AU724524B2 - Pneumatically operated gas demand apparatus - Google Patents

Pneumatically operated gas demand apparatus Download PDF

Info

Publication number
AU724524B2
AU724524B2 AU59330/99A AU5933099A AU724524B2 AU 724524 B2 AU724524 B2 AU 724524B2 AU 59330/99 A AU59330/99 A AU 59330/99A AU 5933099 A AU5933099 A AU 5933099A AU 724524 B2 AU724524 B2 AU 724524B2
Authority
AU
Australia
Prior art keywords
regulator
supply
gas
flow
valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
AU59330/99A
Other versions
AU5933099A (en
Inventor
James M. Davenport
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Salter Labs Inc
Original Assignee
Salter Labs Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Salter Labs Inc filed Critical Salter Labs Inc
Priority to AU59330/99A priority Critical patent/AU724524B2/en
Publication of AU5933099A publication Critical patent/AU5933099A/en
Application granted granted Critical
Publication of AU724524B2 publication Critical patent/AU724524B2/en
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Landscapes

  • Respiratory Apparatuses And Protective Means (AREA)

Description

AUSTRALIA
Patents Act 1990 COMPLETE SPECIFICATION STANDARD PATENT Applicant: SALTER LABS Invention Title: Pneumatically Operated Gas Demand Apparatus The following statement is a full description of this invention, including the best method of performing it known to me/us: 1 PNEUMATICALLY-OPERATED GAS DEMAND APPARATUS FIELD OF THE INVENTION The present invention relates broadly to an intermittent gas delivery device disposed between and in intermittent fluid communication with a nebuliser for producing a medicament containing aerosol and a source of pressurised gas.
BACKGROUND OF THE INVENTION Many medical patients suffering from any one of a variety of lung ailments are often prescribed supplemental oxygen therapy so that the patient could breath oxygen-enriched air throughout the day and sometimes throughout the night. Earlier supplemental oxygen therapy employed a nasal cannula system operably connected between a tank of compressed oxygen and the patient's nose. Oxygen was continuously delivered to the patient throughout the patient's entire breathing cycle. This method of continuously delivering oxygen to the patient throughout the patient's breathing cycle was considered wasteful because much of the oxygen dissipated into the ambient air environment. Better methods of delivering oxygen to the patient were later developed which included improved oo *oo• \\GHSYDNT1\users\Speci\300 399\350 399\36014.doc -2equipment that would only deliver oxygen to the patient during the inhalation phase of the patient's breathing cycle. Usually, this improved equipment employed a demand valve which opened to deliver supplemental oxygen to the patient only when the patient inhaled. Numerous types of demand valves are well known in the prior art.
One such demand valve is described in U.S. Patent 5,360,000 to Carter. This demand valve is compact, simplified and totally pneumatic. The demand valve which is coupled between a source of pressurized gas such as oxygen and the patient includes a valve body having a gas flow passageway and pneumatically-coupled sensing and slave diaphragms. The slave diaphragm is interposed in the gas flow passageway and prevents gas from flowing during the exhalation phase of the patient's respiratory cycle.
During inhalation, which is sensed by a sensing diaphragm, the slave diaphragm moves to open the gas flow passageway, thus permitting flow of gas to the patient. Although effective in delivering gas to a patient upon demand, this 20 demand valve has an inherent problem. When the patient inhales to cause delivery of oxygen to patient, oxygen is also vented into the ambient air environment for as long as the slave diaphragm remains opened. This leads to wastage of oxygen which is the very problem that demand valves were designed to prevent.
Furthermore, this demand valve has an inherent deficiency of delivering gas to the patient in a continuous flow stream upon and during the inhalation phase.
Unfortunately, the air remaining in the patient's respiratory passageway i.e. the nasal cavity and the throat, is first taken into the lungs upon inhalation. The oxygen-enriched air then follows the remaining air and only approximately one-half of the oxygen-enriched air ever reaches the lungs. The remaining one-half of the oxygen-enriched air remains in the patient's respiratory -3 passageway during the waning moments of inhalation and is the first to be exhaled therefrom during exhalation. It would be beneficial to the patient if this air remaining in the patient's respiratory passageway after exhalation could be purged or otherwise enriched with oxygen before it is inhaled. Such an approach is utilized in Patent No.
4,686,974 to Sato et al.
There is a need in the industry to provide a pneumatically-operated gas demand apparatus which can control delivery of oxygen to the recipient/patient as the recipient inhales and exhales while minimizing wastage of oxygen. It would be advantageous of this pneumatically-operated gas demand apparatus can deliver a high-flow pulse of oxygen to the recipient/patient upon 15 commencement of the inhalation phase of the patient's breathing cycle. Such a high-flow pulse of oxygen delivered upon commencement of the inhalation phase would enrich the air remaining in the patient's respiratory passageway upon inhalation and, simultaneously therewith, 20 purge some of this air therefrom before being inhaled. It would also be advantageous if this pneumatically-operated gas demand apparatus can deliver a continuous flow of oxygen immediately after delivery of the pulse of high-flow oxygen and throughout the remaining portion of inhalation.
