BR112015016401A2 - sistemas e métodos para criação otimizada de poço em uma formação de folhelho - Google Patents
sistemas e métodos para criação otimizada de poço em uma formação de folhelhoInfo
- Publication number
- BR112015016401A2 BR112015016401A2 BR112015016401A BR112015016401A BR112015016401A2 BR 112015016401 A2 BR112015016401 A2 BR 112015016401A2 BR 112015016401 A BR112015016401 A BR 112015016401A BR 112015016401 A BR112015016401 A BR 112015016401A BR 112015016401 A2 BR112015016401 A2 BR 112015016401A2
- Authority
- BR
- Brazil
- Prior art keywords
- pacing
- formation
- methods
- systems
- location
- Prior art date
Links
- 230000015572 biosynthetic process Effects 0.000 title abstract 6
- 238000000034 method Methods 0.000 title abstract 4
- 238000005259 measurement Methods 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/12—Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
- E21B7/06—Deflecting the direction of boreholes
- E21B7/068—Deflecting the direction of boreholes drilled by a down-hole drilling motor
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Geochemistry & Mineralogy (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geophysics (AREA)
- Remote Sensing (AREA)
- Earth Drilling (AREA)
- Geophysics And Detection Of Objects (AREA)
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
- General Engineering & Computer Science (AREA)
- Operations Research (AREA)
- User Interface Of Digital Computer (AREA)
- Auxiliary Devices For Music (AREA)
Abstract
resumo sistemas e métodos para criação otimizada de poço em uma formação de folhelho sistemas e métodos para criação otimizada de poço em uma formação de folhelho são descritos aqui. o método inclui determinar uma primeira localização de estimulação planejada (107) dentro da formação baseada num modelo predeterminado de uma formação. um poço é perfurado usando uma composição de fundo (204) seção lwd/mwd (206). medições em tempo real sãi usadas para atualizar o modelo de formação e uma localização alternativa (301) para a estimulação é determinada. a bha é isolada do conjunto de estimulação (205) assentando uma esfera de queda em um assento de esfera entre a seção lwd e o conjunto de estimulação. uma segunda localização de estimulação pode ser determinada com base em dados recebidos na bha após estimulação da formação na localização de estimulação alternativa.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/US2013/027115 WO2014130036A1 (en) | 2013-02-21 | 2013-02-21 | Systems and methods for optimized well creation in a shale formation |
Publications (3)
Publication Number | Publication Date |
---|---|
BR112015016401A2 true BR112015016401A2 (pt) | 2017-07-11 |
BR112015016401B1 BR112015016401B1 (pt) | 2020-11-24 |
BR112015016401B8 BR112015016401B8 (pt) | 2021-07-13 |
Family
ID=47844469
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
BR112015016401A BR112015016401B8 (pt) | 2013-02-21 | 2013-02-21 | sistemas e métodos para criação otimizada de poço em uma formação de folhelho |
Country Status (10)
Country | Link |
---|---|
US (1) | US9234408B2 (pt) |
EP (1) | EP2929135B1 (pt) |
CN (1) | CN104903541B (pt) |
AU (1) | AU2013378834B2 (pt) |
BR (1) | BR112015016401B8 (pt) |
CA (1) | CA2898736C (pt) |
MX (1) | MX358853B (pt) |
RU (1) | RU2622280C2 (pt) |
WO (1) | WO2014130036A1 (pt) |
ZA (1) | ZA201504285B (pt) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2897797C (en) * | 2013-03-13 | 2017-01-10 | Exxonmobil Upstream Research Company | Producing hydrocarbons from a formation |
US20160265329A1 (en) * | 2015-03-10 | 2016-09-15 | Schlumberger Technology Corporation | Fracturing while tripping |
