2592. The setback structure 2512 is located adjacent to the hull window 2722 laterally offset from the axis defined by the well centers.

[00138] Além disso a plataforma de perfuração compreende uma ou mais passarelas elevadas adicionais (não mostradas) configuradas para alimentar dutos a partir da área de armazenamento de tubo 2509 ou a partir de outra área de armazenamentos no lado oposto do mastro (em direção à popa do navio) para o equipamento de construção de suporte 2677, tudo como descrito em relação à Figura 14. O equipamento de construção de suporte 2677 pode então receber os tubos a partir da passarela elevada, trazendo-os na orientação vertical, e conectando-os a outros pedaços para formar suportes. Para este fim o equipamento de construção de suporte pode compreender uma toca de rato 2589 através da qual o suporte pode ser gradualmente baixado enquanto é feito até a extremidade mais inferior do suporte estar no nível mais baixo da área de doca 2512, enquanto a extremidade mais superior do suporte está abaixo do nível do piso de perfuração. Os suportes podem então ser recebidos pelos contentores de tubo 2491 e colocados na estrutura de recuo 2515 para uso futuro. Para este fim os contentores de tubo são operáveis para atravessar através da área de doca, por exemplo, na direção paralela à direção conectando os centros do poço.[00138] In addition the drilling rig comprises one or more additional elevated walkways (not shown) configured to feed pipelines from the tube storage area 2509 or from another storage area on the opposite side of the mast (towards the the ship's stern) to the support construction equipment 2677, all as described in relation to Figure 14. The support construction equipment 2677 can then receive the tubes from the elevated walkway, bringing them in the vertical orientation, and connecting them. them to other pieces to form supports. To this end the support construction equipment may comprise a mouse cap 2589 through which the support can be gradually lowered while being made until the lower end of the support is at the lower level of the dock area 2512, while the lower end of the support is The top of the bracket is below the level of the drill floor. The supports can then be received by the tube containers 2491 and placed in the setback structure 2515 for future use. To this end the tube containers are operable to traverse through the dock area, for example in the direction parallel to the direction connecting the well centers.

[00139] A plataforma de perfuração compreende um número de condutos inclinados 2592 cada um para alimentar os tubos a partir da área de doca 2512 para um dos centros do poço. Cada calha 2592 recebe tubos a partir de um dos contentores de tubo 2491 que alimenta os tubos em uma direção inclinada para cima através de uma ranhura correspondente 2485 no piso de perfuração e através da abertura formada pelos cilindros 2406 do sistema elevador correspondente em direção a um respectivo dos centros do poço 2423, onde eles são pegos em suas extremidades mais superior pelo sistema elevador correspondente e levantadas através da ranhura 2485 até eles serem verticalmente suspensos acima do centro do poço correspondente. Para este fim, a plataforma de perfuração compreende adicionalmente equipamento de manuseio de duto operável para guiar os tubos enquanto eles estão sendo elevados através da ranhura 2485. As ranhuras 2485 são alongadas e apontam na direção contrária ao eixo conectando os centros do poço e em direção ao lado onde a área de doca 2512 é posicionada.[00139] The drilling rig comprises a number of inclined conduits 2592 each to feed the pipes from the dock area 2512 to one of the well centers. Each chute 2592 receives tubes from one of the tube containers 2491 which feeds the tubes in an upward sloping direction through a corresponding slot 2485 in the drill floor and through the opening formed by cylinders 2406 of the corresponding lift system towards a respective one of the well centers 2423, where they are caught at their uppermost ends by the corresponding elevator system and raised through the slot 2485 until they are vertically suspended above the center of the corresponding well. To this end, the drilling rig further comprises operable pipeline handling equipment to guide the pipes as they are being lifted through the 2485 slot. beside where dock area 2512 is positioned.

[00140] A plataforma de perfuração compreende outra área de armazenamento 2515 abaixo da coberta do piso de perfuração 2507 e configurada para armazenar tubos de elevação em uma orientação vertical, como descrito em conexão com a Figura 14. A área de armazenamento de duto de elevação 2515 é localizada adjacente à janela do casco 2722, por exemplo, no lado da janela do casco oposto à estrutura de recuo 2512. Os tubos de elevação podem ser movidos, por exemplo, por meio de uma grua do pórtico e respectivas calhas 2794 ou outro equipamento de alimentação de tubo adequado através de furos 2481 no piso da coberta de perfuração. O tubo de perfuração que alimenta os furos 2481 pode ser coberto por placas, escotilhas ou cobertura similares. Na Figura 15, os furos são mostrados na posição aberta com a extremidade mais superior de um tubo de perfuração que se estende através do furo aberto. O tubo de perfuração que alimenta os furos é deslocado a partir do eixo conectando a centros do poço.[00140] The drilling rig comprises another storage area 2515 below the drill floor cover 2507 and configured to store riser pipes in a vertical orientation, as described in connection with Figure 14. The riser duct storage area 2515 is located adjacent to the hull window 2722, for example, on the window side of the hull opposite the setback structure 2512. The riser tubes can be moved, for example, by means of a gantry crane and respective chutes 2794 or other suitable pipe feeding equipment through holes 2481 in the floor of the drill deck. The drill pipe feeding holes 2481 may be covered by plates, hatches or similar covering. In Figure 15, the holes are shown in the open position with the uppermost end of a drill pipe extending through the open hole. The drill pipe that feeds the holes is offset from the shaft connecting to well centers.

