Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filedfiledCritical
Publication of BE719871ApublicationCriticalpatent/BE719871A/fr
E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
E04B5/16—Load-carrying floor structures wholly or partly cast or similarly formed in situ
E04B5/32—Floor structures wholly cast in situ with or without form units or reinforcements
E04B5/36—Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor
E04B5/38—Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor with slab-shaped form units acting simultaneously as reinforcement; Form slabs with reinforcements extending laterally outside the element
E—FIXED CONSTRUCTIONS
E04—BUILDING
E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
E04C5/01—Reinforcing elements of metal, e.g. with non-structural coatings
E04C5/02—Reinforcing elements of metal, e.g. with non-structural coatings of low bending resistance
Assemblage par emboitement de deux profiles a section droite en z, notamment pour la realisation d'une panne, d'une lisse ou d'un support de plancher.
Poutres et poteaux, simples et doubles, constitués par la réunion de profilés à section droite en Z, et permettant notamment la réalisation d'un portique ou d'une potence destinée à une construction de bâtiment