BG1098U1 - Pvc-based construction shuttering - Google Patents

Pvc-based construction shuttering Download PDF

Info

Publication number
BG1098U1
BG1098U1 BG1084U BG108406U BG1098U1 BG 1098 U1 BG1098 U1 BG 1098U1 BG 1084 U BG1084 U BG 1084U BG 108406 U BG108406 U BG 108406U BG 1098 U1 BG1098 U1 BG 1098U1
Authority
BG
Bulgaria
Prior art keywords
formwork
horizontal surface
walls
concrete
pvc
Prior art date
Application number
BG1084U
Other languages
Bulgarian (bg)
Inventor
Bekir Canikara
Original Assignee
Adopen Plastik Ve Insaat Sanayi Anonim Sirketi
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Adopen Plastik Ve Insaat Sanayi Anonim Sirketi filed Critical Adopen Plastik Ve Insaat Sanayi Anonim Sirketi
Publication of BG1098U1 publication Critical patent/BG1098U1/en

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Laminated Bodies (AREA)
  • Finishing Walls (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The PVC-based construction formwork comprises construction shuttering panels (1), which are mounted prior to casting the concrete; they are used to keep the concrete and ensure its hardening. Such panels are manufactured on the basis of an elastic PVC material, while the fact that they are manufactured together with walls ensures even distribution of the load.

Description

Област на техникатаTechnical field

Настоящият полезен модел се отнася до строителен кофраж, включващ строителни кофражни платна, които се монтират преди изливане на бетона и се използват за задържане на бетона, осигурявайки неговото стягане, и остават монтирани за известен период от време след стягането на бетона.This utility model relates to a construction formwork comprising construction formwork panels that are installed before pouring concrete and used to hold the concrete to ensure its tightening and remain installed for a period of time after the concrete is poured.

Настоящият полезен модел се отнася също до произвеждането на такива платна на базата на еластичен PVC, със стени, които осигуряват еднакво разпределение на натоварването между тях.The present utility model also relates to the production of such webs on the basis of elastic PVC, with walls providing an equal distribution of load between them.

Предшестващо състояние на техникатаBACKGROUND OF THE INVENTION

Известно е, че бетонът се излива в конструкцията след монтиране на подпорите и подовия кофраж и поставяне на арматурата. След известен период кофражните платна се отстраняват, стените се изграждат, измазват се, след което се извършва останалата част от строителните работи.It is known that concrete is poured into the structure after mounting the supports and floor formwork and installing the reinforcement. After some period the shuttering panels are removed, the walls are built, plastered, and then the rest of the construction works are carried out.

Основно за подов кофраж се използват дървени и метални платна.Mainly for floor formwork wooden and metal panels are used.

Металните платна са предпочитани пред дървените от една страна, от гледна точка на устойчивостта; обаче, водата, съдържаща се в хоросана, допринася за корозирането на тези платна. При тези платна корозията е нежелателна. Само едната страна на тези платна е в контакт с хоросана, другата страна не позволява редуваща се употреба.Metal panels are preferred over wooden ones on the one hand in terms of durability; however, the water contained in the mortar contributes to the corrosion of these sails. Corrosion is undesirable in these sails. Only one side of these sails is in contact with the mortar, the other side does not allow alternate use.

Тъй като са тежки, тяхното пренасяне и транспорт са по-трудоемки и по-скъпи в сравнение с дървените платна. Не е възможно тяхното рязане и прекрояване, както при дървените. Поради тази причина, когато кофражът не пасва както е необходимо, се налага част от него да бъде довършена с дървени кофражни елементи. Поради тази причина, строителите, използващи метален кофраж, трябва да разполагат също и с известни количества дървен.Because they are heavy, carrying and transporting them is more labor-intensive and expensive than wooden sails. It is not possible to cut and reshape them, as in wooden ones. For this reason, when the formwork does not fit as needed, part of it has to be finished with wooden formwork elements. For this reason, builders using metal shuttering must also have some wood available.

