AU5662386A - In situ casting of concrete foundation piles with a recover- able tube-shaped form - Google Patents
In situ casting of concrete foundation piles with a recover- able tube-shaped formInfo
- Publication number
- AU5662386A AU5662386A AU56623/86A AU5662386A AU5662386A AU 5662386 A AU5662386 A AU 5662386A AU 56623/86 A AU56623/86 A AU 56623/86A AU 5662386 A AU5662386 A AU 5662386A AU 5662386 A AU5662386 A AU 5662386A
- Authority
- AU
- Australia
- Prior art keywords
- recover
- tube
- concrete foundation
- shaped form
- foundation piles
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000005266 casting Methods 0.000 title 1
- 238000011065 in-situ storage Methods 0.000 title 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D9/00—Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
- E02D9/02—Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof by withdrawing
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/02—Handling of bulk concrete specially for foundation or hydraulic engineering purposes
- E02D15/04—Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
- E02D5/385—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with removal of the outer mould-pipes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/62—Compacting the soil at the footing or in or along a casing by forcing cement or like material through tubes
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- Piles And Underground Anchors (AREA)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
IT8547836A IT1209942B (en) | 1985-03-20 | 1985-03-20 | METHOD FOR THE REALIZATION OF FOUNDATION POLES THROUGH THE WORK CONTUBO-FORM RECOVERABLE AND RELATED DEVICE |
IT47836/85 | 1985-03-20 |
Publications (1)
Publication Number | Publication Date |
---|---|
AU5662386A true AU5662386A (en) | 1986-10-13 |
Family
ID=11262837
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
AU56623/86A Abandoned AU5662386A (en) | 1985-03-20 | 1986-03-14 | In situ casting of concrete foundation piles with a recover- able tube-shaped form |
Country Status (5)
Country | Link |
---|---|
EP (1) | EP0250428B1 (en) |
AU (1) | AU5662386A (en) |
DE (1) | DE3671489D1 (en) |
IT (1) | IT1209942B (en) |
WO (1) | WO1986005533A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111519615A (en) * | 2020-04-22 | 2020-08-11 | 广东裕基建筑工程有限公司 | Manual hole digging pile structure and hole digging pile pouring method |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104452836A (en) * | 2014-12-10 | 2015-03-25 | 青岛理工大学 | Stability detection early warning method for deep foundation pit supporting structure |
US10407859B2 (en) * | 2016-02-22 | 2019-09-10 | Board Of Regents Of The Nevada System Of Higher Education On Behalf Of The University Of Nevada, Reno | Method and loading module to mechanically increase pile/drilled shaft end bearing stiffness |
US10526764B2 (en) | 2016-02-22 | 2020-01-07 | Board Of Regents Of The Nevada System Of Higher Education On Behalf Of The University Of Nevada, Reno | Deep foundation porewater pressure dissipater |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB833394A (en) * | 1958-10-21 | 1960-04-21 | Raymond Int Inc | Method for making and installing concrete piles |
SE321646B (en) * | 1964-09-25 | 1970-03-09 | V Soerensen | |
US3316723A (en) * | 1964-11-02 | 1967-05-02 | Myles H Schutte | Method and apparatus for forming foundation members |
DE1759325A1 (en) * | 1968-04-20 | 1971-06-03 | Starkstrom Anlagen Gmbh | Method and device for pulling the ram body in the production of site stakes |
US3654767A (en) * | 1970-05-08 | 1972-04-11 | Raymond Int Inc | Method of forming a composite pile |
-
1985
- 1985-03-20 IT IT8547836A patent/IT1209942B/en active
-
1986
- 1986-03-14 WO PCT/IT1986/000021 patent/WO1986005533A1/en active IP Right Grant
- 1986-03-14 EP EP86901994A patent/EP0250428B1/en not_active Expired
- 1986-03-14 AU AU56623/86A patent/AU5662386A/en not_active Abandoned
- 1986-03-14 DE DE8686901994T patent/DE3671489D1/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111519615A (en) * | 2020-04-22 | 2020-08-11 | 广东裕基建筑工程有限公司 | Manual hole digging pile structure and hole digging pile pouring method |
Also Published As
Publication number | Publication date |
---|---|
EP0250428B1 (en) | 1990-05-23 |
IT1209942B (en) | 1989-08-30 |
WO1986005533A1 (en) | 1986-09-25 |
EP0250428A1 (en) | 1988-01-07 |
DE3671489D1 (en) | 1990-06-28 |
IT8547836A0 (en) | 1985-03-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU564523B2 (en) | Concrete pile cast in situ using a mould set | |
GB2067633B (en) | Concrete foundation pile | |
GB8818906D0 (en) | Improvements in & relating to precast concrete structures | |
AU6467386A (en) | Pile foundation | |
GB2154630B (en) | Construction method for foundation piling | |
AU5662386A (en) | In situ casting of concrete foundation piles with a recover- able tube-shaped form | |
GB2177148B (en) | Repairing concrete piles | |
DK145786A (en) | Auger bit for use in the production of in situ concrete piles | |
AU7782087A (en) | Process for anchoring a prefabricated pile in the earth and pile for performance of the process | |
AU563261B2 (en) | Concrete pile cast in situ with enlarged footing | |
GB2157750B (en) | Improvements relating to cast-in-situ concrete pile construction | |
GB8521010D0 (en) | Concrete pile construction | |
GB2175033B (en) | In-situ casting of concrete piles | |
GB2163800B (en) | Precast concrete piles | |
GB8531919D0 (en) | Auger construction for concrete slabs | |
GB8405141D0 (en) | Concrete pile | |
GB8723766D0 (en) | Foundation piles | |
PHUM6921Z (en) | Concrete foundation pile | |
SU1144439A1 (en) | Method of erecting pile foundation in permafrost | |
PH20546A (en) | Improvements relating to cast-in-place concrete pile construction | |
PL275178A1 (en) | Vertical concrete foundation precast unit | |
GB2238567B (en) | Foundation piles | |
PH20551A (en) | Improved pre-cast concrete pile and method of placing it in the ground | |
PL252827A1 (en) | Reinforced concrete pile | |
PL273636A2 (en) | Method of manufacture of fluidizator of a mixture for pouring of foundation in building |