BE787800A -
PROCESS WITH A VIEW TO CARRYING OUT LARGE UNDERGROUND PASSAGES IN EARTHWORKING PLATFORMS OF COMMUNICATION TRACKS, IN PARTICULAR, RAILWAYS AND PREFABRICATED STOPPER OR PILLAR USED IN THIS PROCESS
- Google Patents
PROCESS WITH A VIEW TO CARRYING OUT LARGE UNDERGROUND PASSAGES IN EARTHWORKING PLATFORMS OF COMMUNICATION TRACKS, IN PARTICULAR, RAILWAYS AND PREFABRICATED STOPPER OR PILLAR USED IN THIS PROCESS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Emka Ingenieur G M B H FafiledCriticalEmka Ingenieur G M B H Fa
Priority to BE787800ApriorityCriticalpatent/BE787800A/en
Publication of BE787800ApublicationCriticalpatent/BE787800A/en
E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
E21D9/005—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by forcing prefabricated elements through the ground, e.g. by pushing lining from an access pit
Landscapes
Engineering & Computer Science
(AREA)
Mining & Mineral Resources
(AREA)
Environmental & Geological Engineering
(AREA)
Life Sciences & Earth Sciences
(AREA)
General Life Sciences & Earth Sciences
(AREA)
Geochemistry & Mineralogy
(AREA)
Geology
(AREA)
BE787800A1972-08-211972-08-21
PROCESS WITH A VIEW TO CARRYING OUT LARGE UNDERGROUND PASSAGES IN EARTHWORKING PLATFORMS OF COMMUNICATION TRACKS, IN PARTICULAR, RAILWAYS AND PREFABRICATED STOPPER OR PILLAR USED IN THIS PROCESS
BE787800A
(en)
PROCESS WITH A VIEW TO CARRYING OUT LARGE UNDERGROUND PASSAGES IN EARTHWORKING PLATFORMS OF COMMUNICATION TRACKS, IN PARTICULAR, RAILWAYS AND PREFABRICATED STOPPER OR PILLAR USED IN THIS PROCESS
PROCESS WITH A VIEW TO CARRYING OUT LARGE UNDERGROUND PASSAGES IN EARTHWORKING PLATFORMS OF COMMUNICATION TRACKS, IN PARTICULAR, RAILWAYS AND PREFABRICATED STOPPER OR PILLAR USED IN THIS PROCESS
PROCESS WITH A VIEW TO CARRYING OUT LARGE UNDERGROUND PASSAGES IN EARTHWORKING PLATFORMS OF COMMUNICATION TRACKS, IN PARTICULAR, RAILWAYS AND PREFABRICATED STOPPER OR PILLAR USED IN THIS PROCESS
PROCESS WITH A VIEW TO CARRYING OUT LARGE UNDERGROUND PASSAGES IN EARTHWORKING PLATFORMS OF COMMUNICATION TRACKS, IN PARTICULAR, RAILWAYS AND PREFABRICATED STOPPER OR PILLAR USED IN THIS PROCESS
PROCEDURE IN WHICH A FLUID IS PUT INTO A BORE HOLE IN THE EARTH AND IN CONTACT WITH A SUBGROUND FORMATION, AND A PROCESS FOR PREPARING A WATERY GEL TO BE USED IN THE ABOVE MENTIONED PROCEDURE.
SQUEEGEE CONVEYOR DRIVE HEAD CONTAINING A CHAIN WHEEL LATERAL COVER, INTENDED IN PARTICULAR FOR THE DRIVING OF A PLANE OR ANALOGUE TOOL, USED IN PARTICULAR IN MINING