BR112012016251A2 - method for building a well, and method for efficient well construction - Google Patents
method for building a well, and method for efficient well constructionInfo
- Publication number
- BR112012016251A2 BR112012016251A2 BR112012016251A BR112012016251A BR112012016251A2 BR 112012016251 A2 BR112012016251 A2 BR 112012016251A2 BR 112012016251 A BR112012016251 A BR 112012016251A BR 112012016251 A BR112012016251 A BR 112012016251A BR 112012016251 A2 BR112012016251 A2 BR 112012016251A2
- Authority
- BR
- Brazil
- Prior art keywords
- well
- probe
- building
- efficient
- transmitted
- Prior art date
Links
- 238000000034 method Methods 0.000 title abstract 6
- 238000010276 construction Methods 0.000 title abstract 2
- 239000000523 sample Substances 0.000 abstract 4
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B44/00—Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
Abstract
"método para construir um poço, e método para construção de poço eficiente". uma metodologia reduz o número necessário de pessoal em uma sonda, permitindo o desempenho de uma variedade de funções de uma localização remota. o método compreende utilizar uma pluralidade de dispositivos de observação que monitoram parâmetros da sonda remotamente. dados dos dispositivos de observação são transmitidos para um centro de operações remoto usado para analisar os dados para determinar mudanças operacionais para a sonda. instruções de controle, em seguida, podem ser transmitidas para a sonda para implementar as mudanças operacionais."method for building a well, and method for efficient well construction". One methodology reduces the number of personnel required on a probe, enabling it to perform a variety of functions from a remote location. The method comprises using a plurality of observation devices that monitor probe parameters remotely. Observation device data is transmitted to a remote operations center used to analyze the data to determine operational changes to the probe. Control instructions can then be transmitted to the probe to implement operational changes.
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US29096709P | 2009-12-30 | 2009-12-30 | |
US12/963,736 US20110297395A1 (en) | 2009-12-30 | 2010-12-09 | Remote drilling and completions management |
PCT/US2010/060850 WO2011081979A1 (en) | 2009-12-30 | 2010-12-16 | Remote drilling and completions management |
Publications (1)
Publication Number | Publication Date |
---|---|
BR112012016251A2 true BR112012016251A2 (en) | 2016-05-17 |
Family
ID=44226765
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
BR112012016251A BR112012016251A2 (en) | 2009-12-30 | 2010-12-16 | method for building a well, and method for efficient well construction |
Country Status (8)
Country | Link |
---|---|
US (1) | US20110297395A1 (en) |
CN (1) | CN102713140A (en) |
AU (1) | AU2010337071A1 (en) |
BR (1) | BR112012016251A2 (en) |
CA (1) | CA2785816A1 (en) |
EA (1) | EA201290587A1 (en) |
MX (1) | MX2012007768A (en) |
WO (1) | WO2011081979A1 (en) |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8949416B1 (en) * | 2012-01-17 | 2015-02-03 | Canyon Oak Energy LLC | Master control system with remote monitoring for handling tubulars |
US9706185B2 (en) | 2012-04-16 | 2017-07-11 | Canrig Drilling Technology Ltd. | Device control employing three-dimensional imaging |
US20140326505A1 (en) * | 2012-07-23 | 2014-11-06 | Halliburton Energy Services, Inc. | Well drilling methods with audio and video inputs for event detection |
MX366941B (en) | 2013-03-15 | 2019-07-31 | Wellaware Holdings Inc | Systems and methods for providing end-to-end monitoring and/or control of remote oil and gas production assets. |
CA2907557C (en) * | 2013-03-28 | 2021-10-05 | Schlumberger Canada Limited | Automated rig activity report generation |
LU92352B1 (en) * | 2014-01-14 | 2015-07-15 | Marques Firmiliano Manuel Vida | Land drilling machine and method |
US9957754B2 (en) | 2016-02-12 | 2018-05-01 | Ozzie Enterprises Llc | Systems and methods of operating directional drilling rigs |
CN113153152A (en) * | 2021-05-25 | 2021-07-23 | 甘肃西沟矿业有限公司 | Visual accurate positioning method for rotary drill based on CORS base station |
US20230038752A1 (en) * | 2021-08-04 | 2023-02-09 | Nabors Drilling Technologies Usa, Inc. | Methods and apparatus to identify and implement downlink command sequence(s) |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6873267B1 (en) * | 1999-09-29 | 2005-03-29 | Weatherford/Lamb, Inc. | Methods and apparatus for monitoring and controlling oil and gas production wells from a remote location |
US7128167B2 (en) * | 2002-12-27 | 2006-10-31 | Schlumberger Technology Corporation | System and method for rig state detection |
