AU6847587A - A process and installation for integrated catching of liquid slugs/separation of oil and gas in a lined rock cavern, independently of ground water level - Google Patents
A process and installation for integrated catching of liquid slugs/separation of oil and gas in a lined rock cavern, independently of ground water levelInfo
- Publication number
- AU6847587A AU6847587A AU68475/87A AU6847587A AU6847587A AU 6847587 A AU6847587 A AU 6847587A AU 68475/87 A AU68475/87 A AU 68475/87A AU 6847587 A AU6847587 A AU 6847587A AU 6847587 A AU6847587 A AU 6847587A
- Authority
- AU
- Australia
- Prior art keywords
- container
- rock
- separation
- concrete
- pressure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G5/00—Storing fluids in natural or artificial cavities or chambers in the earth
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Physical Or Chemical Processes And Apparatus (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
- Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)
Description
A process and installation for integrated catching of liquid slugs/separation of oil and gas in a lined rock cavern, independently of ground water level.
The present invention relates to a proces for integrated catching of liguid plugs and separation of oil, water and gas in a lined rock cavern, advantageously in the form of a tunnel, independently of the ground water level the process being characterized that the catching/separation is effected in a pressure container arranged in the rock cavern, the volume of the said container giving sufficient buffer volume and residence time for separation in a single stage and without strength restrictions of structural materials limiting the size of the container, as the pressure forces exerted from the interior of the container being transferred to the surrounding rock formations.
The invention comprises also an installation for carrying out of the said process, the installation being characterized thereby that is comprises a lined rock cavern, advantage¬ ously in the form of a tunnel, and wherein it is arranged a container having a concrete lining and which acts as an integrated liquid slug catcher/ separator, and having volume for sufficient buffer effect and residence time for separa¬ tion in a single stage, in combination with pipelines for supply in single phase or multiple phase and for effluent in gas phase and oil phase and optionally water phase after separation and optionally also for drainage of water.
Advantageously the pressure forces are transferred to the rock formation through a concrete lining arranged between an inner sealing membrane and the rock around the cavern.
Advantageously are oil, water and gas being supplied to the container through the supply pipeline in single phase or multiple phase separated into separate phase streams for being passed to processing or consumption.
Advantageously the container is delimited against the entrance part of the rock cavern by means of a pressure resistant concrete plug.
Advantageously the ground water pressure in the rock forma¬ tion is relieved by drainage means near to the concrete lining so that back pressure against the seating membrane is prevented during the construction period, inspection and maintenance when the liquid slug catcher/separator not being internally pressurized.
The rock cavern toward the entrance part is advantageously delimited by means of a pressure resistant concrete plug.
Advantageously an inner sealing membrane is arranged between the concrete lining and the concrete plug and the inner space of the container, the concrete parts serving as a form- giving element for the sealing membrane when this is pressed to contact with the concrete parts because of the inner overpressure.
Advantageously the supply pipeline and/or exit pipes are passed through the concrete plug and/or walls and/or ceiling of the container.
Advantageoulsy are valves arranged in the supply pipe and/or exiting pipes for pressure and flow control or shut-off.
Advantageously is usual equipment for flow directing and energy killing arranged in the container in the rock cavern, in the form of baffle plates and/or deflectors as well as sand trap.
Thus, the invention relates to liquid slug catching/ separation of oil, water and gas in connection with delivery from pipelines transporting a two phase flow (i.e. oil and gas transport in one and the same pipeline) or where the flow can be of two phase character.
For two phase transport of hydrocarbons in pipelines it is known that liquid pools which from time to time fill a
substantial portion of the flow cross sectional area, so called "slugs" or liquid slugs, will cause instabilities and operation disturbances in an otherwise steady oil-gas flow. The size of the liquid slug formed in the pipeline will vary with the composition of the transported medium, the transport velocity, physical factors as pressure and temperature as well as the transport lane. At the receiving end of the pipeline there is a need for devices for taking up and separate liquid and liquid slugs from the gasous components prior to sending liquid phases and gasous phases separately to processing/consumption.
For great diameter transport pipelines where the liquid slugs can reach very large sizes, it is previously known a technique for separating liquid from gas in great tubes liquid slug catchers formed as long slightly stoping tubes coupled in parallel. Gas and liquid are fed into the parallel tubes in the upstream end via a distribution manifold.
Gas and liquid are permitted to flow with a low velocity and large free contact area in the parallel tubes from which the gas is drawn off from the upper part of the tubes and liquid from the lower part of the tubes at the downstream end. Such installations built hitherto for two phase pipelines are often very large. Lengths of 200-300 meters with 6-8 parallel tubes of 1 meter diameter and wall thickness of more than 2 cm not being unusual. Total weight of equipment can exceed 1000 tons of steel. Operating pressures of 100 bar and more is usual. Dimension criteria are necessary buffer volume, residence time and penetration depth for gas bubbles in liquid. It is because of strength considerations prohibited to build liquid slug catchers equivalent with the liquid slug catcher described in the foregoing as a single free-standing pressure tank built of steel.
