BR0105884C1 - Electricity generating plant in rivers - Google Patents
Electricity generating plant in riversInfo
- Publication number
- BR0105884C1 BR0105884C1 BR0105884-3A BR0105884A BR0105884C1 BR 0105884 C1 BR0105884 C1 BR 0105884C1 BR 0105884 A BR0105884 A BR 0105884A BR 0105884 C1 BR0105884 C1 BR 0105884C1
- Authority
- BR
- Brazil
- Prior art keywords
- rivers
- electricity generating
- float
- generating plant
- tube
- Prior art date
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Other Liquid Machine Or Engine Such As Wave Power Use (AREA)
- Wind Motors (AREA)
Abstract
"USINA GERADORA DE ENERGIA ELéTRICA EM RIOS". é constituido de um Flutuador, vasado longitudinalmente por ua Tubo, e neste inserido um conjunto de um ou mais Hélices. Um outro modelo, partindo do mesmo Flutuador, contará com o mesmo tubo e mais dois outros, laterais. para que se obtenha, neste caso, o triplo da geração. Comportando, desse modo, três alternadores, por exemplo de dez KVA, seria gerada uma energia de 24.000 W, aproximadamente 20 médias residências. O objetivo maior até agora procurado é a facilidade em sua instalação, sem necessitar maiores recursos técnicos ou materiais. O serviço seria feito de terra com auxílio, se precisar, de uma simples canoa."ELECTRIC POWER GENERATOR IN RIVERS". It consists of a Float, longitudinally drawn by a Tube, and a set of one or more Propellers is inserted therein. Another model, starting from the same Float, will have the same tube and two others, side. so that in this case triple the generation. Thus comprising three alternators, for example ten KVA, would generate a power of 24,000 W, approximately 20 medium residences. The biggest goal so far sought is ease of installation, without requiring greater technical resources or materials. The service would be made of land with the help, if needed, of a simple canoe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
BR0105884-3A BR0105884C1 (en) | 2001-07-27 | 2001-07-27 | Electricity generating plant in rivers |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
BR0105884-3A BR0105884C1 (en) | 2001-07-27 | 2001-07-27 | Electricity generating plant in rivers |
Publications (2)
Publication Number | Publication Date |
---|---|
BR0105884A BR0105884A (en) | 2003-06-24 |
BR0105884C1 true BR0105884C1 (en) | 2003-11-04 |
Family
ID=3948149
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
BR0105884-3A BR0105884C1 (en) | 2001-07-27 | 2001-07-27 | Electricity generating plant in rivers |
Country Status (1)
Country | Link |
---|---|
BR (1) | BR0105884C1 (en) |
-
2001
- 2001-07-27 BR BR0105884-3A patent/BR0105884C1/en not_active Application Discontinuation
Also Published As
Publication number | Publication date |
---|---|
BR0105884A (en) | 2003-06-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Dastgeer et al. | Efficiency comparison of DC and AC distribution systems for distributed generation | |
BR0017286A (en) | Electricity generator for use in conjunction with an underground well, and method of producing energy in an underground well | |
ATE222640T1 (en) | DC VOLTAGE LOCAL LINE NETWORK FOR WIND FARM | |
CY1117967T1 (en) | METHOD FOR THE OPERATION OF A WIND ENERGY PLANT | |
DE50010649D1 (en) | WIND ENERGY PLANT WITH TWO RACED REAR-ROTORS | |
BR0010509A (en) | Power distribution network for the supply of hydrogen fuel to a user | |
GB0202435D0 (en) | Renewable energy resources | |
NO20062538L (en) | Renewable energy resources | |
BR9805181A (en) | Hydro-reactor for the use of water kinetic energy in places where currents are significant for the production of electrical energy. | |
BR0105884C1 (en) | Electricity generating plant in rivers | |
Soewardi et al. | Developing a Portable Hydroelectric Generator Using Axiomatic Design Method | |
Akhikpemelo et al. | Simulation of Inverter Circuit Using Multism and Proteus | |
Leitch et al. | Non-grid electrification of 45 schools in the Eastern Cape, South Africa: an assessment | |
Abramov et al. | Energy efficiency matching of electric traction network with double and single-way circuits | |
Yasuhara | Overview of Policy on Geothermal Development | |
BRPI0414140A (en) | tidal power system | |
Lim et al. | State Estimation on the Composite Distribution System with Distributed Generation | |
Kashin et al. | Analysis of the Relationship between the Ratio of the Basic Dimensions of the Generator Units and their Design at the Predesign Stage | |
Greenwald et al. | Does the IMF High Latitude Convection? | |
BR0205233A (en) | Hydroelectric plants installed downstream from existing or loop / channel plants using bulb or equivalent | |
Gonoh | SMALL SIGNAL STABILITY ANALYSIS OF A 330KV NETWORK: A CASE STUDY OF THE NIGERIAN 330KV NETWORK | |
Lee et al. | Power Analysis of Grid Connected Doubly Fed Induction Generator for Wind Power Generating System | |
Kitaev | Electric-field generation in the magnetic boundary layer of the earth's magnetosphere | |
Lee et al. | Development of EMTDC Classical Generator Model Considering Reactive Power Control | |
JP2003164177A (en) | Ion engine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
B11A | Dismissal acc. art.33 of ipl - examination not requested within 36 months of filing | ||
B11Y | Definitive dismissal acc. article 33 of ipl - extension of time limit for request of examination expired | ||
B11A | Dismissal acc. art.33 of ipl - examination not requested within 36 months of filing |
Free format text: ADDITIONAL INVENTOR S CERTIFICATE: |
|
B11Y | Definitive dismissal acc. article 33 of ipl - extension of time limit for request of examination expired |
Free format text: ADDITIONAL INVENTOR S CERTIFICATE: |