[00141] Como no exemplo anterior, nas modalidades das Figuras 1421 uma coberta principal está situada abaixo da coberta do piso de perfuração e permite que o equipamento submarino pesado, por exemplo, BOPs e Árvores de Natal seja movido para a janela do casco sob os centros do poço de modo a permitir que tal equipamento seja baixado em direção ao leito do oceano. Consequentemente, a coberta do piso de perfuração e, em particular, a parte dessa coberta do piso de perfuração que está situada em estreita proximidade ao centro do poço pode ser estacionária e não precisar ser içada ou baixada para o equipamento submarino seja baixado para o leito do oceano.[00141] As in the previous example, in the embodiments of Figures 1421 a main deck is situated below the drilling floor deck and allows heavy subsea equipment, for example, BOPs and Christmas Trees to be moved to the hull window under the well centers in order to allow such equipment to be lowered towards the ocean floor. Consequently, the drilling floor cover and, in particular, the part of that drilling floor cover that is situated in close proximity to the center of the well may be stationary and need not be raised or lowered for the subsea equipment to be lowered to the bed. of the ocean.

[00142] Como as cadeias de dutos e os tubos de elevação são armazenados abaixo da coberta do piso de perfuração, e já que as passarelas elevadas 2508 se estendem em direção aos lados opostos a partir do centros do poço, e já que a estrutura do mastro 2404 está situada em um lado do centros do poço, a coberta do piso de perfuração fornece uma grande área desobstruída de coberta no lado do centros do poço oposto ao mastro. Esta área fornece acesso desobstruído a ambos os centros do poço e é livre do equipamento de manuseio de duto. Consequentemente, estas áreas podem ser usadas como área de trabalho, por exemplo, para montar equipamento auxiliar suspendível, e/ou para posicionar o equipamento auxiliar sobre a coberta como descrito em conexão com o exemplo das Figuras 1-8 acima. Em particular, quando operações são realizadas no tubo de perfuração, os furos 2481 podem ser cobertos ou de outro modo fixados. Além disso, pelo menos partes da estrutura de recuo 2512 podem ser cobertas por uma plataforma de modo a fornecer armazenamento ou área de trabalho adicional.[00142] As the pipelines and riser tubes are stored below the cover of the drilling floor, and as the 2508 elevated walkways extend towards opposite sides from the well centers, and since the structure of the 2404 mast is situated on one side of the well centers, the drill floor cover provides a large unobstructed area of cover on the center side of the well opposite the mast. This area provides unobstructed access to both well centers and is free of pipeline handling equipment. Consequently, these areas can be used as a working area, for example, to mount suspendable auxiliary equipment, and/or to position auxiliary equipment on the deck as described in connection with the example of Figures 1-8 above. In particular, when operations are carried out on the drill pipe, holes 2481 may be covered or otherwise fixed. In addition, at least parts of the setback structure 2512 can be covered by a platform to provide additional storage or work area.

[00143] Embora a modalidades das Figuras 14-21 tenham sido descritas no contexto de um navio de perfuração, será apreciado que os recursos descritos também podem ser implementados no contexto de um semi-submersível ou outro tipo de plataforma de perfuração. Em particular, o armazenamento dos tubos de elevação e/ou outro dutos abaixo da coberta do piso de perfuração pode ser implementado em outros tipos de plataformas de perfuração como o poço. Da mesma forma, a estrutura protetora, a estrutura de montagem, e outros recursos descritos com as modalidades das Figuras 1-13 podem ser implementados em outro nas perfurações mostradas nas Figuras 14-21 como poço.Although the embodiment of Figures 14-21 has been described in the context of a drilling vessel, it will be appreciated that the features described can also be implemented in the context of a semi-submersible or other type of drilling rig. In particular, storage of the riser pipes and/or other ducts below the cover of the drilling floor can be implemented on other types of drilling rigs such as the well. Likewise, the protective structure, mounting structure, and other features described with the embodiments of Figures 1-13 can be implemented in another borehole shown in Figures 14-21 as well.

[00144] Figuras 22A - 22D mostram modalidades de uma plataforma de perfuração nas quais cadeias de dutos que são construídas em uma estrutura de construção de suporte 2277 e armazenadas verticalmente em uma área de doca 2212 atrás de uma estrutura do mastro 2204 são entregues para um número de centros do poço 2223 situados sobre uma coberta do piso de perfuração 2207. Os dutos são entregues a partir da área de doca por meio de conduto inclinados 2292 através de ranhuras correspondentes 2285 permitindo o acesso a partir da área de doca para a coberta do piso de perfuração. A operação dos dutos que entram para os centros do poço pode ser controlada e monitorada na cabine do perfurador 2234.[00144] Figures 22A - 22D show embodiments of a drilling rig in which pipeline chains that are built into a supporting building structure 2277 and stored vertically in a dock area 2212 behind a mast frame 2204 are delivered to a number of well centers 2223 located on a cover of the drill floor 2207. The ducts are delivered from the dock area through sloped conduit 2292 through corresponding slots 2285 allowing access from the dock area to the cover of the drill floor. The operation of the pipelines entering the well centers can be controlled and monitored in the 2234 drill cabin.

[00145] A modalidade da Figura 22A tem conduto inclinados separados 2292 e ranhuras 2285 situadas perpendiculares à área de doca 2212 ligando assim essa à coberta do piso de perfuração 2207 através de uma abertura entre os cilindros do sistema elevador 2206.[00145] The embodiment of Figure 22A has separate inclined conduit 2292 and grooves 2285 situated perpendicular to the dock area 2212 thereby connecting this to the drill floor cover 2207 through an opening between the cylinders of the elevator system 2206.