US20180189702A1 (en) * | 2016-12-29 | 2018-07-05 | Halliburton Energy Services, Inc. | Power distribution system optimization for well stimulation and servicing environments |
CN106970423B (zh) * | 2017-03-28 | 2019-02-15 | 中国石油天然气股份有限公司 | 一种确定页岩气地层构造模型的方法及装置 |
US20220372841A1 (en) * | 2019-10-22 | 2022-11-24 | Velikx Llc | Flow diffuser |
US20210388700A1 (en) * | 2020-06-12 | 2021-12-16 | Landmark Graphics Corporation | Shale field wellbore configuration system |
Family Cites Families (36)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2303090A (en) | 1938-11-08 | 1942-11-24 | Guiberson Corp | Pressure drilling head |
US3648777A (en) | 1969-04-04 | 1972-03-14 | Roy L Arterbury | Well bore circulating tool including positioning method by casing annulus fluid stretching tubing string |
US4047569A (en) | 1976-02-20 | 1977-09-13 | Kurban Magomedovich Tagirov | Method of successively opening-out and treating productive formations |
US5394941A (en) * | 1993-06-21 | 1995-03-07 | Halliburton Company | Fracture oriented completion tool system |
US7147068B2 (en) | 1994-10-14 | 2006-12-12 | Weatherford / Lamb, Inc. | Methods and apparatus for cementing drill strings in place for one pass drilling and completion of oil and gas wells |
US7040420B2 (en) | 1994-10-14 | 2006-05-09 | Weatherford/Lamb, Inc. | Methods and apparatus for cementing drill strings in place for one pass drilling and completion of oil and gas wells |
US6028534A (en) * | 1997-06-02 | 2000-02-22 | Schlumberger Technology Corporation | Formation data sensing with deployed remote sensors during well drilling |
US7475742B2 (en) | 2000-06-09 | 2009-01-13 | Tesco Corporation | Method for drilling with casing |
US7100688B2 (en) * | 2002-09-20 | 2006-09-05 | Halliburton Energy Services, Inc. | Fracture monitoring using pressure-frequency analysis |
US7350590B2 (en) | 2002-11-05 | 2008-04-01 | Weatherford/Lamb, Inc. | Instrumentation for a downhole deployment valve |
US7503404B2 (en) * | 2004-04-14 | 2009-03-17 | Halliburton Energy Services, Inc, | Methods of well stimulation during drilling operations |
US20070284106A1 (en) * | 2006-06-12 | 2007-12-13 | Kalman Mark D | Method and apparatus for well drilling and completion |
US9135475B2 (en) * | 2007-01-29 | 2015-09-15 | Sclumberger Technology Corporation | System and method for performing downhole stimulation operations |
US7650947B2 (en) | 2007-02-28 | 2010-01-26 | Titan Specialties, Ltd. | One trip system for circulating, perforating and treating |
US7775299B2 (en) | 2007-04-26 | 2010-08-17 | Waqar Khan | Method and apparatus for programmable pressure drilling and programmable gradient drilling, and completion |
RU2471980C2 (ru) * | 2007-09-21 | 2013-01-10 | Нэборз Глобал Холдингз, Лтд. | Автоматизированное устройство и способы для наклонно-направленного бурения |
US7963325B2 (en) * | 2007-12-05 | 2011-06-21 | Schlumberger Technology Corporation | Method and system for fracturing subsurface formations during the drilling thereof |
US8714244B2 (en) * | 2007-12-18 | 2014-05-06 | Schlumberger Technology Corporation | Stimulation through fracturing while drilling |
US7845431B2 (en) | 2008-05-22 | 2010-12-07 | Tesco Corporation | Retrieval tool with slips for retrieving bottom hole assembly during casing while drilling operations |
US8498852B2 (en) * | 2009-06-05 | 2013-07-30 | Schlumberger Tehcnology Corporation | Method and apparatus for efficient real-time characterization of hydraulic fractures and fracturing optimization based thereon |
US8220547B2 (en) * | 2009-07-31 | 2012-07-17 | Schlumberger Technology Corporation | Method and apparatus for multilateral multistage stimulation of a well |