\\GHSYDNT1\users\Speci\300 399\350 399\36014.loc 4 SUMMARY OF THE INVENTION In accordance with a first aspect of the present invention, there is provided in combination with a nebuliser for producing a Smedicament-containing aerosol and a source of pressurized gas, an intermittent gas delivery device disposed between and in intermittent fluid communication with the nebulizer and the source of pressurized gas, comprising: a regulator mechanism in continuous fluid communication with and disposed downstream of the source of pressurized gas; a bolus chamber structure defining a bolus chamber therein and disposed downstream of and in fluid communication with said regulator mechanism; 15 a supply orifice element having a supply orifice formed therethrough, said supply orifice element disposed between said regulator mechanism and said bolus chamber, said supply orifice providing fluid communication between said regulator mechanism and said bolus chamber; and 20 a supply valve in downstream fluid communication with said supply orifice and operative to move between a flow-blocking position whereby the pressurized gas is prevented from flowing from the source to the nebulizer and a flow-supplying position whereby the pressurized gas flows from the source to the nebulizer such that a high flow pulse of pressurized gas first generates a fine-mist plume of the medicament-containing aerosol in the nebulizer and subsequently a steady state flow of pressurized gas continues to produce the fine-mist plume of the medicament-containing aerosol in the nebulizer until said supply valves moves to the flow-blocking position.
The present invention may become more readily appreciated and understood from consideration of the following detailed description of the \\GHSYDNTl\users\Speci\300 399\350 399\36014.doc 5 exemplary embodiments of the present invention when taken in conjunction with the accompanying drawings, in which: BRIEF DESCRIPTION OF THE DRAWINGS- Figure 1 is partially a schematic view and partially an elevational side view in cross-section of a first exemplary embodiment of a pneumatically-operated gas demand apparatus of the present invention shown coupled between and in fluid communication with a single source of pressurized gas and a recipient with a supply valve in a flow-blocking position and a sensing valve in a flow-stopping position as a result of the recipient exhaling; Figure 2 is partially a schematic view and partially an elevational side view in cross-section of the first 15 exemplary embodiment of the pneumatically-operated gas demand apparatus of the present invention shown coupled between and in fluid communication with the single source of pressurized gas and the recipient with the supply valve in a flow-supplying position and the sensing valve in a 20 flow-causing position as a result of the recipient inhaling; Figure 3 is an enlarged elevational side view in cross-section of the supply valve in the flow-supplying position and the sensing valve the flow-causing position as shown in Figure 2; Figure 4 is an elevational side view in cross-section of a second exemplary embodiment of the pneumatically-operated gas demand apparatus of the present invention integrating the supply valve, the sensing valve and a regulator mechanism into a unitary construction with a valve assembly of the regulator mechanism in a closed condition; Figure 5 is an elevational side view in cross-section of the second exemplary embodiment of the pneumatically-operated gas demand apparatus of the present 6 invention of Figure 4 with the valve assembly of the regulator mechanism in an opened condition; Figure 6 is a chart illustrating graphically a flow-rate of the gas being delivered to the recipient by the pneumatically-operated gas demand apparatus of the present invention and superimposed onto a sign wave reflecting an inhalation pressure and exhalation pressure of the recipient throughout the recipient's breathing cycle; Figure 7 is partially a schematic view and partially an elevational side view in cross-section of a third exemplary embodiment of the pneumatically-operated gas demand apparatus of the present invention shown coupled between and in fluid communication with two sources of different pressurized gases and a recipient with the supply valve in the flow-blocking position and the sensing valve in the flow-stopping position as a result of the recipient exhaling; Figure 8 is partially a schematic view and partially an elevational side view in cross-section of the third exemplary embodiment of the pneumatically-operated gas demand apparatus of the present invention shown coupled between and in fluid communication with the two sources of different pressurized gases and the recipient with the supply valve in the flow-supplying position and the sensing valve in the flow-causing position as a result of the recipient inhaling one while the other gas vents to ambient air environment; Figure 9 is an elevational side view in cross-section of a fourth exemplary embodiment of the pneumatically-operated gas demand apparatus of the present invention integrating the supply valve, the sensing valve and the regulator mechanism into a unitary construction with a valve assembly of the regulator mechanism in a closed condition and with the supply valve and the sensing 7 valve having independent inlets for receiving respective ones of the two different gases from independent sources; and Figure 10 is a partial schematic view and a partial cross-sectional view of a fifth exemplary embodiment of the present invention which is an intermittent gas delivery device used in combination with a conventional nebulizer.
DETAILED DESCRIPTION OF THE EXEMPLARY EMBODIMENTS A. pneumatically-operated gas demand apparatus is coupled in interruptible fluid communication between a recipient and a source of pressurized oxygen and is adapted i for controlling delivery of oxygen to the recipient as the recipient inhales and exhales. Although the pneumatically-operated gas demand apparatus is specifically suited to provide oxygen to a recipient/patient, one of ordinary skill in the art would appreciate that the present invention can also be adapted and used to deliver other kinds of gases to recipients such as nitrous oxide.
Further, since the pneumatically-operated gas demand apparatus can deliver and operate with either a single gas such as oxygen or two gases such as oxygen and inexpensive compressed air, other types of gases can also be employed without departing from the spirit and concepts of the present invention.