[00146] Figura 22B mostra uma modalidade onde as calhas e ranhuras são situadas entre os centros do poço de modo que dutos são alimentados para os centros do poço por meio de um número de aparelhos de manuseio de tubo 2201. Os conjuntos de calhas adjacentes, ranhuras e aparelhos de manuseio de tubo são mostrados para garantir a redundância na operação de tal modo que as operações de perfuração podem ser realizadas mesmo que um conjunto deva experimentar falha ou de outro modo estar fora de operação.[00146] Figure 22B shows an embodiment where the chutes and grooves are situated between the well centers so that ducts are fed to the well centers by means of a number of pipe handling apparatus 2201. The adjacent chute assemblies, grooves and pipe handling apparatus are shown to ensure redundancy in operation such that drilling operations can be performed even if an assembly should experience failure or otherwise be out of operation.

[00147] Figura 22C ilustra uma modalidade onde as calhas e ranhuras são situadas entre os centros do poço e seguindo um caminho angulado que leva aos centros do poço de modo que as calhas 2292 podem alimentar dutos diretamente para os centros do poço 2223. Nesta modalidade, uma abertura entre os cilindros 2206 do sistema elevador não é necessária.[00147] Figure 22C illustrates a modality where the gutters and grooves are located between the well centers and following an angled path that leads to the well centers so that the gutters 2292 can feed pipelines directly to the well centers 2223. In this modality , an opening between the cylinders 2206 of the elevator system is not required.

[00148] Figura 22D ilustra uma modalidade onde dutos são entregues a partir da área de doca 2212 para os centros do poço 2223 seguindo um caminho ao longo da parte externa da estrutura do mastro 2204.[00148] Figure 22D illustrates a modality where pipelines are delivered from dock area 2212 to well centers 2223 following a path along the outside of mast frame 2204.

[00149] Figuras 23 A)-D) mostram cortes de uma porção de uma plataforma de perfuração para ilustrar várias modalidades de disposições nas quais cilindros de sistemas elevadores 2206 são posicionados dentro de uma estrutura do mastro 2204 de modo que uma abertura 2301 no lado do mastro de frente para o centro do poço 2223 pode ser feita. Estas aberturas permitem que os dutos sejam entregues a partir de uma área de doca 2212 através de uma ranhura 2285 por meio de uma calha 2292 para um centro do poço 2223 sem colidir com a estrutura do mastro ou o sistema elevador de qualquer modo.[00149] Figures 23 A)-D) show cross-sections of a portion of a drilling rig to illustrate various modalities of arrangements in which lift system cylinders 2206 are positioned within a mast frame 2204 so that an opening 2301 in the side of the mast facing the center of the well 2223 can be made. These openings allow ducts to be delivered from a dock area 2212 through a slot 2285 through a chute 2292 to a center of well 2223 without impinging on the mast structure or the elevator system in any way.

[00150] Na Figura 23A) uma disposição é mostrada onde os cilindros 2206 do sistema elevador são dispostos de modo que uma porção deles seja situada adicionalmente dentro da base do mastro 2204 para permitir uma abertura 2301 no mastro de modo que dutos podem ser alimentados através de uma ranhura 2285 para um centro do poço 2223 sem interferir com os cilindros e estrutura do mastro, proporcionando um grande espaçamento entre os cilindros desnecessário.[00150] In Figure 23A) an arrangement is shown where the cylinders 2206 of the elevator system are arranged so that a portion of them is further situated within the base of the mast 2204 to allow an opening 2301 in the mast so that ducts can be fed through. from a groove 2285 to a well center 2223 without interfering with the cylinders and mast frame, providing unnecessary large spacing between the cylinders.

[00151] A Figura 23B) mostra uma variação na disposição na figura 23A) onde alguns dos cilindros 2206 são movidos ainda mais para trás dentro da base da estrutura do mastro 2204 para acomodar uma abertura maior/rebaixo mais profundo em comparação com a figura 23 A).[00151] Figure 23B) shows a variation on the arrangement in figure 23A) where some of the cylinders 2206 are moved further back within the base of the mast frame 2204 to accommodate a larger opening/deeper recess compared to figure 23 THE).

[00152] Na Figura 23C) uma modalidade é mostrada onde os cilindros 2206 são dispostos em duas fileiras de frente uma para a outro para criar uma abertura maior na estrutura do mastro 2204 possibilitando o acesso ao redor da ranhura 2285 e calha 2292.[00152] In Figure 23C) an embodiment is shown where cylinders 2206 are arranged in two rows facing each other to create a larger opening in the structure of mast 2204 enabling access around slot 2285 and chute 2292.

[00153] Figura 23D) mostra a modalidade onde o sistema elevador de cilindro é substituído por um sistema elevador usando um meio diferente de elevação, por exemplo um mecanismo de extração, de modo que uma carga carregando qualidades dos cilindros seja transferida para uma estrutura do mastro esticada 2302 de tal modo que esta estrutura carrega estas cargas inteiramente. A estrutura do mastro é esticada enquanto tem espaço suficiente para uma abertura 2301 permitir acesso aos dutos sendo alimentados para os centros do poço.[00153] Figure 23D) shows the modality where the cylinder elevator system is replaced by an elevator system using a different means of elevation, for example an extraction mechanism, so that a load carrying qualities of the cylinders is transferred to a structure of the cylinder. stretched mast 2302 in such a way that this structure carries these loads fully. The mast frame is stretched while having enough space for an opening 2301 to allow access to the ducts being fed to the well centers.