Дървеният кофраж не притежава някои от горепосочените недостатъци. Например, тъй като дървените платна са по-леки в сравнение с металните, тяхното пренасяне и транспорт не предизвикват проблеми както при металните. Тъй като дървените платна могат да се режат и прекрояват, те пасват на всеки размер.Wooden formwork does not have some of the above disadvantages. For example, since wooden sails are lighter than metal ones, their transportation and transportation does not cause problems like metal ones. Because wooden panels can be cut and cut, they fit any size.

При дървените платна е необходимо намазването на тяхната повърхност с катран преди изливането на бетона. Тази допълнителна операция предпазва залепването на бетона към повърхността на платното. Тъй като катранът съдържа вода, с времето дървените платна се издуват и деформират. Деформацията на повърхностите оставя постоянни отпечатъци върху бетона. За да се заличат тези отпечатъци е необходим дебел слой мазилка. Поради тази причина разходите ненужно нарастват.For wooden sails it is necessary to smear their surface with tar before pouring the concrete. This additional operation prevents the concrete from sticking to the surface of the canvas. As tar contains water, over time the wooden sails swell and warp. The deformation of the surfaces leaves permanent imprints on the concrete. A thick layer of plaster is required to erase these prints. For this reason, costs are unnecessarily rising.

Практиката показва, че понякога платната се напукват или чупят след изливане на бетона поради нееднаквото разпределение на натоварването. Само едната страна на платното може да се използува ефективно, независимо дали то е дървено или метално.Practice shows that sometimes the webs are cracked or broken after pouring the concrete due to unequal load distribution. Only one side of the canvas can be used effectively, whether it is wooden or metal.

Техническа същност на полезния моделThe technical nature of the utility model

Настоящият полезен модел цели да разреши изброените по-горе проблеми. За изпълнението на тази задача е проектиран строителен кофраж, включващ платно с гладки повърхности, чието тегло е много по-малко от това на дървените или металните платна, което има подходяща конструкция, за да разпределя налягането върху себе си и което може да се реже при необходимост, за да се напасват размерите.This utility model aims to solve the problems listed above. To accomplish this task, a construction formwork has been designed, incorporating a canvas with smooth surfaces, whose weight is much less than that of wooden or metal canvases, which has a suitable structure to distribute the pressure on itself and which can be cut at need to fit the size.

Полезният модел предвижда строителен кофраж, включващ строително кофражно платно, направено от PVC, с поне една хоризонтална плоска повърхност. Външната повърхност на платното (която ще бъде в контакт с кофража по време на изливане на бетона) може да бъде направена така гладка, че да не причинява оставащи отпечатъци.The utility model provides a construction formwork comprising a construction formwork made of PVC with at least one horizontal flat surface. The outer surface of the canvas (which will come in contact with the formwork during pouring of the concrete) can be made so smooth that it does not cause any residual prints.

Според един предпочитан вариант на изпълнение се предвижда втора плоска хоризонтална повърхност, паралелна на първата. По този начин втората повърхност не се нуждае от допълнителна обработка (осмоляване и т.н.), като така се увеличава животът на платното.According to a preferred embodiment, a second flat horizontal surface parallel to the first is provided. In this way, the second surface does not need further processing (resin coating, etc.), thus increasing the life of the canvas.

Според следващ предпочитан вариант на изпълнение строителният кофраж е снабден със стени между горното и долното хоризонтални нива. Вертикалните стени са разположени от една плоска горна хоризонтална повърхност спрямо втората долна хоризонтална повърхност перпендикулярно. Други стени са разположени от една хоризонтална повърхност спрямо друга втора хоризонтална повърхност под известен ъгъл. Благодарение на тези стени се постига амортизиране на натоварването, след като бетонът е налят.According to another preferred embodiment, the construction formwork is provided with walls between the upper and lower horizontal levels. The vertical walls are arranged from a flat upper horizontal surface relative to the second lower horizontal surface perpendicularly. Other walls are located from one horizontal surface to another second horizontal surface at a certain angle. Thanks to these walls, load cushioning is achieved after concrete is poured.

