H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
H02J9/00—Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
H02J9/04—Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
H02J9/06—Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems
H02J9/08—Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems requiring starting of a prime-mover
Landscapes
Business, Economics & Management
(AREA)
Emergency Management
(AREA)
Engineering & Computer Science
(AREA)
Power Engineering
(AREA)
Devices For Conveying Motion By Means Of Endless Flexible Members
(AREA)
Procede d'optimisation du fonctionnement d'une chaine de traction d'un vehicule automobile hybride, et chaine de traction mettant en œuvre ce procede