BR102021003614A2 - SET OF CLAMPS AND LOCKING METHOD IN A STRUCTURE MOUNTED NEAR THE ROOM CEILING, FOR INSTALLATION OF SUSPENDED CEILING - Google Patents
SET OF CLAMPS AND LOCKING METHOD IN A STRUCTURE MOUNTED NEAR THE ROOM CEILING, FOR INSTALLATION OF SUSPENDED CEILING Download PDFInfo
- Publication number
- BR102021003614A2 BR102021003614A2 BR102021003614-1A BR102021003614A BR102021003614A2 BR 102021003614 A2 BR102021003614 A2 BR 102021003614A2 BR 102021003614 A BR102021003614 A BR 102021003614A BR 102021003614 A2 BR102021003614 A2 BR 102021003614A2
- Authority
- BR
- Brazil
- Prior art keywords
- ceiling
- clip
- clips
- room
- upper base
- Prior art date
Links
- 238000009434 installation Methods 0.000 title claims abstract description 12
- 238000000034 method Methods 0.000 title claims description 8
- 238000004873 anchoring Methods 0.000 claims abstract description 11
- 238000005553 drilling Methods 0.000 claims description 3
- 239000000725 suspension Substances 0.000 claims description 3
- 230000015572 biosynthetic process Effects 0.000 description 2
- 238000005192 partition Methods 0.000 description 2
- 230000002708 enhancing effect Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000004033 plastic Substances 0.000 description 1
- 239000012815 thermoplastic material Substances 0.000 description 1
- 238000012800 visualization Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/22—Connection of slabs, panels, sheets or the like to the supporting construction
- E04B9/225—Connection of slabs, panels, sheets or the like to the supporting construction with the slabs, panels, sheets or the like hanging at a distance below the supporting construction
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/21—Fastening means specially adapted for covering or lining elements
Landscapes
- Finishing Walls (AREA)
Abstract
Para a instalação, através de um conjunto de presilhas (1), de placas (PL) EPS, PVC, MDF e DRYWAL para forros suspensos, incluindo forros tabicados, nos tetos (T) de ambientes.Cada presilha (1) possui canaleta (5) em ‘C’.Uma presilha lateral (1a), uma presilha intermediária (1b) e uma presilha para tabica (1d) incorporam, a partir da base superior (2), um clipe (6) de hastes flexíveis (7). Uma presilha de união (1b) de placas de forro é desprovida de clipe (6), assim como uma outra presilhapara tabica (1d), a qual, no entanto, possui um batente superior (11) vazado por furos (12) para chumbagem entre as paredes opostas do ambiente. As presilhas para tabica (1d) e (1e) possuem canaleta (5) deslocada formando um anteparo (10) para a base superior (2). As presilhas (1a), (1c) e (1d) são inseridas e travadas por seus clipes (6) em uma estrutura de haste (H) e tubos paralelos (TP) previamente montados junto ao teto do ambiente. Em combinação com as presilhas de união (1b) posicionam suas canaletas (5) para o encaixe das placas de forro (PL), formando o forro suspenso. Através do anteparo (10) das presilhas para tabica (1e) e (1d), é formado um vão (V) com as paredes (P) do ambiente, para forro tabicado. For installation, through a set of clamps (1), EPS, PVC, MDF and DRYWAL plates (PL), for suspended ceilings, including partitioned ceilings, on the ceilings (T) of environments. Each clamp (1) has a channel ( 5) in 'C'. A side clip (1a), an intermediate clip (1b) and a tab clip (1d) incorporate, from the upper base (2), a clip (6) of flexible rods (7) . A joint clip (1b) for lining plates is devoid of a clip (6), as well as another clip for tabica (1d), which, however, has an upper stop (11) hollowed out by holes (12) for anchoring. between the opposite walls of the environment. The tabs (1d) and (1e) have a channel (5) displaced, forming a shield (10) for the upper base (2). The clips (1a), (1c) and (1d) are inserted and locked by their clips (6) in a rod structure (H) and parallel tubes (TP) previously mounted next to the room ceiling. In combination with the joining clips (1b) they position their channels (5) for the fitting of the ceiling tiles (PL), forming the suspended ceiling. Through the bulkhead (10) of the tabica clips (1e) and (1d), a gap (V) is formed with the walls (P) of the environment, for the partitioned ceiling.