[00154] Figura 24 mostra uma modalidade de uma plataforma de perfuração onde a estrutura do mastro 2204 é mostrada tendo aberturas 2301 para permitir que os dutos sejam alimentados para os centros do poço 2223 através de ranhuras 2285 na coberta do piso de perfuração 2207. A modalidade mostrada não usa um sistema elevador do tipo cilindro mas é ao invés uma variante da modalidade mostrada na Figura 23 D) onde a estrutura do mastro é esticada para acomodar a falta de cilindros que carregam a carga. A falta de cilindros posicionados em relativa proximidade aos centros do poço no plano horizontal permite que aberturas 2301 sejam fornecidas na estrutura do mastro para os dutos passarem abaixo e através da estrutura do mastro sejam entregues ao centro do poço.[00154] Figure 24 shows an embodiment of a drilling rig where the mast frame 2204 is shown having openings 2301 to allow pipelines to be fed to the well centers 2223 through slots 2285 in the cover of the drilling floor 2207. The embodiment shown does not use a cylinder-type lift system but is instead a variant of the embodiment shown in Figure 23D) where the mast frame is stretched to accommodate the lack of load carrying cylinders. The lack of cylinders positioned in relative proximity to the well centers in the horizontal plane allows openings 2301 to be provided in the mast frame for the ducts to pass below and through the mast frame to be delivered to the well center.

[00155] Embora algumas modalidades tenham sido descritas e mostradas em detalhe, a invenção não é restrita a elas, mas também podem ser incorporadas de outras maneiras dentro do escopo da matéria definida nas reivindicações a seguir. Em particular, deve-se compreender que outras modalidades podem ser usadas e modificações estruturais e funcionais podem ser feitas sem se afastar do escopo da presente invenção.[00155] Although some embodiments have been described and shown in detail, the invention is not restricted thereto, but may also be incorporated in other ways within the scope of matter defined in the following claims. In particular, it is to be understood that other modalities can be used and structural and functional modifications can be made without departing from the scope of the present invention.

[00156] Por exemplo, as modalidades descritas compreendem dois centros de poço, mas será apreciado que modalidades alternativas compreendem um único centro de poço ou um centro de poço e centros de poço adicionais.[00156] For example, the modalities described comprise two well centers, but it will be appreciated that alternative modalities comprise a single well center or a well center and additional well centers.

[00157] Os inventores perceberam ainda que muitas das vantagens dos vários aspectos da plataforma de perfuração descrita aqui, por exemplo, a coberta do piso de perfuração aberta, uma estrutura protetora e/ou uma estrutura de montagem aqui descritas ou definidas nas reivindicações dependentes podem ser obtidas com uma variedade de modalidades diferentes de plataformas de perfuração, não limitadas às modalidades específicas aqui descritas. Por exemplo, um ou mais destes aspectos e/ou outros aspectos podem ser incorporados em combinação com outras modalidades de uma plataforma de perfuração offshore, por exemplo, uma plataforma de perfuração offshore compreendendo: uma coberta do piso de perfuração tendo um orifício que define um primeiro centro do poço; um primeiro mastro que se estende para cima em relação à coberta do piso de perfuração, e um primeiro sistema elevador suportado pelo primeiro mastro e configurado para içar e baixar o equipamento tubular através do primeiro centro do poço; sendo que o primeiro sistema elevador é deslocado a partir de e localizado em um primeiro lado do primeiro centro do poço; primeiro equipamento de manuseio de dutos para mover o equipamento tubular para o primeiro sistema elevador de modo a permitir que o primeiro sistema elevador eleve ou abaixe o equipamento tubular através do primeiro centro do poço.[00157] The inventors further realized that many of the advantages of the various aspects of the drilling rig described herein, for example, the open drilling floor covering, a protective structure and/or a mounting structure described herein or defined in the dependent claims may be obtainable with a variety of different rig modalities, not limited to the specific modalities described herein. For example, one or more of these aspects and/or other aspects may be incorporated in combination with other embodiments of an offshore drilling rig, e.g. an offshore drilling rig comprising: a drilling floor cover having an orifice defining a first well center; a first mast that extends upwardly relative to the cover of the drilling floor, and a first lift system supported by the first mast and configured to raise and lower the tubular equipment through the first center of the well; the first elevator system being displaced from and located on a first side of the first shaft center; first pipeline handling equipment to move the tubular equipment to the first elevator system so as to allow the first elevator system to raise or lower the tubular equipment through the first center of the well.

[00158] Em reivindicações do dispositivo enumerando vários recursos, vários destes recursos podem ser incorporados por um e o mesmo item de hardware. O simples fato de que certas medidas são citadas mutuamente em diferentes reivindicações dependentes ou em diferentes modalidades descritas não indica que uma combinação destas medidas não pode ser usada para vantagem. Por exemplo, embora não explicitamente mostrado, será apreciado que as plataformas de perfuração das figuras 9 a 13 podem ser fornecidas com uma estrutura protetora, como aqui descrito e/ou uma estrutura de montagem içável como aqui descrito.[00158] In device claims enumerating multiple features, multiple of these features may be incorporated by one and the same piece of hardware. The mere fact that certain measures are cited mutually in different dependent claims or in different described modalities does not indicate that a combination of these measures cannot be used to advantage. For example, although not explicitly shown, it will be appreciated that the drilling rigs of Figures 9 to 13 may be provided with a protective structure as described herein and/or a hoist mounting structure as described herein.