US7832500B2 (en) * | 2004-03-01 | 2010-11-16 | Schlumberger Technology Corporation | Wellbore drilling method |
WO2007136378A1 (en) * | 2006-05-23 | 2007-11-29 | Halliburton Energy Services, Inc. | Remote logging operations environment |
US8215417B2 (en) * | 2007-01-23 | 2012-07-10 | Canrig Drilling Technology Ltd. | Method, device and system for drilling rig modification |
GB2459064B (en) * | 2007-02-25 | 2011-09-07 | Network Technologies Ltd | Drilling collaboration infrastructure |
EP2334903B1 (en) * | 2008-10-14 | 2023-07-12 | Schlumberger Technology B.V. | System and method for online automation |
US8131510B2 (en) * | 2008-12-17 | 2012-03-06 | Schlumberger Technology Corporation | Rig control system architecture and method |
-
2010
- 2010-12-09 US US12/963,736 patent/US20110297395A1/en not_active Abandoned
- 2010-12-16 CN CN2010800618729A patent/CN102713140A/en active Pending
- 2010-12-16 EA EA201290587A patent/EA201290587A1/en unknown
- 2010-12-16 WO PCT/US2010/060850 patent/WO2011081979A1/en active Application Filing
- 2010-12-16 AU AU2010337071A patent/AU2010337071A1/en not_active Abandoned
- 2010-12-16 MX MX2012007768A patent/MX2012007768A/en not_active Application Discontinuation
- 2010-12-16 BR BR112012016251A patent/BR112012016251A2/en not_active IP Right Cessation
- 2010-12-16 CA CA2785816A patent/CA2785816A1/en not_active Abandoned
Also Published As
Publication number | Publication date |
---|---|
CA2785816A1 (en) | 2011-07-07 |
MX2012007768A (en) | 2012-08-01 |
US20110297395A1 (en) | 2011-12-08 |
EA201290587A1 (en) | 2012-12-28 |
CN102713140A (en) | 2012-10-03 |
WO2011081979A1 (en) | 2011-07-07 |
AU2010337071A1 (en) | 2012-07-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
BR112012016251A2 (en) | method for building a well, and method for efficient well construction | |
MY180251A (en) | Cement slurry monitoring | |
BR112014002679A2 (en) | method | |
BR112015004446A2 (en) | data collection device for monitoring the use history of a medical device, system for monitoring the use history of a medical device, and method for monitoring the use history of a medical device | |
BRPI0913271A2 (en) | infusion systems including computer facilitated maintenance and / or operation and method of use | |
FR2978588B1 (en) | METHOD AND DEVICE FOR OPTIMIZED MANAGEMENT OF THE USE OF BECS AND SHUTTERS, AS WELL AS THE LANDING TRAIN OF AN AIRCRAFT | |
BR112012009449A2 (en) | telemetry system | |
BR112014018729A8 (en) | METHOD AND APPARATUS FOR TESTING LOST CIRCULATION MATERIALS FOR UNDERGROUND FORMATIONS | |
FI20106387A0 (en) | Method, computer program and device for determining the site of infection | |
MX2016007538A (en) | Real-time monitoring of health hazards during hydraulic fracturing. | |
NO20084948L (en) | Remote monitoring of an operating environment | |
BR112014002682A8 (en) | method | |
BR112014027507A2 (en) | methods and systems for real-time monitoring and wellbore data processing | |
BR112014002678A2 (en) | method | |
BR112012009237A2 (en) | '' method of selecting a maintenance operation to be performed on a device and computer system '' | |
BR112014015133A2 (en) | method and apparatus for adapting a remote control user interface | |
BR112012027925A2 (en) | method for operating a data processing apparatus, method and system for testing visual acuity and / or visual contrast, and computer program | |
BR112015008807A2 (en) | subsea processor for subsea drilling operations | |
BR112013028437A2 (en) | energy infrastructure risk analysis and remediation | |
GB201212298D0 (en) | Fracture monitoring and characterisation | |
BR112014007515A2 (en) | apparatus and methods using non-explosive energy materials for downhole applications | |
CO6620009A2 (en) | Apparatus and methods for providing information about one or more underground variables | |
BR112018007846A2 (en) | method and system for performing pressure tests. | |
BR112013022787A2 (en) | graph to analyze drilling parameters | |
BR112013019851A2 (en) | automatic planning of control equipment of a technical system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
B08F | Application dismissed because of non-payment of annual fees [chapter 8.6 patent gazette] |
Free format text: REFERENTE A 5A ANUIDADE. |
|
B08K | Patent lapsed as no evidence of payment of the annual fee has been furnished to inpi [chapter 8.11 patent gazette] |
Free format text: EM VIRTUDE DO ARQUIVAMENTO PUBLICADO NA RPI 2383 DE 06-09-2016 E CONSIDERANDO AUSENCIA DE MANIFESTACAO DENTRO DOS PRAZOS LEGAIS, INFORMO QUE CABE SER MANTIDO O ARQUIVAMENTO DO PEDIDO DE PATENTE, CONFORME O DISPOSTO NO ARTIGO 12, DA RESOLUCAO 113/2013. |