As generally introduced in Figures 1 3, a pneumatically-operated gas demand apparatus 10 is coupled in interruptible fluid communication between a recipient 12 and a source 14 of pressurized oxygen. Conventional tubing 16 interconnects pneumatically-operated gas demand apparatus 10 to source 14 and a partitioned, nasal cannula assembly 18 interconnects pneumatically-operated gas demand apparatus 10 and recipient 12. A dual-lumen, nasal cannula assembly (not shown) can also be employed and is well known in the art and no additional explanation thereof is deemed necessary to practice the present invention. A first lumen 8 of dual-lumen, nasal cannula assembly 18 is connected between pneumatically-operated gas demand apparatus 10 and a cannula 22 to conduct oxygen (as shown by dashed arrows in Figure 2) to a nose 22 of recipient 12. A second lumen 24 is connected between pneumatically-operated gas demand apparatus 10 and cannula 22 to act as a conduit so that inhalation pressure and exhalation pressure (as shown by solid double-line arrows in Figures 1 and 2) from recipient 12 can be conveyed to pneumatically-operated gas demand apparatus 10. As a result, pneumatically-operated gas demand apparatus 10 is adapted for controlling delivery of gaseous oxygen to recipient 12 as recipient 12 inhales and Sexhales.
Again, with reference to figures 1 and 2, 15 pneumatically-operated gas demand apparatus 10 comprises a supply valve 28 and a sensing valve 30. Supply valve 28 includes a supply valve housing 32 and a flexible first diaphragm member 34. Supply valve housing 32 defines a first interior chamber 36 which is formed therein.
20 Flexible first diaphragm member 34 is disposed within first interior chamber 36 and is connected to supply valve housing 32 in a manner to divide first interior chamber 36 eo.. into a supply chamber region 38 and a control chamber region 40. Supply chamber region 38 is in interruptible fluid communication with and between source 14 of the pressurized oxygen and recipient 12. Throughout the description of the exemplary embodiments, the phrase, "interruptible fluid communication" is used and, by way of example only, "interruptible fluid communication" means that sometimes supply chamber region 38 is in fluid communication with source 14 while at other times supply chamber region 38 is not in fluid communication with source 14. Control chamber region 40 is in continuous fluid communication with source 14 of pressurized oxygen. First diaphragm member 34 is operative to hermetically seal 9 supply chamber region 38 and control chamber region 40 from one another. Additionally, first diaphragm member 34 is operative to move between a flow-blocking position as shown in Figure 1 and a flow-supplying position as shown in Figure 2.
Sensing valve 30 includes a sensing valve housing 42 and a flexible second diaphragm member 44. Sensing valve housing 42 defines a second interior chamber 46 which is formed therein. Second diaphragm member 44 is disposed within second interior chamber 46 and is connected to sensing valve housing 42 in a manner to divide second 09e9 interior chamber 46 into a venting chamber region 48 and a sensing chamber region 50. Venting chamber region 48 is in interruptible fluid communication with and between control 15 chamber region 40 of first interior chamber 36 of supply valve 28 and an ambient air environment 52 through a bleed conduit 54. Sensing chamber region 50 is in continuous fluid communication with recipient 12.
Second diaphragm member 44 is operative to 20 hermetically seal venting chamber region 48 and sensing chamber region 50 from one another. Further, second diaphragm member 44 is responsive when recipient 12 -inhales and exhales by moving between a flow-stopping S. position as shown in Figure 1 and a flow-causing position as shown by Figure 2. As best shown in Figure 3, when recipient 12 inhales, second diaphragm member 44 is in the flow-causing position thereby causing oxygen (represented by the single solid line arrows) to flow from control chamber region 40, through venting chamber region 48 and into ambient air environment 52. In turn, second diaphragm member 44 being in the flow-causing position causes first diaphragm member 34 to be in the flow-supplying position thereby delivering oxygen (represented by dashed arrows) from source 14 of pressurized oxygen to recipient 12. As shown in Figure 2, when recipient 12 exhales, second diaphragm member 44 is in the flow-stopping position thereby preventing oxygen to flow from control chamber region 40, through venting chamber region 48 and into ambient air environment 52 which, in turn, causes first diaphragm member 34 to be in the flow-blocking position thereby preventing delivery of oxygen to recipient 12.
As best shown in Figure 3, supply valve 28 includes a supply tube stem 56 and a supply valve spring 58. Supply tube stem 56 is disposed within supply chamber region 38 of supply valve 28 and has a supply seat 60 defining a supply opening 62 into a tube stem conduit 64. Tube stem conduit 64 provides fluid communication into supply chamber region 0 0 38. Supply seat 60 is sized and adapted to removably contact a blocking side 64 of first diaphragm member 34 in a fluid-tight relation when supply valve 28 is in the flow-blocking position as shown in Figure 1. Also, as best shown in Figures 2 and 3, supply opening 62 is in a spaced-apart, facially-opposing relationship with blocking side 64 when supply valve 28 is in the flow-supplying 20 position. Supply valve spring 58 is disposed within supply chamber recion 38 and surrounding supply tube stem 56.
Supply valve spring 58 is operative to yieldably urge first [-diaphragm member 34 into the flow-supplying position.
As best shown in Figure 3, sensing valve 30 includes a sensing valve seat member *66 and a sensing valve adjustment assembly 68. Sensing valve seat member 66 is disposed in and extends into venting chamber region 48.
Sensing valve seat member 66 has a sensing valve seat which defines a flow opening 72 into a supply valve conduit 74. Supply valve conduit 74 provides fluid communication into venting chamber region 48 of sensing valve Sensing valve seat 70 is sized and adapted to removably contact a stopping side 76 of second diaphragm member 44 in a fluid-tight relation when sensing valve 30 is in the flow-stopping position as shown in Figure i. Flow opening 11 72 is in a spaced-apart, facially-opposing relationship from stopping side 72 when sensing valve 30 is in the flow-causing position as shown in Figures 2 and 3.