US8186457B2 (en) | 2009-09-17 | 2012-05-29 | Tesco Corporation | Offshore casing drilling method |
WO2011044012A1 (en) | 2009-10-05 | 2011-04-14 | Halliburton Energy Services, Inc. | Single-assembly system and method for one-trip drilling, casing, cementing and perforating |
AU2010310816B2 (en) * | 2009-10-20 | 2016-01-28 | Schlumberger Technology B.V. | Methods for characterization of formations, navigating drill paths, and placing wells in earth boreholes |
US8529984B2 (en) * | 2010-07-26 | 2013-09-10 | Sally Sirkin Lewis | Method of producing an ombré´ finish for materials |
CA2808301A1 (en) * | 2010-08-23 | 2012-03-01 | Schlumberger Canada Limited | Sand control well completion method and apparatus |
AU2011350663B2 (en) * | 2010-12-30 | 2015-09-03 | Schlumberger Technology B.V. | System and method for performing downhole stimulation operations |
US20130140031A1 (en) * | 2010-12-30 | 2013-06-06 | Schlumberger Technology Corporation | System and method for performing optimized downhole stimulation operations |
US9062530B2 (en) * | 2011-02-09 | 2015-06-23 | Schlumberger Technology Corporation | Completion assembly |
US8662179B2 (en) * | 2011-02-21 | 2014-03-04 | Halliburton Energy Services, Inc. | Remotely operated production valve and method |
BR112013021608A2 (pt) * | 2011-02-23 | 2019-09-24 | Landmark Graphics Corp | método e sistemas de determinação de cenários de fraturas hidráulicas viávies |
US8762118B2 (en) * | 2011-03-07 | 2014-06-24 | Schlumberger Technology Corporation | Modeling hydraulic fractures |
GB2506793A (en) * | 2011-07-28 | 2014-04-09 | Schlumberger Holdings | System and method for performing wellbore fracture operations |
RU2567067C1 (ru) * | 2011-10-11 | 2015-10-27 | Шлюмберже Текнолоджи Б.В. | Система и способ выполнения операции интенсификации |
US9064066B2 (en) * | 2011-10-28 | 2015-06-23 | Landmark Graphics Corporation | Methods and systems for well planning based on a complex fracture model |
US20140262240A1 (en) * | 2013-03-13 | 2014-09-18 | Thomas J. Boone | Producing Hydrocarbons from a Formation |
-
2013
- 2013-02-21 US US14/240,578 patent/US9234408B2/en active Active
- 2013-02-21 BR BR112015016401A patent/BR112015016401B8/pt active IP Right Grant
- 2013-02-21 CN CN201380069921.7A patent/CN104903541B/zh not_active Expired - Fee Related
- 2013-02-21 CA CA2898736A patent/CA2898736C/en active Active
- 2013-02-21 MX MX2015008833A patent/MX358853B/es active IP Right Grant
- 2013-02-21 AU AU2013378834A patent/AU2013378834B2/en active Active
- 2013-02-21 EP EP13708574.2A patent/EP2929135B1/en active Active
- 2013-02-21 RU RU2015122933A patent/RU2622280C2/ru not_active IP Right Cessation
- 2013-02-21 WO PCT/US2013/027115 patent/WO2014130036A1/en active Application Filing
-
2015
- 2015-06-12 ZA ZA2015/04285A patent/ZA201504285B/en unknown
Also Published As
Publication number | Publication date |
---|---|
RU2015122933A (ru) | 2017-03-27 |
CA2898736A1 (en) | 2014-08-28 |
AU2013378834B2 (en) | 2016-07-21 |
EP2929135A1 (en) | 2015-10-14 |
MX358853B (es) | 2018-09-06 |
BR112015016401B1 (pt) | 2020-11-24 |
CN104903541B (zh) | 2017-10-24 |
EP2929135B1 (en) | 2020-04-15 |
CA2898736C (en) | 2017-02-21 |
BR112015016401B8 (pt) | 2021-07-13 |
US20150068735A1 (en) | 2015-03-12 |
CN104903541A (zh) | 2015-09-09 |
ZA201504285B (en) | 2016-04-28 |
WO2014130036A1 (en) | 2014-08-28 |
RU2622280C2 (ru) | 2017-06-13 |
MX2015008833A (es) | 2015-10-14 |
US9234408B2 (en) | 2016-01-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
BR112015016401A2 (pt) | sistemas e métodos para criação otimizada de poço em uma formação de folhelho | |
