BR0306058B1 - Pendular method for installation of equipment under the sea in offshore operations. - Google Patents

Pendular method for installation of equipment under the sea in offshore operations.

Info

Publication number
BR0306058B1
BR0306058B1 BR0306058A BR0306058A BR0306058B1 BR 0306058 B1 BR0306058 B1 BR 0306058B1 BR 0306058 A BR0306058 A BR 0306058A BR 0306058 A BR0306058 A BR 0306058A BR 0306058 B1 BR0306058 B1 BR 0306058B1
Authority
BR
Brazil
Prior art keywords
pendular
sea
installation
equipment under
offshore operations
Prior art date
Application number
BR0306058A
Other languages
Portuguese (pt)
Other versions
BR0306058A (en
Inventor
Rogerio Diniz Machado
Jose Americo Ney Ferreira
Luis Gustavo Franco Cosentino
Edson Luiz Labanca
Pedro Felipe Katrein Stock
Cerqueira Maxwell Brandao De
Francisco Edward Roveri
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to BR0306058A priority Critical patent/BR0306058B1/en
Publication of BR0306058A publication Critical patent/BR0306058A/en
Publication of BR0306058B1 publication Critical patent/BR0306058B1/en

Links

BR0306058A 2003-12-18 2003-12-18 Pendular method for installation of equipment under the sea in offshore operations. BR0306058B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
BR0306058A BR0306058B1 (en) 2003-12-18 2003-12-18 Pendular method for installation of equipment under the sea in offshore operations.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
BR0306058A BR0306058B1 (en) 2003-12-18 2003-12-18 Pendular method for installation of equipment under the sea in offshore operations.

Publications (2)

Publication Number Publication Date
BR0306058A BR0306058A (en) 2005-08-16
BR0306058B1 true BR0306058B1 (en) 2012-06-12

Family

ID=34831815

Family Applications (1)

Application Number Title Priority Date Filing Date
BR0306058A BR0306058B1 (en) 2003-12-18 2003-12-18 Pendular method for installation of equipment under the sea in offshore operations.

Country Status (1)

Country Link
BR (1) BR0306058B1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BRPI0800140A2 (en) 2008-02-01 2009-10-20 Zytech Industrial Ltda process for lowering equipment to the bottom of the sea
BRPI0800075A2 (en) 2008-02-01 2009-10-20 Zytech Industrial Ltda auxiliary floating structure and process for descending equipment overboard
GB2463697B (en) * 2008-09-22 2012-06-27 Technip France Method of locating a subsea structure for deployment

Also Published As

Publication number Publication date
BR0306058A (en) 2005-08-16

Similar Documents

Publication Publication Date Title
GB2429479B (en) System and method for rigging up well workover equipment
GB2423516B (en) Corrosion inhibitor systems for low, moderate and high temperarture fluids and methods for making and using same
EP1741040A4 (en) Document mark up methods and systems
EP1782272A4 (en) Methods and systems for endorsing local search results
HK1095065A1 (en) Capsaicin derivates and the production and use thereof
BR0318140B1 (en) Method for drilling and well completion.
IS2532B (en) Method of desalinating the sea
GB0524523D0 (en) Semi-submersible multicolumn floating offshore platform
FI20030556A0 (en) Method and equipment for steering the ship
NO20031306L (en) Device for monitoring the interface between oil and water
NO20042118L (en) Semi-submersible offshore platform
BRPI0404834B1 (en) clamp for use in deep sea oil prospecting operations.
GB2442911B (en) System and method for processing drilling cuttings during offshore drilling
NO20044129A (en) Umbilical for installation on the seabed
BR0306058B1 (en) Pendular method for installation of equipment under the sea in offshore operations.
ITTO20050447A1 (en) EQUIPMENT AND MIXING METHOD ON THE SITE FOR DIAPHRAGM FORMATION.
GB2430915B (en) Semi-submersible multicolumn floating offshore platform
ES2965732T3 (en) Subsea drilling device and method for carrying out underwater drilling, in particular for fixing an underwater anchor
BR0106461B1 (en) apparatus and method for pre-installation by freefall of an underwater wellhead.
AU2002344652A1 (en) Filtration method, filtration device, method of desalinating sea water by using the device, and method of desulfurizing petroleum
FR2844966B1 (en) METHOD, DEVICE AND POULTRY GAVING INSTALLATION SUCH AS PALMIPEDES.
NO20033626D0 (en) Device for concrete construction in the sea, and method for installing the same
BRPI0404835B1 (en) oil recovery equipment in produced water.
GB0207581D0 (en) Sub sea or land based oil pipeline sealing system
IL160343A0 (en) Device and method for neutralizing land mines and the like

Legal Events

Date Code Title Description
B04C Request for examination: application reinstated [chapter 4.3 patent gazette]
B06G Technical and formal requirements: other requirements [chapter 6.7 patent gazette]

Free format text: PARA QUE A SOLICITACAO REQUERIDA NA PETICAO NO 001845/RJ DE 12/01/2004 SEJA ATENDIDA, APRESENTE DOCUMENTO DE DECLARACAO DE INCLUSAO DE INVENTOR, NO QUAL DEVE SE MANIFESTAR O INVENTOR CITADO NA PETICAO DE DEPOSITO.

B03H Publication of an application: rectification [chapter 3.8 patent gazette]

Free format text: REFERENTE A RPI 1806 DE 16/08/2005, QUNATO AO ITEM (72); CONFORME SOLICITADO NA PETICAO NO001845/RJ DE 12/01/2004.

B09A Decision: intention to grant [chapter 9.1 patent gazette]
B16A Patent or certificate of addition of invention granted [chapter 16.1 patent gazette]

Free format text: PRAZO DE VALIDADE: 20 (VINTE) ANOS CONTADOS A PARTIR DE 18/12/2003, OBSERVADAS AS CONDICOES LEGAIS.