Description
[001] Refere-se o presente relatório descritivo, a um pedido de patente de invenção para um conjunto envolvendo inédito sistema de instalação de forro suspenso, incluindo forros tabicados, para acabamento nos ambientes das edificações.[001] This descriptive report refers to an invention patent application for a set involving an unprecedented suspended ceiling installation system, including partitioned ceilings, for finishing in building environments.
[002] Como se sabe, forros suspensos são formados a partir de dispositivos de ancoragem chumbados no teto, aos quais são encaixadas lado a lado as placas de forro. Após a instalação formam um painel rebaixado que esconde o teto, valorizando o ambiente. O forro suspenso pode ser também tabicado, ou seja, levemente afastado das paredes do ambiente por meio de um vão, oferecendo um outro tipo de estética.[002] As is known, suspended ceilings are formed from anchoring devices anchored in the ceiling, to which the ceiling boards are fitted side by side. After installation, they form a recessed panel that hides the ceiling, enhancing the environment. The suspended ceiling can also be partitioned, that is, slightly removed from the walls of the environment through a gap, offering another type of aesthetic.
[003] Apenas como exemplo são inseridas 3 imagens como figura 1 para o pedido a ser descrito mais adiante, as quais foram extraídas do documento de patente PI 1101195-5 de título “SISTEMA PARA FIXAÇÃO DE FORROS EM GERAL”, constituído a partir de um suporte ‘L’ (4) com orifícios (5) e (6), respectivamente para chumbamento no teto e para a passagem e ancoragem do gancho (11) de um pendural (7) unifilar que fixa, na sua ponta inferior, uma presilha (12) de encaixe do trilho (13) de ancoragem do forro suspenso (14) (em forma de placas dispostas lado a lado).[003] Just as an example, 3 images are inserted as figure 1 for the application to be described later, which were extracted from the patent document PI 1101195-5 entitled "SYSTEM FOR FIXING CEILINGS IN GENERAL", consisting of an 'L' support (4) with holes (5) and (6), respectively for anchoring in the ceiling and for the passage and anchoring of the hook (11) of a single-line pendant (7) that fixes, at its lower end, a clip (12) for fitting the rail (13) anchoring the suspended ceiling (14) (in the form of plates arranged side by side).
[004] Os dispositivos convencionais, tais como o suportecitadoacima e mostrado pela figura 1, por causa da sua fixação no teto e o encaixe das placas em seus pendurais, não têm sustentação de travamento eficaz, podendo flambar. Contam com o encaixe das placas que, mesmo faceadas entre si podem favorecer desníveis no forro. Além dissoessas presilhas convencionais, por serem metálicas exigem processos de estampo e montagemmuitas vezes complexos, de alto custo.[004] Conventional devices, such as the support mentioned above and shown in Figure 1, because of their fixation to the ceiling and the fitting of the plates in their hangers, do not have effective locking support, and may buckle. They have the fitting of the plates that, even facing each other, can favor unevenness in the lining. In addition, these conventional clamps, as they are metallic, require stamping and assembly processes, which are often complex and expensive.
[005] A proposta do pedido em questão é exatamente baratear a produção, facilitar a instalação e prender de forma segura e ágil, placas de forro para a formação de forro suspenso, incluindo forro tabicado.[005] The purpose of the order in question is exactly to make production cheaper, to facilitate installation and to secure, in a safe and agile way, lining plates for the formation of suspended lining, including partitioned lining.