Sensing valve adjustment assembly 68 includes a set screw 78 and a sensing valve spring 80. Set screw 78, threadably mounted into sensing valve housing 42, extends into sensing chamber region 50 and is accessible exteriorly of sensing valve housing 42. Sensing valve spring 80 is disposed within sensing chamber region 50 and in contact with and between set screw 78 and second diaphragm member 44. Sensing valve spring 80 imparts a yi eldable tension force shown in Figure 1, to second diaphragm member 44 against sensing valve seat 70 to resiliently bias second *diaphragm member 44 into the f low-stopping position. As commonly known in the art, turning set screw 78 in a f irst direction 14ncreases tension force 'IF" and turning set 6::.*screw 78 in a second direction 2 1 opposite the first :::direction decreases the tension force "1 F"II.
Again referring to Figures 1 and 2, pneumatically-operated gas demand apparatus 10 includes a regulator mechanism 82 (drawn symbolically), a bolus chamber structure 84, a supply orifice element 86 (drawn symbolically) and a pilot orifice element 88 (drawn symbolically). For the first exemplary embodiment of the of the present invention, regulator mechanism 82 is a conventional regulator. Regulator -mechanism 82 is disposed between and in interruptible fluid communication with source 14 of pressurized oxygen and supply chamber region 38 of supply valve 28. Bolus chamber structure 84 defines a bolus chamber 90 therein and is disposed between and in fluid communication with regulator mechanism 82 and supply chamber region 38 of supply valve 28. Supply orifi-ce element 86 is disposed between regulator mechanism 82 and bolus chamber structure 84. Pilot orif ice element 88 is disposed between source 14 of the pressurized oxygen and 12 control chamber region 40 of supply valve 28. By way of example and not limitation, pilot orifice element 88 and supply orifice element 86, as reflected by the symbolic drawings, are of an adjustable, variable orifice type which are commonly known in the art.
A second exemplary embodiment of a pneumatically-operated gas demand apparatus 210 of the present invention is introduced in Figures 4 and Pneumatically-operated gas demand apparatus 210 of the present invention is functionally similar than the first exemplary embodiment of pneumatically-operated oxygen apparatus 10 of the present invention but includes structural modifications as discussed below. Generally, a skilled artisan would appreciate that pneumatically-operated gas demand apparatus 210 integrates the components referred to hereinabove into a unitary construction. The skilled artisan would further appreciate S.oo that pneumaticaily-operated gas demand apparatus 210 o: 20 employs a single housing 212 which, in essence, can be 20 subdivided into the various housings, structures, interior chambers and chamber regions of the components described above. Therefore, no further discussion of these components is deemed necessary except as hereinafter described which structurally distinguishes the first and 25 second exemplary embodiments from one another.
With reference to Figures 4 and 5, a supply orifice element 86' has a supply orifice 92 which is formed therethrough. Supply orifice 92 is fixed in size and provides fluid communication between a regulator mechanism 82' and bolus chamber 90. A pilot orifice element 88' has a pilot orifice 94 which is formed therethrough. Pilot orifice 94 is also fixed in sized and provides fluid communication with and between source 14 of pressurized oxygen and control chamber region 40 of supply valve 28 through a single inlet 96.
13 For the second exemplary embodiment of the pneumatically-operated gas demand apparatus 210 of the present invention, regulator mechanism 82' -is employed therewith. Regulator mechanism 82' includes a regulator housing 214, a flexible regulator diaphragm 216 and a valve assembly 218. Regulator housing 214 defines a regulator chamber 220 formed therein. Regulator diaphragm 216 is disposed within regulator chamber 220 and is connected to regulator housing 214 in a manner to divide regulator chamber 220 into a vented regulator chamber region 222 and a supply regulator chamber region 224. Vented regulator chamber region 222 is in continuous fluid communication with ambient air environment 52. Supply regulator chamber region 224 is in interruptible fluid communication between source 14 of pressurized oxygen and supply chamber region 38 of supply valve 28. Regulator diaphragm 216 is operative to hermetically seal vented regulator chamber region 222 and supply regulator chamber region 224 from one another.
20 Valve assembly 218 is operably ccnnected to regulator diaphragm 216 and is disposed within supply regulator chamber region 224. Valve assembly 218 is operative between a closed condition (shown in Figure 4) and an opened condition (shown in Figure 5) In the closed S" 25 condition, an upstream portion 226 of supply regulator chamber region 224 is isolated from fluid communication with a downstream portion 228 of supply regulator chamber Sregion 224. In the opened condition, upstream portion 226 of supply regulator chamber region 224 is in fluid communication with downstream portion 228 of supply regulator chamber region 224. Valve assembly 218 is resiliently and yieldably biased against regulator diaphragm 216 in the closed condition while simultaneously therewith regulator diaphragm 216 is resiliently and yieldably biased against valve assembly 218 in the opened 14 condition. Now, when a gas pressure reaches a threshold gas pressure amount in downstream portion 228 of supply regulator chamber region 224, valve assembly 218 is in the closed condition. And, when the gas pressure is less than the threshold gas pressure amount, valve assembly 218 is in the opened condition so that oxygen can flow from upstream portion 226, through downstream portion 228 and to supply valve 28.
Valve assembly 218 includes a poppet valve stem 230 which has a poppet valve head 232. As best shown in Figure poppet valve stem 230 is slidably received by a poppet valve conduit 234 having a poppet valve seat 236. Poppet valve seat 236 is sized and adapted to removably receive poppet valve head 232 in a matable, fluid-tight relationship when valve assembly 218 is in the closed condition as shown in Figure 4. Valve assembly 218 also includes an offset spring 237 which is disposed within upstream portion 226 of supply regulator chamber region 224 and against poppet valve head 232. Offset spring 237 is 20 operative to yieldably urge valve assembly 218 in the closed condition.