[00159] Deve-se enfatizar que o termo "compreende/- compreendendo" quando usado nesta especificação é adotado para especificar a presença de recursos indicados, números inteiros, etapas ou componentes, mas não exclui a presença ou a adição de uma ou mais outros recursos, número inteiro, etapas, componentes ou grupos dos mesmos.[00159] It should be emphasized that the term "comprises/-comprises" when used in this specification is adopted to specify the presence of indicated features, integers, steps or components, but does not exclude the presence or addition of one or more others features, integer, steps, components or groups thereof.

Claims (20)

1. Plataforma de perfuração offshore, que compreende - uma coberta do piso de perfuração (107) tendo um orifício que define um primeiro centro do poço (123a); - um primeiro mastro (104) que se estende para cima em relação à coberta do piso de perfuração (107); - um primeiro sistema elevador (105a) suportado pelo primeiro mastro (104) e configurado para elevar e abaixar o equipamento tubular através do primeiro centro do poço (123a); sendo que uma estrutura de suporte de carga do primeiro sistema elevador (105a) é deslocada a partir de e localizada em um primeiro lado do primeiro centro do poço (123a); - primeiro equipamento de manuseio de dutos (136, 132a,b; 2592) para mover o equipamento tubular para o primeiro sistema elevador (135a) de modo a permitir que o primeiro sistema elevador (135a) eleve ou abaixe o equipamento tubular através do primeiro centro do poço (123a); caracterizado pelo fato de que o primeiro equipamento de manuseio de dutos (136, 132a,b; 2592) é operável para mover o equipamento tubular através de uma abertura (126a; 1226) formada na dita estrutura de suporte de carga.1. Offshore drilling platform, comprising - a drilling floor deck (107) having a hole defining a first well center (123a); - a first mast (104) extending upwards with respect to the cover of the perforation floor (107); - a first lift system (105a) supported by the first mast (104) and configured to raise and lower the tubular equipment through the first center of the well (123a); wherein a load-bearing structure of the first elevator system (105a) is displaced from and located on a first side of the first shaft center (123a); - first pipeline handling equipment (136, 132a,b; 2592) to move the tubular equipment to the first elevator system (135a) so as to allow the first elevator system (135a) to raise or lower the tubular equipment through the first well center (123a); characterized in that the first pipeline handling equipment (136, 132a,b; 2592) is operable to move the tubular equipment through an opening (126a; 1226) formed in said load-bearing structure. 2. Plataforma de perfuração offshore de acordo com a reivindicação 1, caracterizada pelo fato de que compreende uma estrutura de armazenamento (1412; 2512) para armazenar dutos escolhidos a partir de dutos de perfuração, revestimentos, cadeias de dutos de perfuração e cadeias de revestimentos, pelo menos parcialmente atrás da estrutura de suporte de carga quando visto a partir do primeiro centro do poço (123a).2. Offshore drilling platform according to claim 1, characterized in that it comprises a storage structure (1412; 2512) to store pipelines chosen from drilling pipelines, casings, drilling pipeline chains and casing chains , at least partially behind the load-bearing structure when viewed from the first center of the well (123a). 3. Plataforma de perfuração offshore, de acordo com a reivindicação 2, caracterizada pelo fato de que a estrutura de armazenamento (1412, 2512) compreende uma estrutura de recuo.3. Offshore drilling platform according to claim 2, characterized in that the storage structure (1412, 2512) comprises a setback structure. 4. Plataforma de perfuração offshore, de acordo com qualquer uma das reivindicações anteriores, caracterizada pelo fato de que compreende uma cabine do perfurador (134, 1434, 2234, 2434) posicionada no primeiro lado do primeiro centro do poço (123a).4. Offshore drilling platform, according to any one of the preceding claims, characterized in that it comprises a driller cabin (134, 1434, 2234, 2434) positioned on the first side of the first center of the well (123a). 5. Plataforma de perfuração offshore, de acordo com qualquer uma das reivindicações anteriores, caracterizada pelo fato de que a coberta do piso de perfuração (107) compreende pelo menos uma primeira área de coberta do piso de perfuração aberta (110a) localizada adjacente ao primeiro mastro (104) que não seja qualquer área de coberta do piso de perfuração (107) configurada para o movimento do equipamento tubular ou equipamento submarino para o primeiro centro do poço (123a) durante a operação de perfuração normal; e uma via de acesso (114a) conectando a área de coberta do piso de perfuração aberta (110a) com o primeiro centro do poço (123a).5. Offshore drilling platform according to any one of the preceding claims, characterized in that the drilling floor cover (107) comprises at least a first area of open drilling floor cover (110a) located adjacent to the first mast (104) other than any area covered by the drilling floor (107) configured for movement of tubular equipment or subsea equipment to the first well center (123a) during normal drilling operation; and an access road (114a) connecting the open drilling floor cover area (110a) with the first well center (123a). 6. Plataforma de perfuração offshore, de acordo com a reivindicação 5, caracterizada pelo fato de que a plataforma de perfuração é configurada para realizar o movimento do equipamento tubular ou equipamento submarino para o primeiro centro do poço (123a) ao longo de uma ou mais vias de alimentação de duto (1139a,b; 1132a,b) durante o uso normal que uma ou mais via de alimentação de duto somente cruza as áreas de coberta do piso de perfuração (107) fora da primeira área de coberta do piso de perfuração aberta (110a).6. Offshore drilling platform according to claim 5, characterized in that the drilling platform is configured to carry out the movement of tubular equipment or subsea equipment to the first well center (123a) along one or more pipeline feed paths (1139a,b; 1132a,b) during normal use one or more pipeline feed paths only cross the drilling floor cover areas (107) outside the first drilling floor cover area open (110a). 