Описание на приложените фигуриDescription of the attached figures

Фигура 1 представлява перспективна проекция на строителен кофраж;Figure 1 is a perspective view of a construction formwork;

фигура 2 - проекция на странично разположение на платната.Figure 2 is a side projection of the canvas.

Примери за изпълнение на полезния моделExamples of implementation of the utility model

Съгласно приложената фиг. 1, строителният кофраж включва строителни кофражни платна 1. Всяко кофражно платно 1 е изработено чрез метода на екструдиране от материал от PVC. Кофражното платно 1 има плоски повърхности 2 на горно и долно хоризонтално ниво. Повърхността, върху която ще се излива бетонът, е съставена от много кофражни платна 1, разположени странично едно спрямо друго.According to the attached FIG. 1, construction formwork includes construction formwork panels 1. Each formwork formwork 1 is made by the method of extrusion from PVC material. Formwork web 1 has flat surfaces 2 on the upper and lower horizontal level. The surface on which the concrete will be poured is made up of many shuttering panels 1, positioned side by side.

Съгласно приложената фиг. 2, кофражното платно 1 има стени 3, предвидени да пренесат натоварването между горна хоризонтална повърхност 2.1, и долна хоризонтална повърхностAccording to the attached FIG. 2, the shuttering web 1 has walls 3 designed to transfer the load between the upper horizontal surface 2.1 and the lower horizontal surface

2.2 след изливане на бетона.2.2 after pouring the concrete.

Горепосочените стени 3 са предвидени да издържат на хоризонталните и вертикалните натоварвания и да предотвратят повреждането на кофражното платно 1. Долните и горните повърхности 2.1, 2.2 на стените 3 са свързани една към друга. Горните и долните повърхности 2.1,The aforementioned walls 3 are designed to withstand horizontal and vertical loads and prevent damage to the formwork web 1. The lower and upper surfaces 2.1, 2.2 of the walls 3 are connected to each other. Upper and lower surfaces 2.1,

2.2 са паралелни една спрямо друга. Стените 3 представляват вертикални стени 3.1 или наклонени стени 3.2. Докато вертикалните стени 3.1 са разположени от една плоска повърхност 2 спрямо друга втора такава 2.2 под ъгъл от 90°, наклонените стени 3.2 са разположени от една горна плоска повърхност 2 спрямо друга долна2.2 are parallel to each other. Walls 3 are vertical walls 3.1 or sloping walls 3.2. While the vertical walls 3.1 are disposed from one flat surface 2 relative to another second such 2.2 at an angle of 90 °, the inclined walls 3.2 are disposed from one upper flat surface 2 relative to the other lower

2.2 под известен ъгъл. За предпочитане е този ъгъл да бъде 45°.2.2 at a certain angle. This angle is preferably 45 °.

Полезният модел не се ограничава в рамките на посочените изпълнения. Очевидно е, че по него могат да бъдат направени много промени по отношение на размери и конструкция, докато основната идея за строително кофражно платно от PVC, притежаващо поне една плоска повърхност, остава постоянна.The utility model is not limited to the above embodiments. Obviously, many changes can be made to it in terms of size and construction, while the basic idea for a PVC construction shutter having at least one flat surface remains constant.

Claims (5)