The present invention reduces the requirement for space, costs and maintenance and increases the safety for personel,
installation and sabotage compared with the corresponding factors for known technique.
The idea forming the basis of the invention is that the liquid slug catcher/separator is arranged in the form of and in at least one lined rock cavern, advantageously a tunnel, where the rock formation will take up the pressure forces, a lining of concrete will serve to transfer the inner pressure forces from an inner membrane sealing in the form of steel, metal or suitable polymer material. For preventing that the membrane sealing falling inwardly (collapsing) caused by possible ground water pressure during construction, inspec¬ tion and/or maintenance when the installation is internally without pressure, drainage possibility between concrete lining and rock and/or between membrane and concrete lining has been arranged.
The installation has been delimited against the entrance portion of the rock cavern by means of at least one concrete slug.
An installation according to the present invention will then comprise pipe connections for incoming two phase pipeline, exiting gas and liquid pipes, connection valves and instru¬ mentation devices and internal means for energy killing, flow directing and baffle plates and deflectors for effective separation of liquid and gas, as well as usual sand trap devices .
The invention is more detailedly illustrated with reference to the attached drawing which schematically shows an install¬ ation according to and for carrying out the invention, with at least one rock cavern 1, advantageously in the form of a rock tunnel. The tunnel has a concrete lining 2 serving for pressure transfer to the surrounding rock formation and is together with a concrete plug 4 serving to give form to the sealing membrane 3. The end wall of the container is made up
of a concrete plug 4. The installation is arranged for connections for incoming supply pipe 5, outgoing gas pipe 6, oil pipe 7 and water pipe 11 and usual devices for energy killing and flow directing in the form of baffle plates and deflectors as well as sand trap being indicated by 8. Drainage pipes for ground water pressure relief are indicated and also valve devices 10 for control of flow and pressure and optionally shut off.
Claims (11)
1. A process for integrated catching of liquid props ("slugs") and separation of oil, water and gas in a lined rock cavern (1), advantageously in the form of a tunnel, independently of ground water level, characterized in that the catching/separation being effected in a pressure container arranged in the rock cavern (1), the volume of the said container giving sufficient buffer volume and residence time for separation in a single stage and with¬ out strength limitations in the construction materials restricting the size of the container, the pressure forces from the inner of the container being transferred to the surrounding rock formation.
2. A process according to claim 1, characterized in that the pressure forces being transferred to the rock through a concrete lining (2) arranged between an inner sealing membrane (3) and the rock in the rock cavern (1) .
3. A process according to claim 1 or 2 , characterized in that oil, water and gas supplied to the supply pipe (5) in single phase or multiple phase flow being separated therein to separate phase streams (6, 7 and 11) for being passed to processing or consumption.
4. A process according to any of claims 1-3, characterized in that the container is delimited towards the entrance portion of the rock cavern (1) by means of a pressure resistant concrete plug (4).
5. A process according to any of claims 1-4, characterized in that the ground water pressure in the rock is relieved by drainage means (9) arranged near to the concrete lining (2) or that back pressure against the sealing membrane (3) is prevented during the construction period, inspection and maintenance when the liquid slug catcher/ separator is not internally pressurized.
6. An installation for carrying out the process according to claim 1, characterized by comprising a lined rock cavern (1), advan¬ tageously in the form of a tunnel, wherein it is arranged a container with a concrete lining (2) and which is acting as integrated liquid slug catcher/separator with volume for sufficient buffer effect and residence time for separation in a single stage, in combination with pipes for supply (5) in single phase or multiple phase flow and for exit of gas phase (6) and oil phase (7) and optional water phase (11) after separation and optionally also for ground water drainage (9).
7. An installation according to claim 6, characterized in that the rock cavern (1) towards the entrance portion being delimited by means of a pressure resistant concrete plug (4).
8. An installation according to claim 6 or 7, characterized in that an inner sealing membrane (3) is arranged between the concrete lining (2) and the concrete plug (4) and the inner space of the container, the concrete parts serving as form donors for the sealing membrane when this moves to contact against the concrete parts because of inner overpressure.
9. An installation according to any of claims 6-8, characterized in that the supply pipe (5) and/or outgoing pipes (6,7 and/or 11) are passed through the concrete plug
(4) and/or walls and/or ceiling of the container.
10. An installation according to any of claims 6-9, characterized in that valves (10) for control of pressure and flow and optionally shut off are arranged in the supply pipe
(5) and/or outgoing pipes (6, 7 and/or 11) .