[006] Para tanto, um conjunto de presilhas é fabricado em material termoplástico de alta resistência por projeto de molde simplificado, em cinco configurações, todas conformando canaleta em ‘C’ com aberturas variáveis para o encaixe das placas de forro de acordo com as diversas espessuras destas últimas. A presilha possui configurações incorporando clipe, para introdução, por simples pressão, em estrutura de estrado previamente montadano teto do ambiente, sendo: - uma presilha lateral; - uma presilha intermediária; - e uma presilha lateral para tabica. Em duas outras configurações a presilha é desprovida de clipe sendo: - uma presilha de união das placas de forro; - e uma presilha lateral para tabica, de chumbamento nas paredes laterais do ambiente, junto ao teto.[006] For that, a set of clips is manufactured in high resistance thermoplastic material by a simplified mold design, in five configurations, all conforming a 'C' channel with variable openings for the fitting of the lining plates according to the various thicknesses of the latter. The clip has configurations incorporating clip, for introduction, by simple pressure, in a platform structure previously mounted on the ceiling of the room, being: - a lateral clip; - an intermediate clip; - and a side tab for tabica. In two other configurations, the clip is devoid of a clip, being: - a clip for joining the lining plates; - and a side clip for tabica, anchoring the side walls of the room, close to the ceiling.
[007] Para a instalação, quadros em “H” são chumbados no teto e recebem por parafuso e porca, a montagem de tubos estendidos paralelamente em suspensão nos quais são travadas as presilhas, pelos seus clipes, expondo suas canaletas em “C” para receber o encaixe das placas de forro, formando o forro suspenso.[007] For the installation, “H” frames are anchored to the ceiling and receive by screw and nut, the assembly of pipes extended in parallel in suspension in which the clips are locked, by their clips, exposing their “C” channels to receive the fitting of the lining plates, forming the suspended lining.
[008] Explicado superficialmente, passa o invento a ser detalhado.[008] Explained superficially, the invention becomes detailed.
[009] A figura 1, com suas imagens extraídas do documento PI 1101195-5, como já foi dito, representa o estado da técnica.[009] Figure 1, with its images extracted from the document PI 1101195-5, as already mentioned, represents the state of the art.
[010] As figuras a seguir relacionadas, que vão de 2 a 14, referem-se ao conjunto, motivo desse pedido de patente:
Figura 2 – vistas frontal, lateral e isométrica da presilha lateral incorporando clipe. Como se observa, a canaleta em ‘C’, para o encaixe das placas de forro é formada por parede superior da qual estende-se parede vertical delimitada inferiormente por parede paralela;
Figura 3 - vistas frontal, lateral e isométrica da presilha de união das placas de forro, desprovida de clipe e com duas canaletas contrapostas;
Figura 4 – vistas frontal, lateral e isométrica da presilha intermediária incorporando clipe e também com duas canaletas contrapostas;
Figura 5 – vistas frontal, lateral e isométrica da presilha lateral para tabica, incorporando clipe e com canaleta deslocada, formando um anteparo na parede superior;
Figura 6 – vistas frontal, lateral e isométrica de outra presilha para tabica, de chumbamento nas paredes laterais do ambiente, desprovida do clipe e com canaleta deslocada, igualmente formando anteparo com a parede superior;
Figura 7 – mostra parcialmente o teto do ambiente, em corte, com furação para bucha e parafuso dechumbagem dos quadros “H”, conforme o detalhe A. No detalhe B é mostrado o sentido do chumbamento dos quadros “H” e o alinhamento com os tubos paralelos;
Figura 8 – mostra os quadros “H” chumbados, detalhe A, travando por parafuso e porca, detalhe B, a partir de sua travessa lateral inferior, os tubos paralelos, montando-se uma estrutura de estrado, logo abaixo do teto;
Figura 9 – mostra o teto do ambiente, em corte e em vista superior para melhor visualização da montagem da estrutura;
