BR112013025250A2 - mobile drill rig system, and method for drilling and completing a plurality of wellbores - Google Patents
mobile drill rig system, and method for drilling and completing a plurality of wellboresInfo
- Publication number
- BR112013025250A2 BR112013025250A2 BR112013025250A BR112013025250A BR112013025250A2 BR 112013025250 A2 BR112013025250 A2 BR 112013025250A2 BR 112013025250 A BR112013025250 A BR 112013025250A BR 112013025250 A BR112013025250 A BR 112013025250A BR 112013025250 A2 BR112013025250 A2 BR 112013025250A2
- Authority
- BR
- Brazil
- Prior art keywords
- drill rig
- site
- drilling
- completing
- wellbores
- Prior art date
Links
- 238000005553 drilling Methods 0.000 title abstract 3
- 238000000034 method Methods 0.000 title abstract 3
- 239000000523 sample Substances 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/02—Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B15/00—Supports for the drilling machine, e.g. derricks or masts
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Mechanical Engineering (AREA)
- Earth Drilling (AREA)
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
Abstract
sistema de sonda de perfuração móvel, e, método para perfurar e completar uma pluralidade de furos de poço um sistema de sonda de perfuração móvel compreende uma plataforma autopropulsionada suportando uma sonda de perfuração em um primeiro local de furo de poço e uma sonda de completação em um segundo local de furo de poço, pelo menos dois preventores de erupção, e um dispositivo de transporte de bop para transportar um dos ditos preventores de erupção para um local de furo de poço.; um método para perfurar e completar umapluralidade de furos de poço compreende: prover um sistema de sonda de perfuração móvel, instalar um preventor de erupção em um primeiro local de furo de poço e instalar outro preventor de erupção em um segundo local de furo de poço, usando a sonda de perfuração um furo de poço dito primeiro local enquanto usa a sonda de completação para completar um furo de poço no segundo local, usar o dispositivo de transporte de bop para transportar um dos preventores de erupção do segundo local para um terceiro local de furo de poço,e mover a plataforma de modo que a sonda de perfuração seja posicionada no terceiro local.mobile drill rig system, and method for drilling and completing a plurality of wellbores a mobile drill rig system comprises a self-propelled platform supporting a drill rig at a first wellbore site and a completion probe in a second borehole location, at least two blowout preventers, and a bop conveying device for transporting one of said blowout preventers to a borehole site; One method for drilling and completing a plurality of wellbores comprises: providing a mobile drill rig system, installing an eruption preventer at a first wellbore site and installing another eruption preventer at a second wellbore site, using the drill rig a first well hole said while using the completion drill to complete a well hole at the second site, use the bop transport device to transport one of the second site eruption preventers to a third site borehole, and move the rig so that the drill rig is positioned at the third location.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US201161475565P | 2011-04-14 | 2011-04-14 | |
PCT/US2012/033284 WO2012142259A2 (en) | 2011-04-14 | 2012-04-12 | Self-propelled simultaneous platform |
Publications (1)
Publication Number | Publication Date |
---|---|
BR112013025250A2 true BR112013025250A2 (en) | 2017-02-07 |
Family
ID=47009965
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
BR112013025250A BR112013025250A2 (en) | 2011-04-14 | 2012-04-12 | mobile drill rig system, and method for drilling and completing a plurality of wellbores |
Country Status (5)
Country | Link |
---|---|
CN (1) | CN103477029B (en) |
AU (1) | AU2012242798B2 (en) |
BR (1) | BR112013025250A2 (en) |
CA (1) | CA2831077A1 (en) |
WO (1) | WO2012142259A2 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20150226026A1 (en) * | 2014-02-07 | 2015-08-13 | Allan R. Nelson Engineering (1997) Inc. | Blowout preventer installation and removal devices and related methods |
DK178718B1 (en) | 2014-11-20 | 2016-12-05 | Maersk Drilling As | A mobile offshore drilling unit, a method of using such a unit and a system comprising such a unit |
CN104787575A (en) * | 2015-04-24 | 2015-07-22 | 中国石油天然气股份有限公司勘探开发研究院 | Horizontal moving device for perforating gun for oil-gas-well |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4063650A (en) * | 1976-02-02 | 1977-12-20 | Exxon Production Research Company | Equipment handling system |
US4198179A (en) * | 1978-08-11 | 1980-04-15 | The Offshore Company | Production riser |
US4819730A (en) * | 1987-07-24 | 1989-04-11 | Schlumberger Technology Corporation | Development drilling system |
US6766860B2 (en) * | 2002-02-22 | 2004-07-27 | Globalsantafe Corporation | Multi-activity offshore drilling facility having a support for tubular string |