7. Plataforma de perfuração offshore, de acordo com a reivindicação 5 ou 6, caracterizada pelo fato de que a via de acesso (114a) se estende inteiramente fora da base do primeiro mastro (104).7. Offshore drilling platform according to claim 5 or 6, characterized in that the access road (114a) extends entirely outside the base of the first mast (104). 8. Plataforma de perfuração offshore, de acordo com qualquer uma das reivindicações 5 a 7, caracterizada pelo fato de que a via de acesso (114a) é uma via de acesso reta.8. Offshore drilling platform, according to any one of claims 5 to 7, characterized in that the access road (114a) is a straight access road. 9. Plataforma de perfuração offshore, de acordo com qualquer uma das reivindicações 5 a 8, caracterizada pelo fato de que a primeira área de coberta do piso de perfuração aberta (110a) é localizada adjacente ao primeiro centro do poço (123a) em uma direção longitudinal definida dentro de um plano da coberta do piso de perfuração (107) pelo primeiro centro do poço (123a) e o primeiro sistema elevador (105a).9. Offshore drilling rig according to any one of claims 5 to 8, characterized in that the first covered area of the open drilling floor (110a) is located adjacent to the first well center (123a) in one direction longitudinal defined within a plane of the cover of the drill floor (107) by the first well center (123a) and the first elevator system (105a). 10. Plataforma de perfuração offshore, de acordo com qualquer uma das reivindicações 5 a 9, caracterizada pelo fato de que a primeira área de coberta do piso de perfuração aberta (110a) é localizada adjacente ao primeiro centro do poço (123a) em uma direção transversal normal a uma direção longitudinal definida dentro de um plano da coberta do piso de perfuração (107) pelo primeiro centro do poço (123a) e o primeiro sistema elevador (105a).10. Offshore drilling platform according to any one of claims 5 to 9, characterized in that the first covered area of the open drilling floor (110a) is located adjacent to the first well center (123a) in one direction transverse normal to a longitudinal direction defined within a plane of the drill floor deck (107) by the first well center (123a) and the first elevator system (105a). 11. Plataforma de perfuração offshore, de acordo com qualquer uma das reivindicações anteriores, caracterizada pelo fato de que a estrutura de suporte de carga compreende pelo menos um atuador linear que se estende substancialmente verticalmente, como cilindro hidráulico (106a), tendo uma extremidade estacionária sendo fixa com relação à coberta do piso de perfuração (107), e uma extremidade de deslocamento conectada a pelo menos uma de uma ou mais polias (133a).11. Offshore drilling rig according to any one of the preceding claims, characterized in that the load-bearing structure comprises at least one linear actuator extending substantially vertically, such as a hydraulic cylinder (106a), having a stationary end being secured with respect to the perforation floor cover (107), and a displacement end connected to at least one of one or more pulleys (133a). 12. Plataforma de perfuração offshore, de acordo com a reivindicação 11, caracterizada pelo fato de que compreende uma pluralidade de cilindros (106a) que se estendem para cima em relação à coberta do piso de perfuração (107), sendo que a pluralidade de cilindros (106a) compreende pelo menos dois grupos de cilindros (106a) que estão afastados uns dos outros de modo a formar uma abertura (126a) entre os dois grupos de cilindros (106a) através dos quais o equipamento tubular da abertura é móvel em direção ao primeiro centro do poço (123a) a partir do primeiro lado.12. Offshore drilling platform according to claim 11, characterized in that it comprises a plurality of cylinders (106a) extending upwards in relation to the cover of the drilling floor (107), the plurality of cylinders (106a) comprises at least two groups of cylinders (106a) which are spaced apart so as to form an opening (126a) between the two groups of cylinders (106a) through which the tubular apparatus of the opening is movable towards the first well center (123a) from the first side. 13. Plataforma de perfuração offshore, de acordo com qualquer uma das reivindicações anteriores, caracterizada pelo fato de que o primeiro sistema elevador (105a) compreende um mecanismo de extração operável para enrolar e alimentar um comprimento do cabo de elevação.13. Offshore drilling rig according to any one of the preceding claims, characterized in that the first lift system (105a) comprises an operable extraction mechanism to wind up and feed a length of lifting cable. 14. Plataforma de perfuração offshore, de acordo com qualquer uma das reivindicações anteriores, caracterizada pelo fato de que o primeiro equipamento de manuseio de dutos (136, 132a,b; 2592) define uma primeira via de alimentação de duto ao longo da qual o equipamento tubular é movido em direção ao primeiro centro do poço (123a), sendo que a primeira via de alimentação de duto se estende substancialmente ao longo de uma direção longitudinal (1140) definida dentro de um plano da coberta do piso de perfuração (107) pelo primeiro centro do poço (123a) e o primeiro sistema elevador (105a).14. Offshore drilling platform, according to any one of the preceding claims, characterized in that the first pipeline handling equipment (136, 132a,b; 2592) defines a first pipeline feed path along which the tubular equipment is moved towards the first center of the well (123a), the first pipeline feed path substantially extending along a longitudinal direction (1140) defined within a plane of the cover of the drilling floor (107) through the first shaft center (123a) and the first elevator system (105a). 