11. An installation according to any of claims 6-10, characterized in that it in the container in the rock cavern (1) is arranged usual equipment (18) for flow directing and energy killing in the form of baffle plates and/or deflectors as well as sand trap.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
NO860086 | 1986-01-13 | ||
NO860086A NO163609C (en) | 1986-01-13 | 1986-01-13 | PROCEDURE AND PLANT FOR SEPARATION OF A HYDROCARBON-CONTAINING CURRENT SUPPLY IN A MULTIPLE PHASE FROM A PIPE PIPE. |
Publications (1)
Publication Number | Publication Date |
---|---|
AU6847587A true AU6847587A (en) | 1987-07-28 |
Family
ID=19888675
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
AU68475/87A Abandoned AU6847587A (en) | 1986-01-13 | 1987-01-12 | A process and installation for integrated catching of liquid slugs/separation of oil and gas in a lined rock cavern, independently of ground water level |
Country Status (5)
Country | Link |
---|---|
AU (1) | AU6847587A (en) |
BR (1) | BR8705378A (en) |
GB (1) | GB2193908A (en) |
NO (1) | NO163609C (en) |
WO (1) | WO1987004138A1 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19745743C2 (en) * | 1997-07-09 | 2000-05-18 | Thyssen Gas | Security system for a gas storage cavern |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2930197A (en) * | 1954-11-12 | 1960-03-29 | Phillips Petroleum Co | Underground storage of high pressure petroleum gases |
US3184922A (en) * | 1960-07-12 | 1965-05-25 | Suburban Propane Gas Corp | Method of and means for storing liquefied petroleum gases underground |
FR2044634A1 (en) * | 1969-05-05 | 1971-02-26 | Lebon Et Cie | |
SU1009930A1 (en) * | 1981-02-27 | 1983-04-07 | Всесоюзный Научно-Исследовательский Институт Использования Газа В Народном Хозяйстве, Подземного Хранения Нефти, Нефтепродуктов И Сжиженных Газов "Вниипромгаз" | Method of preparing unstable gas condensate to transportation |
-
1986
- 1986-01-13 NO NO860086A patent/NO163609C/en not_active IP Right Cessation
-
1987
- 1987-01-12 GB GB08721115A patent/GB2193908A/en not_active Withdrawn
- 1987-01-12 BR BR8705378A patent/BR8705378A/en unknown
- 1987-01-12 WO PCT/NO1987/000003 patent/WO1987004138A1/en unknown
- 1987-01-12 AU AU68475/87A patent/AU6847587A/en not_active Abandoned
Also Published As
Publication number | Publication date |
---|---|
GB2193908A (en) | 1988-02-24 |
NO163609C (en) | 1990-06-27 |
NO860086L (en) | 1987-07-14 |
NO163609B (en) | 1990-03-19 |
WO1987004138A1 (en) | 1987-07-16 |
BR8705378A (en) | 1988-02-23 |
GB8721115D0 (en) | 1987-10-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9873067B1 (en) | Desanding, flow splitting, degassing vessel | |
US7152682B2 (en) | Subsea process assembly | |
US6315813B1 (en) | Method of treating pressurized drilling fluid returns from a well | |
RU2462591C2 (en) | Underwater plant and method for separation of liquid fraction and gas fraction | |
NO330020B1 (en) | Apparatus and method for separating a fluid from a mixture of fluids | |
EP1352679A1 (en) | Separator | |
KR101606062B1 (en) | Gas lift system and gas lift method | |
US8393398B2 (en) | Device for controlling slugging | |
EP0071633A1 (en) | Offshore pollution control | |
US5288312A (en) | Fluid slug flow mitigation and gas separation system | |
NO332062B1 (en) | Assembly for separating a multiphase stream | |
WO2006010765A1 (en) | Plant for separating a mixture of oil, water and gas | |
DK147740B (en) | PROCEDURE AND APPARATUS FOR TREATING A TWO-PHASE MIXTURE OF LIQUID AND GAS IN A PIPELINE PIPE | |
US20200139266A1 (en) | Subsea Processing of Crude Oil | |
US20180073343A1 (en) | Method and System for Subsea Purification of Produced Water From Subsea Oil Producing Installations | |
DK168498B1 (en) | Method and apparatus for separating liquid plugs from natural gas pipelines | |
AU6847587A (en) | A process and installation for integrated catching of liquid slugs/separation of oil and gas in a lined rock cavern, independently of ground water level | |
RU2292227C1 (en) | Tubular preliminar separation apparatus | |
WO1997047857A1 (en) | Method and equipment for offshore oil production by intermittent gas injection | |
RU2349749C2 (en) | Method and device for separation of oil and water at their extraction from underground or sea deposits | |
US20230193703A1 (en) | Spherical sand separator for petroleum and natural gas wells | |
WO2023058097A1 (en) | Floating facility | |
NO327682B1 (en) | Apparatus and method for increasing the production stream from an underground well | |
RU2206368C1 (en) | Separating plant | |
NO860085L (en) | PROCEDURE AND PLANT FOR INTEGRATED COLLECTION OF LIQUID PROPERTIES / SEPARATION IN AN EXTENDED MOUNTAIN ROOM, LOCATED IN THE MOUNTAIN UNDER THE GROUND WATER LEVEL. |