US6902007B1 (en) * | 2003-03-28 | 2005-06-07 | Helmerich & Payne, Inc. | Blow out preventer transportation |
ATE430872T1 (en) * | 2004-06-02 | 2009-05-15 | Stena Drilling Ltd | FACILITY FOR MULTIPLE ACTIVITIES |
AU2008230917A1 (en) * | 2007-03-26 | 2008-10-02 | Technip France | Parallel drilling and completion for a dry tree floating production facility |
US20080296063A1 (en) * | 2007-05-28 | 2008-12-04 | Pantano Energy Services Inc. | Low ground pressure and amphibious coring system |
WO2009117813A1 (en) * | 2008-03-24 | 2009-10-01 | Saxon Energy Services Inc. | System and method for drilling multiple wells |
US8181697B2 (en) * | 2008-08-15 | 2012-05-22 | National Oilwell Varco L.P. | Multi-function multi-hole drilling rig |
-
2012
- 2012-04-12 CA CA2831077A patent/CA2831077A1/en not_active Abandoned
- 2012-04-12 CN CN201280018287.XA patent/CN103477029B/en not_active Expired - Fee Related
- 2012-04-12 BR BR112013025250A patent/BR112013025250A2/en not_active IP Right Cessation
- 2012-04-12 AU AU2012242798A patent/AU2012242798B2/en not_active Ceased
- 2012-04-12 WO PCT/US2012/033284 patent/WO2012142259A2/en active Application Filing
Also Published As
Publication number | Publication date |
---|---|
WO2012142259A2 (en) | 2012-10-18 |
WO2012142259A3 (en) | 2013-01-24 |
CN103477029A (en) | 2013-12-25 |
AU2012242798A1 (en) | 2013-10-03 |
CA2831077A1 (en) | 2012-10-18 |
AU2012242798A8 (en) | 2013-10-10 |
CN103477029B (en) | 2016-06-01 |
AU2012242798B2 (en) | 2015-12-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
GB2490451A (en) | Reverse circulation apparatus and methods for using same | |
BR112014008844A2 (en) | method of performing a fracturing operation over a wellbore of an underground formation, method of performing a stimulation operation for a well having a reservoir positioned in an underground formation, method of performing a stimulation operation for a wellbore having a reservoir positioned in an underground formation, and system for performing a stimulation operation for a well site having well drilling penetrating an underground formation, the underground formation having discontinuities therein | |
BR112014020207A8 (en) | SYSTEMS AND METHODS FOR PRESSURE MANAGEMENT IN A WELLHOLE | |
CO6602124A2 (en) | System and method to optimize drilling speed | |
BRPI0919775A2 (en) | system and method for forming a subsurface wellbore, and method for adding a new tubular to a drill string | |
MX2020006909A (en) | Heave compensation system for assembling a drill string. | |
MX2019005745A (en) | Wellbore drilling using dual drill string. | |
NO20100737A (en) | Method and system for positioning a well drilling tool in a well bore that cuts through an underground formation | |
GB2530440A (en) | Dual activity off-shore drilling rig | |
WO2014049369A3 (en) | Drilling method for drilling a subterranean borehole | |
SG11201401714UA (en) | Method and apparatus for drilling multiple subsea wells from an offshore platform at a single site | |
CL2013003584A1 (en) | Apparatus for injecting resin for joint use with a drilling rig in the ground anchors installation where the injector is in fluid communication with the hollowed out drilling shaft so that the resins are injected through said shaft to the bottom of the drill to fix the anchor; piercing apparatus | |
BR112015030338A2 (en) | drilling apparatus and method | |
DK201470499A (en) | Method and device for treating an underground area | |
WO2012082514A3 (en) | Christmas tree installation using coiled tubing injector | |
EA201992246A1 (en) | METHOD FOR DRILLING BOREHOLES OF A WELL WITH THE USE OF THE LAYOUT OF A DRILLING CORE OPTIMIZED TO INTERRUPTED VIBRATION MODES | |
CL2013003364A1 (en) | A computer system for drilling holes in the ground by a drilling rig where the system comprises a drilling arrangement that allows to balance the speed of the drilled holes with the stability of the hole that has been formed. (Application divisional no. 1339- 10) | |
GB201208223D0 (en) | Drilling and lining subsea wellbores | |
GB2485731A (en) | Offshore casing drilling method | |
BR112013025250A2 (en) | mobile drill rig system, and method for drilling and completing a plurality of wellbores | |
MX2016008689A (en) | Films for printing. | |
ZA201304123B (en) | Device and method for handling drill string components,as well as rock drilling rig | |
NO20084782L (en) | Dispersive drilling fluid without riser | |
GB2531171A8 (en) | Dual barrier open water completion | |
GB2511660A (en) | Method and device for riserless drilling fluid recovery |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
B06F | Objections, documents and/or translations needed after an examination request according art. 34 industrial property law | ||
B08F | Application fees: dismissal - article 86 of industrial property law |
Free format text: REFERENTE A 7A ANUIDADE. |
|
B08K | Lapse as no evidence of payment of the annual fee has been furnished to inpi (acc. art. 87) |
Free format text: REFERENTE AO ARQUIVAMENTO PUBLICADO NA RPI 2509 DE 05/02/2019. |