15. Plataforma de perfuração offshore, de acordo com qualquer uma das reivindicações anteriores, caracterizada pelo fato de que a plataforma de perfuração compreende adicionalmente um segundo centro de trabalho (123b) deslocado a partir do primeiro centro do poço (123a); as posições do primeiro centro do poço (123a) e o segundo centro de trabalho (123b) juntos definindo uma direção transversal no plano da coberta do piso de perfuração (107); um segundo sistema elevador (105b) configurado para içar e baixar o equipamento tubular através do segundo centro de trabalho (123b); sendo que os primeiro e segundo sistemas elevadores (105a, 105b) são dispostos lado a lado na direção transversal; um equipamento de manuseio de duto (136, 132a,b; 2592) para alimentar o equipamento tubular em direção ao primeiro centro do poço (123a); e equipamento de manuseio de duto (136, 132a,b; 2592) para alimentar o equipamento tubular em direção ao segundo centro de trabalho (123b); e sendo que o equipamento de manuseio de duto (136, 132a,b; 2592) para alimentar o equipamento tubular em direção ao primeiro centro do poço (123a) e o equipamento de manuseio de duto (136, 132a,b; 2592) para alimentar o equipamento tubular em direção ao segundo centro de trabalho (123b) definem as respectivas vias de alimentação de duto cada se estendendo substancialmente ao longo da direção longitudinal normal à direção transversal.15. Offshore drilling platform, according to any one of the preceding claims, characterized in that the drilling platform additionally comprises a second work center (123b) displaced from the first well center (123a); the positions of the first well center (123a) and the second working center (123b) together defining a transverse direction in the plane of the drill floor deck (107); a second lift system (105b) configured to raise and lower tubular equipment through the second work center (123b); the first and second elevator systems (105a, 105b) being arranged side by side in the transverse direction; a pipeline handling equipment (136, 132a,b; 2592) for feeding the tubular equipment towards the first center of the well (123a); and pipeline handling equipment (136, 132a,b; 2592) for feeding the tubular equipment towards the second work center (123b); and wherein the pipeline handling equipment (136, 132a,b; 2592) to feed the tubular equipment towards the first well center (123a) and the pipeline handling equipment (136, 132a,b; 2592) to feeding the tubular equipment towards the second working center (123b) define respective duct feed paths each extending substantially along the longitudinal direction normal to the transverse direction. 16. Plataforma de perfuração offshore, de acordo com qualquer uma das reivindicações anteriores, caracterizada pelo fato de que pelo menos uma parte da coberta do piso de perfuração (107) é formada por um teto de um gabinete (121) para acomodar o equipamento de mistura de lama e/ou outro equipamento operacional da plataforma de perfuração.16. Offshore drilling platform, according to any one of the preceding claims, characterized in that at least a part of the drilling floor cover (107) is formed by a roof of a cabinet (121) to accommodate the drilling equipment mud mix and/or other drilling rig operating equipment. 17. Plataforma de perfuração offshore, de acordo com qualquer uma das reivindicações anteriores, caracterizada pelo fato de que compreende a área de armazenamento (115) para armazenar dutos localizada abaixo do nível da coberta do piso de perfuração (107), e equipamento de manuseio de duto (136, 132a,b; 2592) para alimentar os dutos a partir da dita área de armazenamento (115) através de uma abertura na coberta do piso de perfuração (107) em direção ao primeiro centro do poço (123a).17. Offshore drilling platform according to any one of the preceding claims, characterized in that it comprises the storage area (115) for storing pipelines located below the level of the drilling floor cover (107), and handling equipment of duct (136, 132a,b; 2592) for feeding the ducts from said storage area (115) through an opening in the cover of the drill floor (107) towards the first center of the well (123a). 18. Plataforma de perfuração offshore, de acordo com qualquer uma das reivindicações anteriores, caracterizada pelo fato de que o primeiro sistema elevador (105a) é um sistema elevador hidráulico compreendendo cilindros (106a) que se estendem para cima para carregar a carga a ser içada ou baixada através das polias (133a) montadas na parte de cima dos cilindros (106a) de modo que a estrutura de suporte de carga do primeiro sistema elevador (105a) compreende os cilindros (106) e as polias (133a).18. Offshore drilling platform according to any one of the preceding claims, characterized in that the first lift system (105a) is a hydraulic lift system comprising cylinders (106a) that extend upwards to carry the load to be lifted or lowered through pulleys (133a) mounted on top of the cylinders (106a) so that the load-bearing structure of the first elevator system (105a) comprises the cylinders (106) and the pulleys (133a). 19. Plataforma de perfuração offshore, de acordo com qualquer uma das reivindicações anteriores, caracterizada pelo fato de que o primeiro sistema elevador (105a) é sistema de mecanismo de extração compreendendo uma ou mais polias (133a) carregadas pelo mastro (104) de modo que as cargas a serem içadas são transferidas para o navio de perfuração através do mastro (104); e a estrutura de suporte de carga do primeiro sistema elevador (105a) compreende as polias (133a) e aquelas porções do mastro (104) que carregam as polias (133a) e qualquer carga suspensa a partir das polias (133a).19. Offshore drilling platform, according to any one of the preceding claims, characterized in that the first elevator system (105a) is an extraction mechanism system comprising one or more pulleys (133a) loaded by the mast (104) so that the loads to be lifted are transferred to the drillship through the mast (104); and the load-bearing structure of the first elevator system (105a) comprises the pulleys (133a) and those portions of the mast (104) that carry the pulleys (133a) and any load suspended from the pulleys (133a). 20. Plataforma de perfuração offshore, de acordo com qualquer uma das reivindicações anteriores; caracterizada pelo fato de que o primeiro equipamento de manuseio de duto (136, 132a,b; 2592) que é operável para mover equipamento tubular pelo menos parcialmente debaixo da estrutura de suporte de carga através de uma abertura (126a, 1226) formada na dita estrutura de suporte de carga a partir da dita estrutura de armazenagem (1412; 2512) para armazenar dutos localizados pelo menos parcialmente atrás da estrutura de suporte de carga quando visto a partir do primeiro centro do poço (123a).Offshore drilling rig according to any one of the preceding claims; characterized in that the first pipeline handling equipment (136, 132a,b; 2592) which is operable to move tubular equipment at least partially under the load-bearing structure through an opening (126a, 1226) formed in said load-bearing structure from said storage structure (1412; 2512) for storing pipelines located at least partially behind the load-bearing structure when viewed from the first center of the well (123a).
BR112015016668A 2013-01-11 2014-01-13 DRILLING PLATFORM BR112015016668B8 (en)