Figura 10 – sequência tomada inferiormente e em ângulodiferente em relação ao ângulo do teto da figura 9, mostrando o travamento de uma presilha (no caso, presilha lateral), pelo seu clipe, em um dos tubos paralelos da estrutura de estrado;
Figura 11 -vista do teto do ambiente segundo figura anterior mostrando, pelos detalhes A e D a fixação das presilhas laterais; no detalhe Ba fixação da presilha de união das placas de forro e no detalhe C a fixação da presilha intermediária. Como se observa, as presilhas recebem o encaixe, nas suas canaletas, das placas de forro;
Figura 12 – mostra, em sequência a instalação do forro suspenso, com o travamento das presilhas, no caso presilha intermediária, e o encaixe das placas de forro;
Figura 13 - vista do teto do ambiente em corte e em planta superiormostrando, pelos detalhes A e B, C e D, as presilhas para tabica para travamento por clipe nos tubos paralelos da estrutura de estrado, já encaixadas, por suascanaletas, com as placas de forro;
Figura 14 – vista do teto do ambiente em corte parcial e planta superior mostrando, pelos detalhes A, B, C e D, as presilhas para tabica para chumbagem nas paredes laterais do ambiente, com suas canaletas já encaixadas com as placas de forro.[010] The following figures, ranging from 2 to 14, refer to the set, reason for this patent application:
Figure 2 – Front, side and isometric views of the side clip incorporating clip. As can be seen, the channel in 'C', for the fitting of the lining boards, is formed by an upper wall of which extends a vertical wall delimited below by a parallel wall;
Figure 3 - front, side and isometric views of the clamp for joining the lining plates, without a clip and with two opposing channels;
Figure 4 – front, side and isometric views of the intermediate clip incorporating a clip and also with two opposing channels;
Figure 5 – front, side and isometric views of the side clip for the tabica, incorporating a clip and with an offset channel, forming a bulkhead on the upper wall;
Figure 6 - front, side and isometric views of another tab for tabica, anchored on the side walls of the room, without the clip and with displaced channel, also forming a shield with the upper wall;
Figure 7 - partially shows the ceiling of the room, in section, with holes for anchors and screws for anchoring the "H" frames, as shown in detail A. In detail B, the direction of the anchoring of the "H" frames and the alignment with the parallel tubes;
Figure 8 – shows the “H” frames, detail A, locked by screw and nut, detail B, from its lower side beam, the parallel tubes, assembling a platform structure, just below the ceiling;
Figure 9 - shows the ceiling of the room, in section and in top view for better visualization of the assembly of the structure;
Figure 10 – sequence taken from below and at a different angle in relation to the angle of the ceiling in figure 9, showing the locking of a clip (in this case, side clip), by its clip, in one of the parallel tubes of the platform structure;
Figure 11 - view of the ceiling of the room according to the previous figure showing, by details A and D, the fixing of the side clips; in detail B the fixing of the clasp to join the ceiling tiles and in detail C the fixing of the intermediate bracket. As can be seen, the clips receive the fitting, in their channels, of the lining plates;
Figure 12 – shows, in sequence, the installation of the suspended ceiling, with the locking of the clips, in the case of the intermediate clip, and the fitting of the ceiling tiles;
Figure 13 - view of the room's ceiling in section and in top plan, showing, from details A and B, C and D, the tabica clamps for clip-locking the parallel tubes of the platform structure, already fitted, by their channels, with the plates of lining;
Figure 14 – Partial view of the room ceiling and top plan showing, from details A, B, C and D, the tabica clamps for anchoring on the side walls of the room, with their channels already fitted with the lining plates.
