Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Publication of BE510739ApublicationCriticalpatent/BE510739A/xx
E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
E04G25/00—Shores or struts; Chocks
E04G25/04—Shores or struts; Chocks telescopic
E04G25/06—Shores or struts; Chocks telescopic with parts held together by positive means
E—FIXED CONSTRUCTIONS
E04—BUILDING
E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
E04G25/00—Shores or struts; Chocks
E04G25/04—Shores or struts; Chocks telescopic
E04G25/06—Shores or struts; Chocks telescopic with parts held together by positive means
E04G25/061—Shores or struts; Chocks telescopic with parts held together by positive means by pins
Landscapes
Engineering & Computer Science
(AREA)
Architecture
(AREA)
Mechanical Engineering
(AREA)
Civil Engineering
(AREA)
Structural Engineering
(AREA)
Forms Removed On Construction Sites Or Auxiliary Members Thereof
(AREA)