S: Regulator mechanism 82' also has a regulator adjustment assembly 239 with an adjustment screw 238 and a set point spring 240. Adjustment screw 238 is threadably S 25 mounted into regulator housing 214 and is accessible exteriorly of regulator housing 214. Adjustment screw 238 also extends into vented regulator chamber region 222. Set point spring 240 is disposed within vented regulator chamber region 222 and in contact with and between adjustment screw 238 and regulator diaphragm 216. As is commonly known in the art, advancing adjustment screw 238 into regulator housing 214 by a turning knob 235 increases a threshold gas pressure amount permitted into downstream portion 228 of supply regulator chamber region 224 from upstream porticn 226 of supply regulator chamber region 224 15 and, correspondingly, retracting adjustment screw 238 by turning knob 235 in an opposite direction decreases the threshold gas pressure amount permitted into- downstream portion 228 of supply regulator chamber region 224 from upstream portion 226 of supply regulator chamber region 224. Thus, combined forces of the threshold gas pressure amount acting on a regulating side 242 of regulating diaphragm 216 and offset spring 237 overcome a spring force exerted by set point spring 240 to move valve assembly 218 into the closed condition.
Therefore, the oxygen contained in bolus chamber 90 is also under the threshold amount of gas pressure. Now, when recipient inhales, the pneumatically-operated gas demand apparatus of the present invention delivers a high-flow pulse of oxygen to the recipient/patient upon commencement of the recipient's inhalation phase of the breathing cycle.
Once the threshold pressure drops thereafter, valve assembly 218 opens and a continuous flow of oxygen is delivered to the recipient throughout the remaining portion 20 of the inhalation phase. Figure 6 illustrates a flow-rate of the gas, i.e. oxygen, being delivered to the recipient by the pneumatically-operated gas demand apparatus of the present invention and superimposed onto a dashed sign wave which reflects an inhalation pressure and exhalation S 25 pressure of the recipient throughout the recipient's Sbreathing cycle. Note the high-flow pulse of .oxygen flowing during an initiation period of the inhalation phase of the breathing cycle and the continuous, lower flow of oxygen flowing during a remaining period of the inhalation phase.
One of ordinary skill in the art would appreciate the relationship among regulator mechanism 82 (or supply orifice element 86 (or bolus chamber structure 84 defining bolus chamber 90 and supply valve 28. Oxygen is conveyed from regulator mechanism 82 (or 82') into bolus 16 chamber 90 through supply orifice element 86 (or As with any conventional regulator, regulator mechanism 82 (or 82') is pre-set to control pressure of the oxygen into pneumatically-operated gas demand apparatus of the present invention. Thus, when supply valve 28 is in the flow-blocking position, oxygen flows into bolus chamber only until the pre-set control pressure is achieved. When the oxygen discontinues flowing, bolus chamber 90 is charged with oxygen at the pre-set control pressure of regulator mechanism 82 (or When supply valve 28 moves to the flow-supplying position, a high flow pulse of oxygen at a high flow rate (indicated by initiation period in Figure is, in essence, injected to nose 24 of recipient 12 in a brief burst. This pulse of oxygen, in part, displaces a portion of exhaled air extant in the recipient's respiratory passageway at the ending portion of the exhalation phase of the recipient's breathing cycle and, in part, enriches the remaining portion of air therein 20 with oxygen. Upon inhalation, recipient 12 can now ingest oxygen-enriched air from within the recipient's respiratory passageway rather than oxygen-depleted air remaining in the respiratory passageway from the prior expiration.
An oxygen pressure "blow down" occurs in bolus chamber 90 when supply valve 28 moves to the S 25 flow-supplying position. With the oxygen "blow down" pressure below the pre-set control pressure, regulator 82 (or 82') activates to convey oxygen at a pre-set pressure through the pneumatically-operated gas demand apparatus of the present invention in a steady state flow during the remaining period of inhalation phase (illustrated by remaining period in Figure This steady state flow is generally constant throughout remaining period and is less that peak oxygen flow during initiation period This steady state flow is controlled by regulator mechanism 82 (and 82') and the size of supply orifice 92.
17 Interestingly, the amount of oxygen injected into nose 24 of the recipient 12 is governed by the pre-set pressure of regulator 82 (or By way of example only and not limitation, the regulator mechanism 82 (or 82') is pre-set at its full-opened state to deliver a maximum amount of oxygen to bolus chamber 90 for which it was designed. If one-half of the amount of oxygen is later prescribed for injection into recipient 12, then 'regulator mechanism 82 (or 82') is adjusted so that the pre-set is at one-half of its full-opened state.
Figures 7 and 8 depict a third exemplary embodiment of a pneumatically-operated gas demand apparatus 310 of the present invention. Although structurally similar to the first and second exemplary embodiments of the pneumatically-operated oxygen demand apparatuses of the present invention, the pneumatically-operated gas demand apparatus 310 delivers a first gas from a first gas source 312 and operates on a second gas supplied by a second gas source 314. Obviously, first gas source 312 is different 20 from second gas source 314. It is preferred that the first gas and the second gas are different from one another although the first gas and the second gas can be the same, if desired. It is preferred that the first gas and the second gas are selected from different ones of a group of 25 gases including oxygen, nitrous oxide, air or any other kind of gas. However, it is possible that the first and second gases are selected from the same group of gases, if desired.