Applications Claiming Priority (7)

Application Number Priority Date Filing Date Title
DKPA201370017 2013-01-11
DKPA201370017 2013-01-11
US13/772,709 US9458680B2 (en) 2013-01-11 2013-02-21 Drilling rig
US13/772,709 2013-02-21
DKPA201370604 2013-10-22
DKPA201370604 2013-10-22
PCT/EP2014/050509 WO2014108541A2 (en) 2013-01-11 2014-01-13 Drilling rig

Publications (3)

Publication Number Publication Date
BR112015016668A2 BR112015016668A2 (en) 2018-04-24
BR112015016668B1 true BR112015016668B1 (en) 2021-10-26
BR112015016668B8 BR112015016668B8 (en) 2023-04-18

Family

ID=54012371

Family Applications (1)

Application Number Title Priority Date Filing Date
BR112015016668A BR112015016668B8 (en) 2013-01-11 2014-01-13 DRILLING PLATFORM

Country Status (6)

Country Link
AP (1) AP2015008590A0 (en)
BR (1) BR112015016668B8 (en)
GB (1) GB2526008B (en)
MX (1) MX361905B (en)
NO (1) NO347295B1 (en)
ZA (1) ZA201504945B (en)

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL1007799C2 (en) * 1997-12-15 1999-06-17 Huisman Spec Lifting Equip Bv Device for moving an elongated object, in particular a riser part or a drill pipe cassette.
NL1016051C2 (en) * 2000-08-30 2002-03-01 Huisman Spec Lifting Equip Bv Double mast.
US6766860B2 (en) * 2002-02-22 2004-07-27 Globalsantafe Corporation Multi-activity offshore drilling facility having a support for tubular string
WO2011011505A2 (en) * 2009-07-23 2011-01-27 Bp Corporation North America Inc. Offshore drilling system

Also Published As

Publication number Publication date
MX2015008914A (en) 2016-05-31
ZA201504945B (en) 2016-11-30
GB2526008A (en) 2015-11-11
GB201513319D0 (en) 2015-09-09
NO20151016A1 (en) 2015-08-11
GB2526008B (en) 2020-05-20
AP2015008590A0 (en) 2015-07-31
BR112015016668B8 (en) 2023-04-18
NO347295B1 (en) 2023-09-04
BR112015016668A2 (en) 2018-04-24
MX361905B (en) 2018-12-19

Similar Documents

Publication Publication Date Title
US9856705B2 (en) Drilling rig
US9714546B2 (en) Offshore drilling rig and a method of operating the same
US9068398B2 (en) Deepwater completion installation and intervention system
NL2012354B1 (en) Offshore drilling system, vessel and methods.
WO2004035985A1 (en) An offshore drilling system
WO2014108541A2 (en) Drilling rig
CN111491857B (en) Vessel and method for performing subsea wellbore related activities
WO2014108542A2 (en) Drilling rig
US10202808B2 (en) Offshore drilling rig and a method of operating the same
US10570672B2 (en) Offshore drilling rig and a method of operating the same
US10086917B2 (en) Drilling vessel and method for operating a drilling vessel adapted to run large diameter casing strings
BR112015016668B1 (en) DRILLING PLATFORM
WO2017050336A1 (en) Offshore drilling vessel
CN110914145B (en) Vessel and method for performing subsea wellbore related operations
OA18037A (en) Drilling rig.
NL2023601B1 (en) Semi-submersible floating offshore vessel
DK201470227A1 (en) An offshore drilling rig and a method of operating the same
GB2549258A (en) Drillship
BR112016020290B1 (en) OFF-SHORE DRILLING VESSEL, AND, METHOD OF DRILLING A SEA WELL BORE
MX2008003998A (en) Device for storing tubulars and devices for handling of tubulars
BRPI1004603A2 (en) floating offshore structure for offshore hydrocarbon production, and riser support system

Legal Events

Date Code Title Description
B25G Requested change of headquarter approved

Owner name: MAERSK DRILLING A/S (DK)

B06F Objections, documents and/or translations needed after an examination request according [chapter 6.6 patent gazette]
B06U Preliminary requirement: requests with searches performed by other patent offices: procedure suspended [chapter 6.21 patent gazette]
B350 Update of information on the portal [chapter 15.35 patent gazette]
B09A Decision: intention to grant [chapter 9.1 patent gazette]
B16A Patent or certificate of addition of invention granted [chapter 16.1 patent gazette]

Free format text: PRAZO DE VALIDADE: 20 (VINTE) ANOS CONTADOS A PARTIR DE 13/01/2014, OBSERVADAS AS CONDICOES LEGAIS.

B25D Requested change of name of applicant approved

Owner name: NOBLE DRILLING A/S (DK)