ПретенцииClaims 1. Строителен кофраж на база поливинилхлорид, включващ кофражни платна, характеризиращ се с това, че всяко кофражно платно (1) е направено от PVC с поне една плоска хоризонтална повърхност (2).A polyvinyl chloride based formwork comprising formwork webs, characterized in that each formwork web (1) is made of PVC with at least one flat horizontal surface (2). 2. Строителен кофраж съгласно претенцияConstruction formwork according to claim 1, характеризиращ се с това, че кофражното платно (1) притежава втора долна плоска хоризонтална повърхност (2, 2.2), паралелна на посочената горна плоска хоризонтална повърхност (2.1).1, characterized in that the shuttering web (1) has a second lower flat horizontal surface (2, 2.2) parallel to said upper flat horizontal surface (2.1). 3. Строителен кофраж съгласно претенцияConstruction formwork according to claim 2, характеризиращ се с това, че кофражното платно (1) включва стени (3), разположени между горната плоска хоризонтална повърхност (2.1) и долната плоска хоризонтална повърхност (2.2).2, characterized in that the shuttering web (1) includes walls (3) located between the upper flat horizontal surface (2.1) and the lower flat horizontal surface (2.2). 4. Строителен кофраж съгласно претенции 2 и 3, характеризиращ се с това, че кофражното платно (1) включва вертикални стени (3.1), разположени перпендикулярно от горната плоска хоризонтална повърхност (2.1) спрямо другата втора плоска повърхност (2.2).Building formwork according to Claims 2 and 3, characterized in that the formwork web (1) includes vertical walls (3.1) perpendicular to the upper flat horizontal surface (2.1) relative to the second second flat surface (2.2). 5. Строителен кофраж съгласно претенции от 1 до 3, характеризиращ се с това, че включва наклонени стени (3.2), разположени от горна плоска хоризонтална повърхност (2.1) спрямо другата втора плоска повърхност (2.2) под известен ъгъл.Building formwork according to Claims 1 to 3, characterized in that it includes sloping walls (3.2) located from an upper flat horizontal surface (2.1) with respect to the second second flat surface (2.2) at a known angle.
BG1084U 2006-03-24 2006-12-11 Pvc-based construction shuttering BG1098U1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TR200601395 2006-03-24

Publications (1)

Publication Number Publication Date
BG1098U1 true BG1098U1 (en) 2008-07-31

Family

ID=38315924

Family Applications (1)

Application Number Title Priority Date Filing Date
BG1084U BG1098U1 (en) 2006-03-24 2006-12-11 Pvc-based construction shuttering

Country Status (4)

Country Link
BG (1) BG1098U1 (en)
BR (1) BRMU8602805U (en)
RU (1) RU64242U1 (en)
UA (1) UA24107U (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
USD959989S1 (en) * 2020-01-24 2022-08-09 HCT Group Holdings Limited Cosmetic jar
RU209449U1 (en) * 2021-05-25 2022-03-16 Леонид Павлович Белов Polymer panel for formwork of concrete walls or ceilings

Also Published As

Publication number Publication date
BRMU8602805U (en) 2007-11-20
UA24107U (en) 2007-06-25
RU64242U1 (en) 2007-06-27

Similar Documents

Publication Publication Date Title
HU228967B1 (en) Lightweight building structure and a method making thereof
CN107327063A (en) A kind of prefabricated underplate concrete superimposed sheet with ribbing
CN211037802U (en) All-steel support reinforced template system
WO2010074550A1 (en) Assemblage formwork
BG1098U1 (en) Pvc-based construction shuttering
RU153650U1 (en) REINFORCEMENT STRUCTURE
JP2009518564A (en) Concrete floor equipment
WO2010130000A1 (en) Floor for a modular building
EP1739253A2 (en) Thermal insulating floor panel with reinforcement and supported floor structure
JP5316297B2 (en) Building fabric foundation structure
CN214169600U (en) Laminated floor slab
CN211622233U (en) Autoclaved sand aerated concrete block with good water permeability resistance
CN113482328A (en) Integral hoisting installation construction method for steel pipe template of outer shear wall
KR20220089410A (en) Drain structure of a building
US10105869B2 (en) Method of manufacturing a cement-mixed concrete tile
JP4911379B2 (en) Tile laying method and its structure
CN220167223U (en) Prefabricated bare concrete non-structural filling wall
CN210917853U (en) Hollow internal mold wall with moisture-proof layer
KR200361482Y1 (en) Stainless steel swimming pool
JP7289489B1 (en) Remaining formwork
CN218437502U (en) Roof simply supported beam node
JP7337752B2 (en) Formwork unit and concrete structure construction method
KR100652011B1 (en) Pile in pile
CN212583244U (en) Pier arch template structure
CN116695769A (en) Preparation method of mixing tower foundation with flexible connection structure and mixing tower foundation