In Figures 7 and 8, supply chamber region 38 of supply valve 28 is in interruptible fluid communication with and between first source 312 of the first gas and the recipient. Control chamber region 40 of supply valve 28 is in continuous fluid communication with second source 314 of the pressurized second gas. As shown in Figure 8, when recipient 12 inhales, second diaphragm member 44 of sensing 18 valve 30 is in the flow-causing position thereby causing the second gas to flow from control chamber region through venting chamber region 48 and into ambient air environment 52. This, in turn, causes first diaphragm member 34 to be in the flow-supplying position thereby delivering the first gas from the first source of pressurized first gas to the recipient. In Figure 7, when the recipient exhales, second diaphragm member 44 is in the flow-stopping position thereby preventing the second gas to flow -from control chamber region 40, through venting chamber region 48 and into ambient air environment 52.
This, in turn, causes first diaphragm member 34 to be in the flow-blocking position thereby preventing delivery of the first gas to the recipient.
This third exemplary embodiment of the S. pneumatically-operated gas demand apparatus 310 is S: particularly useful to prevent wastage of the first gas.
For example, oxygen is considered expensive and compressed air is considered inexpensive relative to the cost of 20 oxygen. With oxygen used as the first gas, no oxygen is dissipated to the ambient air environment and all of the oxygen is delivered to the patient. With compressed air as the second gas, the inexpensive compressed air is now dissipated to the ambient air environment.
25 A fourth exemplary embodiment of a 0**00* pneumatically-operated gas demand apparatus 410 is introduced in Figure 9 and is a unitary construction of the third exemplary embodiment of the pneumatically-operated S" gas demand apparatus 310. Pneumatically-operated gas demand apparatus 410 has a first gas inlet 412 with a first gas conduit 414 leading into upstream portion 226 of supply regulator chamber region 224. First gas inlet 412 is adapted to connect to the first gas source of the pressurized first gas. Pneumatically-operated gas demand apparatus 410 has a second gas inlet 416 with a second gas 19 conduit 418 leading into control chamber region 224 of supply valve 28. Second gas inlet 416 is adapted to connect to the second gas source of the pressurized second gas.
A skilled artisan would appreciate that regulator mechanism 82 (or supply orifice element 86 (or 86'), bolus chamber structure 84 and supply valve 28 can be combined in a manner described hereinabove to construct an intermittent gas delivery device 510 as generally introduced in Figure 10. Intermittent gas delivery device 510 could be utilized, for example, with a nebulizer 512 such as the one described in a patent application filed on even date herewith by inventors James Chua and Peter W.
Salter. Other nebulizers are commonly known in the art and can be employed with the present invention if equipped with an inhalation sensing structure or supplemental sensing apparatus. With intermittent gas delivery device 510 connected in fluid communication between gas source 14 of pressurized gas, such as air or oxygen, and nebulizer 512, intermittent gas delivery device 510 generates a fine-mist plume 514 of a medicament-containing aerosol by first permitting the pressurized gas into nebulizer 512.
Initially, a high flow pulse of the pressurized gas generates this fine-mist plume and subsequently a steady 25 state flow of the gas delivered to nebulizer 512 continues to generate and deliver this fine-mist plume to the patient. The high flow pulse and subsequent steady flow sequentially occurs by the implementation of a sense tube 516. A finger 518 of recipient 12 being placed over a sense tube inlet 520 causes supply valve to be in the flow-blocking position. Removing finger 518 from sense tube inlet 520 causes supply valve 28 to move to the flow-supplying position. One of ordinary skill in the art would appreciate that other methods such as mechanically triggering supply valve 28 during a selected interval of r r a rr o *o* time within each breathing cycle could be utilized in lieu thereof.
The pneumatically-operated gas demand apparatus of the present invention can minimize wastage of oxygen, if desired. The pneumatically-operated gas demand apparatus delivers a high-flow pulse of oxygen to the recipient/patient during an initiation period of the recipient/patient's inhalation phase of the breathing cycle. This high-flow pulse of oxygen causes oxygen enrichment of the exhaled air remaining in a nasal and other portions of the respiratory passageway from the prior exhalation phase of the breathing cycle. With this enriched exhaled air now becoming the first air to be inhaled into the recipient's lungs, more therapeutically valuable oxygen can be utilized by the recipient.
Thereafter, a continuous flow of oxygen is delivered to the recipient throughout the remaining period of inhalation phase of the breathing cycle. As described, the pneumatically-operated gas demand apparatus can be fabricated from readily available components or can be integrated into a unitary construction. In either regard, the pneumatically-operated gas demand apparatus is simple in design and compact.
Accordingly, the present invention has been described 25 with some degree of particularity directed to the exemplary embodiments of the present invention. It should be appreciated, though, that the present invention is defined by the following claims construed in light of the prior art so that modifications or changes may be made to the exemplary embodiments of the present invention without departing from the inventive concepts contained herein.
21 In the claims that follow and in the summary of the invention, except where the context requires otherwise due to express language or necessary implication, the word "comprising" is used in the sense of "including", i.e. the features specified may be associated with further features in various embodiments of the invention.
a \\GHSYDNT1\users\Speci\300 399\350 399\36014.doc