[011] Em conformidade com os desenhos anexos, o “CONJUNTO DE PRESILHAS E MÉTODO DE TRAVAMENTO EM ESTRUTURA MONTADA JUNTO AO TETO DE AMBIENTES, PARA INSTALAÇÃO DE FORRO SUSPENSO”, motivo desse pedido de patente de modelo de utilidade, constitui-se a partir de um conjunto de presilhas (1) laminares com cinco configurações distintas, conformadas cada qual em peça únicade material plástico, por projeto de molde dedicado[011] In accordance with the attached drawings, the "SET OF CLAMPS AND LOCKING METHOD IN A STRUCTURE MOUNTED NEAR THE ROOM CEILING, FOR THE INSTALLATION OF SUSPENDED CEILING", reason for this utility model patent application, is constituted from of a set of laminar clips (1) with five different configurations, each one formed in a single piece of plastic material, by a dedicated mold design
[012] Cada presilha (1) possui, obrigatoriamente, uma base superior (2) horizontal da qual estende-se perpendicularmente uma parede vertical (3), delimitada inferiormente por base inferior (4) paralela à referida base superior (2) horizontal, formando canaletas (5) em ‘C’.[012] Each clip (1) must have a horizontal upper base (2) from which a vertical wall (3) extends perpendicularly, inferiorly delimited by a lower base (4) parallel to said horizontal upper base (2), forming channels (5) in 'C'.
[013] Desse modo, uma presilha lateral (1a) possui uma canaleta (5) e incorpora, a partir da base superior (2), um clipe (6) formado por duas hastes flexíveis (7) espaçadas entre si e delimitadas por dobras internas (8), das quais estendem-se terminais abertos (9) em ângulo, figura 2. Uma presilha de união (1b) de placas de forro é formada por duas canaletas (5) contrapostas, figura 3. Uma presilha intermediária (1c) é formada também por duas canaletas (5) contrapostas, porém incorporando, a partir da base superior (2), o clipe (6),figura 4. Uma presilha para tabica (1d) possui canaleta (5) deslocada formando um anteparo(10) para a base superior (2), a qual incorpora ainda o clipe (6), figura 5. Uma outra presilha para tabica (1e) para chumbamento nas paredes (P) do ambiente, possui também canaleta (5)deslocada com anteparo (10) para a base superior (2), em cuja borda livre forma, perpendicularmente, um batente superior (11) vazado por furos (12), figura 6.[013] Thus, a side clip (1a) has a channel (5) and incorporates, from the upper base (2), a clip (6) formed by two flexible rods (7) spaced apart and delimited by folds internals (8), from which open terminals (9) extend at an angle, figure 2. A joint clip (1b) for ceiling tiles is formed by two opposing channels (5), figure 3. An intermediate clip (1c) ) is also formed by two opposing channels (5), however incorporating, from the upper base (2), the clip (6), figure 4. 10) for the upper base (2), which also incorporates the clip (6), figure 5. Another tab for the tabica (1e) for anchoring the walls (P) of the environment, also has a channel (5) displaced with a bulkhead (10) for the upper base (2), on whose free edge it forms, perpendicularly, an upper stop (11) pierced by holes (12), figure 6.
[014] Para a instalação do forro suspenso, como mostra a figura 7 e seu detalhe A, no teto (T) são chumbados quadros (H) de perfil tubular oco, através da furação (F) de sua travessa lateral superior (TS), expondo em suspensão a travessa lateral inferior (TI) na qual, por seus furos (F’) são aparafusados tubos paralelos (TP), ocos, por sua furação (F’’) como mostram os detalhes A e B da figura 8.[014] For the installation of the suspended ceiling, as shown in Figure 7 and its detail A, frames (H) of hollow tubular profile are anchored to the ceiling (T), through the drilling (F) of its upper side beam (TS) , exposing in suspension the lower lateral crossbeam (TI) to which, through its holes (F') are screwed parallel tubes (TP), hollow, through its drilling (F'') as shown in details A and B of figure 8.