BR112012005724A2 (pt) | método de inversão conjunta implementado por computador para criar uma representação rochosa em 3d de uma estrutura rochosa de subsolo utilizando dados petrofísicos, e, sistema de computador configurado para efetuar inversão conjunta de conjuntos de dados petrofísicos para obter uma representação rochosa em 3d de uma estrutura rochosa de subsolo | |
Huber et al. | The ocean circulation in the southern hemisphere and its climatic impacts in the Eocene | |
MX2021002871A (es) | Analisis de atributos sismicos basado en el aprendizaje automatico. | |
BR112016006621A2 (pt) | método para gerenciar um risco predeterminado durante as operações de perfuração de um poço e dispositivo transportador de programa não transitório tangível | |
AR098175A1 (es) | Predicción de riesgos en tiempo real durante operaciones de perforación | |
BR112017010078A2 (pt) | composições, dispositivos e métodos de teste de sensibilidade de ibs | |
MX343815B (es) | Inversión 1d extendida de mediciones electromagnéticas para la evaluación de la formación. | |
BR112012017182A2 (pt) | método e sistema para utilizar simulação estatística multiponto para modelar tendências de propriedade de reservatório | |
MX2017010291A (es) | Inhibidores de kdm1a para el tratamiento de enfermedades. | |
GB2466412A (en) | Formation modeling while drilling for enhanced high angle or horizontal well placement | |
NO20090868L (no) | Fremgangsmate for a bestemme fysiske egenskaper av strukturer | |
BR112016001807A2 (pt) | compartimentos de atualização dinâmica que representam uma ou mais estruturas geológicas | |
GB2546046A (en) | Structure tensor constrained tomographic velocity analysis | |
BR112015011087A2 (pt) | método para obter as medições de resistividade profunda e sistema para otimizar as medições de resistividade profunda | |
GB2535343A (en) | Formation evaluation using stochastic analysis of log data | |
BR112012022361A2 (pt) | aparelho e método para medir a composição e as propriedades de fluido de fundo de poço | |
GB2561106A (en) | Real-time true resistivity estimation for logging-while-drilling tools | |
BR112019007580A2 (pt) | avaliação e mitigação de risco e perigo geomecânico | |
WO2011085083A3 (en) | Apparatus and method for pulsed neutron measurement | |
BRPI1007579A2 (pt) | Método de utilizar um modelo de choque para previsão de efeitos de perfuração e método para prever efeitos de perfuração em uma coluna de perfuração em um poço | |
GB2569900A (en) | Geostatistical analysis of microseismic data in fracture modelling | |
AR110824A1 (es) | Inversión de la distancia hasta el límite de una capa (dtbb) de múltiples capas con múltiples suposiciones iniciales | |
BR112014019190A8 (pt) | método para estimar parâmetro de interesse em furo de poço e aparelho para adquirir parâmetro de interesse em furo de poço | |
BR112013026528A2 (pt) | "método e aparelho para avaliar uma formação de terra" |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
B06F | Objections, documents and/or translations needed after an examination request according [chapter 6.6 patent gazette] | ||
B06U | Preliminary requirement: requests with searches performed by other patent offices: procedure suspended [chapter 6.21 patent gazette] | ||
B09A | Decision: intention to grant [chapter 9.1 patent gazette] | ||
B16A | Patent or certificate of addition of invention granted [chapter 16.1 patent gazette] |
Free format text: PRAZO DE VALIDADE: 20 (VINTE) ANOS CONTADOS A PARTIR DE 21/02/2013, OBSERVADAS AS CONDICOES LEGAIS. |
|
B16C | Correction of notification of the grant [chapter 16.3 patent gazette] |
Free format text: REF. RPI 2603 DE 24/11/2020 QUANTO AO ENDERECO. |