Claims (4)

1. In combination with a nebulizer for producing a medicament-containing aerosol and a source of pressurized gas, an intermittent gas delivery device disposed between and in intermittent fluid communication with the nebulizer and the source of pressurized gas, comprising: a regulator mechanism in continuous fluid communication with and disposed downstream of the source of pressurized gas; a bolus chamber structure defining a bolus chamber therein and disposed downstream of and in fluid communication with said regulator mechanism; a supply orifice element having a supply orifice formed therethrough, said supply orifice element disposed between said regulator mechanism and said bolus chamber, said supply orifice providing fluid communication between said regulator mechanism and said bolus chamber; and a supply valve in downstream fluid communication with said supply orifice and operative to move between a flow-blocking position whereby the pressurized gas is prevented from flowing from the source to the nebulizer and a flow-supplying position whereby the pressurized gas flows from the source to the nebulizer such that a high flow pulse of pressurized gas first generates a fine-mist plume of the medicament-containing aerosol in the nebulizer and subsequently a steady state flow of pressurized gas continues to produce the fine-mist plume of the medicament-containing aerosol in the nebulizer until said supply valves moves to the flow-blocking position.
2. An intermittent gas delivery device according to claim 1 including a sensing valve operably connected to said supply valve and the source of pressurized gas to cause said supply valve to move between the flow-causing and the flow-blocking positions. \\GHSYDNT1\users\Speci\300 399\350 399\36014.doc 23
3. An intermittent gas delivery device according to claim 1 including a sense tube connected in fluid communication with said supply valve and having a sense tube inlet thereinto, said sense tube operative with a finger of the recipient to be placed over a sense tube inlet 518 to cause said supply valve to be in the flow-blocking position and to be removed from said sense tube inlet to cause said supply valve to move to the flow-supplying position.
4. A pneumatically-operated gas demand apparatus according to claim 3 wherein said regulator mechanism includes a regulator housing, a flexible regulator diaphragm and a valve assembly, said regulator housing defining a regulator chamber therein, said regulator diaphragm disposed within said regulator chamber and connected to said regulator housing in a manner to divide said regulator chamber into a vented regulator chamber region in continuous fluid communication with the ambient air environment and a supply regulator chamber region in interruptible fluid communication between the first source *of pressurized first gas and said supply chamber region of said supply valve, said regulator diaphragm operative to hermetically seal said vented regulator chamber region and said supply regulator chamber region from one another, said valve assembly operably connected to said regulator diaphragm and disposed within said supply regulator chamber region, said valve assembly operative between a closed condition whereby an upstream portion of said supply regulator region is in fluid isolation with a downstream portion of said supply regulator region and an opened condition whereby said upstream portion of said supply regulator region is in fluid communication with said downstream portion of said supply regulator region, said valve assembly resiliently and yieldably biased against \\GHSYDNTI\users\Speci\300 399\350 399\36014.doc 24 said regulator diaphragm in the closed condition, said regulator diaphragm resiliently and yieldably biased against said valve assembly in the opened condition whereby when a first gas pressure of the first gas reaches a threshold gas pressure amount in said downstream portion of said supply regulator region, said valve assembly is in the closed condition and when said first gas pressure is less Sthan said threshold gas pressure amount, said valve assembly is in the opened condition. A pneumatically-operated gas demand apparatus substantially as herein described with reference to the accompanying drawings in Figure 4 o 4 6 a. \\GHSYDNT1\users\Speci\300 399\350 399\36014.doc
AU59330/99A 1995-06-07 1999-11-10 Pneumatically operated gas demand apparatus Ceased AU724524B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AU59330/99A AU724524B2 (en) 1995-06-07 1999-11-10 Pneumatically operated gas demand apparatus