[015] Como mostra a figura 9, os tubos paralelos (TP) possuem extensão predefinida, compatível à totalidade ou à porção do teto (T) que se deseja dar acabamento, formando uma estrutura de estrado (E). Essa estrutura (E) recebe, como mostra a figura 10, a introdução das presilhas (1), com as hastes flexíveis (7) do seu clipe (6) aproximadas e introduzidas pelas bordas (B) do tubo paralelo (TP), abrindo-se para a ultrapassagem e,com o retorno dos terminais (9), travando a presilha (1). Tal procedimento, como mostra a figura 11, é feito com as presilhas laterais (1a), detalhe A, seguidas das presilhas intermediárias (1c), detalhe B, formando linhas e fileiras ao longo desses tubos paralelos (TP) até a parede oposta do ambiente, onde são complementadas pelas presilhas laterais (1a), opostas, detalhe D. Essas presilhas (1a) e (1c) são inseridas com suas canaletas (5) alinhadas para o encaixe das bordas das placas de forro (PL) de modo a recobrir o ambiente imediatamente abaixo do teto (T), formando assim o forro suspenso. Durante a introdução das presilhas (1), para a formação das linhas e fileiras ao longo dos tubos paralelos (TP), dependendo da extensão do ambiente as presilhas intermediárias (1c) são alternadasa presilhas de união (1b) de placas de forro, detalhe C da figura 11, as quais (desprovidas de clipe (6)), não são inseridas nos tubos paralelos (TP), porém possibilitando oencaixe das placas de forro (PL) de EPS, PVC, MDF, DRYWAL e similares, como mostra a figura 12, dando continuidade àinstalação, agilizando-a.[015] As shown in Figure 9, the parallel tubes (TP) have a predefined extension, compatible with the entirety or the portion of the ceiling (T) that you want to finish, forming a platform structure (E). This structure (E) receives, as shown in Figure 10, the introduction of the clips (1), with the flexible rods (7) of its clip (6) approximated and introduced by the edges (B) of the parallel tube (TP), opening to overtake and, with the return of the terminals (9), locking the clamp (1). This procedure, as shown in Figure 11, is done with the side clips (1a), detail A, followed by the intermediate clips (1c), detail B, forming lines and rows along these parallel tubes (TP) to the opposite wall of the environment, where they are complemented by the side clips (1a), opposite, detail D. These clips (1a) and (1c) are inserted with their grooves (5) aligned to fit the edges of the lining plates (PL) in order to cover the environment immediately below the ceiling (T), thus forming the suspended ceiling. During the introduction of the clips (1), for the formation of lines and rows along the parallel tubes (TP), depending on the extension of the environment, the intermediate clips (1c) are alternated with clips for joining (1b) of lining plates, detail C of figure 11, which (without a clip (6)) are not inserted into the parallel tubes (TP), however, allowing the fitting of the lining plates (PL) of EPS, PVC, MDF, DRYWAL and the like, as shown in figure 12, continuing the installation, speeding it up.
[016] Através das presilhas para tabica (1d) e (1e) é possibilitada a instalação de forro tabicado. Para tanto, entre o início e o final da montagem das presilhas (1), na configuração (1d) da figura 13, a presilha para tabica (1d) é inserida pelo clipe (6) no tubo paralelo (TP) de modo a formar no anteparo (10), entre sua parede vertical (3) e as paredes (P) do ambiente,o vão (V) de tabica como mostram os detalhes A, B, C e D. Na outra configuração da presilha para tabica (1e), a mesma é encostada e chumbada pelo seu batente superior (11) nas paredes (P) do ambiente. Nessa condição também é formado no anteparo (10), entre sua parede vertical (3) e as paredes (P) do ambiente, o vão (V) de tabica, como mostram os detalhes A, B, C e D da figura 14.[016] Through the tabica clips (1d) and (1e) it is possible to install a partitioned lining. For that, between the beginning and the end of the assembly of the clamps (1), in the configuration (1d) of figure 13, the clamp for tabica (1d) is inserted by the clip (6) in the parallel tube (TP) in order to form on the bulkhead (10), between its vertical wall (3) and the walls (P) of the environment, the gap (V) of the partition as shown in details A, B, C and D. In the other configuration of the bracket for the partition (1e ), it is leaned against and anchored by its upper stop (11) to the walls (P) of the room. In this condition, the gap (V) of the tabica is also formed in the bulkhead (10), between its vertical wall (3) and the walls (P) of the environment, as shown in details A, B, C and D of figure 14.