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US08/488202 1995-06-07
AU59330/99A AU724524B2 (en) 1995-06-07 1999-11-10 Pneumatically operated gas demand apparatus

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
AU59510/96A Division AU714583B2 (en) 1995-06-07 1996-06-03 Pneumatically-operated gas demand apparatus

Publications (2)

Publication Number Publication Date
AU5933099A AU5933099A (en) 2000-02-03
AU724524B2 true AU724524B2 (en) 2000-09-21

Family

ID=3744500

Family Applications (1)

Application Number Title Priority Date Filing Date
AU59330/99A Ceased AU724524B2 (en) 1995-06-07 1999-11-10 Pneumatically operated gas demand apparatus

Country Status (1)

Country Link
AU (1) AU724524B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114619456B (en) * 2022-03-23 2023-08-01 东南大学 Bionic snail soft robot capable of automatically crawling

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4575042A (en) * 1984-08-17 1986-03-11 Associates Of Dallas Pneumatically amplified conservation valve
US4706664A (en) * 1986-04-11 1987-11-17 Puritan-Bennett Corporation Inspiration oxygen saver
US5241955A (en) * 1990-01-08 1993-09-07 Neotronics Medical Limited Breathing apparatus

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4575042A (en) * 1984-08-17 1986-03-11 Associates Of Dallas Pneumatically amplified conservation valve
US4706664A (en) * 1986-04-11 1987-11-17 Puritan-Bennett Corporation Inspiration oxygen saver
US5241955A (en) * 1990-01-08 1993-09-07 Neotronics Medical Limited Breathing apparatus

Also Published As

Publication number Publication date
AU5933099A (en) 2000-02-03

Similar Documents

Publication Publication Date Title
US5666945A (en) Pneumatically-operated gas demand apparatus
EP1863555B1 (en) Conserving device for breathable gas
US6237594B1 (en) Pneumatically-operated gas demand apparatus
US6378520B1 (en) Variable pressure and flow control for a pneumatically-operated gas demand apparatus
US5000173A (en) Respiratory aid device
US6484721B1 (en) Pneumatic oxygen conserving device
EP1275412B1 (en) Exhalation valve for a nasal breathing mask
US4206754A (en) Lung ventilators
EP0510040B1 (en) Breathing apparatus
US20100212669A1 (en) Gas conserving regulator
US3581742A (en) Intermittent positive pressure breathing device
US6425396B1 (en) Sensing valve motion limiting mechanism for respiratory equipment
US20070283951A1 (en) Mask-nebulizer assembly
EP1214112B1 (en) Supply valve and diaphragm for a pneumatically-operated gas demand apparatus
US3653379A (en) Adjustable pressure ippb ventilator
AU724524B2 (en) Pneumatically operated gas demand apparatus
WO2016193649A1 (en) Respiratory therapy apparatus and system
US20040194829A1 (en) Differential pressure valve employing near-balanced pressure
MXPA97009753A (en) Appliance on gas demand pneumatically oper

Legal Events

Date Code Title Description
FGA Letters patent sealed or granted (standard patent)