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
BR102021003614-1A BR102021003614A2 (en) | 2021-02-25 | 2021-02-25 | SET OF CLAMPS AND LOCKING METHOD IN A STRUCTURE MOUNTED NEAR THE ROOM CEILING, FOR INSTALLATION OF SUSPENDED CEILING |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
BR102021003614-1A BR102021003614A2 (en) | 2021-02-25 | 2021-02-25 | SET OF CLAMPS AND LOCKING METHOD IN A STRUCTURE MOUNTED NEAR THE ROOM CEILING, FOR INSTALLATION OF SUSPENDED CEILING |
Publications (1)
Publication Number | Publication Date |
---|---|
BR102021003614A2 true BR102021003614A2 (en) | 2022-08-30 |
Family
ID=83398732
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
BR102021003614-1A BR102021003614A2 (en) | 2021-02-25 | 2021-02-25 | SET OF CLAMPS AND LOCKING METHOD IN A STRUCTURE MOUNTED NEAR THE ROOM CEILING, FOR INSTALLATION OF SUSPENDED CEILING |
Country Status (1)
Country | Link |
---|---|
BR (1) | BR102021003614A2 (en) |
-
2021
- 2021-02-25 BR BR102021003614-1A patent/BR102021003614A2/en not_active Application Discontinuation
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9163402B2 (en) | Suspended architectural structure | |
US5579624A (en) | Profile bar for the attachment of flat objects | |
US8572928B2 (en) | System for erecting structures and support profile | |
US10309107B2 (en) | Cold rolled channel without clip | |
US3332188A (en) | Plaster wall frame structure with stud securing clips | |
EP2843145B1 (en) | Ceiling system with element mounting brackets | |
BRPI0610925A2 (en) | paired main tee profile clamp | |
PT1434919E (en) | Hollow interconnecting panels as lost formwork and method of forming a structure | |
US10590647B2 (en) | Cold rolled channel without clip | |
US3975792A (en) | Double track drapery guide assembly | |
BR112020023880A2 (en) | ceiling covering system | |
US20170067254A1 (en) | Modular hooking device for a cloth for a tensioned false ceiling | |
BR102021003614A2 (en) | SET OF CLAMPS AND LOCKING METHOD IN A STRUCTURE MOUNTED NEAR THE ROOM CEILING, FOR INSTALLATION OF SUSPENDED CEILING | |
EP2706162B1 (en) | Suspended ceiling grid adapter | |
PT85595B (en) | UNIQUE DEVICE | |
RU201403U1 (en) | Hockey board rack | |
NZ524088A (en) | Grid for a suspended ceiling, with relatively loose and tight connections so as to provide a more accurate grid member spacings | |
GB2520433A (en) | Attachment system | |
KR100376097B1 (en) | Interactive channel supporter for partition panel | |
US20130276404A1 (en) | Buck Bracket | |
BR112016020886B1 (en) | Modular hook device for a cloth for a stretch ceiling | |
PT612894E (en) | PANEL INTENDED FOR BUILDING CONSTRUCTION INDUSTRY | |
PT1854933E (en) | Grid framework fora suspended ceiling or partition wall and corresponding suspended ceiling or partition wall aimed mainly at increasing their fire resistance | |
CN218715515U (en) | Novel wall material adjusting structure | |
TWM631922U (en) | Solar panel supporting frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
B03A | Publication of a patent application or of a certificate of addition of invention [chapter 3.1 patent gazette] | ||
B11A | Dismissal acc. art.33 of ipl - examination not requested within 36 months of filing |